2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 3 88886WAY SR 0083
00.62/00.74WAY
Replace a 22' concrete slab bridge over a small
creek and replace a 12' concrete slab structure
over a small creek.
WAY-SR-83-00.62 & WAY-SR-
83-00.74
ODOT SPONSORING
AGENCYAMATS CO CO Contr $640,000 $0 $880,000 $1,435,455 2020 4PF7 Federal Bridge Replacement M232 STBG 0.02
Air Quality
Exempt32
FHWA 3 88886 CO CO Contr $160,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 3 88886 CO CO Engr $64,000 2020 LABR Federal Z232 STBG 32
FHWA 3 88886 CO CO Engr $16,000 2020 LABR State 002 Labor - State Match 32
FHWA 3 92892 WAY SR 0083 14.64 WAYWooster Urban PavingWAY-083-14.64 (end
concrete pavement) to 16.30 (Wooster NCL)WAY-083-14.64 to 16.30
ODOT SPONSORING
AGENCYAMATS CO CO Contr $61,196 $0 $795,527 $849,068 2018 4BG7 Local Match
Resurfacing, Undivided
System002 Local Match 1.66
Air Quality
Exempt32
FHWA 3 92892 CO CO Contr $30,728 2018 4PF7 Federal M232 STBG 32
FHWA 3 92892 CO CO Contr $7,682 2018 4PS7 State 002 State Funds (002) 32
FHWA 3 92892 CO CO Contr $532,259 2018 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 3 92892 CO CO Contr $133,065 2018 4BG7 Local Match 002 Local Match 32
FHWA 3 92892 CO CO Engr $1,229 2018 LABR Federal M232 STBG 32
FHWA 3 92892 CO CO Engr $307 2018 LABR State 002 Labor - State Match 32
FHWA 3 92892 CO CO Engr $21,290 2018 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 3 92892 CO CO Engr $5,323 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 3 92892 CO CO Engr $2,448 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 3 92892 WAY SR 0083 14.64 WAYWooster Urban PavingWAY-083-14.64 (end
concrete pavement) to 16.30 (Wooster NCL)WAY-083-14.64 to 16.30
ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $8,031 $0 $53,541 $849,068 2018 LABR State
Resurfacing, Undivided
System002 Labor - State Match 1.66
Air Quality
Exempt32
FHWA 3 92892 PE Env PE $45,510 2018 LABR State 002 Labor - State Match 32
FHWA 3 93552 D03 SRTS Rittman WAY
Project to construct Home Street sidewalks,
add path lighting, improve crosswalks and
install speed feedback signs in the City of
Rittman.
City of Rittman Rittman, City of AMATS PE Dtl Dsgn $31,000 $165,265 $196,265 $492,428 2018 4SC7 Federal Add Sidewalks LU2E STBG/Safe Routes to School 0Air Quality
Exempt24
FHWA 3 95581 WAY SR 0094 16.73 WAY Bridge ReplacementWAY-094-16.74 Ditch WAY-094-16.74ODOT SPONSORING
AGENCYAMATS CO CO Engr $28,000 $0 $35,000 $900,500 2020 LABR Federal Bridge Replacement Z232 STBG 0.02
Air Quality
Exempt32
FHWA 3 95581 CO CO Engr $7,000 2020 LABR State 002 Labor - State Match 32
FHWA 3 95581 WAY SR 0094 16.73 WAY Bridge ReplacementWAY-094-16.74 Ditch WAY-094-16.74ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $100,000 $115,500 $215,500 $900,500 2020 4PS7 State Bridge Replacement 002 State Funds (002) 0.02
Air Quality
Exempt32
FHWA 3 98492 WAY SR 0585 03.33 WAYResurfacing WAY-585-3.33 (Thompson Rd) to
11.89 (Mile Post 12)WAY-585-3.33 to 11.89
ODOT SPONSORING
AGENCYAMATS CO CO Contr $453,530 $0 $2,376,998 $2,446,231 2019 4PF7 Federal
Minor Rehabilitation -
Pavement Gnrl SysZ001 National Hwy Performance Prgm 8.65
Air Quality
Exempt32
FHWA 3 98492 CO CO Contr $113,383 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 98492 CO CO Contr $1,312,682 2019 4PF7 Federal Z232 STBG 32
FHWA 3 98492 CO CO Contr $328,170 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 98492 CO CO Contr $80,000 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 3 98492 CO CO Contr $20,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 98492 CO CO Engr $41,781 2019 LABR Federal Z232 STBG 32
FHWA 3 98492 CO CO Engr $10,445 2019 LABR State 002 Labor - State Match 32
FHWA 3 98492 CO CO Engr $13,606 2019 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 3 98492 CO CO Engr $3,401 2019 LABR State 002 Labor - State Match 32
FHWA 3 98492 WAY SR 0585 03.33 WAYResurfacing WAY-585-3.33 (Thompson Rd) to
11.89 (Mile Post 12)WAY-585-3.33 to 11.89
ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $10,385 $0 $69,233 $2,446,231 2019 LABR State
Minor Rehabilitation -
Pavement Gnrl Sys002 Labor - State Match 8.65
Air Quality
Exempt32
FHWA 3 98492 PE Env PE $58,848 2019 LABR State 002 Labor - State Match 32
FHWA 3 101400 WAY SR 0083 00.00 WAY AC Overlay with RepairsWAY SR 83 0.00-8.09 WAY SR 83 00.00 - 08.09ODOT SPONSORING
AGENCYAMATS CO CO Contr $1,500,000 $0 $1,957,316 $2,119,370 2019 7BPB Bonds
Minor Rehabilitation -
Pavement Gnrl Sys042 State Bonds 8.09
Air Quality
Exempt32
FHWA 3 101400 CO CO Contr $30,400 2019 4PF7 Federal Z232 STBG 32
FHWA 3 101400 CO CO Contr $7,600 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 101400 CO CO Contr $5,213 2019 4PF7 Federal Z231 STBG 32
FHWA 3 101400 CO CO Contr $1,303 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 101400 CO CO Contr $200,598 2019 4PF7 Federal Z232 STBG 32
FHWA 3 101400 CO CO Contr $50,149 2019 4PS7 State 002 State Funds (002) 32
FHWA 3 101400 CO CO Engr $90,000 2019 LABR State 002 Labor - State Match 32
FHWA 3 101400 CO CO Engr $52,391 2019 LABR Federal Z232 STBG 32
FHWA 3 101400 CO CO Engr $13,098 2019 LABR State 002 Labor - State Match 32
FHWA 3 101400 CO CO Engr $5,251 2019 LABR Federal Z231 STBG 32
FHWA 3 101400 CO CO Engr $1,313 2019 LABR State 002 Labor - State Match 32
FHWA 3 101400 WAY SR 0083 00.00 WAY AC Overlay with RepairsWAY SR 83 0.00-8.09 WAY SR 83 00.00 - 08.09ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $24,308 $0 $162,054 $2,119,370 2018 LABR State
Minor Rehabilitation -
Pavement Gnrl Sys002 Labor - State Match 8.09
Air Quality
Exempt32
FHWA 3 101400 PE Env PE $137,746 2018 LABR State 002 Labor - State Match 32
FHWA 3 101439 WAY SR 0021 00.00 WAY
AC Overlay with RepairsWAY SR 21 0.00-
5.86Project received Major Rehab Funds for
FY2024
WAY SR 21 0.00-5.86ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $32,054 $0 $213,695 $9,011,328 2020 LABR State
Minor Rehabilitation -
Pavement Prmy Sys002 Labor - State Match 5.86
Air Quality
Exempt32
FHWA 3 101439 PE Env PE $181,641 2020 LABR State 002 Labor - State Match 32
FHWA 3 101646 WAY US 250 28.84 WAY
Culvert Replacement- WAY-250-28.84Removed
Culvert Invert Pave-WAY-SR-0604-10.53,-
Performed by Wayne Co. Removed Culvert
Culvert Repair - WAY-21-0.15 move to PID
98927
WAY-250-28.84ODOT SPONSORING
AGENCYAMATS CO CO Contr $87,086 $0 $118,857 $195,455 2018 4PF7 Federal
Culvert
Construction/Reconstr/Repa
ir
Z001 National Hwy Performance Prgm 0Air Quality
Exempt32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 1 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 3 101646 CO CO Contr $21,771 2018 4PS7 State 002 State Funds (002) 32
FHWA 3 101646 CO CO Engr $8,000 2018 LABR Federal Un-Assigned Federal Labor 32
FHWA 3 101646 CO CO Engr $2,000 2018 LABR State 002 Labor - State Match 32
FHWA 3 103920WAY SR 0604/0301
20.65/04.50WAY
Culvert ReplacementWAY-604-20.65WAY-301-
4.50
WAY-604-20.65 / WAY-301-
4.50
ODOT SPONSORING
AGENCYAMATS CO CO Contr $275,000 $0 $302,500 $549,771 2019 4PS7 State
Culvert
Construction/Reconstr/Repa
ir
002 State Funds (002) 0.04Air Quality
Exempt32
FHWA 3 103920 CO CO Engr $27,500 2019 LABR State 002 Labor - State Match 32
FHWA 3 103920WAY SR 0604/0301
20.65/04.50WAY
Culvert ReplacementWAY-604-20.65WAY-301-
4.50
WAY-604-20.65 / WAY-301-
4.50
ODOT SPONSORING
AGENCYAMATS RW Acquis $20,000 $1,020 $41,020 $549,771 2018 4PS7 State
Culvert
Construction/Reconstr/Repa
ir
002 State Funds (002) 0.04Air Quality
Exempt32
FHWA 3 103920 RW RW Serv $20,000 2018 LABR State 002 Labor - State Match 32
FHWA 3 106418D03 GR FY2018
NHSD03
District-wide project to remove all Type A end
anchors on the NHS system.Note: Some Type A
end anchors have/will be replaced on FY17, FY
18, FY 19 resurfacing/bridge projects.Counties
included: CRA, HUR, ERI, and RIC.
variousODOT SPONSORING
AGENCYAMATS CO CO Contr $665,795 $0 $732,375 $758,741 2018 4HJ7 Federal Guardrail upgrade/replace ZS30 Highway Safety Imp Prog 0.42
Air Quality
Exempt15
FHWA 3 106418 CO CO Engr $66,580 2018 4HJ7 Federal ZS30 Highway Safety Imp Prog 15
FHWA 3 106418D03 GR FY2018
NHSD03
District-wide project to remove all Type A end
anchors on the NHS system.Note: Some Type A
end anchors have/will be replaced on FY17, FY
18, FY 19 resurfacing/bridge projects.Counties
included: CRA, HUR, ERI, and RIC.
variousODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $3,955 $0 $26,366 $758,741 2018 LABR State Guardrail upgrade/replace 002 Labor - State Match 0.42
Air Quality
Exempt15
FHWA 3 106418 PE Env PE $22,411 2018 LABR Federal ZS30 Highway Safety Imp Prog 15
FHWA 3 106419D03 GR FY2019
NHSD03
District-wide project to remove all Type A end
anchors on the NHS system.Note: Some Type A
end anchors have/will be replaced on the FY17,
FY18, FY19 Resurfacing/Bridge Projects.
