1
1 AREA OF WORK WITHIN DASHED LINES 1 1 4 1 3 1 CORRIDOR 3KC12 PATIENT ROOM 3 3K045 BICU 7 3K007 PATIENT ROOM 1 3K041 BICU 3 3K027 FAMILY ROOM 3K070 MD WORK ROOM 3K039 MULTIPURPOSE ROOM 3K025 BICU 2 3K029 BICU 1 3K031 BICU 6 3K009 BICU 8 3K005 PATIENT ROOM 2 3K043 PATIENT ROOM 4 3K047 PATIENT ROOM 5 3K049 PATIENT ROOM 6 (A.I.I.) 3K051 IDF 3KTD33 EVS 3K010 (E) PUBLIC TOILET 3KR01 (E) PUBLIC TOILET 3KR02 (E) ELEC CLOSET 3KME2 ANTE 3K051A BICU 4 (ACC) 3K013 BICU 5 3K011 OPERATING ROOM 3K012 STERILE CORRIDOR 3KC13 PPE VESTIBULE 3K031A PPE VESTIBULE 3K029A PPE VESTIBULE 3K027A PPE VESTIBULE 3K009A PPE VESTIBULE 3K013A PPE VESTIBULE 3K011A PPE VESTIBULE 3K007A PPE VESTIBULE 3K005A (E) CORRIDOR 3K026 PT TOILET 3K013B PT TOILET 3K011B PT TOILET 3K009B PT TOILET 3K007B PT TOILET 3K027B PT TOILET 3K029B PT TOILET 3K031B PT TOILET/ SHOWER 3K041A PT TOILET/ SHOWER 3K043A PT TOILET/ SHOWER 3K045A PT TOILET/ SHOWER 3K047A PT TOILET/ SHOWER 3K049A PT TOILET/ SHOWER 3K051B PT TOILET 3K005B SPLINT 3K053 TX BAY 438 STORAGE 441 PEDIATRIC TX BAY 448 TX BAY 450 STORAGE 451 STAFF LOUNGE 3K063 DIRECTOR OFFICE 3K065 ASST. NURSE MANAGERS OFFICE 3K069 NURSE MGR OFFICE 3K067 COPY 461 EVS 3K086 STAFF TOILET 3KR04 STEPDOWN STORAGE 3K057 SOILED HOLDING 3K083 OUTPATIENT WAITING 3K076 EXAM 1 3K078 EXAM 2 3K080 CLEAN UTILITY 3K081 RECEPTION / WAITING (INPATIENT) 3K085 EXAM 4 3K084 EXAM 3 3K082 PATIENT TOILET/ SHOWER 3KR06 FAMILY TOILET / SHOWER 3KR05 OPEN OFFICE 3K061 ON-CALL 3K087 HALLWAY 3KC06 HALLWAY 3KC04 REGISTRATION / SHARED OFFICE 3K079 STEPDOWN NURSE STATION 3K026 HYDROTHERAPY 3K018 HYDROTHERAPY 3K016 BICU NURSE STATION 3K028 EVS 3K032 MEDS 3K042 CLEAN UTILITY & LINEN STORAGE 3K024 NOURISHMENT 3K019 SOILED HOLDING 3K017 STAFF TLT 3KR03 CRASH CARTS 3K030 BICU STORAGE 3K022 BICU STORAGE 3K035 OR EQUIP STORAGE 3K008 (E)TELE CLOSET 3KTD03 CONTROL 594 CLEAN HOLDING 3K004 LIGHT-TRAFFIC NON-PATIENT SERVICE CORRIDOR 3KC14 ANESTHESIA WORKROOM 3K006 (E) STAIR K1 3KST1 CORRIDOR 3KC08 (E) EGRESS BALCONY 3KC09 CORRIDOR 3KC11 CORRIDOR 3KC10 (E) ELEVATOR LOBBY 3KC02 (E) CORRIDOR 3KC18 (E) ELEVATOR LOBBY 3KC16 (E) CORRIDOR 3KC17 (E) ELEV 3KEL05 (E) ELEV 3KEL04 (E) SHAFT 3KS02 (E) SHAFT 3KS06 (E) ELEV 3KEL02 (E) ELEV 3KEL01 (E) SHAFT 3KS04 (E) CORRIDOR 3KC05 PHYSICAL THERAPY 3K055 (E) BALCONY 3K025A SCRUB VESTIBULE 3KA01 STAFF CORRIDOR 3KC15 (E) SHAFT 3K-3 CORRIDOR 3KC03 CORRIDOR 3KC07 SCALES 612 (E) CORRIDOR 3KC01 (E) ELEV 3KEL01 (E) ELEV 3KEL02 M. TLT/ SHWR 3K001B SOILED HOLDING 3K003 LOCKER VESTIBULE 3K000 M. LOCKERS (16 ct) 3K001A F. LOCKERS (56 ct) 3K001D F. TLT/ SHWR 3K001C ELEC CLOSET 3K025A (E) BALCONY 3K024 (E) STAIR #10 (E) STAIR #4 3K034 GURNEY STORAGE 3K036 DEMOLISH ALL DUCTWORK, ASOCIATED