44
▪ Mota & Cia was founded in 1946 by Mr. Manuel António da Mota Incorporated in Portugal but with operations only in Angola
▪ The company won its first contract in Portugal in 1975
▪ In 1987 Mota & Cia become listed in the Portuguese stock exchange
▪ In 2000, the Mota Family acquired Engil, merged Mota & Cia and Engil and became leader in Portugal not only inconstruction but also in waste management
▪ In the last 15 years Mota-Engil has grown more than nine times outside Portugal with Africa and Latam being the mainfocus on the internationalisation strategy
▪ Leader in Portugal | European Top 25 | World Top 100
▪ Market Cap: €257 mn (30 September 2020)
▪ Main Shareholders: Mota Family (65%) / Mutima Capital (3.13%) / Norges Bank (2.31%) / Cobas (1.99%)/ Az Valor (1.92%)
Snapshot
5
Strategic Partnership and Investment Agreement
MOTA-ENGIL is in the last stages of negotiation of a Partnership and Investment Agreement with CCCC, with significant activity worldwide,
aiming CCCC to become a relevant shareholder and a long-term partner of MOTA-ENGIL.
In the context of the envisaged Agreement, MGP, the controlling shareholder of MOTA-ENGIL, has accepted to sell a relevant stake in the share
capital of MOTA-ENGIL at a price that reflects a valuation which is high above the current market price.
Also pursuant to the Agreement, if concluded successfully — which is expected to occur shortly —, and assuming that the regulatory clearances
and several other conditions precedent will be met, CCCC:
• Will enter into a partnership and investment understanding with MOTA-ENGIL to jointly develop commercial opportunities;
• Will be committed to subscribe a relevant stake in a share capital increase of up to 100 million new shares that will be submitted for
deliberation in a General Meeting, to be called shortly.
Following such share capital increase:
• MGP will have a stake of c. 40% of MOTA-ENGIL, showing a full commitment and alignment with its historical position in the Company;
• CCCC will reach a stake slightly above 30%.
This new configuration and the framework of this partnership, which is based on a Group´s valuation of circa €750 million, will enhance the
financial, technical and commercial capabilities of MOTA-ENGIL in order to upscale its activities in all markets and will open new opportunities
for further developments.
MOTA-ENGIL, as the leading Portuguese infrastructure multinational group, will strengthen its commitment, based on its 75-year culture and
corporate values, towards its clients, employees, communities, environment and all other stakeholders.
6
Mota-Engil is engaged in a wide range of activities associated with the design, construction, management and operation of infrastructures, and boasts a long and recognized experience, accompanied by a high level of technical know-how in the development of various areas such as:
Activities
Engineering and Construction
· Infrastructures
· Civil construction
· Real estate
· Other business areas
Waste Management
· Collection
· Processing
· Recovery
· Waste-to-Energy
Transport Concessions
· Highways
· Motorways
· Bridges
· Railways
· Underground
· Rail freight
Logistics
Energy
· Production
· Management
· Trading
· Maintenance
· Landscaping
Multiservices
Mining
· Prospecting
· Extracting
7
300600900
1200150018002100240027003000
050
100150200250300350400450
AfricaAngola Mozambique Malawi South Africa Zimbabwe Uganda RwandaGuinea ConakryCameroonIvory CoastKenya
Latin America
20192017
417405 407
35%1,007
34%949
31%885
TOTAL:
2,827 M€
EBITDA(million euros)
51%2,711
27%1,448 22%
1,206TOTAL:
5,365 M€
EuropePortugal SpainUnited KingdomPoland Ireland
TURNOVER 2019(million euros)
20192018
2,8272,597
2,802
2019 ORDER BOOK(million euros)
Main IndicatorsTURNOVER(million euros)
The Mota-EngilWorld
Latin America
Mexico Peru Brazil ColombiaDominican RepublicArubaPanama
3 Continents
23 Countries
2018 2018
AfricaEurope
ResultsOverview
2
9
€5.5 bn(record high)
BACKLOG
€ 1,157 mn
(-14% YoY)
TURNOVER
€ 144 mn
(margin 12%)
EBITDA
Europe
Africa
Latam
€ 1,248 mn
(Net debt / EBITDA 3.4x)
NET DEBT
€ 94 mn
(-13mn YoY)
CAPEX
Key Highlights
NET LOSS
€ 5 mn
10
EBITDA margin of 12%
1The caption “Net monetary position” reflects partially the accounting, as an hyperinflationary economy
(IAS 29), of Zimbabwe in the 1H20,
P&L (€ mn)
Turnover
EBITDA 144 194 (26%)
Margin 12% 14% (2 p.p.)
EBIT 33 91 (64%)
Margin 3% 7% (4 p.p.)
