ACTIVE 2018-2021 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM ACTIVE STIP PRINTED 7/6/2018 For information on projects included in this document, please contact ODOT at https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N

ACTIVE STIP - oregon.gov · ACTIVE 2018-2021 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM ACTIVE STIP PRINTED 6/21/2018 For information on projects included in this document,

Embed Size (px)

Citation preview

  • ACTIVE 2018-2021 STIPSTATEWIDE TRANSPORTATION IMPROVEMENT

    PROGRAM

    ACTIVE STIPPRINTED7/6/2018

    For information on projects included in this document, please contact ODOT at

    https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP

    O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O N

    http://www.oregon.gov/odot/Pages/index.aspx

  • 2018-2021 Active STIP CLACKAMAS

    Name: Clackamas County Regional Freight ITS Key: 18001

    Description Improves the reliability of the regional freight system by reducing freight delays in known congested areas through a variety of ITC system enhancements.

    Region: 1

    MPO: Portland Metro MPO Work Type: OP-ITS

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2020 2014

    Total $347,199.00 $1,699,120.00 $204,879.00 $2,251,198.00

    Fund 1 ACP0 $311,541.66 M230 $954,458.91 M230 $89,621.43

    Match $35,657.34 $109,242.09 $10,257.57

    Fund 2 L230 $570,161.47 L23E $51,097.02

    Match $65,257.53 $5,849.00

    Fund 3 L230 $43,118.98

    Match $4,935.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0149 Approval Date: 10/30/2017

    Requested Action: Slip CN to 2019. Update name and description to match MTIP.

    2018-2021 Active STIP CLACKAMAS

    Name: SMART Employer Outreach Program 2013 Key: 18119

    Description Travel options including vanpooling, riding transit, bicycling, walking and telecommuting. Region: 1

    MPO: Portland Metro MPO Work Type: TR-OPS

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    0.00 REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $79,000.00 $79,000.00

    Fund 1 Z230 $70,887.00

    Match $8,113.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0087 Approval Date: 10/31/2017

    Requested Action: Slip the OT phase to 2018

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 2 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: US26: SE 282nd Ave (Boring Rd) Oxing Key: 18583

    Description Increase the clearance on US26 under the SE 282nd Ave (Boring Rd) Structure (Bridge no. 09381) and perform joint and deck work on the structure.

    Region: 1

    MPO: Portland Metro MPO Work Type: BRIDGE, PRESRV

    Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    17.52 to 17.58 0.06 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2015 2017 2018 2018

    Total $1,095,000.00 $608,000.00 $3,028,339.02 $50,000.00 $4,781,339.02

    Fund 1 M001 $982,544.00 M240 $384,044.40 Z001 $2,715,085.35 S010 $50,000.00

    Match $112,456.00 $43,955.60 $310,753.67

    Fund 2 Z231 $161,514.00 OTH0 $2,500.00

    Match $18,486.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0373 Approval Date: 12/28/2017

    Requested Action:Add an OT phase of $50,000 by reducing CN to $4,655,000 and adding $15,000 from Region 1 Reserves.

    2018-2021 Active STIP CLACKAMAS

    Name: OR99E RAILROAD TUNNEL ILLUMINATION AND ITS Key: 18759

    Description Upgrade the illumination systems of the roadway and pedestrian tunnels that pass under the railroad. Install a Variable Message Sign (VMS) south of the tunnel.

    Region: 1

    MPO: Portland Metro MPO Work Type: OP-SSI

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    12.60 to 12.65 0.05 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2018

    Total $453,000.00 $1,487,000.00 $1,940,000.00

    Fund 1 Z240 $406,477.00 ACP0 $1,334,285.00

    Match $46,523.00 $152,715.00

    Footnote: $1,940,000 Total R1 Ops funding

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 3 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OR99E:Rockfall - Oregon City Tunnel to Old Canemah Park Key: 18769

    Description Inspect and repair mesh. Scale slope behind mesh removing loose rock and vegetation. Rock bolting as needed and clear catchment area / roadside ditch

