Offshore Europe 2007
BP North Sea
Procurement & Supply Chain Management Share Fair 11, November 09
Share Fair 11
Alternative Energylow and zero-carbon future
About BP
Refining & Marketing
customer facing products
Exploration & Production
resources
Alaska
NAG
T&T
Azerbaijan
ME & P
NAG
Azerbaijan
ME & P
Russia OffshoreNorth Sea
North Africa
Asia Pacific
Angola
Egypt
Andean
GoM
• 12% of UK production
• 45 producing fields
− Wytch Farm (largest onshore)
− West Sole (1st commercial gas field)
− Foinaven, Schiehallion, Clair(First and only producing WoS fields)
− Magnus (most northerly)
• Sullom Voe Terminal operator
• 10 pipeline systems
• Major decommissioning projects
• 3000 BP staff + contractors
• >$4bn Capex + Opex per annum
• Production around 350 mbd
• Total resources over 3 bn barrels
BP in the North Sea
BP North Sea Costs
1.2 1.2
1.41.5 1.5
0.9
1.2
1.5
1.8
2004 2005 2006 2007 2008 2009
0
40
80
120
160
Cost ($) Billions
Oil / Gas Price - $
1.4
Subsea Construction, Inspection, Repair & Maintenance (SCIRM)
• BP Contact, Mark Borowski, SCIRM Category Manager. Contact details:
− 01224 835626
• Adopted a category approach:
− IRM
− Projects (Devenick & AAD)
− Decommissioning (NW Hutton & Don pipelines)
− RFP issued to the market 2Q ’09
Drilling & Completions
• BP Contact, Victor Reutsky, Senior PSCM Specialist, Contact Details:
− 01224 846456
• BP Contact, Sajid Sahgal, PSCMD&C Manager. Contact details:
− 01224 836094
• European Well Services Project 2
− Downhole rental tool
− Liner Hangers
− Fishing Milling Whipstocks
− Tractors
− Tubing Running Services
• RFI issued to the market place in July ’09. Suppliers selected through FPAL.
• RFP to be issued to the market December ‘09
Engineering Mods & Maintenance (EMM) and Platform Services
• 4 Service lines:
− Offshore Engineering & Construction
− Offshore Maintenance
− Offshore Platform Services
− Onshore EMM / SIP
• BP Contact, Vikas Ghai, Market Sector Manager, [email protected], 01224 835425
Devenick RFPs - Subsea (Forthcoming)
November – December 09Multi Phase Flow Meters
January - April 10Subsea Manifold Structure
Subsea Umbilical
PACKAGE
November – January 09/10
MARKET APPROACH TIME
TABLE
Devenick RFPs currently in the market place (Subsea)
Q1 2010SCIRM – Subsea Installation (Pipelay and Construction)
NovemberValves
Primarily against Global or Federal agreements
Pipelines
Controls
PACKAGE
Primarily against Federal Agreements
ESTIMATED AWARD DATE
Andrew Area Development – Subsea RFPscurrently in the market place
ESTIMATED AWARD DATE PACKAGE
November – December 09Multi Phase Flow Meters
November 09 – April 10Caisson Riser Materials / Bulkheads and caisson fabrication (3 packages).
Subsea Umbilical November – January 09/10
Andrew Area Development – Subsea RFPscurrently in the market place
Q1 2010SCIRM – Subsea Installation (Pipelay and Construction)
November 2009Valves
February 2010Pipelines
Controls
PACKAGE
Primarily against Federal Agreements
ESTIMATED AWARD DATE
Andrew Area Development – Top Side RFPscurrently in the market place
February 2010Modules
January 2010Pumps
November 2009Valves (ongoing)
November 2009Separators (ongoing)
PACKAGE ESTIMATED AWARD DATE
• BP Contact, Iain Jessiman, Lead PSCM Specialist – Projects, e-mail [email protected], Tel - 01224 851052
Decommissioning – Miller
• BP Contact, Allison MacNab, PSCM Specialist. Contact details:
− 01224 832492
• Facts:
− The Miller field was operational for 15 years during which time it produced some 345 million barrels of oil.
