Transcript
Page 1: C OUNTY EH O T F VALLEY ANTA C L A

1AREA OF WORKWITHIN DASHED LINES

1

1

4

1

3 1

CORRIDOR

3KC12

PATIENT ROOM 3

3K045

BICU 7

3K007

PATIENT ROOM 1

3K041

BICU 3

3K027

FAMILY ROOM

3K070

MD WORK ROOM

3K039

MULTIPURPOSEROOM

3K025

BICU 2

3K029

BICU 1

3K031

BICU 6

3K009

BICU 8

3K005

PATIENT ROOM 2

3K043

PATIENT ROOM 4

3K047

PATIENT ROOM 5

3K049

PATIENT ROOM 6(A.I.I.)

3K051

IDF

3KTD33

EVS

3K010

(E) PUBLIC TOILET

3KR01

(E) PUBLIC TOILET

3KR02

(E) ELEC CLOSET

3KME2

ANTE

3K051A

BICU 4 (ACC)

3K013

BICU 5

3K011

OPERATING ROOM

3K012

STERILE CORRIDOR

3KC13

PPE VESTIBULE

3K031A

PPE VESTIBULE

3K029A

PPE VESTIBULE

3K027A

PPE VESTIBULE

3K009A

PPE VESTIBULE

3K013A

PPE VESTIBULE

3K011A

PPE VESTIBULE

3K007A

PPE VESTIBULE

3K005A

(E) CORRIDOR

3K026

PT TOILET

3K013BPT TOILET

3K011B

PT TOILET

3K009B

PT TOILET

3K007B

PT TOILET

3K027B

PT TOILET

3K029B

PT TOILET

3K031B

PT TOILET/ SHOWER

3K041A

PT TOILET/ SHOWER

3K043A

PT TOILET/ SHOWER

3K045A

PT TOILET/ SHOWER

3K047A

PT TOILET/ SHOWER

3K049A

PT TOILET/ SHOWER

3K051B

PT TOILET

3K005B

SPLINT

3K053

TX BAY

438

STORAGE

441

PEDIATRIC TX BAY

448

TX BAY

450

STORAGE

451

STAFF LOUNGE

3K063

DIRECTOR OFFICE

3K065

ASST. NURSEMANAGERS OFFICE

3K069

NURSE MGR OFFICE

3K067

COPY

461

EVS

3K086

STAFF TOILET

3KR04

STEPDOWNSTORAGE

3K057

SOILED HOLDING

3K083

OUTPATIENTWAITING

3K076

EXAM 1

3K078

EXAM 2

3K080CLEAN UTILITY

3K081

RECEPTION /WAITING (INPATIENT)