Net financial results (39) (52) 26%
Associates 3 1 145%
Net monetary position1
7 - n.m.
EBT 5 40 (88%)
Net income 10 26 (61%)
Attributable to:
Non-controlling interests 15 17 (13%)
Group (5) 8 n.m.
1,157 1,344 (14%)
1H20 YoY1H19
▪ EBITDA margin at 12% with the non-E&C businesses accounting for 45% of the total EBITDA
▪ Net financial results positively impacted by forex gains
▪ Covid-19 had an estimated negative impact of €280 mn in Turnover and of €45 mn in EBITDA, mostly affecting the emerging markets
▪ Tax was impacted by the lower EBT and by some investment tax credits
▪ Turnover of €1,157 mn, with the non-E&C businesses accounting for 26% of the total
▪ Net loss of €5 mn, with the minorities mostly related to Angola and Mexico
▪ EBIT impacted by €16 Mn of provisions and impairment losses, mainly related to Covid-19
11
P&L breakdown (€ mn)
Turnover
Europe 455 407 12%
Africa 385 453 (15%)
Latin America 305 457 (33%)
Other and intercompany 11 28 (60%)
EBITDA 144 194 (26%)
Margin 12% 14% (2 p.p.)
Europe 48 41 16%
Margin 10% 10% 0 p.p.
Africa 69 91 (24%)
Margin 18% 20% (2 p.p.)
Latin America 27 59 (55%)
Margin 9% 13% (4 p.p.)
Other and intercompany - 3 n.m.
1,157 1,344 (14%)
1H20 YoY1H19
Europe was resilient within the Covid-19 context
▪ EBITDA margin in Africa reached 18% with resilient contributions from the main markets
▪ Africa’s turnover was down 15% YoY to €385 mn as Covid-19 led to slower execution pace and stoppages in some markets, namely in Angola, Uganda and Mozambique
▪ EBITDA margin in Latin America was 9% as the Covid-19 impacted the E&C operations
▪ In Latin America, turnover was the most impacted by Covid-19 (mainly Peru and Mexico) due to the imposed lockdowns andstoppages policies
▪ Positive turnover evolution in Europe reflected a strong activity in the E&C business and a positive evolution in the E&S activity, partially offsetting the weaker performance of the other regions (higher Covid-19 impact)
▪ EBITDA in Europe was up 16% YoY, with higher margin both in E&C and E&S
12
42%
11%
17%
16%
14%
47%
21%
32%
Largest projects enhancing value creation
TOTAL BACKLOG EVOLUTION (€ mn)
Africa
Mining
Latin America
Europe
Roads, Infrastructures andOthers
Civil Construction
Oil & Gas
and Power
BACKLOG BY REGIONE&C BACKLOG BY SEGMENT
€5.5 bn€4.7 bn
▪ Record backlog level: €5,491 mn (E&C represents 86% of the total) with a backlog/sales ratio1 in the E&C activity of 2.3
▪ There were no cancellations of projects due to Covid-19
▪ Largest contracts awarded in the 1H20 (> €200 Mn):- Mexico - First stretch of Tren Maya (Mota-Engil Mexico: 58% stake)- Mozambique - Construction of a pier bridge and an offloading facility for Mozambique LNG project (Mota-Engil: 50% stake)- Poland - S1 expressway Kosztowy – Bielsko-Biała - Section II (Mota-Engil: 50% stake)- Angola - Construction of infrastructures for the collection, treatment and distribution of water (Mota-Engil Angola: 40% stake)- Colombia - Construction of a Dam (Talasa) (Mota-Engil: 100% stake)
Railway
1Sales of the last 12 months
13
Major construction projects in
backlog at June 301
1Selection of E&C projects above €100 mn.
Project
Tren Maya > 250 MexicoRailway
infrastructures2022
Vale Mining Moatize > 250 Mozambique Mining 2022
Gran Canal highway > 250 Mexico Roads 2020
BR-381 highway dualisation (section 3.1 and section 7) > 250 Brazil Roads 2021
Requalification of the Soyo Naval Base > 250 Angola Ports 2022
Las Bambas dam (phase 4 under execution) > 250 Peru Power 2021
Talasa hydroelectric facility [200;250[ Colombia Power 2024
Mandiana gold mine [150;200[ Guinea Conakry Mining 2027
Siguiri gold mine [150;200[ Guinea Conakry Mining 2022
Calacuve Dam [150;200[ Angola Power 2023
Calueque Dam - lifting system, irrigated perimeter and hybrid generation plant [100;150[ Angola Power 2023
General Hospital of Cabinda [100;150[ Angola Civil Construction 2021
Capacity Improvement Kampala Northern Bypass [100;150[ Uganda Roads 2021
BITA System - B1 (Construction of infrasctructures for the collection, treatment and distribution of water) [100;150[ AngolaUrban
infrastructures2022
Bordo Poniente landfill [100;150[ MexicoUrban
infrastructures2022
Range(€ mn) Country Segment
Exp. Yearof
Completion
141Includes mining contracts in Africa and the Energy business in Latin America.
