1AREA OF WORKWITHIN DASHED LINES
1
1
4
1
3 1
CORRIDOR
3KC12
PATIENT ROOM 3
3K045
BICU 7
3K007
PATIENT ROOM 1
3K041
BICU 3
3K027
FAMILY ROOM
3K070
MD WORK ROOM
3K039
MULTIPURPOSEROOM
3K025
BICU 2
3K029
BICU 1
3K031
BICU 6
3K009
BICU 8
3K005
PATIENT ROOM 2
3K043
PATIENT ROOM 4
3K047
PATIENT ROOM 5
3K049
PATIENT ROOM 6(A.I.I.)
3K051
IDF
3KTD33
EVS
3K010
(E) PUBLIC TOILET
3KR01
(E) PUBLIC TOILET
3KR02
(E) ELEC CLOSET
3KME2
ANTE
3K051A
BICU 4 (ACC)
3K013
BICU 5
3K011
OPERATING ROOM
3K012
STERILE CORRIDOR
3KC13
PPE VESTIBULE
3K031A
PPE VESTIBULE
3K029A
PPE VESTIBULE
3K027A
PPE VESTIBULE
3K009A
PPE VESTIBULE
3K013A
PPE VESTIBULE
3K011A
PPE VESTIBULE
3K007A
PPE VESTIBULE
3K005A
(E) CORRIDOR
3K026
PT TOILET
3K013BPT TOILET
3K011B
PT TOILET
3K009B
PT TOILET
3K007B
PT TOILET
3K027B
PT TOILET
3K029B
PT TOILET
3K031B
PT TOILET/ SHOWER
3K041A
PT TOILET/ SHOWER
3K043A
PT TOILET/ SHOWER
3K045A
PT TOILET/ SHOWER
3K047A
PT TOILET/ SHOWER
3K049A
PT TOILET/ SHOWER
3K051B
PT TOILET
3K005B
SPLINT
3K053
TX BAY
438
STORAGE
441
PEDIATRIC TX BAY
448
TX BAY
450
STORAGE
451
STAFF LOUNGE
3K063
DIRECTOR OFFICE
3K065
ASST. NURSEMANAGERS OFFICE
3K069
NURSE MGR OFFICE
3K067
COPY
461
EVS
3K086
STAFF TOILET
3KR04
STEPDOWNSTORAGE
3K057
SOILED HOLDING
3K083
OUTPATIENTWAITING
3K076
EXAM 1
3K078
EXAM 2
3K080CLEAN UTILITY
3K081
RECEPTION /WAITING (INPATIENT)
3K085
EXAM 4
3K084
EXAM 3
3K082
PATIENT TOILET/SHOWER
3KR06FAMILY TOILET /
SHOWER
3KR05
OPEN OFFICE
3K061
ON-CALL
3K087
HALLWAY
3KC06
HALLWAY
3KC04
REGISTRATION /SHARED OFFICE
3K079
STEPDOWN NURSESTATION
3K026
HYDROTHERAPY
3K018
HYDROTHERAPY
3K016BICU NURSESTATION
3K028
EVS
3K032MEDS
3K042
CLEAN UTILITY &LINEN STORAGE
3K024
NOURISHMENT
3K019
SOILED HOLDING
3K017
STAFF TLT
3KR03
CRASH CARTS
3K030 BICU STORAGE
3K022
BICU STORAGE
3K035
OR EQUIP STORAGE
3K008
(E)TELE CLOSET
3KTD03
CONTROL
594
CLEAN HOLDING
3K004LIGHT-TRAFFICNON-PATIENT
SERVICE CORRIDOR
3KC14
ANESTHESIAWORKROOM
3K006
(E) STAIR K1
3KST1
CORRIDOR
3KC08
(E) EGRESSBALCONY
3KC09
CORRIDOR
3KC11
CORRIDOR
3KC10
(E) ELEVATORLOBBY
3KC02
(E) CORRIDOR
3KC18
(E) ELEVATORLOBBY
3KC16
(E) CORRIDOR
3KC17
(E) ELEV
3KEL05
(E) ELEV
3KEL04
(E) SHAFT
3KS02
(E) SHAFT
3KS06 (E) ELEV
3KEL02(E) ELEV
3KEL01
(E) SHAFT
3KS04
(E) CORRIDOR
3KC05
PHYSICAL THERAPY
3K055
(E) BALCONY
3K025A
SCRUB VESTIBULE
3KA01
STAFF CORRIDOR
3KC15
(E) SHAFT
3K-3
CORRIDOR
3KC03
CORRIDOR
3KC07
SCALES
612
(E) CORRIDOR
3KC01
(E) ELEV
3KEL01
(E) ELEV
3KEL02
M. TLT/ SHWR
3K001B
SOILED HOLDING
3K003LOCKER VESTIBULE
3K000
M. LOCKERS (16 ct)
3K001A
F. LOCKERS (56 ct)
3K001D
F. TLT/ SHWR
3K001C
ELEC CLOSET
3K025A
(E) BALCONY
3K024
(E) STAIR #10 (E) STAIR #4
3K034
GURNEY STORAGE
3K036
DEMOLISH ALL DUCTWORK, ASOCIATED EQUIPMENT,GRILLES, DIFFUSERS AND DUCTWORK ASSESORIES INTHE AREA OF WORK SHOWN ON THIS DRAWING. AREA OFWORK IS INDICATED WITHIN THE DARK DASHED LINE. CAPALL MAIN DUCTWORK DOWNSTREAM OF FSD'S OUTSIDEOF SHAFTS ABOVE CEILING.