Counties included: Ashland, Wayne, Lorain and
Medina.
variousODOT SPONSORING
AGENCYAMATS CO CO Contr $665,795 $0 $732,375 $749,952 2019 4HJ7 Federal Guardrail upgrade/replace ZS30 Highway Safety Imp Prog 7.47
Air Quality
Exempt15
FHWA 3 106419 CO CO Engr $66,580 2019 4HJ7 Federal ZS30 Highway Safety Imp Prog 15
FHWA 3 106419D03 GR FY2019
NHSD03
District-wide project to remove all Type A end
anchors on the NHS system.Note: Some Type A
end anchors have/will be replaced on the FY17,
FY18, FY19 Resurfacing/Bridge Projects.
Counties included: Ashland, Wayne, Lorain and
Medina.
variousODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $2,637 $0 $17,577 $749,952 2018 LABR Federal Guardrail upgrade/replace ZS30 Highway Safety Imp Prog 7.47
Air Quality
Exempt15
FHWA 3 106419 PE Env PE $14,940 2018 LABR Federal ZS30 Highway Safety Imp Prog 15
FHWA 3 106519 WAY SR 0021 01.80 WAYSmooth SealWAY-SR-0021-1.80 to 5.86
Preventive Maintenance
WAY SR 0021 01.80 (North of
Bridge) to 05.86(Wayne
County Line)
ODOT SPONSORING
AGENCYAMATS CO CO Contr $1,700,694 $0 $2,189,644 $2,207,470 2018 4PF7 Federal Preventive Maintenance Z001 National Hwy Performance Prgm 4.06
Air Quality
Exempt32
FHWA 3 106519 CO CO Contr $425,174 2018 4PS7 State 002 State Funds (002) 32
FHWA 3 106519 CO CO Engr $51,021 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 3 106519 CO CO Engr $12,755 2018 LABR State 002 Labor - State Match 32
FHWA 3 106519 WAY SR 0021 01.80 WAYSmooth SealWAY-SR-0021-1.80 to 5.86
Preventive Maintenance
WAY SR 0021 01.80 (North of
Bridge) to 05.86(Wayne
County Line)
ODOT SPONSORING
AGENCYAMATS PE Dtl Dsgn $2,674 $0 $17,826 $2,207,470 2018 LABR State Preventive Maintenance 002 Labor - State Match 4.06
Air Quality
Exempt32
FHWA 3 106519 PE Env PE $15,152 2018 LABR State 002 Labor - State Match 32
FHWA 3 106881WAY - CR 133 -
02.10WAY
Replacement of a deficient bridge structure,
minor approach roadway work with grading
and guardrail. The project is to be let as a
Design/Build
0.125 miles north of the Bieri
Road and Black Diamond Road
intersection
WAYNE COUNTY
ENGINEERAMATS PE Env PE $15,000 $0 $15,000 $1,071,000 2018 LABR State Bridge Replacement 002 Labor - State Match 0
Air Quality
Exempt16
FHWA 3 106881WAY - CR 133 -
02.10WAY
Replacement of a deficient bridge structure,
minor approach roadway work with grading
and guardrail. The project is to be let as a
Design/Build
0.125 miles north of the Bieri
Road and Black Diamond Road
intersection
WAYNE COUNTY
ENGINEERAMATS RW RW Serv $3,000 $0 $3,000 $1,071,000 2018 LABR State Bridge Replacement 002 Labor - State Match 0
Air Quality
Exempt16
FHWA 4 76394FACD04 Facilities
ImprovementsD04
Facilities improvements throughout the
District.Districtwide
DISTRICT 4-
MAINTENANCEAMATS CO Oth Remb $16,553 $6,413,159 $6,570,764 $7,072,567 2018 LBM7 State Buildings - Mix Shed,etc. 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 76394 CO Oth Remb $134,246 2018 LBM7 State 002 State Funds (002) 99
FHWA 4 76394 CO Oth Remb $6,806 2018 LBM7 State 002 State Funds (002) 99
FHWA 4 81632 SUM IR 0077 28.37 SUM Resurfacing with miscellaneous bridge work.Richfield to Cuyahoga County
line.
ODOT SPONSORING
AGENCYAMATS CO CO Contr $180,000 $0 $5,974,000 $6,148,000 2020 4PF7 Federal
Minor Rehabilitation -
Pavement Prmy SysL01E Interstate Maintenance 5.24
Air Quality
Exempt32
FHWA 4 81632 CO CO Contr $20,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 81632 CO CO Contr $5,040,000 2020 4PF7 Federal L01E Interstate Maintenance 32
FHWA 4 81632 CO CO Contr $560,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 81632 CO CO Engr $5,400 2020 LABR Federal L01E Interstate Maintenance 32
FHWA 4 81632 CO CO Engr $600 2020 LABR State 002 Labor - State Match 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 2 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 81632 CO CO Engr $151,200 2020 LABR Federal L01E Interstate Maintenance 32
FHWA 4 81632 CO CO Engr $16,800 2020 LABR State 002 Labor - State Match 32
FHWA 4 84656 SUM IR 0077 07.44 SUMResurfacing. Includes bridge work to 10
structures TBD.SLM 7.44 to 9.77
ODOT SPONSORING
AGENCYAMATS CO CO Contr $135,000 $0 $3,926,000 $4,031,000 2021 4PF7 Federal
Minor Rehabilitation -
Pavement Prmy SysUn-Assigned Federal 2.33
Air Quality
Exempt32
FHWA 4 84656 CO CO Contr $15,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 84656 CO CO Contr $135,000 2021 4PF7 Federal Un-Assigned Federal 32
FHWA 4 84656 CO CO Contr $15,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 84656 CO CO Contr $3,150,000 2021 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 4 84656 CO CO Contr $350,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 84656 CO CO Engr $9,450 2021 LABR Federal Un-Assigned Federal Labor 32
FHWA 4 84656 CO CO Engr $1,050 2021 LABR State 002 Labor - State Match 32
FHWA 4 84656 CO CO Engr $9,450 2021 LABR Federal Un-Assigned Federal Labor 32
FHWA 4 84656 CO CO Engr $1,050 2021 LABR State 002 Labor - State Match 32
FHWA 4 84656 CO CO Engr $94,500 2021 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 84656 CO CO Engr $10,500 2021 LABR State 002 Labor - State Match 32
FHWA 4 84657SUM IR 0480 Noise
WallSUM
Construction of two noise walls along IR-480, in
the City of Twinsburg, Summit County, Ohio.
Construction of NSA#4 near the Chamberlain
Trail/Mortus Drive/Greenway Drive/Concord
Circle/Gettysburg Drive residential
neighborhood. Construction of NSA#6 in th
Construction of two noise
walls along IR-480 in the City
of Twinsburg.
DISTRICT 4-PLANNING AMATS CO CO Contr $2,700,000 $0 $3,150,000 $3,518,902 2020 5BV7 Federal Noise Wall M001 National Hwy Performance Prgm 0Air Quality
Exempt28,32
FHWA 4 84657 CO CO Contr $300,000 2020 4BV7 State 002 State Funds (002) 28,32
FHWA 4 84657 CO CO Engr $135,000 2020 LABR Federal M001 National Hwy Performance Prgm 28,32
FHWA 4 84657 CO CO Engr $15,000 2020 LABR State 002 Labor - State Match 28,32
FHWA 4 87286SUM 271/8
6.62/12.71SUM
Resurfacing. Miscellaneous bridge work. Heat
straightening of SUM-8-12.71
IR 271: SLM 6.62 to SLM 8.53,
SUM-8-12.71
DISTRICT 4-
MAINTENANCEAMATS CO CO Contr $88,240 $0 $1,832,800 $1,882,150 2018 4PF7 Federal
Minor Rehabilitation -
Pavement Prmy SysZ001 National Hwy Performance Prgm 1.92
Air Quality
Exempt32
FHWA 4 87286 CO CO Contr $22,060 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 87286 CO CO Contr $1,375,830 2018 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 4 87286 CO CO Contr $152,870 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 87286 CO CO Contr $117,900 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 87286 CO CO Contr $13,100 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 87286 CO CO Engr $41,310 2018 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 87286 CO CO Engr $4,590 2018 LABR State 002 Labor - State Match 32
FHWA 4 87286 CO CO Engr $6,160 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 87286 CO CO Engr $1,540 2018 LABR State 002 Labor - State Match 32
FHWA 4 87286 CO CO Engr $8,280 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 87286 CO CO Engr $920 2018 LABR State 002 Labor - State Match 32
FHWA 4 88937 SUM IR 77 15.87 SUM Resurfacing, with miscellaneous bridge work. SUM-IR77 DISTRICT 4-PLANNING AMATS CO CO Contr $4,680,000 $0 $5,705,000 $5,865,800 2021 4PF7 FederalMinor Rehabilitation -
Pavement Prmy SysZ001 National Hwy Performance Prgm 3.64
Air Quality
Exempt32
FHWA 4 88937 CO CO Contr $520,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 88937 CO CO Contr $144,000 2021 4PF7 Federal Un-Assigned Federal 32
FHWA 4 88937 CO CO Contr $16,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 88937 CO CO Engr $310,500 2021 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 88937 CO CO Engr $34,500 2021 LABR State 002 Labor - State Match 32
FHWA 4 90890SUM White Pond
Drive - Phase 3SUM
Signal upgrades at three locations: IR-77/Mull
Avenue/White Pond Drive, IR-77/White Pond
Drive, and Collier Road/Copley Road, in the City
of Akron, Summit County, Ohio. FED Earmark:
TCSP 0806
Between Mull Avenue and
Copley RoadAkron, City of AMATS CO CO Contr $20,000 $312,707 $339,291 $719,615 2018 4R47 Federal Signals L680 Trans & Com Sys Pres (TCSP) 0.9
Air Quality
Exempt9
FHWA 4 90890 CO CO Contr $5,000 2018 LNTP Local Match LNTP Local Match 9
FHWA 4 94123SUM SR 21/585
0.00/0.00SUM
Resurfacing SUM State Route 21 from 0.00 to
5.14 and SUM State Route 585 from 0.00 to
1.28 including ramps at the SR 21/585
interchange. Also includes minor bridge work
to several structures. Unknown abandoned
railroad and Akron Barberton Cluster Railway
State Route 21 and 585. DISTRICT 4-PLANNING AMATS CO CO Contr $4,000,000 $0 $5,526,200 $5,856,200 2020 4PF7 FederalMinor Rehabilitation -
Pavement Gnrl SysM001 National Hwy Performance Prgm 6.42
Air Quality
Exempt32
FHWA 4 94123 CO CO Contr $1,000,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 94123 CO CO Contr $400,000 2020 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 4 94123 CO CO Contr $100,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 94123 CO CO Engr $960 2020 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 94123 CO CO Engr $240 2020 LABR State 002 Labor - State Match 32
FHWA 4 94123 CO CO Engr $20,000 2020 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 94123 CO CO Engr $5,000 2020 LABR State 002 Labor - State Match 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 3 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 94126SUM US 224/SR
532 14.84/00.00SUM
Resurfacing of SUM US 224 from 14.84 to 16.07
and SUM SR 532 from 0.00 to 3.54 (urban
paving from 2.63 to 3.59 in the City of
Tallmadge), and minor bridge work to 3
structures.