    Region: 1

    MPO: Portland Metro MPO Work Type: OP-SLD

    Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    12.62 to 12.87 0.25 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    13.15 to 13.36 0.21 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    13.82 to 14.06 0.24 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2018 2018

    Total $391,000.00 $1,772,999.34 $200,000.00 $2,363,999.34

    Fund 1 Z240 $350,844.30 Z240 $1,590,912.31 S010 $200,000.00

    Match $40,155.70 $182,087.03

    Fund 2

    Match

    Footnote: $1,889,000 Total R1 Operations funding

    Most Recent Amendment ApprovedAmendment No: 18-21-0709 Approval Date: 2/15/2018

    Requested Action:Update the project name to OR99E:Rockfall - Oregon City Tunnel to Old Canemah Park. Update project location mile points from 13.82-14.06 to 13.15-13.36.

    2018-2021 Active STIP CLACKAMAS

    Name: OR212: SE Richey Rd - US26 Key: 18772

    Description Paving of the highway in conjunction with targeted deeper pavement repairs within the project limits. Missing or non-compliant ADA sidewalk ramps will be brought up to standard. Drainage and storm water treatment improvements may be required. Culvert at Deep Creek to be replaced.

    Region: 1

    MPO: Portland Metro MPO Work Type: OPERAT, PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    6.85 to 8.87 2.02 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2015 2018 2018 2019

    Total $1,480,591.00 $306,500.00 $150,000.00 $3,037,000.00 $4,974,091.00

    Fund 1 ACP0 $628,110.00 Z002 $248,152.80 Z001 $134,595.00 ACP0 $2,725,100.10

    Match $71,890.00 $28,402.20 $15,405.00 $311,899.90

    Fund 2 Z001 $459,050.60 ACP0 $26,869.65

    Match $52,540.40 $3,075.35

    Fund 3 L05E $241,374.00

    Match $27,626.00

    Footnote: $3,124,091 Total R1 Preservation funds, $700,000 HB2017 and $1,150,000 R1 Operations

    Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval Date: 5/14/2018

    Requested Action:Increase the Right of Way phase estimate by $76,500, moving funds from project key 18780. Add a Utility Relocation phase, using savings from the region 1 fix-it program.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 4 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OR99E: S Pine St - SW Berg Parkway (Canby) Key: 18775

    Description Repave this section of highway, replace signs, signal loops, install pedestrian push buttons and construct sidewalk curb ramps. Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    20.60 to 21.86 1.26 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2015 2021 2021

    Total $894,555.01 $177,000.00 $5,036,000.00 $6,107,555.01

    Fund 1 Z231 $533,494.21 ACP0 $158,822.10 ACP0 $4,518,802.80

    Match $61,060.80 $18,177.90 $517,197.20

    Fund 2 M231 $269,190.00

    Match $30,810.00

    Footnote: $300,000 Preservation, $594,555 R1 Shelf Ready and $5,213,000 HB2017

    Most Recent Amendment ApprovedAmendment No: 18-21-0900 Approval Date: 4/19/2018

    Requested Action:Add the project to the 2018-2021 STIP. Add Right of Way and Construction phases.

    2018-2021 Active STIP CLACKAMAS

    Name: S Ivy Street (Canby) Key: 18805

    Description Construct sidewalks and bike lane on S Ivy Street between OR-99E and Lee Elementary School and install a signal at the intersection with Township Road.

    Region: 1

    MPO: Non-MPO Work Type: BIKPED

    Applicant: CITY OF CANBY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2017 2019 2020

    Total $293,000.00 $211,000.00 $1,684,806.00 $2,188,806.00

    Fund 1 Z302 $234,400.00 ACP0 $168,800.00 ACP0 $1,347,845.00

    Match $58,600.00 $42,200.00 $336,961.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0601 Approval Date: 1/25/2018

    Requested Action: Slip RW to 2019 and CN to 2020

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 5 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Boones Ferry Rd: Oakridge Rd/Reese Rd - Madrona St Key: 18809

    Description Full reconstruction of Boones Ferry Road from south of Madrona Street to north of Reese Road/Oakridge Road. Crosswalks, signals, pedestrian signals, sidewalks, planter strips and a median with stormwater treatment. Left turn lanes on side streets.