TEMINATE DUCTWORK AND PREPARE DUCTWORK FORCONNECTION SHOWN IN NEW WORK PLAN.
FAN COILS AND ASSOCIATED DUCTWORK, HHW, CHW,AND DIFFUSERS/GRILLS SHALL BE PROTECTED DURINGDEMOLITION. THE ABOVE EQUIPMENT AND ASSOCIATEDHYDRONICS CONNECTIONS ARE EXISTING TO REMAIN.CONTRACTOR SHALL CONFIRM OUTSIDE AIRCONNECTIONS DUCTWORK AND INDICATE TO AOR/EOR.OUTSIDE AIR CONNECTIONS SHALL BE PROTECTED.
HYDRONIC PIPING SHALL BE DEMOLISHED BACK TOISOLATION VALVE AT THIS LOCATION.
STEAM AND CONDENSATE PIPING SHALL BE DEMOLISHEDBACK TO ISOLATION VALVE AT THIS LOCATION.
REFER TO NEW WORK PLAN FOR INSTALLATION OFVOLUME DAMPERS AT MAIN DUCTWORK TO BE RE-UTILIZED.
MECHANICAL DEMO KEYED NOTES1
2
3
4
5
6
1.
MECHANICAL DEMOLITION GENERAL NOTESTHE EXISTING CONDITIONS DRAWING IS SHOWN BELOW.ANY KEYED NOTES INDICATED WITH A CIRCLE SHALL NOTBE UTILIZED.
REGISTERE
DPRO
FESSIONAL
ENGINEER
STATE OF CALIFORNI
A
MECHAN ICAL
No.M33939
NAW
KGNOOL
KUYL
I CE N S E D A R C H
I TE
CT
ST
AT
EO F C A L I F O
RN
IA
John BoergerNo. C8147
REN.
Scale
Date
DP Project #
ARCHITECT OF RECORD
THEDESIGNPARTNERSHIP LLPArchitects + Planners239 Ninth Street, 2nd FloorSan Francisco, CA 94103http://www.dpsf.comPhone: 415-777-3737
MEP ENGINEERS
ARUP NORTH AMERICA LTD.560 MISSION STREET, STE 700SAN FRANCISCO, CA 94105PHONE: 415-946-0242
STRUCTURAL ENGINEERS
DEGENKOLB ENGINEERS375 BEALE ST, STE 500SAN FRANCISCO, CA 94105PHONE: 415-392-6952
Sheet Name
SANTA CLARA
VALLEYHEALTH & HOSPITAL SYSTEM
T FHE
COUNTYO
S AAN T A C L AR
Revision Schedule
CONSTRUCTION DOCUMENTS
Key Plan
1950
SCVHHS Project #
PRIN
TED
ON
:
NORTHNORTHNORTHNORTH
CONSULTANT'S STAMP:ARCHITECT'S STAMP:
SANTA CLARA VALLEY MEDICAL CENTER
751 S. Bascom AvenueSan Jose, CA 95128
VMC BURN UNIT UPGRADEBLDG K - WEST WING3RD FLOOR
OSHPD Facility 10935OSHPD Building 02553
CALIFORNIA STATE OSHPD
Agency Approval: OSHPD No.: H170268-43-00
LOW VOLTAGE
TEECOM1333 BROADWAY, STE 601OAKLAND, CA 94612PHONE: 510-337-2800
263-CP18009
Revision Schedule
OSHPD FIRST SUBMITTAL 09/28/2018NO. DESCRIPTION DATE
28 September, 2018
SHEET NOTES
OSHPD BACKCHECK 1 06/19/2019AOSHPD BACKCHECK 2 12/16/2019C
OSHPD BACKCHECK 2 / AHU 03/23/2020DOSHPD BACKCHECK 3 06/15/2020EOSHPD BACKCHECK 4 09/04/2020F
1/11
/202
1 10
:03:
38 P
M
As indicatedM1.31D
104.0400.00
MECHANICAL HVACDEMO PLAN 3RDFLOOR
1/8" = 1'-0"1 MECHANICAL HVAC DEMO PLAN 3RD FLOOR
A
A
E