− The field started up in June 1992 and, during the plateau years to 1997, output averaged up to 150,000 barrels of oil and 255 million cubic feet of gas a day. Production ceased in July 2007.
Decommissioning Portfolio – Subsea
• BP Contact, Sarah Hill, PSCM Specialist. Contact details:
− 01224 835488
• Facts:
• Platforms
− 8 large steel platforms > 10K tonnes jackets
− 31 medium steel platforms 2K – 10K tonne jackets
− 58 small steel platforms < 2K tonne jackets
− 965,000 tonnes of steel
− 3 concrete jackets
• Wells
− 766 platform wells
− 200 subsea wells
− 51 E&A wells
− 98 onshore wells
• Pipelines and Terminals
− Over 6,500kms of pipelines and umbilicals
− 8 onshore terminals
Valhall Re-development Project
• BP Contact, Simon Bateson, BP Norge Capital Projects PSCMManager. Contact details:
− +47 52 01 47 41
• Facts:
− New facility design life 40 years
− Hotel – 180 single bed cabins
− Oil production capacity – 180 mbopd
− Gas handling capacity – 5 million Sm3/day
− Platform installation summer 2010 and start up in 2011
Skarv Idun Development
• BP contact, Kjell Magne Madsen, SkarvIdun Project SCM Lead. Contact details:
− +47 67 59 5218
• AKER contact Rune Andersen, Procurement Manager. Contact details:
− Market approaches will be issued either directly from BP or via AKERin Norway
• Facts:
− Investments ca. $5bn phased development with early oil production
− Production start up 3Q 2011
− Accommodation 100 single bed cabins
− Wells 16
− Subsea templates 5
Quad 204
• BP Contact, Mike Evans, PSCMTeam Leader, [email protected]
• Facts:
− Schiehallion replacement
− Provide systems for ‘enhanced oil recovery’.
− Provide opportunities for further field tie-backs
− Concept selection is still under consideration
Clair Platform
Clair Ridge appraisal wellClair Ridge appraisal well
Ridge exploration well(1978)
40km
Clair Phase 1
Clair Ridge
SW Clair
Clair Platform
Clair Ridge appraisal wellClair Ridge appraisal well
Ridge exploration well(1978)
40km
Clair Phase 1
Clair Ridge
SW Clair
Clair Phase 1
40km
Clair Platform
SW Clair
Ridge Exploration Well (1978)
Clair Ridge appraisal wellClair Ridge
Clair Ridge
• BP Contact, Mike Evans, PSCMTeam Leader, [email protected]
• Facts:
− Further development of the Clair field
− Concept selection is still under consideration
Norway PSCM Org Chart
Eamon CondonPSCM Manager
Norway
Operations/ D&C PSCM Manager Ian Millar
Capital Projects PSCM ManagerSimon Bateson
Skarv PSCM MgrKjell Madsen
Arnfinn Bærheim Skarv Ops
Reidar Håland D&C
Sitham Pillai (Consultant) Rigs / Skarv D&C
David Hatton (Consultant) VRD
Petter Kommedal (Consultant) VRD
Crawford Page Capital Projects
Terje Ohrstrand Capital ProjectsLone Beth Nyman Ula Valhall Ops.
Jarl Iversen Ula Valhall Ops
13 PSCM Specialists
Inger Vadset Ula Valhall Ops –Agency Sector
Kjeld Helge Omland (Consultant) Ops
Sverre Mikkelsen (Consultant) Ops.
Mons Svendsen D& C Operations
Vacancy Capital Projects
Øyvind Sandved (Challenger)
Alan Chaplin (Consultant) Capital Projects
Contract Manager Operations –Post Award
Claudia Fortmuller
Supply Chain Code of Practice
• BP supports the Supply Chain Code of Practice:
� Improve performance
� Eliminate unnecessary costs
� Add value and boost competitiveness
• Our preferred suppliers are registered with First Point Assessment Limited. For more information or to register your company go towww.fpal.com
‘Keep in Touch’
• Entry points into the North Sea – PSCM Contacts Sheet