Raymond Hall, BP 21-Nov-03
EAG/31/03
UKOOA/DTI Industry Activity Survey 2003
Presentation to EAG 21st November 2003
Raymond Hall, BP - EAG
UKOOA Activity survey 2003
November 2003
UKOOA/DTI Industry activity survey 2003
Presentation to EAG 21st November 2003
Ray Hall-EAG
UKOOA Activity survey 2003
November 2003
UKOOA 2003 Survey- ContextIn August 2003 a joint DTI/UKOOA survey was launched to gather data on all identified projects across the UKCS.
Identifies all projects in Operators portfolio ranging from fields in production to Possible developments.
Exploration & Appraisal activity excluded
Data presented on Risked basis
Probable & Possible Projects slipped according to probability
All analysis is on the slipped cases
Probability Years delaybelow 20% 420% to 39% 340%-59% 260% to 79% 1above 80% (no delay) 0
UKOOA Activity survey 2003
November 2003
Project components
Number of fields/projects
Oct 2003 Survey
Oct 2002 Survey
Oct 2001 Survey
Sept 2000 Survey
Sanctioned 270 260 248 257Incremental 135 144 96 97Probable 43 51 64 65Possible 40 33 84 56Total 488 488 492 475
UKOOA Activity survey 2003
November 2003
Oil & Gas production forecast
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2002 2003 2004 2005 2006 2007 2008 2009 2010
Mbo
epd
2003 survey2002 survey
Production 2003-10 lower by 74 million boe
2010 production up by 100 mboepd
UKOOA Activity survey 2003
November 2003
UKCS production to 2020
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
Mbo
epd
2003 survey2002 survey
Production up by 100 million boe
UKOOA Activity survey 2003
November 2003
Liquids production
-
500
1,000
1,500
2,000
2,500
2002 2003 2004 2005 2006 2007 2008 2009 2010
Liqu
ids
mbp
d
PossibleProbableIncrementalSanctioned
2003-10 production down 30 million bbls
UKOOA Activity survey 2003
November 2003
Gas production
-
2,000
4,000
6,000
8,000
10,000
12,000
2002 2003 2004 2005 2006 2007 2008 2009 2010
Mill
ion
scfp
d
PossibleProbableIncrementalSanctioned
2003-10 production down 250 bcf
UKOOA Activity survey 2003
November 2003
Oil & Gas production- elements (2003 survey)
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2002 2003 2004 2005 2006 2007 2008 2009 2010
Mbo
epd
PossibleProbableIncrementalSanctioned
PILOT Vision
571 mboepd gap
Intermediate target389 mboepd gap
UKOOA Activity survey 2003
November 2003
Oil & Gas production- elements (2003 survey)
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
Mbo
epd
PossibleProbableIncrementalSanctioned
Possible - - - - 1 35 130 182 211 Probable 1 7 19 110 266 602 612 569 515 Incremental - 4 147 310 446 547 532 438 385 Sanctioned 4,155 4,054 3,570 3,191 2,691 2,254 1,877 1,599 1,317
2002 2003 2004 2005 2006 2007 2008 2009 2010
UKOOA Activity survey 2003
November 2003
Oil & Gas Production- elements (2002 survey)
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Prod
uctio
nm
boep
d
Possible ProbableIncrementalSanctioned
PILOT Vision
Intermediate target
307 mboepd gap
667 mboepd gap
Missing elements:•Exploration•Undeveloped discoveries•Brown fields
UKOOA Activity survey 2003
November 2003
Unslipped production
-500
1,0001,5002,0002,5003,0003,5004,0004,500
2002 2003 2004 2005 2006 2007 2008 2009 2010
Mbo
epd
PossibleProbableIncrementalSanctioned
2005 gap = 227mboepd2010 gap = 500 mboepd
UKOOA Activity survey 2003
November 2003
Costs
UKOOA Activity survey 2003
November 2003
Capex build up
-
1,000
2,000
3,000
4,000
5,000
Cap
ex £
mill
ion
real
Possible - - - 16 116 325 626 480 452 Probable 108 262 938 1,185 1,080 581 243 285 270 Incremental 6 132 868 832 890 522 390 251 160 Sanctioned 3,723 3,031 1,799 1,092 674 401 271 201 142
2002 2003 2004 2005 2006 2007 2008 2009 2010
UKOOA Activity survey 2003
November 2003
Capex comparison
-
1,000
2,000
3,000
4,000
5,000
Cap
ex £
mill
ion
real
2002 survey 3,971 3,361 2,881 2,801 2,370 1,814 1,114 612 567 2003 survey 3,837 3,425 3,605 3,124 2,760 1,829 1,530 1,217 1,024
2002 2003 2004 2005 2006 2007 2008 2009 2010
Capex 2003-10 increased by £3 billion
UKOOA Activity survey 2003
November 2003
Opex elements
-500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
2002 2003 2004 2005 2006 2007 2008 2009 2010
Ope
x £
mill
ion
real
PossibleProbableIncrementalSanctioned
UKOOA Activity survey 2003
November 2003
Opex components
-500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
2002 2003 2004 2005 2006 2007 2008 2009 2010
Ope
x £
mill
ion
real
TariffsOther opexWells
UKOOA Activity survey 2003
November 2003
Trends since 2000
-
1,000
2,000
3,000
4,000
5,000
Cap
ex £
mili
on re
al
2000 survey 3,666 3,001 1,843 1,112 736 458 468 224 162 2003 survey 3,837 3,425 3,605 3,124 2,760 1,829 1,530 1,217 1,024
2002 2003 2004 2005 2006 2007 2008 2009 2010
-
1,000
2,000
3,000
4,000
5,000
6,000
2002 2003 2004 2005 2006 2007 2008 2009 2010
Mbo
epd
2003 survey2000 survey
Production
Down 1 billion boe
Capex Up £10 billion
UKOOA Activity survey 2003
November 2003
Cumulative removal costs
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
2032
2034
Cum
ulat
ive
rem
oval
cos
ts £
mill
ion
real
2003 survey2002 survey
Cumulative costs increased by £ 600 million
UKOOA Activity survey 2003
November 2003
Remaining reserves from 1/1/2003
-
2,000
4,000
6,000
8,000
10,000
12,000
Res
erve
s m
illio
n bo
e
Gas 4,430 627 772 330 Oil 5,405 915 925 687
Sanctioned Incremental Probable Possible
UKOOA Activity survey 2003
November 2003
UKOOA Survey- Statistics (2003 Survey)
Field Category No of Fields Reserves Million boe Capex £ millions
Sanctioned fields 270 (260) 9835 (9251) 8203 (5480)
Incremental 135 (144) 1542 (1643) 4135 (3556)
Probable fields 43 (51) 1698 (2218) 5029 (5315)
Possible fields 40 (33) 1018 (933) 2967 (2391)
Total 2002-2040 488 (488) 14092 (14044) 20334 (16743)
Data from 1/1/2003Figures in brackets denote 2002 survey data