3K085

EXAM 4

3K084

EXAM 3

3K082

PATIENT TOILET/SHOWER

3KR06FAMILY TOILET /

SHOWER

3KR05

OPEN OFFICE

3K061

ON-CALL

3K087

HALLWAY

3KC06

HALLWAY

3KC04

REGISTRATION /SHARED OFFICE

3K079

STEPDOWN NURSESTATION

3K026

HYDROTHERAPY

3K018

HYDROTHERAPY

3K016BICU NURSESTATION

3K028

EVS

3K032MEDS

3K042

CLEAN UTILITY &LINEN STORAGE

3K024

NOURISHMENT

3K019

SOILED HOLDING

3K017

STAFF TLT

3KR03

CRASH CARTS

3K030 BICU STORAGE

3K022

BICU STORAGE

3K035

OR EQUIP STORAGE

3K008

(E)TELE CLOSET

3KTD03

CONTROL

594

CLEAN HOLDING

3K004LIGHT-TRAFFICNON-PATIENT

SERVICE CORRIDOR

3KC14

ANESTHESIAWORKROOM

3K006

(E) STAIR K1

3KST1

CORRIDOR

3KC08

(E) EGRESSBALCONY

3KC09

CORRIDOR

3KC11

CORRIDOR

3KC10

(E) ELEVATORLOBBY

3KC02

(E) CORRIDOR

3KC18

(E) ELEVATORLOBBY

3KC16

(E) CORRIDOR

3KC17

(E) ELEV

3KEL05

(E) ELEV

3KEL04

(E) SHAFT

3KS02

(E) SHAFT

3KS06 (E) ELEV

3KEL02(E) ELEV

3KEL01

(E) SHAFT

3KS04

(E) CORRIDOR

3KC05

PHYSICAL THERAPY

3K055

(E) BALCONY

3K025A

SCRUB VESTIBULE

3KA01

STAFF CORRIDOR

3KC15

(E) SHAFT

3K-3

CORRIDOR

3KC03

CORRIDOR

3KC07

SCALES

612

(E) CORRIDOR

3KC01

(E) ELEV

3KEL01

(E) ELEV

3KEL02

M. TLT/ SHWR

3K001B

SOILED HOLDING

3K003LOCKER VESTIBULE

3K000

M. LOCKERS (16 ct)

3K001A

F. LOCKERS (56 ct)

3K001D

F. TLT/ SHWR

3K001C

ELEC CLOSET

3K025A

(E) BALCONY

3K024

(E) STAIR #10 (E) STAIR #4

3K034

GURNEY STORAGE

3K036

DEMOLISH ALL DUCTWORK, ASOCIATED EQUIPMENT,GRILLES, DIFFUSERS AND DUCTWORK ASSESORIES INTHE AREA OF WORK SHOWN ON THIS DRAWING. AREA OFWORK IS INDICATED WITHIN THE DARK DASHED LINE. CAPALL MAIN DUCTWORK DOWNSTREAM OF FSD'S OUTSIDEOF SHAFTS ABOVE CEILING.

TEMINATE DUCTWORK AND PREPARE DUCTWORK FORCONNECTION SHOWN IN NEW WORK PLAN.

FAN COILS AND ASSOCIATED DUCTWORK, HHW, CHW,AND DIFFUSERS/GRILLS SHALL BE PROTECTED DURINGDEMOLITION. THE ABOVE EQUIPMENT AND ASSOCIATEDHYDRONICS CONNECTIONS ARE EXISTING TO REMAIN.CONTRACTOR SHALL CONFIRM OUTSIDE AIRCONNECTIONS DUCTWORK AND INDICATE TO AOR/EOR.OUTSIDE AIR CONNECTIONS SHALL BE PROTECTED.

HYDRONIC PIPING SHALL BE DEMOLISHED BACK TOISOLATION VALVE AT THIS LOCATION.

STEAM AND CONDENSATE PIPING SHALL BE DEMOLISHEDBACK TO ISOLATION VALVE AT THIS LOCATION.

REFER TO NEW WORK PLAN FOR INSTALLATION OFVOLUME DAMPERS AT MAIN DUCTWORK TO BE RE-UTILIZED.

MECHANICAL DEMO KEYED NOTES1

2

3

4

5

6

1.

MECHANICAL DEMOLITION GENERAL NOTESTHE EXISTING CONDITIONS DRAWING IS SHOWN BELOW.ANY KEYED NOTES INDICATED WITH A CIRCLE SHALL NOTBE UTILIZED.

REGISTERE

DPRO

FESSIONAL

ENGINEER

STATE OF CALIFORNI

A

MECHAN ICAL

No.M33939

NAW

KGNOOL

KUYL

I CE N S E D A R C H

I TE

CT

ST

AT

EO F C A L I F O

RN

IA

John BoergerNo. C8147

REN.

Scale

Date

DP Project #

ARCHITECT OF RECORD

THEDESIGNPARTNERSHIP LLPArchitects + Planners239 Ninth Street, 2nd FloorSan Francisco, CA 94103http://www.dpsf.comPhone: 415-777-3737

MEP ENGINEERS

ARUP NORTH AMERICA LTD.560 MISSION STREET, STE 700SAN FRANCISCO, CA 94105PHONE: 415-946-0242

STRUCTURAL ENGINEERS

DEGENKOLB ENGINEERS375 BEALE ST, STE 500SAN FRANCISCO, CA 94105PHONE: 415-392-6952

Sheet Name

SANTA CLARA

VALLEYHEALTH & HOSPITAL SYSTEM

T FHE

COUNTYO

S AAN T A C L AR

Revision Schedule

CONSTRUCTION DOCUMENTS

Key Plan

1950

SCVHHS Project #

PRIN

TED

ON

:

NORTHNORTHNORTHNORTH

CONSULTANT'S STAMP:ARCHITECT'S STAMP:

SANTA CLARA VALLEY MEDICAL CENTER

751 S. Bascom AvenueSan Jose, CA 95128

VMC BURN UNIT UPGRADEBLDG K - WEST WING3RD FLOOR

OSHPD Facility 10935OSHPD Building 02553

CALIFORNIA STATE OSHPD

Agency Approval: OSHPD No.: H170268-43-00

LOW VOLTAGE

TEECOM1333 BROADWAY, STE 601OAKLAND, CA 94612PHONE: 510-337-2800

263-CP18009

Revision Schedule

OSHPD FIRST SUBMITTAL 09/28/2018NO. DESCRIPTION DATE

28 September, 2018

SHEET NOTES

OSHPD BACKCHECK 1 06/19/2019AOSHPD BACKCHECK 2 12/16/2019C

OSHPD BACKCHECK 2 / AHU 03/23/2020DOSHPD BACKCHECK 3 06/15/2020EOSHPD BACKCHECK 4 09/04/2020F

1/11

/202

1 10

:03:

38 P

M

As indicatedM1.31D

104.0400.00

MECHANICAL HVACDEMO PLAN 3RDFLOOR

1/8" = 1'-0"1 MECHANICAL HVAC DEMO PLAN 3RD FLOOR

A

A

E

09/30/21

Recommended