SUM US 224 from 14.84 to
16.07 and SUM SR 532 from
0.00 to 3.54, structures at slm
1.60, 2.45 and 2.85
DISTRICT 4-PLANNING AMATS CO CO Contr $20,960 $0 $1,541,050 $1,630,450 2018 4PF7 FederalMinor Rehabilitation -
Pavement Gnrl SysM240 STBG 4.8
Air Quality
Exempt32
FHWA 4 94126 CO CO Contr $5,240 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 94126 CO CO Contr $274,960 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 94126 CO CO Contr $68,740 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 94126 CO CO Contr $21,600 2018 4PF7 Federal Z240 STBG 32
FHWA 4 94126 CO CO Contr $5,400 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 94126 CO CO Contr $604,080 2018 4PF7 Federal M240 STBG 32
FHWA 4 94126 CO CO Contr $151,020 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 94126 CO CO Contr $176,240 2018 4PF7 Federal Z240 STBG 32
FHWA 4 94126 CO CO Contr $44,060 2018 4BG7 Local Match 002 Local Match 32
FHWA 4 94126 CO CO Contr $117,700 2018 4BG7 Local Match 002 Local Match 32
FHWA 4 94126 CO CO Engr $18,160 2018 LABR Federal M240 STBG 32
FHWA 4 94126 CO CO Engr $4,540 2018 LABR State 002 Labor - State Match 32
FHWA 4 94126 CO CO Engr $1,440 2018 LABR Federal M240 STBG 32
FHWA 4 94126 CO CO Engr $360 2018 LABR State 002 Labor - State Match 32
FHWA 4 94126 CO CO Engr $1,520 2018 LABR Federal Z240 STBG 32
FHWA 4 94126 CO CO Engr $380 2018 LABR State 002 Labor - State Match 32
FHWA 4 94126 CO CO Engr $3,500 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 4 94126 CO CO Engr $9,040 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 94126 CO CO Engr $2,260 2018 LABR State 002 Labor - State Match 32
FHWA 4 94126 CO CO Engr $5,280 2018 LABR Federal Z240 STBG 32
FHWA 4 94126 CO CO Engr $1,320 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 4 94126 CO RR Remb $2,600 2018 4PF7 Federal Un-Assigned Federal 32
FHWA 4 94126 CO RR Remb $650 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 94133 POR SR 0303 02.71 POR
Resurfacing of POR SR 303 from SLM 2.71 to
4.98 in the City of Streetsboro, includes partial
depth repairs, ADA curb ramps and other misc.
items.
SLM 2.71 to 4.98 DISTRICT 4-PLANNING AMATS CO CO Contr $402,400 $0 $563,800 $595,910 2018 4PF7 FederalMinor Rehabilitation -
Pavement Gnrl SysM240 STBG 2.27
Air Quality
Exempt32
FHWA 4 94133 CO CO Contr $100,600 2018 4BG7 Local Match 002 Local Match 32
FHWA 4 94133 CO CO Contr $37,000 2018 4BG7 Local Match 002 Local Match 32
FHWA 4 94133 CO CO Engr $3,700 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 4 94133 CO CO Engr $16,080 2018 LABR Federal M240 STBG 32
FHWA 4 94133 CO CO Engr $4,020 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 4 94138POR 44/282
22.14/0.00POR
Resurfacing POR SR 44 from 22.14 to 24.19,
POR SR 282 from 0.00 to 2.69. Unknown
abandoned railroad on SR 44 at 22.15,
POR SR 44 from 22.14 to 24.19,
POR SR 282 from 0.00 to 2.69.DISTRICT 4-PLANNING AMATS CO CO Contr $1,560,000 $0 $2,008,500 $2,125,500 2019 4PF7 Federal
Minor Rehabilitation -
Pavement Gnrl SysM232 STBG 6.25
Air Quality
Exempt32
FHWA 4 94138 CO CO Contr $390,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 94138 CO CO Engr $46,800 2019 LABR Federal M232 STBG 32
FHWA 4 94138 CO CO Engr $11,700 2019 LABR State 002 Labor - State Match 32
FHWA 4 95944SUM FY13 JRayl
CNG TrucksSUM
J Rayl Trucking- The cost differential to replace
32 diesel trucks with compressed natural gas
(CNG) trucks. This is an OEPA DERG public
private partnership project with OAQDA
serving as the public sponsor.
0
Ohio Air Quality
Development
Authority
AMATS OTH Oth Remb $810,041 $889,177 $1,901,728 $1,901,728 2018 4NG5 Federal Diesel Emission Reduction M003 CMAQ 0Air Quality
Exempt27
FHWA 4 95944 OTH Oth Remb $202,510 2018 LNTP Local Match LNTP Local Match 27
FHWA 4 96559 SUM SR 0261 17.09 SUM Resurfacing SUM SR 261 from 17.09 to 18.41.Resurfacing SUM SR 261 from
17.09 to 18.41.DISTRICT 4-PLANNING AMATS CO CO Contr $296,000 $0 $384,800 $407,000 2019 4PF7 Federal
Minor Rehabilitation -
Pavement Gnrl SysM001 National Hwy Performance Prgm 1.32
Air Quality
Exempt32
FHWA 4 96559 CO CO Contr $74,000 2019 4BG7 Local Match 002 Local Match 32
FHWA 4 96559 CO CO Engr $11,840 2019 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 96559 CO CO Engr $2,960 2019 LABR Local Match 002 Labor - Local Match 32
FHWA 4 96560POR MCRO
FY2021(A)POR
Microsurfacing of POR SR 44 from 19.18 to
21.65, POR SR 82 from 10.64 to 12.86 and 13.8
to 22.54.
POR SR 44 19.18 to 21.65, POR
SR 82 10.64 to 12.86 and 13.8
to 22.54
DISTRICT 4-PLANNING AMATS CO CO Contr $509,360 $0 $1,457,400 $1,542,310 2021 4PF7 Federal Preventive Maintenance M231 STBG 13.43Air Quality
Exempt32
FHWA 4 96560 CO CO Contr $127,340 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 96560 CO CO Contr $158,480 2021 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 96560 CO CO Contr $39,620 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 96560 CO CO Contr $464,160 2021 4PF7 Federal M232 STBG 32
FHWA 4 96560 CO CO Contr $116,040 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 96560 CO CO Engr $4,720 2021 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 96560 CO CO Engr $1,180 2021 LABR State 002 Labor - State Match 32
FHWA 4 96560 CO CO Engr $13,920 2021 LABR Federal M232 STBG 32
FHWA 4 96560 CO CO Engr $3,480 2021 LABR State 002 Labor - State Match 32
FHWA 4 96560 CO CO Engr $15,280 2021 LABR Federal M231 STBG 32
FHWA 4 96560 CO CO Engr $3,820 2021 LABR State 002 Labor - State Match 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 4 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 96562SUM SR 162/261
VARSUM
Resurfacing of SUM SR 162 from 9.12 to 9.26,
Resurfacing of SUM SR 261D from 0.80 to 1.47
and 1.82 to 1.90, Resurfacing of SUM SR 261
from 10.89 to 11.33, Minor bridge work to SFN
7700423 SUM 261 11.88 over SR 8/SR 59.
Unknown abandoned railroad on SR 162
SUM SR 162 9.12 to 9.26, SR
261D 0.80 to 1.47 and 1.82 to
1.90, SR 261 10.89 to 11.33,
bridge at 11.88,
DISTRICT 4-PLANNING AMATS CO CO Contr $68,000 $0 $1,340,750 $1,418,150 2019 4PF7 FederalMinor Rehabilitation -
Pavement Gnrl SysM240 STBG 1.33
Air Quality
Exempt32
FHWA 4 96562 CO CO Contr $17,000 2019 4BG7 Local Match 002 Local Match 32
FHWA 4 96562 CO CO Contr $240,000 2019 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 4 96562 CO CO Contr $60,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 96562 CO CO Contr $724,000 2019 4PF7 Federal M001 National Hwy Performance Prgm 32
FHWA 4 96562 CO CO Contr $181,000 2019 4BG7 Local Match 002 Local Match 32
FHWA 4 96562 CO CO Engr $16,800 2019 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 96562 CO CO Engr $4,200 2019 LABR State 002 Labor - State Match 32
FHWA 4 96562 CO CO Engr $2,080 2019 LABR Federal M240 STBG 32
FHWA 4 96562 CO CO Engr $520 2019 LABR Local Match 002 Labor - Local Match 32
FHWA 4 96562 CO CO Engr $21,720 2019 LABR Federal M001 National Hwy Performance Prgm 32
FHWA 4 96562 CO CO Engr $5,430 2019 LABR Local Match 002 Labor - Local Match 32
FHWA 4 96698FACD04 POR FS
FacilityPOR Construct a new Portage Full Service Facility Portage Full Service Facility DISTRICT 4-PLANNING AMATS CO CO Contr $9,000,000 $678,335 $9,678,335 $11,125,957 2018 7LBB Bonds Outpost 029 State Bonds 0
Air Quality
Exempt99
FHWA 4 96698FACD04 POR FS
FacilityPOR Construct a new Portage Full Service Facility Portage Full Service Facility DISTRICT 4-PLANNING AMATS PE Env PE $1,000,000 $100,264 $1,100,264 $11,125,957 2018 7LBB Bonds Outpost 029 State Bonds 0
Air Quality
Exempt99
FHWA 4 96727FACD04 SUM
Greensburg OPSUM
Summit County Greensburg Outpost, build a
permanent 12 bay garage to be shared with
ODOT Summit and Stark County as well as the
Stark County Engineer
Summit County Greensburg
OutpostDISTRICT 4-PLANNING AMATS CO CO Contr $3,500,000 $0 $3,500,000 $4,375,000 2021 LBN7 State Buildings - Mix Shed,etc. 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 96727FACD04 SUM
Greensburg OPSUM
Summit County Greensburg Outpost, build a
permanent 12 bay garage to be shared with
ODOT Summit and Stark County as well as the
Stark County Engineer
Summit County Greensburg
OutpostDISTRICT 4-PLANNING AMATS PE PE Engr $350,000 $525,000 $875,000 $4,375,000 2018 LBN7 State Buildings - Mix Shed,etc. 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 96728FACD04 SUM
IntChg OP SanSUM
Summit County Interchange Outpost, upgrade
floor drains and tie into Sanitary Sewer and
Water. Project to be determined by possible
Industrial Park NE of facility
Summit County Interchange
OutpostDISTRICT 4-PLANNING AMATS CO CO Contr $830,000 $0 $830,000 $1,012,510 2019 LBP7 State Facility Renovation 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 96728FACD04 SUM
IntChg OP SanSUM
Summit County Interchange Outpost, upgrade
floor drains and tie into Sanitary Sewer and
Water. Project to be determined by possible
Industrial Park NE of facility
Summit County Interchange
OutpostDISTRICT 4-PLANNING AMATS PE PE Engr $70,000 $112,510 $182,510 $1,012,510 2018 LBP7 State Facility Renovation 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 97165SUM CR 11 (Home
Avenue)SUM
Replace Home Avenue bridge over Little
Cuyahoga River, includes replacing
substructure and superstructure and
reconstructing approach roadway.