NET CAPEX(€ mn)
CAPEX BY REGION (1H2020)(€ mn)
Growth and long-term capex accounted for 65%
E&C Capex
Capex – long term contracts1
E&S Capex
Maintenance
Growth
Capex – long term contracts1
▪ Capex reached €94 mn, mostly related to growth and long-term projects
▪ Capex decreased €13 mn YoY mainly due to delays in theexecution of some long-term projects, whose investment isexpected to accelerate in 2021
▪ E&C Capex of €30 mn reached c.3% of the E&C Turnover
▪ E&S capex of €33 mn was mainly channeled to EGF in orderto comply with the regulator’s approved investment for thecurrent regulatory period
▪ Maintenance capex reached 2.9% of the total turnover(FY2019: 4%) benefiting from planning, procurement andlogistics efficiencies
15
Working capital to Turnover
ratio of 5%Working capital evolution
1
1Turnover of the last twelve months.
475
367
177 199251
115 139
20%
17%
7%7%
9%
4% 5%
0%
5%
10%
15%
20%
25%
Dec.15 Dec.16 Dec.17 Dec.18 Jun.19 Dec.19 Jun.20
0
50
100
150
200
250
300
350
400
450
500
Working capital (€ mn) Working capital/Turnover
▪ Working capital/Turnover ratio stood at 5%, confirming the downward trend in recent years notwithstanding the challenging context
▪ Alignment of the commercial strategy with strict financialtargets and structuring the contracts with the aim ofminimizing the receivables payment period and the creditrisk exposure with down payment clauses in the largestcontracts
▪ Downward trend follows (i) reinforcement of cooperationwith multilaterals, ECA´s, and (ii) higher exposure to privateclients, namely in the mining sector and to projectsfinanced by the client
16
1,213
1,248
144
24 5
39
94
2
25
Net debt Dec.19 EBITDA Changes in workingcapital
Corporate tax Netfinancials
Capex Dividendspaid
Others Net debt Jun.20
1Net debt considers Angola’s sovereign bonds denominated in US$, US$ linked and kwanzas as “cash and cash equivalents” which amounted to €186 mn (€203 mn nominal value) in June 2020 (€210 mn Angola’s sovereign bonds and €13 mn Ivory Coast’s sovereign bonds in December 2019).
CFFO €126 mn
1
1
Resilient CFFO of €126 mn
(€127 mn in 1H19)FREE CASH-FLOW(€ mn)
Mainly, forex impact
17
621
119
203323 376
230 21590
196
314
Liquidityposition
1 year 2 years 3 years 4 years 5 years > 5 years
3.6x3.4x
2.2x2.5x
2.3x2.5x
2.8x
3.4x
5.8% 5.6% 5.6%5.1% 5.0% 5.2% 5.2% 5.1%
Dec.15 Dec.16 Dec.17 Jun.18 Dec.18 Jun.19 Dec.19 Jun,20
Comfortable liquidity position of €817 Mn
▪ Net debt1 of €1,248 mn, up €34 mn YTD
▪ Liquidity position corresponds to 1.6x of non-revolving financingneeds with maturity less than one year
▪ Leasing & Factoring amounted to €403 mn (of which €292 mnLeasing), down €79 mn from December 2019
▪ Average debt maturity of 2.6 years up from 2.5 in December 19
▪ Cost of debt of 5.1%, slightly down from 2019
▪ Net debt / Ebitda of 3.4x, within a difficult context due to Covid-19, but committed to strengthen the capital structure
▪ Sale and reimbursement during the 1H20 of €35 Mn of Angolanand Ivory Coast sovereign bonds
Non-revolving
RevolvingUndrawn
creditlines
Cash&
Cash equiv.
1Excluding leasing and factoring and including €186 mn (€203 mn nominal value) of Angolan sovereign bonds;
2Excluding leasing and factoring;
Already refinanced or to be shortly
refinanced
GROSS DEBT MATURITY2, JUNE 2020(€ mn)
COST OF DEBT AND NET DEBT / EBITDA
Earnings Release 2018
18
RegionalSegments
3
Earnings Release 2018
19
Europe
Highlights 2019
Portugal Spain PolandIrelandUnited Kingdom
05 €885mn €1,206mn
Countries Turnover Backlog
Earnings Release 2018
2020
141
7193
41 48
2017 2018 2019 1H19 1H20
Turnover (€ mn)
Backlog1 (€ mn)
EBITDA (€ mn) and margin (%)
1Contracts already signed and financed. Excludes future revenues from concessions (highways and EGF). 2ENR Top 250 Global Contractors (2020).
