Download docx - CMT Tests

Transcript

Primary Cementing -Casing Cementing, Liner Cementing, Heavy and Light weight cementing applications, Multi-stage Cementing Remedial Cementing -Well abandonment, Kick-off plugs, Lost circulation plugs, Squeeze jobs, Water shut-off, Gas shut-off, Well control Miscellaneous Pumping -Integrity testing, Well clean, Circulation, Pressure testRompetrol Well Services pumping equipment is designed and constructed to operate and render services under oil field conditions.Each unit is thoroughly tested before being assigned to the field.Before each job, cement slurries or other fluids are tested in RWS own laboratory.Equipment: Twin Pump and Single Pump Cementing Units; Recirculating Mixers, Bulk Trucks, Complete Cement Testing Laboratory.Cement Laboratory - The laboratory facility has all the necessary equipment to perform the tests and analysis according to the requirements of API Specification 10/API Recommended Practice 10B for testing well cements. Testing can be performed twenty-four hours per day seven days a week, with highly qualified lab personnel. Physical Quality Control of Class G Cement Physical Quality Control of CONTRACTORs cementing product Thickening Time Test at Temperature and Pressure (BHCT) up to 200o C and 20,000 psi (BHP) Rheology of Cement Slurry Operating Free Water Test Compressive Strength Test (Crush) Compressive Strength Test (UCA) Fluid Loss Test Slurry Density Compatibility of Mud, Spacer and Cement Slurry