Camdeboo Local Municipality Camdeboo Local Municipality 2012 Blue and Green Drop 2012 Blue and Green Drop

Reports Reports

Page 2: Camdeboo Local Municipality 2012 Blue and Green Drop Reports
Page 3: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Areas that requires attention in terms of the Blue Drop Requirements

• Water Safety Planning • Treatment Process Management• DWQ Compliance • Management, Accountability• Asset Management

Page 4: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Challenges related to the Water Treatment Works• The absence of an operational logbook; • The Operations and Maintenance manual compiled by DWA RRU not being

utilised; • The jar testing equipment is available but not used as yet;• The working conditions of the process controllers (toilet facilities and the area

for eating is not favourable to instil pride in the work place);• The filtration process can be improved noting the recorded turbidity levels of

final water as well as the visible unacceptable condition of the filter media;• The gas chlorine content measurement scale was out of order and is identified

as a significant risk area;• The lack of flow recording at Aberdeen boreholes is a risky operation since the

municipality has no means of monitoring abstraction vs. safe yield of the aquifer.

Page 5: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Water Services Authority:Camdeboo Local Municipality

Assessment Areas Aberdeen Graff Reniet Nieu Bethseda

Technology Oxidation pondsActivated sludge and sludge

lagoonsOxidation ponds

Design Capacity (Ml/d) 0.375 3.1 0.045Operational % i.t.o. Design Capacity 117.3% 154.8% 71.1%

i) Microbiological Compliance NI NI NI

i) Chemical Compliance NI NI NI

i) Physical Compliance NI NI NIAnnual Average Effluent Quality Compliance NI NI NIWastewater Risk Rating (%CRR/CRRmax) 88.2% (↑) 94.1% (→) 35.3% (↓)

Highest Risk Area

Operating capacity exceeds design capacity, non-compliance

with R2834, no effluent compliance monitoring

Operating capacity exceeds design capacity, non-compliance

with R2834, no effluent compliance monitoring

Non-compliance with R2834, no effluent

compliance monitoring

Risk Abatement Process No W2RAP No W2RAP Rough draft W2RAPCapital & Refurbishment expenditure in 2010/2011 R4.2m R7.3mDescription of Projects’ Expenditure Extensions to WWTW Extensions to WWTW

Wastewater Risk Abatement planning Risk management is not practiced in Camdeboo LM

Additional Notes None

Page 6: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Risk trend per plant as CRR/CRRmax %

Page 7: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Highest Risk Area

Operating capacity exceeds design capacity;

Non-compliance with R2834/17;

No effluent compliance monitoring.

Page 8: Camdeboo Local Municipality 2012 Blue and Green Drop Reports

Recommendations to improve the DWQM & WWQM

To develop an action plan that will address all the gaps as identified in the 2012 Blue Drop and Green Drop Reports.

Upload the data on a monthly basis on the Blue Drop System and Green Drop System.

Develop the Waste Water Risk Abatement Plan.