Transcript
Page 1: DDH B-17-01 6-3 FAULT · 2018-01-03 · DDH B-17-01 FAULT MINED STOPE DRILL TARGET 200m 1000' SCALE BRUNSWICK #1 VEIN GOLD-QUARTZ VEIN PROPOSED DRILLHOLE 6-3 FAULT File: TITLE: Drawn

(

P

R

O

J

E

C

T

E

D

A

T

#

1

V

E

I

N

)

SURFACE

B2300 LEVEL

B1600 LEVEL

RE

F B

-54

B3280 LEVEL

NE

W B

RU

NS

WIC

K S

HA

FT

(O

FF

-S

EC

TIO

N)

13000 ft REL

BRUNSWICK #1 VEIN - LONGSECTION N50W - LOOKING NE

2300L-1D was suspended to permit diamonddrilling and the first hole encountered a six footvein, a few feet to the hanging wall from the 1 Vein.-August 1941

2300L-1D has been the best showing of ore on the2300 level. Nearly all of the 484 feet from thecrosscut has contained narrow ore of good grade.The present face shows 23 inches of quartz andvisible free gold-April 1941

2300L-1D haltedfor war's duration-August 1942

STRIKE LENGTH 323 m (1060 ft)

B1880L

10000 ft REL

11000 ft REL

12000 ft REL

13000 ft REL

1060.6337

DDH B-17-01 COLLAR

DDH B-17-0112.2 gpt Au / 14.9 m

(0.36 oz per ton / 48.9 ft)7.8 m (25.5 ft) est true width

Including62.7 gpt Au / 2.7 m

(1.83 oz per ton / 9.0 ft)1.4 m (4.7 ft) est true width

DDH B-17-014.5 gpt Au / 15.2 m

(0.13 oz per ton / 50.0 ft)true width unknown

Including31.4 gpt Au / 2.0 m

(0.91 oz per ton /6.5 ft)true width unknown

6

0

W

IN

Z

E

?

?

1044.7149

VE

RT

IC

AL D

EP

TH

3

18 m

(10

44 ft)

~45

0 m

(147

6 ft)

DO

WN

D

IP

LE

NG

TH

EMPIRE STATE

B1100L

B1450L

B1300L

B300L

B70L

D

D

H

B

-

1

7

-

0

1

FAULT

MINED STOPE

DRILL TARGET

200m

1000'

SCALE

BRUNSWICK #1 VEIN

GOLD-QUARTZ VEIN

PROPOSED DRILLHOLE

6

-

3

F

A

U

L

T

File:

TITLE:

Drawn by:

Approval:Date:

Scale:

Date:

Brunswick #1 Vein

Longsection

RISE

2018/01/01

1 inch = 200 feet

Recommended