Positive Outlook for the upcoming years in Portugal
Key figures and Outlook
▪ Leadership in Portugal in Construction and Waste Management (Collection and Treatment)
▪ Top 25 in the European Construction Ranking2
▪ Europe as an Engineering, Innovation and Development Center
▪ Presence in Central Europe since 1996 (Top 15 in Poland) with positive trend (+62% YoY in 1H20)
▪ Presence in Ireland since 2007 with recent expansion to UK
PUBLIC INVESTMENT WITH POSITIVE OUTLOOK:
▪ Public Tenders (until August): €3,422 mn (+20% YoY) and €1,291 mn awarded (-7% YoY)
▪ New Public and Private Projects with larger dimension (fit with ME competences)
▪ Positive Trend for the upcoming years reinforced with the higher EU commitment
▪ European Recovery Plan with €15 bn3 non-refundable funds channelled to Portugal, willinclude a relevant share allocated to infrastructure projects
PIPELINE (2020/2023)
▪ New Lisbon International Airport: €1.15 Bn (Investment by the concessionaire ANA/Vinci)
▪ Railway Plan 2020: up to €1 bn to be tendered (and executed until 2023)
▪ Total planned investments of €1bn in new hospitals: Projects to be completed in 2023
(Lisbon: €335 mn: Mota-Engil in the final stage-BAFO)
8% 11%
10%
17%
828 859 880
407 455
2017 2018 2019 1H19 1H20
10%
1,0681,226 1,293 1,206 1,156
2017 2018 1H19 2019 1H20
3 €15.3 bn in non-refundable funds and approximately €15.8 bn in loans at favorable interest rates, to be executed (invested or committed) in three years until the end of 2023. In addition, Portugal will have: (i) c.€30 bn of the Multiannual Financial framework to be implemented in seven years until the end of 2029 and (ii) c.€12 bn of the Portugal 2020 framework, still to be implemented.
Earnings Release 2018
2121
Airport Expansion in Lisbon:
CAPEX: €1.15 bn (ANA Aeroportos/Vinci - concessionaire)
Environmental Impact Study approved
National Railway Plan (PNI 2030)1
Total Investment to be executed: €3.5 bn
National Railway Plan: €2 bn (4 different corridors with > 1.000 km)
1PNI: National Plan of Public Investment (2020/2030) of which €2Bn to be executed until 2023 with European funds already committed to Railway projects and Metro expansion .
Public Investment in 5 New Hospitals:Total Investment: €1 bn (until 2023 / European Funds committed)
▪ Lisbon Hospital: c.€335 mn (PPP / 30 years) – 825 beds
Mota-Engil is in the short-list (decision expected in 2020)
Positive Outlook for the upcoming years in Portugal
Earnings Release 2018
22
Africa
Highlights 2019
11 €1,007mn €2,711mn
Countries Turnover Backlog
Angola Mozambique Malawi
South Africa Zimbabwe
Uganda
Rwanda
Guinea Conakry Cameroon Ivory CoastKenya
Earnings Release 2018
2323
164192
214
9169
2017 2018 2019 1H19 1H20
Turnover (€ mn)
19%20%
EBITDA (€ mn) and margin (%)
Backlog1 (€ mn)
1Contracts already signed and financed.
Attractive outlook supported by an all time high backlog value
▪ Backlog: €2.7 bn and resilient EBITDA margins
▪ Long-Term Contracts: Mozambique (LNG Project and Mining for Vale), Guinea (Ashanti Gold / Mandiana) and in Waste Management (Ivory Coast: 7 years Contract since Nov.18) with recurring cash flow
▪ Long presence in Africa with a fully vertically integrated business, supported by a strong installed asset base
▪ Leadership in markets such as Angola, Mozambique and Malawi
▪ Focus on large infrastructure projects and expansion to Environment (Waste Management) and Mining
Key figures and Outlook
18%21% 20%
2,604
2,758
2,648
2,711
2,571
2017 2018 1H19 2019 1H20
860 9051,007
453 385
2017 2018 2019 1H19 1H20
▪ Backlog in hard currency (≥ 85%) with risk mitigation schemes with the growing trend of projects financedby multilaterals or ECA Lines as a clear example of shift in the commercial strategy that allows to optimizethe Working Capital Management in the recent years
Examples (ongoing projects):
▪ Infrastructures for the collection, treatment and distribution of water in Angola financed by World Bank
▪ Angola: Soyo Naval Base (€270 mn): financed by Cosec (Portuguese ECA)
▪ Angola: Cabinda Hospital and Pediatric Luanda Hospital (€160 mn) financed by UKEF (UK´s ECA)
▪ Corporate Credit Line from Afreximbank (5 years) to promote projects in Africa (€100 mn)
Mota-Engil: A recognized brand from the main multilaterals considering the presence in Africa since 1946
Earnings Release 2018
2424
Africa: Project pipelinePositive Outlook with potential contracts to be awarded in new markets:
▪ Opportunities for Public Clients with Programmes financed by multilaterals or ECA Lines
Ghana: Accra-Tema PPP US$500 mn (preferred bidder)
Type of Contract: DBFOM. Concession Completion: 2052Contract Value: US$500 mn (ME: 25% in a JV with AIIM, STOA and Egis)Contracting Authority: Ghanaian GovernmentProject Description: The Accra-Tema motorway is a 19 km dual carriageway. It forms an integral part of theNational Route 1 (N1) starting from Aflao (in the Volta Region) and ending at Elubo (in the Western Region).It is also part of the Trans West African Highway (Abidjan-Lagos Corridor), linking the city of Accra, the KotokaInternational Airport and Tema Port.