EQUIPMENT, GRILLES, DIFFUSERS AND DUCTWORK ASSESORIES IN THE AREA OF WORK SHOWN ON THIS DRAWING. AREA OF WORK IS INDICATED WITHIN THE DARK DASHED LINE. CAP ALL MAIN DUCTWORK DOWNSTREAM OF FSD'S OUTSIDE OF SHAFTS ABOVE CEILING. TEMINATE DUCTWORK AND PREPARE DUCTWORK FOR CONNECTION SHOWN IN NEW WORK PLAN. FAN COILS AND ASSOCIATED DUCTWORK, HHW, CHW, AND DIFFUSERS/GRILLS SHALL BE PROTECTED DURING DEMOLITION. THE ABOVE EQUIPMENT AND ASSOCIATED HYDRONICS CONNECTIONS ARE EXISTING TO REMAIN. CONTRACTOR SHALL CONFIRM OUTSIDE AIR CONNECTIONS DUCTWORK AND INDICATE TO AOR/EOR. OUTSIDE AIR CONNECTIONS SHALL BE PROTECTED. HYDRONIC PIPING SHALL BE DEMOLISHED BACK TO ISOLATION VALVE AT THIS LOCATION. STEAM AND CONDENSATE PIPING SHALL BE DEMOLISHED BACK TO ISOLATION VALVE AT THIS LOCATION. REFER TO NEW WORK PLAN FOR INSTALLATION OF VOLUME DAMPERS AT MAIN DUCTWORK TO BE RE- UTILIZED. MECHANICAL DEMO KEYED NOTES 1 2 3 4 5 6 1. MECHANICAL DEMOLITION GENERAL NOTES THE EXISTING CONDITIONS DRAWING IS SHOWN BELOW. ANY KEYED NOTES INDICATED WITH A CIRCLE SHALL NOT BE UTILIZED. R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R S T A T E O F C A L I F O R N I A M E C H A N I C A L No.M33939 N A W K G N O O L K U Y L I C E N S E D A R C H I T E C T S T A T E O F C A L I F O R N I A John Boerger No. C8147 REN. Scale Date DP Project # ARCHITECT OF RECORD THE DESIGN PARTNERSHIP LLP Architects + Planners 239 Ninth Street, 2nd Floor San Francisco, CA 94103 http://www.dpsf.com Phone: 415-777-3737 MEP ENGINEERS ARUP NORTH AMERICA LTD. 560 MISSION STREET, STE 700 SAN FRANCISCO, CA 94105 PHONE: 415-946-0242 STRUCTURAL ENGINEERS DEGENKOLB ENGINEERS 375 BEALE ST, STE 500 SAN FRANCISCO, CA 94105 PHONE: 415-392-6952 Sheet Name SANTA CLARA VALLEY HEALTH & HOSPITAL SYSTEM T F H E C O U N T Y O S A A N T A C L A R Revision Schedule CONSTRUCTION DOCUMENTS Key Plan 1950 SCVHHS Project # PRINTED ON: NORTH NORTH NORTH NORTH CONSULTANT'S STAMP: ARCHITECT'S STAMP: SANTA CLARA VALLEY MEDICAL CENTER 751 S. Bascom Avenue San Jose, CA 95128 VMC BURN UNIT UPGRADE BLDG K - WEST WING 3RD FLOOR OSHPD Facility 10935 OSHPD Building 02553 CALIFORNIA STATE OSHPD Agency Approval: OSHPD No.: H170268-43-00 LOW VOLTAGE TEECOM 1333 BROADWAY, STE 601 OAKLAND, CA 94612 PHONE: 510-337-2800 263-CP18009 Revision Schedule OSHPD FIRST SUBMITTAL 09/28/2018 NO. DESCRIPTION DATE 28 September, 2018 SHEET NOTES OSHPD BACKCHECK 1 06/19/2019 A OSHPD BACKCHECK 2 12/16/2019 C OSHPD BACKCHECK 2 / AHU 03/23/2020 D OSHPD BACKCHECK 3 06/15/2020 E OSHPD BACKCHECK 4 09/04/2020 F 1/11/2021 10:03:38 PM As indicated M1.31D 104.0400.00 MECHANICAL HVAC DEMO PLAN 3RD FLOOR 1/8" = 1'-0" 1 MECHANICAL HVAC DEMO PLAN 3RD FLOOR A A E 09/30/21

