2
Primary Cementing - Casing Cementing, Liner Cementing, Heavy and Light weight cementing applications, Multi-stage Cementing Remedial Cementing - Well abandonment, Kic-o!! plugs, Lost circulation plugs, "#uee$e %obs, Water shut-o!!, &as shut-o!!, Well control Miscellaneous Pumping - 'ntegrity testing, Well clean, Circulation, Pressure test Rompetrol Well "ervices pumping e#uipment is designed and constructed to operate and render services under oil !ield conditions( )ach unit is thoroughly tested be!ore being assigned to the !ield( *e!ore each %ob, cement slurries or other !luids are tested in RW" own laboratory( )#uipment+ win Pump and "ingle Pump Cementing nits. Recirculating Mi/ers, *ul rucs, Complete Cement esting Laboratory( Cement Laboratory - he laboratory !acility has all the necessary e#uipment to per!orm the tests and analysis according to the re#uirements o! 0P' "peci!ication 123 Recommended Practice 12* !or testing well cements( esting can be per!ormed twenty- !our hours per day seven days a wee, with highly #uali!ied lab personnel( Physical 4uality Control o! Class & Cement Physical 4uality Control o! C56 R0C 5R7s cementing product hicening ime est at emperature and Pressure 8*HC 9 up to :22o C and :2,222 psi 8*HP9 Rheology o! Cement "lurry 5perating ;ree Water est Compressive "trength est 8Crush9 Compressive "trength est 8 C09 ;luid Loss est "lurry <ensity Compatibility o! Mud, "pacer and Cement "lurry

CMT Tests

Embed Size (px)

DESCRIPTION

cmt tests

Citation preview

Primary Cementing -Casing Cementing, Liner Cementing, Heavy and Light weight cementing applications, Multi-stage Cementing Remedial Cementing -Well abandonment, Kick-off plugs, Lost circulation plugs, Squeeze jobs, Water shut-off, Gas shut-off, Well control Miscellaneous Pumping -Integrity testing, Well clean, Circulation, Pressure testRompetrol Well Services pumping equipment is designed and constructed to operate and render services under oil field conditions.Each unit is thoroughly tested before being assigned to the field.Before each job, cement slurries or other fluids are tested in RWS own laboratory.Equipment: Twin Pump and Single Pump Cementing Units; Recirculating Mixers, Bulk Trucks, Complete Cement Testing Laboratory.Cement Laboratory - The laboratory facility has all the necessary equipment to perform the tests and analysis according to the requirements of API Specification 10/API Recommended Practice 10B for testing well cements. Testing can be performed twenty-four hours per day seven days a week, with highly qualified lab personnel. Physical Quality Control of Class G Cement Physical Quality Control of CONTRACTORs cementing product Thickening Time Test at Temperature and Pressure (BHCT) up to 200o C and 20,000 psi (BHP) Rheology of Cement Slurry Operating Free Water Test Compressive Strength Test (Crush) Compressive Strength Test (UCA) Fluid Loss Test Slurry Density Compatibility of Mud, Spacer and Cement Slurry