Nigeria: Lagos’ 4th Mainland Bridge US$2.25 bn (pre-qualified)
Type of Contract: EPCContract Value: US$2.25 bn (JV with CCCC)Contracting Authority: Lagos State GovernmentProject Description: Two-level bridge. The upper level will serve vehicle traffic while its lower level will servepedestrian for social and commercial activities. The bridge is designed to have a four-lane dual carriagewaywith each comprising three lanes and two meters hard shoulders on each side. At 38 km, it is going to be thelongest bridge in Africa.
Nigeria: Kano-Maradi railway US$1.9 bn (preferred bidder)
Type of Contract: EPCContract Value: US$1.88 bnDesign Period:1 year. Construction Period: Up to three years (36 months)Contracting Authority: The Federal Ministry of TransportationProject Description: The design and construction of a single track standard gauge rail line (with associated stations) between Kano to Maradi (284 km) and a branch line between Kano to Dutse (93 km).Borrower: Federal Ministry of Finance of Nigeria. Financing: ECA - covered buyer credit a commercial loansStructuring & Financial Advisors: KfW IPEX-Bank & Africa Finance Corporation (AFC)
▪ Private investments opportunities in Oil & Gas (LNG Project):Awarded in 1H20 a MOF and LNG Jetty worth US$365 mn(JV with Besix) from the Mozambique LNG concession (Total) (the first of several contracts expected for the upcoming years)
LatinAmerica
Mexico
Peru
Brazil
Colombia
Dominican Republic
Aruba
Panama
Highlights 2019
07 €949mn €1,448mn
Countries Turnover Backlog
Earnings Release 2018
2626
109
140118
59
27
2017 2018 2019 1H19 1H20
▪ Mexico activity to be driven by the E&C works related to the Tren Maya, Costa CanuvaTouristic Project and Energy with Fenix and by the Revised Infrastructure Plan (2020-2024)
▪ Commercial Relations with Petrobras and Vale open new opportunities in Brazil
▪ Mota-Engil know-how is a competitive advantage to leverage on PPP and APP opportunities
▪ Concession investment as a promoter of construction, with an asset rotation policy focus
▪ Positive outlook to revamp the commercial and activity dynamism, namely in Mexico
Turnover (€ mn)
Backlog1 (€ mn)
EBITDA (€ mn) and margin (%)
12%11%
1Contracts already signed and financed. Excludes future revenues from concessions (highways).
A Regional Player and a Recognized Brand in Latam
▪ Regional Player (7th position in the Ranking: ENR 2020)
▪ Positive evolution in the EBITDA margin (1H20 impacted by Covid-19)
Key figures and Outlook
13%13%
9601,069
949
457305
2017 2018 2019 1H19 1H20
9%
1,465 1,4811,259
1,4481,764
2017 2018 1H19 2019 1H20
▪ Tren Maya (Railway):
The Flagship Project of the six-year mandate
▪ First stretch (227km) awarded in Apr. 2020 to Mota-Engil.(58% stake in a JV with CCCC and Local Partners).
Biggest contract ever awarded in Latam (15.5MMxn)
Earnings Release 2018
2727
▪ Agreement between the Government and the private sector
▪ Total investment of US$14 bn (MEX$297 bn)
▪ Private investment to amount at least 50% of the total
▪ Sectors: Communications and Transports; Energy; Water; Environment
▪ 39 projects: 7 under development and 32 to be developed:
• 28 highways, two ports, two railways, two water & waste-related andfive energy projects,
▪ Number of projects is expected to increase in the next couple of months asofficials and companies work together to add public-private projects to the plan.