SUM Home Avenue Bridge
over Little Cuyahoga River
SUMMIT COUNTY
ENGINEERAMATS CO CO Contr $1,152,371 $0 $1,602,899 $1,680,184 2018 4B87 Federal Bridge Replacement L1CE Bridge 0
Air Quality
Exempt16
FHWA 4 97165 CO CO Contr $288,093 2018 LNTP Local Match LNTP Local Match 16
FHWA 4 97165 CO CO Engr $129,948 2018 4B87 Federal L1CE Bridge 16
FHWA 4 97165 CO CO Engr $32,487 2018 LNTP Local Match LNTP Local Match 16
FHWA 4 98378 POR SR 0043 18.86 PORResurfacing POR 43 18.86 to 20.70, urban
paving in the City of Streetsboro.POR 43 18.86 to 20.70 DISTRICT 4-PLANNING AMATS CO CO Contr $360,000 $0 $468,000 $481,510 2020 4PF7 Federal Mill and Fill Z001 National Hwy Performance Prgm 1.84
Air Quality
Exempt32
FHWA 4 98378 CO CO Contr $90,000 2020 4BG7 Local Match 002 Local Match 32
FHWA 4 98378 CO CO Engr $14,400 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98378 CO CO Engr $3,600 2020 LABR Local Match 002 Labor - Local Match 32
FHWA 4 98475SUM SR 18/VAR
13.19/VARSUM
Resurfacing SUM SR 18 13.41 to 14.56, SUM SR
241 10.41 to 11.21 and 11.68 to 12.05, SUM SR
261 5.70 to 6.05 and 8.11 to 8.91, Minor Bridge
work to SFN 7708335 SUM-SR 18-13.31 over
Little Cuyahoga River, SFN 7709315 SUM-SR
241-11.72 over Little Cuyahoga Ri
SUM SR 18 13.41, SUM SR 241
10.41, SUM SR 261 5.70,DISTRICT 4-PLANNING AMATS CO CO Contr $581,280 $0 $2,460,728 $2,603,418 2020 4PF7 Federal Mill and Fill Z240 STBG 3.47
Air Quality
Exempt32
FHWA 4 98475 CO CO Contr $145,320 2020 4BG7 Local Match 002 Local Match 32
FHWA 4 98475 CO CO Contr $143,292 2020 4PF7 Federal Z240 STBG 32
FHWA 4 98475 CO CO Contr $35,823 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 98475 CO CO Contr $1,098,720 2020 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98475 CO CO Contr $274,680 2020 4BG7 Local Match 002 Local Match 32
FHWA 4 98475 CO CO Contr $79,308 2020 4PF7 Federal Z240 STBG 32
FHWA 4 98475 CO CO Contr $19,827 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 98475 CO CO Engr $5,552 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98475 CO CO Engr $1,388 2020 LABR State 002 Labor - State Match 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 5 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 98475 CO CO Engr $32,960 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98475 CO CO Engr $8,240 2020 LABR Local Match 002 Labor - Local Match 32
FHWA 4 98475 CO CO Engr $10,030 2020 LABR Federal Z240 STBG 32
FHWA 4 98475 CO CO Engr $2,508 2020 LABR State 002 Labor - State Match 32
FHWA 4 98475 CO CO Engr $17,440 2020 LABR Federal Z240 STBG 32
FHWA 4 98475 CO CO Engr $4,360 2020 LABR Local Match 002 Labor - Local Match 32
FHWA 4 98482 SUM SR 0619 00.00 SUM
Resurfacing of SUM SR 619 from 0.00 to 1.79
urban paving within the City of Barberton.
Minor work to SFN 7705581 SUM-IR 76-6.15,
SFN 7711026 SUM-619-0.12 and 7711034 SUM-
619-0.81. Unknown abandoned railroad on SR
619 at 0.75, CSX railroad on SR 619 at 0.
State Route 619 in the City of
BarbertonDISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $535,000 $621,820 2019 4BG7 Local Match Mill and Fill 002 Local Match 1.79
Air Quality
ExemptMissing
FHWA 4 98482 CO CO Engr $35,000 2019 LABR Local Match 002 Labor - Local Match Missing
FHWA 4 98486SUM US 0224
11.33/14.35SUM
Resurfacing SUM US 224 11.33 to 12.71 and
14.35 to 16.07, Minor Bridge work to SFN
7707819 SUM-US 224-11.35 over Metro RTA
Railroad, SFN 7707843 SUM-US 224-11.55 over
Ramp A, SFN 7707894 SUM-US 224-14.10 over
Springfield Lake Outlet, SFN 7707924 SUM-US
22
SUM US 224 11.33 to 12.71
and 14.35 to 16.07, bridges at
SLM 11.35, 11.55, 14.10, 14.21
DISTRICT 4-PLANNING AMATS CO CO Contr $758,400 $0 $2,338,848 $2,474,608 2020 4PF7 Federal Mill and Fill Z001 National Hwy Performance Prgm 2.03Air Quality
Exempt32
FHWA 4 98486 CO CO Contr $189,600 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 98486 CO CO Contr $123,744 2020 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98486 CO CO Contr $30,936 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 98486 CO CO Contr $928,000 2020 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98486 CO CO Contr $232,000 2020 4BG7 Local Match 002 Local Match 32
FHWA 4 98486 CO CO Engr $27,840 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98486 CO CO Engr $6,960 2020 LABR Local Match 002 Labor - Local Match 32
FHWA 4 98486 CO CO Engr $22,752 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98486 CO CO Engr $5,688 2020 LABR State 002 Labor - State Match 32
FHWA 4 98486 CO CO Engr $10,342 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 98486 CO CO Engr $2,586 2020 LABR State 002 Labor - State Match 32
FHWA 4 99847SUM SR 0008 Noise
WallSUM
Construction of noise wall on the Western side
of State Route 8 between Hampshire Road and
Treeside Drive in the City of Stow, Summit
County, Ohio.
Hampshire Road to Treeside
DriveDISTRICT 4-PLANNING AMATS PE PE Engr $2,614 $198,829 $201,443 $201,443 2018 4PS7 State Noise Wall 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 99881SUM Boston Mills
Rd Phase 1SUM
Widen and resurface Boston Mills Road from
1,000 ft west of Riverview Road to Riverview
Road. Improvements include pavement milling
and resurfacing, base repairs, excavation of
adjacent slopes to provide wider shoulders for
traffic and pedestrians, new pa
1,000ft west of Riverview Road
to Riverview Road
SUMMIT COUNTY
ENGINEERAMATS CO CO Engr $50,000 $294,000 $764,171 $786,171 2018 LNTP Local Match Minor Widening LNTP Local Match 0.19
Air Quality
Exempt30
FHWA 4 100146
Coventry Twp
Summit Cty Sign
Gra
SUMUpgrading of township signage to enhance
safety on high crash roads.
Coventry Twp Summit Cty Sign
Grants
ODOT SPONSORING
AGENCYAMATS CO CO Mtrls $31,055 $0 $31,055 $31,055 2018 4HJ7 Federal Signs MS3E Highway Safety Imp Prog 0
Air Quality
Exempt15
FHWA 4 100742 POR SR 0044 14.86 POR
Construction of a Northbound left turn lane on
State Route 44 at Enterprise Parkway
Intersection. Upgrade the signal at State Route
44 and State Route 14. Adjust driveways at gas
station. In the City of Ravenna, Portage County,
Ohio.
POR-SR44 at Enterprise
ParkwayRavenna, City of AMATS PE Env PE $43,187 $325,781 $373,766 $882,651 2018 4HJ7 Federal Turn Lane Addition MS3E Highway Safety Imp Prog 0.13
Air Quality
Exempt15,32
FHWA 4 100742 PE Env PE $4,799 2018 4BC7 State 002 State Funds (002) 15,32
FHWA 4 100957 POR SR 0005 00.55 POR
Fine graded polymer AC Overlay to POR SR 5
from 0.55 to 5.09. Norfolk Southern active
railroad and unknown abandoned railroad on
SR 5 at 1.75, unknown abandoned railroad on
SR 5 at 3.30, CSX active railroad on SR 5 at 3.6,
POR SR 5 from 0.55 to 5.09 DISTRICT 4-PLANNING AMATS CO CO Contr $1,000,000 $0 $1,287,500 $1,325,010 2020 4PF7 Federal Preventive Maintenance Z001 National Hwy Performance Prgm 4.49Air Quality
Exempt32
FHWA 4 100957 CO CO Contr $250,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 100957 CO CO Engr $30,000 2020 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 100957 CO CO Engr $7,500 2020 LABR State 002 Labor - State Match 32
FHWA 4 100963 D04 CHIP FY2020 D04
Chip sealing the following locations; POR SR
305 from 0.48 to 5.65 and POR SR 305D from
0.00 to 0.09.
POR SR 305 0.48 to 5.65 and SR
305D 0.00 to 0.09DISTRICT 4-PLANNING AMATS CO CO Contr $80,000 $0 $291,200 $305,200 2020 4PF7 Federal Chip Seal Z231 STBG 5.26
Air Quality
Exempt32
FHWA 4 100963 CO CO Contr $20,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 100963 CO CO Contr $80,000 2020 4PF7 Federal Z232 STBG 32
FHWA 4 100963 CO CO Contr $20,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 100963 CO CO Contr $64,000 2020 4PF7 Federal Z231 STBG 32
FHWA 4 100963 CO CO Contr $16,000 2020 4PS7 State 002 State Funds (002) 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 6 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 100963 CO CO Engr $3,200 2020 LABR Federal Z231 STBG 32
FHWA 4 100963 CO CO Engr $800 2020 LABR State 002 Labor - State Match 32
FHWA 4 100963 CO CO Engr $2,560 2020 LABR Federal Z231 STBG 32
FHWA 4 100963 CO CO Engr $640 2020 LABR State 002 Labor - State Match 32
FHWA 4 100963 CO CO Engr $3,200 2020 LABR Federal Z232 STBG 32
FHWA 4 100963 CO CO Engr $800 2020 LABR State 002 Labor - State Match 32
FHWA 4 101060 POR SR 0044 15.10 PORFine graded polymer AC overlay to POR SR 44
from 15.10 to 16.48.POR SR 44 from 15.10 to 16.48 DISTRICT 4-PLANNING AMATS CO CO Contr $21,600 $0 $234,000 $240,750 2020 4PF7 Federal Preventive Maintenance Z240 STBG 1.45
Air Quality
Exempt32
FHWA 4 101060 CO CO Contr $5,400 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 101060 CO CO Contr $158,400 2020 4PF7 Federal Z232 STBG 32
FHWA 4 101060 CO CO Contr $39,600 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 101060 CO CO Engr $880 2020 LABR Federal Z240 STBG 32
FHWA 4 101060 CO CO Engr $220 2020 LABR State 002 Labor - State Match 32
FHWA 4 101060 CO CO Engr $6,320 2020 LABR Federal Z232 STBG 32
FHWA 4 101060 CO CO Engr $1,580 2020 LABR State 002 Labor - State Match 32
FHWA 4 101077 POR IR 0076 00.00 PORConcrete Pavement Repair on POR IR 76 0.00 to
1.57.POR IR 76 0.00 to 1.57 DISTRICT 4-PLANNING AMATS CO CO Contr $315,000 $0 $364,000 $374,510 2021 4PF7 Federal Preventive Maintenance Z001 National Hwy Performance Prgm 1.57
Air Quality
Exempt32
FHWA 4 101077 CO CO Contr $35,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 101077 CO CO Engr $12,600 2021 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101077 CO CO Engr $1,400 2021 LABR State 002 Labor - State Match 32
FHWA 4 101253SUM Akron SRTS
InfrastructureSUM
Signing and striping upgrades to improve
visability of crosswalks.