C OUNTY EH O T F VALLEY ANTA C L A

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: C OUNTY EH O T F VALLEY ANTA C L A

1AREA OF WORKWITHIN DASHED LINES

1

1

4

1

3 1

CORRIDOR

3KC12

PATIENT ROOM 3

3K045

BICU 7

3K007

PATIENT ROOM 1

3K041

BICU 3

3K027

FAMILY ROOM

3K070

MD WORK ROOM

3K039

MULTIPURPOSEROOM

3K025

BICU 2

3K029

BICU 1

3K031

BICU 6

3K009

BICU 8

3K005

PATIENT ROOM 2

3K043

PATIENT ROOM 4

3K047

PATIENT ROOM 5

3K049

PATIENT ROOM 6(A.I.I.)

3K051

IDF

3KTD33

EVS

3K010

(E) PUBLIC TOILET

3KR01

(E) PUBLIC TOILET

3KR02

(E) ELEC CLOSET

3KME2

ANTE

3K051A

BICU 4 (ACC)

3K013

BICU 5

3K011

OPERATING ROOM

3K012

STERILE CORRIDOR

3KC13

PPE VESTIBULE

3K031A

PPE VESTIBULE

3K029A

PPE VESTIBULE

3K027A

PPE VESTIBULE

3K009A

PPE VESTIBULE

3K013A

PPE VESTIBULE

3K011A

PPE VESTIBULE

3K007A

PPE VESTIBULE

3K005A

(E) CORRIDOR

3K026

PT TOILET

3K013BPT TOILET

3K011B

PT TOILET

3K009B

PT TOILET

3K007B

PT TOILET

3K027B

PT TOILET

3K029B

PT TOILET

3K031B

PT TOILET/ SHOWER

3K041A

PT TOILET/ SHOWER

3K043A

PT TOILET/ SHOWER

3K045A

PT TOILET/ SHOWER

3K047A

PT TOILET/ SHOWER

3K049A

PT TOILET/ SHOWER

3K051B

PT TOILET

3K005B

SPLINT

3K053

TX BAY

438

STORAGE

441

PEDIATRIC TX BAY

448

TX BAY

450

STORAGE

451

STAFF LOUNGE

3K063

DIRECTOR OFFICE

3K065

ASST. NURSEMANAGERS OFFICE

3K069

NURSE MGR OFFICE

3K067

COPY

461

EVS

3K086

STAFF TOILET

3KR04

STEPDOWNSTORAGE

3K057

SOILED HOLDING

3K083

OUTPATIENTWAITING

3K076

EXAM 1

3K078

EXAM 2

3K080CLEAN UTILITY

3K081

RECEPTION /WAITING (INPATIENT)

3K085

EXAM 4

3K084

EXAM 3

3K082

PATIENT TOILET/SHOWER

3KR06FAMILY TOILET /