▪ Target: infrastructure investment to reach 25% of GDP
Mexico: Revised National Infrastructure Plan (first package announced)
4FinalRemarks and Outlook
29
Earnings Release
29
• Activity was impacted by Covid-19, with a resilient profitability
• Strong commercial performance that led to a record and comfortable Backlog (€5.5 Bn), which paves the way for a strong recovery inturnover when the economic recovery begins
• Capex was adjusted to the current context and to projects with high profitability and stable cash-flow stream
• Net debt level was up €34 mn YTD in a challenging environment, while maintaining a comfortable liquidity position
• Working capital was under control at 5% of turnover, reflecting the efficiency measures in place
Final Remarks
30
Earnings Release
30
• Total turnover is expected to decrease due to Africa and Latin America, notwithstanding an expected increase in activity in Europe
• EBITDA margin to remain below 2019
• Backlog to stand above €5 bn
• Capex below €200 mn (partially financed by down payments), down from an initial estimate of €200 mn-€250 mn
• Focus on organic cash-flow generation in order to help strengthening the capital structure
Outlook
Appendix
5
Earnings Release 2018
3232
74
YEARS
MARKET
CAP
€257M
Listed
since
1987
SHARE
CAPITAL
€238M
1) Source: Bloomberg (30/09/2020)
▪ Mota Family (FM - Sociedade de Controlo) has an equity stake of 65% and a long termcommitment and fully supports strategy
▪ Treasury shares of 2.6% of share capital
▪ Payout policy: 50%-75%
Snapshot
Share price performance1 (€) FM-Soc.Controlo ; 64.97%
Mutima Capital; 3.13%
Norges Bank; 2.31%
Cobas; 1.99%
AZ Valor; 1.92%
Treasury Stocks; 2.56%
Free Float; 23.10%
MOTA-ENGIL SHAREHOLDERS
0
1
2
3
4
5
6
7
01/1
0/20
10
01/1
0/20
11
01/1
0/20
12
01/1
0/20
13
01/1
0/20
14
01/1
0/20
15
01/1
0/20
16
01/1
0/20
17
01/1
0/20
18
01/1
0/20
19
Earnings Release 2018
3333
Gonçalo Moura MartinsCEO
▪ Degree in Law
▪ With Mota-Engil since 1990, holding several management positions
José Pedro FreitasCFO
▪ Degree in Economics
▪ Since 2009 in senior positions in the Group
Carlos Mota SantosDeputy CEO
▪ Degree in Civil Engineering
▪ With the Group since 2006 in senior positions
Manuel MotaCEO Europe & Africa
▪ Degree in Civil Engineering
▪ More than 10 years of experience in the Group, namely in Central Europe and in Africa’s division
Ismael GasparCEO ME Capital
▪ Degree in Civil Engineering
▪ With the Group for 30 years
João ParreiraCEO Latin America
▪ Degree in Law
▪ Working for Mota-Engil since 2008, being the CEO of LatAm region since 2012
Eduardo PimentelHR / IT and Resources
▪ Degree in Civil Engineering
▪ Working in the Group for 25 years
Luís SilvaStrategic Planning and Control
▪ Degree in Economics
▪ With the Group for 27 years
Executive Committee
Earnings Release 2018
3434
1946
Incorporation of Mota & Companhia in Angola
1952
Completion of the first major project: Luanda International Airport in Angola
1974
Expansion into Sub-Saharan countries other than Angola
1987
IPO of Mota & Companhia on the Lisbon Stock Exchange
2000
Merger of Mota & Companhiaand Engil
2006
Enters the logistics sector through the acquisition of the TertirGroup in Portugal
2012
Awarded two sections of the Nacala Corridor railway project in Malawi
2013
Announced intention to spin-off and list its African business
1952
Incorporation of Engil in Portugal
1976
Mota & Companhiabegins operations in Portugal
1994
Mota & Companhiadiversifies its service offering
2005
Lists on Euronext Lisbon’s main share index
Mota-Engil SGPS completes €110 Mn ABB
2012
Restructures organisationalmodel to geographic business segments
2013
€175 Mn listed medium-term bonds issued
2014
Acquisition of EGF
Mota-Engil SGPS completes €160 MnABB
2016
Ports & Logistics businesses sale
Indaqua sale
Agreement to sell Ascendi’s assets
2015
De-listing of MEAFR and ME SGPS share capital increase
€95 Mn listed medium-term bonds issued
Enters the energy production sector through Fenix (Mexico)
2017
First closing of Ascendi’sassets sale to Ardian
2018
Start of Operations in Waste Management in Ivory Coast
Enter in Oil&GasMaintenance in Brazil
€110 Mn listed medium-term bonds issued (2018/2022)
Mota-Engil past main milestones
2019
€140 Mn listed medium-term bonds issued (2019/2024)
2020
Award of the biggest Contract in Latam: Tren Maya €636 Mn
Mozambique: 1st Contract of the LNG Project from CCS JV (Area 1)
Strategic partnership and investment agreement with CCCC
Earnings Release 2018
3535
Balance sheet
Balance sheet (€ mn)
Fixed assets 1,356 1,358 (2)
Financial investments 346 340 7
Long term receivables 161 190 (29)
Non-current Assets held for sale (net) 101 145 (44)
Working capital 139 115 24
2,101 2,148 (47)
Equity 235 328 (93)
Provisions 110 107 4
Long term payables 510 500 11
Net debt 1,248 1,213 34
2,101 2,148 (47)
Jun. 20
Dec. 19
YoY
Earnings Release 2018
3636
Europe performance breakdown
P&L breakdown (€ mn)
Turnover 455 407 12%
E&C 322 284 14%
E&S 137 127 8%
Other, elim. and interc. (4) (4) (17%)
EBITDA 48 41 16%
Margin 10% 10% 0 p.p.