Various Locations throughout
AkronAkron, City of AMATS CO CO Contr $355,194 $0 $434,661 $443,161 2018 4HJ7 Federal Pavement Marking ZS30 Highway Safety Imp Prog 0
Air Quality
Exempt15
FHWA 4 101253 CO CO Contr $39,466 2018 4BC7 State 002 State Funds (002) 15
FHWA 4 101253 CO CO Engr $4,806 2018 4HJ7 Federal ZS30 Highway Safety Imp Prog 15
FHWA 4 101253 CO CO Engr $534 2018 4BC7 State 002 State Funds (002) 15
FHWA 4 101253 CO CO Engr $34,661 2018 LNTP Local Match LNTP Local Match 15
FHWA 4 101264 SUM SR 0018 07.47 SUMResurfacing SUM-SR 18-7.47 to 9.70, urban
paving in the City of Akron.SUM SR 18 7.47 to 9.70 DISTRICT 4-PLANNING AMATS CO CO Contr $720,000 $0 $936,000 $990,000 2021 4PF7 Federal Mill and Fill Z001 National Hwy Performance Prgm 2.23
Air Quality
Exempt32
FHWA 4 101264 CO CO Contr $180,000 2021 4BG7 Local Match 002 Local Match 32
FHWA 4 101264 CO CO Engr $28,800 2021 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101264 CO CO Engr $7,200 2021 LABR Local Match 002 Labor - Local Match 32
FHWA 4 101270POR 43/43D/59
11.42/12.19/0.00POR
Resurfacing POR SR 43 from 11.42 to 11.66 and
12.19 to 13.21, POR 43D 0.53 to 0.62, POR SR
59 0.00 to 1.51, urban paving in the City of
Kent. Includes minor bridge work to 2
structures.
POR SR 43 from 11.42 to 11.66
and 12.19 to 13.21, POR 43D
0.53 to 0.62, POR SR 59 0.00 to
1.51.
DISTRICT 4-PLANNING AMATS CO CO Contr $960,000 $0 $1,503,500 $1,575,500 2021 4PF7 Federal Mill and Fill Z001 National Hwy Performance Prgm 2.34Air Quality
Exempt32
FHWA 4 101270 CO CO Contr $240,000 2021 4BG7 Local Match 002 Local Match 32
FHWA 4 101270 CO CO Contr $200,000 2021 4PF7 Federal Un-Assigned Federal 32
FHWA 4 101270 CO CO Contr $50,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 101270 CO CO Engr $28,800 2021 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101270 CO CO Engr $7,200 2021 LABR Local Match 002 Labor - Local Match 32
FHWA 4 101270 CO CO Engr $14,000 2021 LABR Federal Un-Assigned Federal Labor 32
FHWA 4 101270 CO CO Engr $3,500 2021 LABR State 002 Labor - State Match 32
FHWA 4 101376D04 BH FY 2018
(West)D04
Bridge maintenance throughout Summit
County.
Various structures in SUM
County.DISTRICT 4-PLANNING AMATS CO CO Contr $369,600 $0 $1,659,600 $1,745,659 2018 4PF7 Federal Bridge Maintenance Z001 National Hwy Performance Prgm 0
Air Quality
Exempt32
FHWA 4 101376 CO CO Contr $92,400 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 101376 CO CO Contr $826,200 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101376 CO CO Contr $91,800 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 101376 CO CO Contr $31,410 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101376 CO CO Contr $3,490 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 101376 CO CO Contr $30,880 2018 4PF7 Federal Z232 STBG 32
FHWA 4 101376 CO CO Contr $7,720 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 101376 CO CO Contr $77,200 2018 4PF7 Federal Z240 STBG 32
FHWA 4 101376 CO CO Contr $19,300 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 101376 CO CO Engr $2,160 2018 LABR Federal Z232 STBG 32
FHWA 4 101376 CO CO Engr $540 2018 LABR State 002 Labor - State Match 32
FHWA 4 101376 CO CO Engr $25,840 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101376 CO CO Engr $6,460 2018 LABR State 002 Labor - State Match 32
FHWA 4 101376 CO CO Engr $3,150 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101376 CO CO Engr $350 2018 LABR State 002 Labor - State Match 32
FHWA 4 101376 CO CO Engr $57,870 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 101376 CO CO Engr $6,430 2018 LABR State 002 Labor - State Match 32
FHWA 4 101376 CO CO Engr $5,440 2018 LABR Federal Z240 STBG 32
FHWA 4 101376 CO CO Engr $1,360 2018 LABR State 002 Labor - State Match 32
FHWA 4 101378D04 BH FY2020
(West)D04
Bridge maintenance on structures located on
various routes within POR, STA and SUM
Counties.
Various locations in POR, STA
and SUM CountiesDISTRICT 4-PLANNING AMATS CO CO Contr $240,000 $0 $330,000 $366,000 2020 4PF7 Federal Bridge Maintenance Un-Assigned Federal 0
Air Quality
Exempt32
FHWA 4 101378 CO CO Contr $60,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 101378 CO CO Engr $24,000 2020 LABR Federal Un-Assigned Federal Labor 32
FHWA 4 101378 CO CO Engr $6,000 2020 LABR State 002 Labor - State Match 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 7 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 101380D04 BH FY2021
(West)D04
Bridge maintenance on structures located on
various routes within POR, STA and SUM
Counties.
Various structures within POR,
STA and SUM Counties.DISTRICT 4-PLANNING AMATS CO CO Contr $2,000,000 $0 $2,675,000 $2,740,000 2021 4PF7 Federal Bridge Maintenance Un-Assigned Federal 0
Air Quality
Exempt32
FHWA 4 101380 CO CO Contr $500,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 101380 CO CO Engr $140,000 2021 LABR Federal Un-Assigned Federal Labor 32
FHWA 4 101380 CO CO Engr $35,000 2021 LABR State 002 Labor - State Match 32
FHWA 4 101572POR/SUM Culverts
FY2019POR
Replace culvert at CFN 677000055 POR-SR 700-
1.01, CFN 770773150 SUM-RA77110-0.13, CFN
TBD SUM-91/480-0.00.
POR-SR 700-1.01, SUM-
RA77110-0.13, SUM-91/480-
0.00
DISTRICT 4-PLANNING AMATS CO CO Contr $400,000 $0 $440,000 $571,578 2019 4PS7 State
Culvert
Construction/Reconstr/Repa
ir
002 State Funds (002) 0Air Quality
Exempt32
FHWA 4 101572 CO CO Engr $40,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 101636SUM Valley View
Detention PondSUM
Construct 2-3 ac ft detention pond on the north
side of I-80, south of Valley View Road and west
of SR 91 to aid in intercepting runoff from the
turnpike. Project includes easement and/or
property acquisition, earthwork, outlet
structure and restoration.
Valley View Road approx 1300
west of SR 91Hudson, City of AMATS CO CO Contr $284,000 $0 $309,000 $326,040 2020 4TN7 State Drainage Improvement 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 101636 CO CO Engr $25,000 2020 LNTP Local Match LNTP Local Match 99
FHWA 4 101721SUM Greensburg
Salt Dome Re-RoofSUM Re-roofing SUM Greensburg Salt Dome. SUM Greensburg Salt Dome DISTRICT 4-HMA AMATS OTH Oth Remb $720 $0 $720 $33,685 2018 LBM7 State Salt Dome 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 101828SUM Columbia Rd
(Richfield)SUM
Roadway improvements to Columbia Road,
upgrade existing signal, realignment of private
drive, and partial depth repairs on Columbia
Road, in the Village of Richfield, Summit
County, Ohio.
Columbia Road DISTRICT 4-PLANNING AMATS CO CO Engr $25,000 $544,660 $599,130 $726,460 2018 LABR State Mill and Fill 002 Labor - State Match 0.3Air Quality
Exempt99
FHWA 4 101828 CO CO Engr $29,470 2018 LABR Local Match 002 Labor - Local Match 99
FHWA 4 101907 POR Bryant Road PORPavement improvement to POR Bryant Road in
Windham Township.POR Bryant Road
Windham, Township of
(Portage County)AMATS CO CO Engr $3,000 $54,539 $57,539 $67,539 2018 4TN7 State Mill and Fill 002 State Funds (002) 1.83
Air Quality
Exempt99
FHWA 4 101908POR North Main
Street (CR 299)POR
Drainage improvements to North Main Street
under the Ohio Turnpike in the Village of
Windham.
POR North Main Street Windham, Village of AMATS CO CO Engr $28,171 $344,359 $372,530 $502,465 2018 4TN7 State Drainage Improvement 002 State Funds (002) 0.86Air Quality
Exempt99
FHWA 4 101977 POR SR 0014 18.06 POR
Intersection improvement at POR SR 14 and
Tallmadge Road. Includes adding left turn
lanes, signal replacement, curbing and radius
improvements on NW and SE corners and
access management improvements.
POR SR 14 at Tallmadge Rd (CR
18)DISTRICT 4-PLANNING AMATS CO CO Contr $1,089,000 $0 $1,294,700 $1,662,607 2018 4HJ7 Federal Intersection Improvement ZS30 Highway Safety Imp Prog 0.13
Air Quality
Exempt15,32
FHWA 4 101977 CO CO Contr $121,000 2018 4BC7 State 002 State Funds (002) 15,32
FHWA 4 101977 CO CO Engr $76,230 2018 LABR Federal ZS30 Highway Safety Imp Prog 15,32
FHWA 4 101977 CO CO Engr $8,470 2018 LABR State 002 Labor - State Match 15,32
FHWA 4 101977 POR SR 0014 18.06 POR
Intersection improvement at POR SR 14 and
Tallmadge Road. Includes adding left turn
lanes, signal replacement, curbing and radius
improvements on NW and SE corners and
access management improvements.