SHOWER

3KR05

OPEN OFFICE

3K061

ON-CALL

3K087

HALLWAY

3KC06

HALLWAY

3KC04

REGISTRATION /SHARED OFFICE

3K079

STEPDOWN NURSESTATION

3K026

HYDROTHERAPY

3K018

HYDROTHERAPY

3K016BICU NURSESTATION

3K028

EVS

3K032MEDS

3K042

CLEAN UTILITY &LINEN STORAGE

3K024

NOURISHMENT

3K019

SOILED HOLDING

3K017

STAFF TLT

3KR03

CRASH CARTS

3K030 BICU STORAGE

3K022

BICU STORAGE

3K035

OR EQUIP STORAGE

3K008

(E)TELE CLOSET

3KTD03

CONTROL

594

CLEAN HOLDING

3K004LIGHT-TRAFFICNON-PATIENT

SERVICE CORRIDOR

3KC14

ANESTHESIAWORKROOM

3K006

(E) STAIR K1

3KST1

CORRIDOR

3KC08

(E) EGRESSBALCONY

3KC09

CORRIDOR

3KC11

CORRIDOR

3KC10

(E) ELEVATORLOBBY

3KC02

(E) CORRIDOR

3KC18

(E) ELEVATORLOBBY

3KC16

(E) CORRIDOR

3KC17

(E) ELEV

3KEL05

(E) ELEV

3KEL04

(E) SHAFT

3KS02

(E) SHAFT

3KS06 (E) ELEV

3KEL02(E) ELEV

3KEL01

(E) SHAFT

3KS04

(E) CORRIDOR

3KC05

PHYSICAL THERAPY

3K055

(E) BALCONY

3K025A

SCRUB VESTIBULE

3KA01

STAFF CORRIDOR

3KC15

(E) SHAFT

3K-3

CORRIDOR

3KC03

CORRIDOR

3KC07

SCALES

612

(E) CORRIDOR

3KC01

(E) ELEV

3KEL01

(E) ELEV

3KEL02

M. TLT/ SHWR

3K001B

SOILED HOLDING

3K003LOCKER VESTIBULE

3K000

M. LOCKERS (16 ct)

3K001A

F. LOCKERS (56 ct)

3K001D

F. TLT/ SHWR

3K001C

ELEC CLOSET

3K025A

(E) BALCONY

3K024

(E) STAIR #10 (E) STAIR #4

3K034

GURNEY STORAGE

3K036

DEMOLISH ALL DUCTWORK, ASOCIATED EQUIPMENT,GRILLES, DIFFUSERS AND DUCTWORK ASSESORIES INTHE AREA OF WORK SHOWN ON THIS DRAWING. AREA OFWORK IS INDICATED WITHIN THE DARK DASHED LINE. CAPALL MAIN DUCTWORK DOWNSTREAM OF FSD'S OUTSIDEOF SHAFTS ABOVE CEILING.

TEMINATE DUCTWORK AND PREPARE DUCTWORK FORCONNECTION SHOWN IN NEW WORK PLAN.