E&C 13 10 23%
Margin 4% 4% 0 p.p.
E&S 35 29 19%
Margin 25% 23% 2 p.p.
Other, elim. and interc. - 1 n.m.
1H20 YoY1H19
37
· Infrastructures
· Civil construction
· Real estate
· Other business areas
1. FOZ TUA DAM – PORTUGAL
2.DOURO INTERIOR– PORTUGAL
3.WIELICKA-LIPSKA RAILWAY – POLAND
4.TUXPAN TAMPICO – MEXICO
5. GUADALAJARA LIGHT RAILWAY SYSTEM – MEXICO
6. ANTAMINA – PERU
7. LUZ HOSPITAL – PORTUGAL
8. IMOB BUSINESS TOWER LUANDA –ANGOLA
The Mota-Engil Group has developed construction projects in over 40 countries, asserting its technical skills and building a reputation of excellence, standing out in the construction of different infrastructures, such as roads, highways, airports, ports, dams, buildings, railway, electromechanics, foundations and geotechnics, mining services, as well as in the construction and maintenance of support platforms to the Oil & Gas segment, among other areas of expertise.
Engineering andConstruction
MainIndicators 2019
2,211 M€
Turnover
4,583 M€
Order Book
265 M€
EBITDA
2,211
2019201820172016
2,2982,046
1,768
MILLION EUROS
TURNOVER
38
1. ENERGY RECOVERY PLANT – PORTUGAL
2. SUMA - PORTUGAL
3. VISTA WASTE – ANGOLA
4. ECOVISION - OMÃ
5. ECOLIFE - MOZAMBIQUE
6. AGIR - CAPE VERDE
7. ECO EBURNIE – IVORY COAST
8. CLEAN EBURNIE – IVORY COAST
9. CONSITA - BRAZIL
10. GISA - MEXICO
· Collection
· Processing
· Recovery
· Waste-to-Energy
The Mota-Engil Group started operating in the Environment sector in 1995 in Portugal through SUMA in the segment of management and waste collection, aggregating competences with EGF, leading company in the waste treatment and recovery, having European cutting-edge technology in waste treatment and recovery, as well as in energy production through biogas capture in landfill and energy recovery plant.
At an international level, Mota-Engil has increasingly expanded its activity in this sector for markets such as Angola (Vista Waste), Mozambique (Eco Life), Cape Verde (Agir), Mexico (Gisa), Brazil (Consita), Oman (Eco Vision) and Côte d’Ivoire (Eco Eburnie and Clean Eburnie).
Environment
MainIndicators 2019
404 M€
Turnover
4,000 M€*
Order Book
83 M€
EBITDA
404
2019201820172016
344359334
MILLION EUROS
TURNOVER
(*) Total amount of the Order Book among the waste collection subsidiaries, adding theestimate turnover up to the end of EGF’s concession (ends in 2034).