POR SR 14 at Tallmadge Rd (CR
18)DISTRICT 4-PLANNING AMATS RW Acquis $56,940 $45,628 $102,568 $1,662,607 2018 4BC7 State Intersection Improvement 002 State Funds (002) 0.13
Air Quality
Exempt15,32
FHWA 4 102204 POR SR 0044 07.71 POR
Widen to install a southbound right turn
storage lane at SR 44/Tallmadge Rd (CR 18)
intersection. Includes signal
replacement/upgrade, restriping the existing
SB left turn lane to increase storage length and
access management.
SR 44 at Tallmadge Road DISTRICT 4-PLANNING AMATS CO CO Contr $441,000 $0 $509,600 $1,376,531 2019 4HJ7 Federal Turn Lane Addition ZS30 Highway Safety Imp Prog 0.2Air Quality
Exempt15,32
FHWA 4 102204 CO CO Contr $49,000 2019 4BC7 State 002 State Funds (002) 15,32
FHWA 4 102204 CO CO Engr $17,640 2019 LABR Federal ZS30 Highway Safety Imp Prog 15,32
FHWA 4 102204 CO CO Engr $1,960 2019 LABR State 002 Labor - State Match 15,32
FHWA 4 102351POR MCRO
FY2021(B)POR
Microsurfacing of POR US 224 from 20.2 to
21.22, POR SR 225 from 10.74 to 15.76, and
MAH US 224 from 0.00 to 1.24.
MAH US 224 0.00 to 1.24, POR
US 224 20.2 to 21.22, POR SR
225 10.74 to 15.76
DISTRICT 4-PLANNING AMATS CO CO Contr $560,000 $0 $728,000 $749,000 2021 4PF7 Federal Preventive Maintenance Z232 STBG 7.24Air Quality
Exempt32
FHWA 4 102351 CO CO Contr $140,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 102351 CO CO Engr $22,400 2021 LABR Federal Z232 STBG 32
FHWA 4 102351 CO CO Engr $5,600 2021 LABR State 002 Labor - State Match 32
FHWA 4 102352POR MCRO
FY2018(B)POR
Double Microsurfacing of POR SR 43 from 7.51
to 8.15 and 8.50 to 10.23Microsurfacing of POR
SR 59 from 5.87 to 6.84 and POR SR 261 from
3.51 to 5.06.
POR SR 43 from 7.51 to 8.15
and 8.50 to 10.23, POR SR 59
from 5.87 to 6.84 and POR SR
261 from 3.51 to 5.06
DISTRICT 4-PLANNING AMATS CO CO Contr $95,760 $0 $941,200 $965,950 2018 4PF7 Federal Preventive Maintenance Z001 National Hwy Performance Prgm 4.89Air Quality
Exempt32
FHWA 4 102352 CO CO Contr $23,940 2018 4BG7 Local Match 002 Local Match 32
FHWA 4 102352 CO CO Contr $628,240 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 8 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 102352 CO CO Contr $157,060 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 102352 CO CO Engr $3,840 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 102352 CO CO Engr $960 2018 LABR Local Match 002 Labor - Local Match 32
FHWA 4 102352 CO CO Engr $25,120 2018 LABR Federal Z001 National Hwy Performance Prgm 32
FHWA 4 102352 CO CO Engr $6,280 2018 LABR State 002 Labor - State Match 32
FHWA 4 102392POR US 224/224D
13.51/0.00POR
Resurfacing of POR US 224 from 13.51 to 18.35,
POR US 422D from 0.00 to 0.08Fine graded
polymer AC overlay to POR US 224 from 18.35
to 18.67.
POR US 224 from 13.51 to
18.67, POR US 224D from 0.00
to 0.08
DISTRICT 4-PLANNING AMATS CO CO Contr $1,440,000 $0 $1,854,000 $1,908,000 2020 4PF7 FederalMinor Rehabilitation -
Pavement Gnrl SysZ232 STBG 5.24
Air Quality
Exempt32
FHWA 4 102392 CO CO Contr $360,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 102392 CO CO Engr $43,200 2020 LABR Federal Z232 STBG 32
FHWA 4 102392 CO CO Engr $10,800 2020 LABR State 002 Labor - State Match 32
FHWA 4 102396SUM SR 162
(0.00)(2.42)SUM
Fine polymer AC overlay to SUM SR 162 0.00 to
2.21 and 2.42 to 5.62.Includes resurfacing SUM
IR 271 NB and SB rest areas.
SUM SR 162 0.00 to 2.21 and
2.42 to 5.62, SUM IR 271 Rest
Areas
DISTRICT 4-PLANNING AMATS CO CO Contr $225,254 $1,085,225 $1,342,944 $1,377,594 2018 4BR7 StateMinor Rehabilitation -
Pavement Gnrl Sys002 State Funds (002) 5.41
Air Quality
Exempt32,99
FHWA 4 102396 CO CO Engr $6,756 2018 LABR State 002 Labor - State Match 32,99
FHWA 4 102591FACD04 SUM FS
SecuritySUM
Access control/intrusion and CCTV, fencing and
Autogate.SUM Boston Heights DISTRICT 4-PLANNING AMATS CO CO Contr $180,000 $0 $180,000 $180,000 2018 LBP7 State Buildings - Mix Shed,etc. 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 102727SUM Republic Serv
DERG VehiclesSUM
Purchase 7 new CNG powered refuse hauler
trucks to replace 7 model year 2009 diesel
powered trucks. Project funding reflects the
cost differential between the CNG-AFVs and
standard diesel vehicles. This is a PPP project
with the OEPA serving as the publi
0 Akron, City of AMATS CO Oth Remb $176,255 $0 $235,007 $235,007 2018 4NG5 Federal Diesel Emission Reduction Z003 CMAQ 0Air Quality
Exempt27
FHWA 4 102727 CO Oth Remb $58,752 2018 LNTP Local Match LNTP Local Match 27
FHWA 4 102728SUM Republic
Services DERG CNGSUM
Construction of a CNG refueling facility at
Republic Services' facility at 964 Hazel St.,
Akron, OH. This is a PPP project with the OEPA
serving as the public sponsor.
0 Akron, City of AMATS CO Oth Remb $1,140,000 $0 $1,900,000 $1,900,000 2018 LNTP Local Match Diesel Emission Reduction LNTP Local Match 0Air Quality
Exempt27
FHWA 4 102728 CO Oth Remb $760,000 2018 4NG5 Federal Z003 CMAQ 27
FHWA 4 102759SUM SR 0091 00.29
(Study)SUM
Drainage study on SUM SR 91 from Farmdale
Road (0.29) to Akron South Corp Limit (0.72).
Farmdale Road to Akron South
Corp LimitDISTRICT 4-PLANNING AMATS PE PE Engr $5,000 $54,763 $59,763 $59,763 2018 4PS7 State Studies 002 State Funds (002) 0.43
Air Quality
Exempt32
FHWA 4 102858POR IR 0076
16.58/21.18POR
Deck Replacements to SFN 6702880 POR-76-
16.58 and SFN 6703216 POR-76-21.18.POR 76 16.58 and 21.18
DISTRICT 4
PRODUCTIONAMATS PE Dtl Dsgn $46,310 $485,236 $536,691 $3,211,691 2019 4PF7 Federal Bridge Deck Replacement Z001 National Hwy Performance Prgm 0
Air Quality
Exempt32
FHWA 4 102858 PE Dtl Dsgn $5,146 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103201POR IR 0076 19.90
SlidePOR
Slide repair (benching and drainage) along IR-
76 at Westbound SLM 19.90, in Palmyra
Township, Portage County, Ohio.
POR IR76 19.90 DISTRICT 4-PLANNING AMATS CO CO Contr $540,000 $0 $660,000 $838,177 2019 4SF7 Federal Slide Repair Z001 National Hwy Performance Prgm 0.5Air Quality
Exempt11,32
FHWA 4 103201 CO CO Contr $60,000 2019 4SS7 State 002 State Funds (002) 11,32
FHWA 4 103201 CO CO Engr $54,000 2019 LABR Federal Z001 National Hwy Performance Prgm 11,32
FHWA 4 103201 CO CO Engr $6,000 2019 LABR State 002 Labor - State Match 11,32
FHWA 4 103282POR SR 88/303
0.00/VARPOR
Part 1: Resurfacing POR SR 88 from 0.00 to
4.02, minor Bridge Work on SFN 6703534 POR
SR 88 1.63 over Harmon Creek; Resurfacing
POR SR 303 17.77 to 20.63, Minor Bridge Work
on SFN 6704506 POR SR 303 over Branch of
Eagle Creek.Part 2: Structure Replacement
State Route 88 and State R303
Various locations in Portage
County.
DISTRICT 4
PRODUCTIONAMATS CO CO Contr $340,000 $0 $2,816,000 $3,169,337 2019 4PF7 Federal
Minor Rehabilitation -
Pavement Gnrl SysUn-Assigned Federal 6.89
Air Quality
Exempt32
FHWA 4 103282 CO CO Contr $85,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103282 CO CO Contr $372,800 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 4 103282 CO CO Contr $93,200 2019 4BG7 Local Match 002 Local Match 32
FHWA 4 103282 CO CO Contr $1,226,200 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 4 103282 CO CO Contr $306,550 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103282 CO CO Contr $233,000 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 4 103282 CO CO Contr $58,250 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103282 CO CO Contr $800 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 4 103282 CO CO Contr $200 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103282 CO CO Contr $44,000 2019 4PF7 Federal Un-Assigned Federal 32
FHWA 4 103282 CO CO Contr $11,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103282 CO CO Engr $40,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 103282 CO CO Engr $5,000 2019 4PS7 State 002 State Funds (002) 32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 9 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 103282POR SR 88/303
0.00/VARPOR
Part 1: Resurfacing POR SR 88 from 0.00 to
4.02, minor Bridge Work on SFN 6703534 POR
SR 88 1.63 over Harmon Creek; Resurfacing
POR SR 303 17.77 to 20.63, Minor Bridge Work
on SFN 6704506 POR SR 303 over Branch of
Eagle Creek.Part 2: Structure Replacement
State Route 88 and State R303
Various locations in Portage
County.
DISTRICT 4
PRODUCTIONAMATS RW Acquis $25,000 $0 $25,000 $3,169,337 2018 4PS7 State
Minor Rehabilitation -
Pavement Gnrl Sys002 State Funds (002) 6.89
Air Quality
Exempt32
FHWA 4 103430D04 GR FY2019B
(Systematic)D04
Systematic Guardrail maintenance and repair
on various routes throughout District Four.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $825,000 $847,480 2019 7BPB Bonds
Guardrail
Maintenance/Repair (NEW)042 State Bonds 0
Air Quality
Exempt32
FHWA 4 103430 CO CO Contr $250,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 103430 CO CO Engr $75,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 103431D04 GR FY2020
(Systematic)D04
Systematic Guardrail maintenance and repair
on various routes throughout District Four.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $550,000 $565,000 2020 4CP7 State
Guardrail
Maintenance/Repair (NEW)002 State Funds (002) 0
Air Quality
Exempt12
FHWA 4 103431 CO CO Engr $50,000 2020 LABR State 002 Labor - State Match 12
FHWA 4 103432D04 GR FY2021
(Systematic)D04
Systematic Guardrail maintenance and repair
on various routes throughout District Four.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $550,000 $565,000 2021 4CP7 State
Guardrail
Maintenance/Repair (NEW)002 State Funds (002) 0
Air Quality
Exempt12
FHWA 4 103432 CO CO Engr $50,000 2021 LABR State 002 Labor - State Match 12
FHWA 4 103548FACD04 D04 Fuel
Tanks RepaintD04
Soda blast and repaint above ground fuel tanks
at 10 sites throughout District 4.Districtwide
DISTRICT 4-
MAINTENANCEAMATS OTH Oth Remb $80,000 $0 $80,000 $80,000 2018 LBM7 State Site Maintenance 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 103551FACD04 SUM IE
Automatic GateSUM
Summit County Interchange Outpost remove
existing gate and replace with automatic gate
located further back from the road.