FAN COILS AND ASSOCIATED DUCTWORK, HHW, CHW,AND DIFFUSERS/GRILLS SHALL BE PROTECTED DURINGDEMOLITION. THE ABOVE EQUIPMENT AND ASSOCIATEDHYDRONICS CONNECTIONS ARE EXISTING TO REMAIN.CONTRACTOR SHALL CONFIRM OUTSIDE AIRCONNECTIONS DUCTWORK AND INDICATE TO AOR/EOR.OUTSIDE AIR CONNECTIONS SHALL BE PROTECTED.

HYDRONIC PIPING SHALL BE DEMOLISHED BACK TOISOLATION VALVE AT THIS LOCATION.

STEAM AND CONDENSATE PIPING SHALL BE DEMOLISHEDBACK TO ISOLATION VALVE AT THIS LOCATION.

REFER TO NEW WORK PLAN FOR INSTALLATION OFVOLUME DAMPERS AT MAIN DUCTWORK TO BE RE-UTILIZED.

MECHANICAL DEMO KEYED NOTES1

2

3

4

5

6

1.

MECHANICAL DEMOLITION GENERAL NOTESTHE EXISTING CONDITIONS DRAWING IS SHOWN BELOW.ANY KEYED NOTES INDICATED WITH A CIRCLE SHALL NOTBE UTILIZED.

REGISTERE

DPRO

FESSIONAL

ENGINEER

STATE OF CALIFORNI

A

MECHAN ICAL

No.M33939

NAW

KGNOOL

KUYL

I CE N S E D A R C H

I TE

CT

ST

AT

EO F C A L I F O

RN

IA

John BoergerNo. C8147

REN.

Scale

Date

DP Project #

ARCHITECT OF RECORD

THEDESIGNPARTNERSHIP LLPArchitects + Planners239 Ninth Street, 2nd FloorSan Francisco, CA 94103http://www.dpsf.comPhone: 415-777-3737

MEP ENGINEERS

ARUP NORTH AMERICA LTD.560 MISSION STREET, STE 700SAN FRANCISCO, CA 94105PHONE: 415-946-0242

STRUCTURAL ENGINEERS

DEGENKOLB ENGINEERS375 BEALE ST, STE 500SAN FRANCISCO, CA 94105PHONE: 415-392-6952

Sheet Name

SANTA CLARA

VALLEYHEALTH & HOSPITAL SYSTEM

T FHE

COUNTYO

S AAN T A C L AR

Revision Schedule

CONSTRUCTION DOCUMENTS

Key Plan

1950

SCVHHS Project #

PRIN

TED

ON

:

NORTHNORTHNORTHNORTH

CONSULTANT'S STAMP:ARCHITECT'S STAMP:

SANTA CLARA VALLEY MEDICAL CENTER

751 S. Bascom AvenueSan Jose, CA 95128

VMC BURN UNIT UPGRADEBLDG K - WEST WING3RD FLOOR

OSHPD Facility 10935OSHPD Building 02553

CALIFORNIA STATE OSHPD

Agency Approval: OSHPD No.: H170268-43-00

LOW VOLTAGE

TEECOM1333 BROADWAY, STE 601OAKLAND, CA 94612PHONE: 510-337-2800

263-CP18009

Revision Schedule

OSHPD FIRST SUBMITTAL 09/28/2018NO. DESCRIPTION DATE

28 September, 2018

SHEET NOTES

OSHPD BACKCHECK 1 06/19/2019AOSHPD BACKCHECK 2 12/16/2019C

OSHPD BACKCHECK 2 / AHU 03/23/2020DOSHPD BACKCHECK 3 06/15/2020EOSHPD BACKCHECK 4 09/04/2020F

1/11

/202

1 10

:03:

38 P

M

As indicatedM1.31D

104.0400.00

MECHANICAL HVACDEMO PLAN 3RDFLOOR

1/8" = 1'-0"1 MECHANICAL HVAC DEMO PLAN 3RD FLOOR

A

A

E

09/30/21