    Region: 1

    MPO: Portland Metro MPO Work Type: OPERAT

    Applicant: CITY OF LAKE OSWEGO Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2015 2016 2018

    Total $4,723,657.01 $5,300,000.00 $22,590,000.00 $32,613,657.01

    Fund 1 LZ2E $2,507,076.86 OTH0 $4,074,100.08 OTH0 $22,590,000.00

    Match $286,946.17

    Fund 2 OTH0 $1,491,739.03 ACP0 $1,100,000.00

    Match $125,899.92

    Fund 3 Z030 $392,923.14

    Match $44,971.81

    Footnote: Total Federal Award of $4M Enhance Funds

    Most Recent Amendment ApprovedAmendment No: 18-21-1068 Approval Date: 6/20/2018

    Requested Action: Increase the Construction phase estimate by $2,900,000 in local funds.

    2018-2021 Active STIP CLACKAMAS

    Name: OR211: OR213 - S Ona Way (Molalla) Key: 18811

    Description Construct a 6ft shoulder and sidewalk on the north side of OR211. Remove ditches. Install inlets and storm pipe. Relocation of utilities and replace culvert and guardrail at Bear Creek.

    Region: 1

    MPO: Non-MPO Work Type: BIKPED

    Applicant: CITY OF MOLALLA Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    11.47 to 11.89 0.42 OR-211 WOODBURN/ESTACADA REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2015 2019 2019 2019

    Total $800,000.00 $139,204.00 $30,000.00 $1,893,359.00 $2,862,563.00

    Fund 1 M240 $462,943.99 ACP0 $80,416.92 OTH0 $30,000.00 ACP0 $1,661,574.00

    Match $52,986.01 $9,204.08 $190,175.00

    Fund 2 M2E1 $228,976.22 OTH0 $49,583.00 OTH0 $41,610.00

    Match $35,766.78

    Fund 3 OTH0 $19,327.00

    Match

    Footnote: $1,683,911 Fed Enhance funds and $750,000 HB2017 funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0547 Approval Date: 12/31/2017

    Requested Action:Add $750,000 to the CN phase. Slip RW, UR and CN to 2019.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 6 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Sandy transit operations center phase II bus barns Key: 18821

    Description Construct Bus Barns. Region: 1

    MPO: Non-MPO Work Type: TRANST

    Applicant: CITY OF SANDY Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $570,000.00 $570,000.00

    Fund 1 Z231 $510,000.00

    Match $58,372.00

    Fund 2 OTH0 $1,628.00

    Match

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 15-18-2865 Approval Date: 9/19/2017

    Requested Action: Slip the OT phase to 2018

    2018-2021 Active STIP CLACKAMAS

    Name: US26: Ten Eyck Rd/Wolf Dr - Vista Loop (Sandy) Key: 18823

    Description Construct sidewalks and widen pavement for bike lanes. Install street lighting and landscaping. Region: 1

    MPO: Non-MPO Work Type: BIKPED

    Applicant: CITY OF SANDY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    24.60 to 25.50 0.90 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2019 2020

    Total $273,687.00 $400,000.00 $1,573,702.00 $2,247,389.00

    Fund 1 M002 $245,579.35 ACP0 $341,573.40 ACP0 $1,331,967.37

    Match $28,107.65 $39,094.60 $152,449.63

    Fund 2 OTH0 $19,332.00 OTH0 $89,285.00

    Match

    Footnote: $1,919,119 Federal MTEP

    Most Recent Amendment ApprovedAmendment No: 18-21-0537 Approval Date: 12/31/2017

    Requested Action: Slip RW to 2019 and CN to 2020

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 7 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: US26: Beaver Creek Culvert Repair Key: 18999

    Description Repair 2 culverts Region: 1

    MPO: Non-MPO Work Type: CULVRT

    Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    28.30 to 28.33 0.03 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2017 2018 2018

    Total $242,000.00 $20,000.00 $462,200.09 $125,000.00 $849,200.09

    Fund 1 M2E2 $217,146.60 M2E2 $17,946.00 Z232 $414,732.14 S010 $125,000.00

    Match $24,853.40 $2,054.00 $47,467.95

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0759 Approval Date: 2/9/2018

    Requested Action: Reduce the Construction phase by $125,000 and move the funds to create an Other phase.