SUM Interchange Outpost DISTRICT 4-HMA AMATS OTH Oth Remb $25,000 $0 $25,000 $25,000 2018 LBM7 State Outpost 002 State Funds (002) 0Air Quality
Exempt99
FHWA 4 103553FACD04 SUM TG
RoofSUM
Summit County Twinsburg Outpost re-roof
outpost with DuroLast.SUM Twinsburg Outpost DISTRICT 4-HMA AMATS OTH Oth Remb $30,000 $0 $30,000 $30,000 2018 LBM7 State Outpost 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 103554FACD04 SUM TG
Salt Dome RoofSUM
Summit County Twinsburg Outpost salt dome
re-roof with DuroLast.SUM Twinsburg Salt Dome DISTRICT 4-HMA AMATS OTH Oth Remb $40,000 $0 $40,000 $40,000 2018 LBM7 State Salt Dome 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 103564FACD04 POR FS
Brine MakerPOR
Portage county Full Service Facility, install
Penguin brine maker at either Rootstown Yard
or temporary setup at Ravenna.
POR Full Service Facility DISTRICT 4-HMA AMATS OTH Oth Remb $50,000 $0 $50,000 $50,000 2018 LBM7 State Site Maintenance 002 State Funds (002) 0Air Quality
Exempt99
FHWA 4 103747SUM Akron SRTS
2016SUM
Add pedestrian signals with backplates and two
road diets at high priority locations throughout
the Akron Public School District.
Various intersections in the
Akron Public School DistrictAkron, City of AMATS CO CO Contr $360,000 $0 $400,000 $414,400 2019 4HJ7 Federal Signals ZS30 Highway Safety Imp Prog 0
Air Quality
Exempt15
FHWA 4 103747 CO CO Engr $40,000 2019 4HJ7 Federal ZS30 Highway Safety Imp Prog 15
FHWA 4 103930SUM IR 0271 08.85
SlideSUM
Repair 500' slide on southbound SUM-271 at
slm 8.85 and install drainage system.SUM-IR271-8.85 DISTRICT 4-PLANNING AMATS CO CO Contr $1,759,500 $0 $2,092,000 $2,462,361 2020 4SF7 Federal Slide Repair Z001 National Hwy Performance Prgm 0.1
Air Quality
Exempt11,32
FHWA 4 103930 CO CO Contr $195,500 2020 4SS7 State 002 State Funds (002) 11,32
FHWA 4 103930 CO CO Engr $123,300 2020 LABR Federal Z001 National Hwy Performance Prgm 11,32
FHWA 4 103930 CO CO Engr $13,700 2020 LABR State 002 Labor - State Match 11,32
FHWA 4 103941SUM Wooster /
HopocanSUM Intersection upgrade. Wooster Road at Hopocan Barberton, City of AMATS PE Dtl Dsgn $2,600 $0 $13,000 $13,000 2018 4HJ7 Federal Pavement Marking ZS30 Highway Safety Imp Prog 0.03
Air Quality
Exempt15
FHWA 4 103941 PE Env PE $10,400 2018 4HJ7 Federal ZS30 Highway Safety Imp Prog 15
FHWA 4 104718 SUM SR 0091 19.14 SUM
Convert the IR 480/SR 91 interchange to a
diverging diamond interchange (DDI), in the
City of Twinsburg, Summit County, Ohio.
SR 91/IR 480 Interchange Twinsburg, City of AMATS PE Env PE $407,143 $0 $452,381 $452,381 2018 4HJ7 Federal Intersection Improvement ZS30 Highway Safety Imp Prog 0.1Air Quality
Exempt15
FHWA 4 104718 PE Env PE $45,238 2018 LNTP Local Match LNTP Local Match 15
FHWA 4 104757D04 SP FY2018
(West)D04
Spot pavement repairs on various routes
throughout Portage, Stark, and Summit
Counties. Includes minor approach work on 4
structures in Summit County.
POR/STA/SUM Counties DISTRICT 4-PLANNING AMATS CO CO Contr $191,800 $0 $1,321,550 $1,350,660 2018 4PS7 State Mill and Fill 002 State Funds (002) 22.78Air Quality
Exempt32
FHWA 4 104757 CO CO Contr $1,078,200 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 104757 CO CO Engr $19,200 2018 LABR State 002 Labor - State Match 32
FHWA 4 104757 CO CO Engr $32,350 2018 LABR State 002 Labor - State Match 32
FHWA 4 104759D04 PM FY2018
(West)D04
Pavement markings on various routes
throughout Portage, Stark, and Summit
Counties.
POR/STA/SUM Counties DISTRICT 4-PLANNING AMATS CO CO Contr $850,000 $0 $875,500 $920,500 2018 4PS7 State Pavement Marking 002 State Funds (002) 0Air Quality
Exempt32
FHWA 4 104759 CO CO Engr $25,500 2018 LABR State 002 Labor - State Match 32
FHWA 4 104765D04FAC SUM IE
SecuritySUM
Access control/intrusion and CCTV, fencing and
Autogate.
SUM Interchange/Norton
OutpostDISTRICT 4-PLANNING AMATS CO CO Contr $120,000 $0 $120,000 $120,000 2019 LBP7 State Buildings - Mix Shed,etc. 002 State Funds (002) 0
Air Quality
Exempt99
FHWA 4 104766D04 PM FY2018
(WO)D04
Pavement Marking Work Order on various
routes throughout District 4.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $400,000 $0 $416,000 $436,000 2018 4PS7 State Pavement Marking 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 104766 CO CO Engr $16,000 2018 LABR State 002 Labor - State Match 32
FHWA 4 104771 D04 CS FY2018 D04Crack sealing various routes throughout District
4.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $1,000,000 $0 $1,186,200 $1,243,700 2018 7BPB Bonds Crack Seal 042 State Bonds 36.51
Air Quality
Exempt32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 10 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 104771 CO CO Contr $150,000 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 104771 CO CO Engr $36,200 2018 LABR State 002 Labor - State Match 32
FHWA 4 105067
SUM CR 0009
Riverview Rd
Bridge
SUM
Replace Riverview Road (CR-9) bridge over
Furnace Run. Includes new approach slabs,
guardrail, traffic control devices and pavement
markings.
Riverview Rd (CR-9) over
Furnace Run
SUMMIT COUNTY
ENGINEERAMATS CO CO Contr $1,141,920 $0 $1,586,000 $1,643,090 2020 4B87 Federal Bridge Replacement Z240 STBG 0
Air Quality
Exempt16
FHWA 4 105067 CO CO Contr $285,480 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 105067 CO CO Engr $126,880 2020 4B87 Federal Z240 STBG 16
FHWA 4 105067 CO CO Engr $31,720 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 105080SUM IR 76/271
5.50/0.00 SignsSUM
Freeway Systematic sign replacements on SUM-
IR 76 from SR 619 to Main/Broadway
interchange includes lead-in signs at non-SR
interchagnes, SUM-IR 271 from Medina County
Line to Brecksville Road and SR 303 to SR 8.
SUM IR 76 from SR 619 to
Main/Broadway and IR 271
from Medina County to
Brecksville Rd and SR 303 to SR
8
DISTRICT 4-
MAINTENANCEAMATS CO CO Contr $600,000 $0 $660,000 $780,000 2020 4PS7 State Signs 002 State Funds (002) 13.39
Air Quality
Exempt32
FHWA 4 105080 CO CO Engr $60,000 2020 LABR State 002 Labor - State Match 32
FHWA 4 105550POR CR 253 Silica
Sand Rd BridgePOR
Replace Silica Sand Road bridge over Eagle
Creek.
Silica Sand Road over Eagle
Creek
PORTAGE COUNTY
ENGINEERAMATS CO CO Contr $842,175 $0 $985,000 $1,020,460 2021 4B87 Federal Bridge Replacement Z233 Bridge 0
Air Quality
Exempt16
FHWA 4 105550 CO CO Contr $44,325 2021 4BG7 Local Match 002 Local Match 16
FHWA 4 105550 CO CO Engr $93,575 2021 4B87 Federal Z233 Bridge 16
FHWA 4 105550 CO CO Engr $4,925 2021 4BG7 Local Match 002 Local Match 16
FHWA 4 105556POR CR 145
Ravenna Rd BridgePOR
Replacement of Ravenna Rd structure over
Norfolk Southern Railroad.
Ravenna Rd over Norfolk
Southern RR
PORTAGE COUNTY
ENGINEERAMATS CO CO Contr $522,000 $0 $580,000 $600,880 2021 5BP7 Federal Bridge Replacement Z240 STBG 0
Air Quality
Exempt16
FHWA 4 105556 CO CO Engr $58,000 2021 5BP7 Federal Z240 STBG 16
FHWA 4 105860 POR SR 0014 12.96 PORDeck Replacement on SFN 6700691 POR-14-
12.96 over SR 5/SR 44.POR-14-12.96
DISTRICT 4
PRODUCTIONAMATS PE Dtl Dsgn $48,000 $30,000 $430,000 $2,891,000 2020 4PF7 Federal Bridge Deck Replacement Z001 National Hwy Performance Prgm 0
Air Quality
Exempt32
FHWA 4 105860 PE Dtl Dsgn $12,000 2020 4PS7 State 002 State Funds (002) 32
FHWA 4 105860 PE Env PE $272,000 2018 4PF7 Federal Z001 National Hwy Performance Prgm 32
FHWA 4 105860 PE Env PE $68,000 2018 4PS7 State 002 State Funds (002) 32
FHWA 4 105861 SUM IR 0077 22.30 SUM
Superstructure Replacement of SFN 7704046
SUM-77-22.30R and SFN 7704038 SUM 77-
22.30L over State Route 21.