39
2018 2019
EBITDA
2018 2019
TURNOVER
44
24
· Power Generation· Management· Trading
Energy
TechnologyInstalledCapacity
5 hydro plants
Jorge Luquepower plant (Gas)
10 mini-hydro plants277 MW
+100 MW in 2020Long-term target: 1700 MW
Sales to spotMarket and toThe Fenix Supply business(Suministradora)
Generation Trading
102
197
91% 9%
100%
1. OIL PLATFORM MAINTENANCE – BRAZIL
2. GENERADORA FÉNIX - MEXICO
3. FÉNIX - MEXICO
PowerGeneration1st private operatorin Mexico
TradingStarted in March 2018
Key Figures 2019
Currently 3 PPA’s in operation for 148 MW (658 GWh/year), being the most relevant the 20 year PPA established with Mexico City (supply c.a. 550 GWh/year)
Turnover €197 MNEBITDA: €24 MN
40
Country Km Mota-Engil End of the
concession
Lusponte* Portugal 19.5 41.80% 2030
Douro Interior* Portugal 242.3 80.75% 2038
Perote - Xalapa* Mexico 60 50.00% 2053
APP Coatzacoalcos - Villahermosa Mexico 105 39.00% 2026
APP Tamaulipas Mexico 279 47.00% 2028
Cardel - Poza Rica Mexico 128 40.00% 2045
Tuxpan - Tampico Mexico 105 33.40% 2045
Cuapiaxtla-Cuacnopalan Mexico 63 100.00% 2048
Perote – Xalapa* Mexico 60 50.00% 2053
Autopista Urbana Siervo de la Nación Mexico 14 33.30% 2059
Watty Vos Boulevard Aruba 24 15.00% 2038
Rodovias do Tiete* Brazil 415 50.00% 2039
Cambao - Manizales Colombia 279 45.60% 2049
Mozambique – Zambeze Roads Mozambique 701 40.00% 2039
* Concessions operated by Lineas in which Mota-Engil SGPS holds a 60 % stake. Total Km: 2,495
%
1. LUSOPONTE – PORTUGAL
2. PEROTE-XALAPA - MEXICO
3. TUXPAN TAMPICO –MEXICO
ConcessionThrough Lineas and its subsidiaries, the Mota-Engil Group operates a network of 2,500 km of roads and motorways, including the two Lisbon bridges.
41
Sustainability is a priority
Investment in the
CommunitySafety Environment
Ethics andComplance
Diversity andInclusion
Path to sustainability
▪ Five operational Goals: in line with the Sustainable Development Goals (SDG) – thepillars of a balanced society, capable of generating employment and wealth whilerespecting nature and Human Rights – and reinforcing the commitment tosustainability of its clients, communities and employees
António Mota, Mota-Engil’sChairman
▪ Mota-Engil begun implementing a sustainability and socialresponsibility strategy in 2006, with the first SustainabilityReport in 2007
▪ CEO Guide to Human Rights of BCSD Portugal: Commitment to innovate inpractices aimed at improving the living conditions not only of its employees, butalso of the communities impacted by the Group’s activity
42
Sustainability is a priority
▪ Portugal’s Charters of Principles: sharingsustainability information with stakeholders;orientation of the entire value chain according tothe principles; alignment and commitment to theSustainable Development Goals
▪ Employees internal training and awareness:sustainability as a competitiveness factor
▪ Ethics and business conduct: Equality and Non-Discrimination Plan, Whistleblowing andCompliance Procedure, Code of Ethics andBusiness Conduct
▪ Manuel António da Mota Foundation:founded in 2009 it has the mission tocontribute to the integrated development ofthe communities where Mota-Engil operates inthe social, educational, cultural andenvironmental fields
▪ Strategy aligned with the United Nations 2030 Agendafor Sustainable Development with 17 SDGs
▪ Mota-Engil México: Empresa SocialmenteResponsable
▪ Mota-Engil Peru: ISO certification for anti-briberyand corruption
43
TURNOVER: corresponds to the caption “Sales and services rendered”.EBITDA MARGIN: corresponds to the division between the algebraic sum of the following captions of the consolidated income statement “Sales and services rendered“; “Cost of goods sold, mat. cons.,Changes in production and Subcontractors”; “Third-party supplies and services”; “Wages and salaries”; “Other operating income / (expenses)” and the TURNOVER.CAPEX: acquisitions less disposals of tangible and intangible assets.NET DEBT: corresponds to the algebraic sum of the following captions of the consolidated statement of financial position: “Cash and cash equivalents without recourse - demand deposits”; “Cash andcash equivalents with recourse - demand deposits”; “Cash and cash equivalents with recourse - term deposits” “Loans without recourse”; “Loans with recourse” and “Other financial investmentsrecorded at amortised cost”. Leasing and factoring operations established by the Group are not recorded in the captions aforementioned.BACKLOG: turnover to be recognised in the future related to projects for which contracts have been signed or awarded.
This presentation used sources deemed credible and reliable but is not guaranteed as to accuracy or completeness.
It also contains forward looking information that expresses management’s best assessments but might prove inaccurate.
The information contained in this presentation is subject to many factors and uncertainties and therefore subject to change without notice.
The company declines any responsibility to update, revise or correct any of the information hereby contained.
This presentation does not constitute an offer or invitation to purchase securities of Mota-Engil nor any of its subsidiaries.
Disclaimer
PEDRO ARRAIS
Head of Investor Relations
MARIA ANUNCIAÇÃO BORREGA
Investor Relations Officer
Rua de Mário Dionísio, 2
2796-957 Linda-A-Velha Portugal
Tel. +351-21-415-8671
www.mota-engil.com
linkedin.com/company/mota-engil
www.youtube.com/motaengilsgps
www.facebook.com/motaengil