    Requirements

    Presentation by

    Burkhard SchnfeldConsultant

    Damascus, 05.04.2011

  • 8/3/2019 Contractor Org

    2/9

    Burkhard

    SchnfeldPage 1

    Content

    2.

    3.

    4.

    Standard Symbol Definition and Standard Coding

    Data Formats

    Data Collection & Delivery

    1. Presentation Consultant

    5.

    Schedule

    Work to be done6.

  • 8/3/2019 Contractor Org

    3/9

    Burkhard

    SchnfeldPage 2

    1. Presentation of the Contractor

    This presentation shall be the guideline for the meeting and needs to be completed

    during the meeting.

    The Contractor will now show the offered solution

    Draft Schedule

  • 8/3/2019 Contractor Org

    4/9

    Burkhard

    SchnfeldPage 3

    2. Schedule

    Draft Schedule

    There are some recommended changes to the schedule which has to be agreed on

    beforehand the schedule and finalization of the project schedule

    Project Schedule

  • 8/3/2019 Contractor Org

    5/9

    Burkhard

    SchnfeldPage 4

    3. Data Forms

    There data forms shall be consider all requirements of the specifications

    The requirements of the Contractor must be considered

    The finalisation of the data forms as per project schedule is currently to late

    A list of all required data forms have to be developed

    The responsible persons have to be defined

    There must be a clear dead line for each form to be finalised

    Data Forms

    For all kind of data forms are needed to provide the complete and correct data.

  • 8/3/2019 Contractor Org

    6/9

    Burkhard

    SchnfeldPage 5

    4. Data Collection & Delivery

    Priority 1:

    Data to be collected for the trial area (Data of system functionality relevance)

    Priority 2:

    Data to be collected for all other areas (Data only as information)

    Recommendation:

    The trial area should be defined on the availability

    of data for the area

    completes of all fields to be documented on the system

    Data should be collected in accordance to the schedule

    The priorities should be only reflected on the schedule

    The data collection should be complete and not partial

    Data Collection

    The Contractor recommends two priorities for the data collection.

  • 8/3/2019 Contractor Org

    7/9

    Burkhard

    SchnfeldPage 6

    5. Standard Symbol Definition and Standard Coding

    Symbols available in:

    Old GIS system

    CCBS

    ?

    Standard coding:

    Rural Telecommunication Project

    CCBS (Arabic only)

    Symbols and Coding

    There are already standard symbols and standard coding available.

  • 8/3/2019 Contractor Org

    8/9

    Burkhard

    SchnfeldPage 7

    6. Work to be done

    Contractor:

    STE:

    Consultant:

    Work to be done

    The Contractor recommends two priorities for the data collection.

  • 8/3/2019 Contractor Org

    9/9

    Burkhard

    SchnfeldPage 8

    Thank you very

    much for yourkind attention

    Contacts

    Burkhard SchnfeldConsultant

    Kapellenstr. 12

    63755 Alzenau (Germany)

    Phone +49 6023 915 643

    Mobile +49 171 974 6275

    [email protected]