SUM-77-22.30RDISTRICT 4
PRODUCTIONAMATS PE Dtl Dsgn $60,000 $25,000 $425,000 $5,347,000 2021 4PS7 State Bridge Deck Replacement 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 105861 PE Env PE $340,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 105925POR SR 0005 06.57
SlidePOR
Slide correction along POR SR5 6.57, in
Charlestown Township, Portage County, Ohio.POR State Route 5 at SLM 6.57 DISTRICT 4-PLANNING AMATS CO CO Contr $336,000 $0 $462,000 $556,837 2018 4SF7 Federal Slide Repair Z001 National Hwy Performance Prgm 0.03
Air Quality
Exempt11,32
FHWA 4 105925 CO CO Contr $84,000 2018 4SS7 State 002 State Funds (002) 11,32
FHWA 4 105925 CO CO Engr $33,600 2018 LABR Federal Z001 National Hwy Performance Prgm 11,32
FHWA 4 105925 CO CO Engr $8,400 2018 LABR State 002 Labor - State Match 11,32
FHWA 4 106204 D04 LG FY2022 D04
Lighting improvements at the SUM IR 271 Rest
Areas and STA US 30/Raff/Whipple
interchanges.
SUM IR 271 Rest Area, STA US
30/Raff/WhippleDISTRICT 4-PLANNING AMATS PE Dtl Dsgn $7,500 $0 $50,000 $1,120,000 2018 LABR State Lighting Maintenance 002 Labor - State Match 0.95
Air Quality
Exempt32
FHWA 4 106204 PE Env PE $42,500 2018 LABR State 002 Labor - State Match 32
FHWA 4 106291D04 PM FY2019
(West)D04
Pavement markings on various routes
throughout Portage, Stark, and Summit
Counties.
POR/STA/SUM Counties DISTRICT 4-PLANNING AMATS CO CO Contr $1,000,000 $0 $1,030,000 $1,080,000 2019 7BPB Bonds Pavement Marking 042 State Bonds 0Air Quality
Exempt32
FHWA 4 106291 CO CO Engr $30,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 106292D04 PM FY2020
(West)D04
Pavement markings on various routes
throughout Portage, Stark and Summit
Counties.
POR/STA/SUM Counties DISTRICT 4-PLANNING AMATS CO CO Contr $1,000,000 $0 $1,030,000 $1,080,000 2020 4PS7 State Pavement Marking 002 State Funds (002) 0Air Quality
Exempt32
FHWA 4 106292 CO CO Engr $30,000 2020 LABR State 002 Labor - State Match 32
FHWA 4 106293D04 PM FY2021
(West)D04
Pavement markings on various routes
throughout Portage, Stark and Summit
Counties.
POR/STA/SUM Counties DISTRICT 4-PLANNING AMATS CO CO Contr $1,000,000 $0 $1,030,000 $1,080,000 2021 4PS7 State Pavement Marking 002 State Funds (002) 0Air Quality
Exempt32
FHWA 4 106293 CO CO Engr $30,000 2021 LABR State 002 Labor - State Match 32
FHWA 4 106298D04 PM FY2019
(WO)D04
Pavement marking Work Order on various
routes throughout District 4.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $520,000 $545,000 2019 7BPB Bonds Pavement Marking 042 State Bonds 0
Air Quality
Exempt32
FHWA 4 106298 CO CO Engr $20,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 106299D04 PM FY2020
(WO)D04
Pavement marking Work Order on various
routes throughout District 4.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $520,000 $545,000 2020 4PS7 State Pavement Marking 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 106299 CO CO Engr $20,000 2020 LABR State 002 Labor - State Match 32
FHWA 4 106300D04 PM FY2021
(WO)D04
Pavement marking Work Order on various
routes throughout District 4.Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $520,000 $545,000 2021 4PS7 State Pavement Marking 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 106300 CO CO Engr $20,000 2021 LABR State 002 Labor - State Match 32
FHWA 4 106304 D04 RPM FY2019 D04Install raised pavement markers along various
routes throughout District 4.Districtwide DISTRICT 4-HMA AMATS CO CO Contr $150,000 $0 $165,000 $172,510 2019 4PS7 State Raised Pavement Markers 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 106304 CO CO Engr $15,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 106305 D04 RPM FY2020 D04Install raised pavement markers along various
routes throughout District 4.Districtwide DISTRICT 4-HMA AMATS CO CO Contr $200,000 $0 $220,000 $230,000 2020 4PS7 State Raised Pavement Markers 002 State Funds (002) 0
Air Quality
Exempt32
Appendix 5: 2018-2021 STIP SLI Grouped Project Report Page 11 of 447
2018-2021 STIP SLI Grouped Project Report as of 02/10/2018 $3,731,193,094Note: SLI Grouped Project Report is a fluid list used to identify the projects programmed as part of the SLI Grouped Project List. * Includes all future SFYs and uncmmitted funding.
Agency Dist PIDProject Name (ie
CRS)Cnty Project Description Project Termini Sponsoring Agency
MPO/RTP
O/Large
City
Ph SubphaseSTIP
Phase Estimate
Total
Phase
Encumbered
STIP
Phase
Total
*Project
TotalSFY SAC
Fund Type
(F, S, B, O)Primary Work Category
Oblig.
CodeObligation Description
SLM
Miles
Air Quality
Status
SLI Ref
ID
FHWA 4 106305 CO CO Engr $20,000 2020 LABR State 002 Labor - State Match 32
FHWA 4 106306 D04 RPM FY2021 D04Install raised pavement markers along various
routes throughout District 4.Districtwide DISTRICT 4-HMA AMATS CO CO Contr $200,000 $0 $220,000 $230,000 2021 4PS7 State Raised Pavement Markers 002 State Funds (002) 0
Air Quality
Exempt32
FHWA 4 106306 CO CO Engr $20,000 2021 LABR State 002 Labor - State Match 32
FHWA 4 106317 D04 CS FY2019 D04
Crack sealing various routes throughout District
4. rail crossing #262546J at 4.2, unknown
abandoned railroad on US 62 at 4.25
Districtwide DISTRICT 4-PLANNING AMATS CO CO Contr $500,000 $0 $520,000 $545,000 2019 7BPB Bonds Crack Seal 042 State Bonds 1.99Air Quality
Exempt32
FHWA 4 106317 CO CO Engr $20,000 2019 LABR State 002 Labor - State Match 32
FHWA 4 106410SUM Akron SRTS
Non-Inf #17SUM
District SRTS coordinator and project staff
funding.Akron Schools Akron, City of AMATS OTH Oth Remb $60,000 $0 $60,000 $60,000 2021 4SC7 Federal S.R.T.S School Travel Plan Z300 TAP/Safe Routes to School 0.01
Air Quality
Exempt24
FHWA 4 106625SUM MetroParks
Nimisila LotsSUM
Resurfacing of the Nimisila parking lots in the
Summit MetroParks District, in Summit County,
Ohio.
Nimisila Parking LotsMetroparks Serving
Summit CountyAMATS CO CO Engr $11,000 $280,013 $291,201 $306,111 2018 LNTP Local Match Parks LNTP Local Match 0
Air Quality
Exempt99
FHWA 4 106625SUM MetroParks
Nimisila LotsSUM
Resurfacing of the Nimisila parking lots in the
Summit MetroParks District, in Summit County,
Ohio.
Nimisila Parking LotsMetroparks Serving
Summit CountyAMATS PE Dtl Dsgn $2,240 $0 $14,910 $306,111 2018 LABR State Parks 002 Labor - State Match 0
Air Quality
Exempt99
FHWA 4 106625 PE Env PE $12,670 2018 LABR State 002 Labor - State Match 99
FHWA 4 106668SUM CR 0206
01.45SUM
Replace Wright Road (CR 206) bridge over
Pigeon Creek with a new structure.
CR-206 Wright Road over
Pigeon Creek
SUMMIT COUNTY
ENGINEERAMATS PE Dtl Dsgn $5,000 $0 $33,100 $955,100 2018 LABR State Bridge Replacement 002 Labor - State Match 0
Air Quality
Exempt16
FHWA 4 106668 PE Env PE $28,100 2018 LABR State 002 Labor - State Match 16
FHWA 4 106702 SUM SR 0162 03.34 SUMSUM SR 162 3.34 to 3.43 deep ditch
elimination.SUM SR 162 3.34 to 3.43 DISTRICT 4-HMA AMATS CO CO Mtrls $2,400 $1,366 $6,710 $6,710 2018 4BC7 State Section Improvement 002 State Funds (002) 0.09
Air Quality
Exempt15
FHWA 4 106702 CO CO Mtrls $2,944 2018 4BC7 State 002 State Funds (002) 15
FHWA 4 106883 D04 LOOP FY2020 D04Loop maintenance and repair along various
routes throughout District 4.Districtwide DISTRICT 4-HMA AMATS CO CO Contr $150,000 $0 $165,000 $172,510 2020 4CP7 State Loop Detector Repair 002 State Funds (002) 0
Air Quality
Exempt12
FHWA 4 106883 CO CO Engr $15,000 2020 LABR State 002 Labor - State Match 12
FHWA 4 106883 D04 LOOP FY2020 D04Loop maintenance and repair along various
routes throughout District 4.Districtwide DISTRICT 4-HMA AMATS PE Dtl Dsgn $1,130 $0 $7,510 $172,510 2018 LABR State Loop Detector Repair 002 Labor - State Match 0
Air Quality
Exempt12
FHWA 4 106883 PE Env PE $6,380 2018 LABR State 002 Labor - State Match 12
FHWA 4 106885 SUM IR 0271 01.51 SUMSFN 7708823 SUM-271-1.51 bridge deck
replacement.SUM-271-01.51 DISTRICT 4-BRIDGES AMATS PE Dtl Dsgn $90,000 $0 $508,000 $2,220,000 2021 4PF7 Federal Bridge Deck Replacement Un-Assigned Federal 0
Air Quality
Exempt32
FHWA 4 106885 PE Dtl Dsgn $10,000 2021 4PS7 State 002 State Funds (002) 32
FHWA 4 106885 PE Dtl Dsgn $48,000 2018 LABR State 002 Labor - State Match 32
FHWA 4 106885 PE Env PE $315,000 2019 4PF7 Federal 002 Non-Federal 32
FHWA 4 106885 PE Env PE $35,000 2019 4PS7 State 002 State Funds (002) 32
FHWA 4 106885 PE Env PE $10,000 2018 LABR State 002 Labor - State Match 32
FHWA 4 107018SUM Ingleside
Drive BridgeSUM
Replace Ingleside Drive bridge over Brandywine
Creek.Ingleside Drive Hudson, City of AMATS CO CO Contr $879,660 $0 $1,246,042 $1,290,902 2020 4R87 Federal Bridge Replacement Un-Assigned Federal 0
Air Quality
Exempt16
FHWA 4 107018 CO CO Contr $46,298 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 107018 CO CO Contr $195,480 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 107018 CO CO Engr $21,720 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 107018 CO CO Engr $97,740 2020 4R87 Federal Un-Assigned Federal 16
FHWA 4 107018 CO CO Engr $5,144 2020 LNTP Local Match LNTP Local Match 16
FHWA 4 107018SUM Ingleside
Drive BridgeSUM
Replace Ingleside Drive bridge over Brandywine
Creek.Ingleside Drive Hudson, City of AMATS PE Dtl Dsgn $6,730 $0 $44,860 $1,290,902 2018 LABR State Bridge Replacement 002 Labor - State Match 0
Air Quality
Exempt16
FHWA 4 107018 PE Env PE $38,130 2018 LABR State 002 Labor - State Match