8/3/2019 Contractor Org
1/9
Burkhard
Schnfeld
GIS based Documentation
& Planning Tool
Requirements
Presentation by
Burkhard SchnfeldConsultant
Damascus, 05.04.2011
8/3/2019 Contractor Org
2/9
Burkhard
SchnfeldPage 1
Content
2.
3.
4.
Standard Symbol Definition and Standard Coding
Data Formats
Data Collection & Delivery
1. Presentation Consultant
5.
Schedule
Work to be done6.
8/3/2019 Contractor Org
3/9
Burkhard
SchnfeldPage 2
1. Presentation of the Contractor
This presentation shall be the guideline for the meeting and needs to be completed
during the meeting.
The Contractor will now show the offered solution
Draft Schedule
8/3/2019 Contractor Org
4/9
Burkhard
SchnfeldPage 3
2. Schedule
Draft Schedule
There are some recommended changes to the schedule which has to be agreed on
beforehand the schedule and finalization of the project schedule
Project Schedule
8/3/2019 Contractor Org
5/9
Burkhard
SchnfeldPage 4
3. Data Forms
There data forms shall be consider all requirements of the specifications
The requirements of the Contractor must be considered
The finalisation of the data forms as per project schedule is currently to late
A list of all required data forms have to be developed
The responsible persons have to be defined
There must be a clear dead line for each form to be finalised
Data Forms
For all kind of data forms are needed to provide the complete and correct data.
8/3/2019 Contractor Org
6/9
Burkhard
SchnfeldPage 5
4. Data Collection & Delivery
Priority 1:
Data to be collected for the trial area (Data of system functionality relevance)
Priority 2:
Data to be collected for all other areas (Data only as information)
Recommendation:
The trial area should be defined on the availability
of data for the area
completes of all fields to be documented on the system
Data should be collected in accordance to the schedule
The priorities should be only reflected on the schedule
The data collection should be complete and not partial
Data Collection
The Contractor recommends two priorities for the data collection.
8/3/2019 Contractor Org
7/9
Burkhard
SchnfeldPage 6
5. Standard Symbol Definition and Standard Coding
Symbols available in:
Old GIS system
CCBS
?
Standard coding:
Rural Telecommunication Project
CCBS (Arabic only)
Symbols and Coding
There are already standard symbols and standard coding available.
8/3/2019 Contractor Org
8/9
Burkhard
SchnfeldPage 7
6. Work to be done
Contractor:
STE:
Consultant:
Work to be done
The Contractor recommends two priorities for the data collection.
8/3/2019 Contractor Org
9/9
Burkhard
SchnfeldPage 8
Thank you very
much for yourkind attention
Contacts
Burkhard SchnfeldConsultant
Kapellenstr. 12
63755 Alzenau (Germany)
Phone +49 6023 915 643
Mobile +49 171 974 6275