    2018-2021 Active STIP CLACKAMAS

    Name: Jennings Ave: OR99E to Oatfield Rd Key: 19276

    Description Construct a curb tight sidewalk on the north side of the road and bike lanes on both sides of the road. Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2017 2019 2020

    Total $650,000.00 $450,000.00 $2,940,213.00 $4,040,213.00

    Fund 1 Z230 $583,245.00 ACP0 $403,785.00 ACP0 $2,638,253.12

    Match $66,755.00 $46,215.00 $301,959.88

    Fund 2

    Match

    Footnote: $3,625,283 Federal STP funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0622 Approval Date: 2/12/2018

    Requested Action:Slip the Right of Way phase to federal fiscal year 2019 and the Construction phase to federal fiscal year 2020 for delivery.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 8 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SE 129th Avenue - bike lane and sidewalk project Key: 19280

    Description Construct sidewalk and add bike lanes Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED

    Applicant: CITY OF HAPPY VALLEY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2019 2020

    Total $895,007.02 $100,000.00 $2,806,000.00 $3,801,007.02

    Fund 1 M301 $435,612.90 ACP0 $89,730.00 ACP0 $2,212,830.92

    Match $49,857.85 $10,270.00 $253,268.08

    Fund 2 M3E1 $364,647.23 OTH0 $339,901.00

    Match $41,735.51

    Fund 3 35B0 $2,829.66

    Match $323.87

    Footnote: $1,366,918 Federal TAP-Urban and $1,738,727 STP-Urban award

    Most Recent Amendment ApprovedAmendment No: 18-21-0623 Approval Date: 2/12/2018

    Requested Action:Slip the Right of Way phase to federal fiscal year 2019 and the Construction phase to federal fiscal year 2020 for delivery.

    2018-2021 Active STIP CLACKAMAS

    Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT 2016 Key: 19305

    Description 5307 Funds for Preventative Maintenance, Associated Improvements and Bus Fleet Replacement FY16 Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $550,000.00 $550,000.00

    Fund 1 FF91 $440,000.00

    Match $110,000.00

    Footnote: 5307 Funds

    Most Recent Amendment ApprovedAmendment No: 15-18-2820 Approval Date: 9/15/2017

    Requested Action: Slip to 2018

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 9 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT 2017 Key: 19306

    Description 5307 Funds for Preventative Maintenance, Associated Improvements and Bus Fleet Replacement FY17 Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $510,644.00 $510,644.00

    Fund 1 FF94 $408,515.20

    Match $102,128.80

    Footnote: 5307 Funds

    Most Recent Amendment ApprovedAmendment No: 15-18-2821 Approval Date: 9/18/2017

    Requested Action: Slip to 2018

    2018-2021 Active STIP CLACKAMAS

    Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT Key: 19307

    Description 5307 Funds for Preventative Maintenance, Associated Improvements and Bus Fleet Replacement FY18 Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $625,000.00 $625,000.00

    Fund 1 FF91 $500,000.00

    Match $125,000.00

    Footnote: $500,000.00 Federal 5307 Funds

    Most Recent Amendment ApprovedAmendment No: 15-18-136 Approval Date: 7/10/2015

    Requested Action: Name and description change.

    2018-2021 Active STIP CLACKAMAS

    Name: 5307 FY18 ASSOCIATED TRANSIT IMPROVEMENTS (1%) Key: 19312

    Description 1% Of Sec 5307 Appropriations For Transit Amenities Improvements Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $6,250.00 $6,250.00

    Fund 1 FF91 $5,000.00

    Match $1,250.00

    Footnote: $5,000 Federal 5307 funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 10 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: 5310 FY16 - Senior & Disabled Key: 19314

    Description Services & Facility Improvements for Elderly & Disabled Customers FY16 Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $20,008.00 $20,008.00

    Fund 1 F160 $16,006.00

    Match $4,002.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0636 Approval Date: 4/30/2018

    Requested Action:Slip project to federal fiscal year 2018 for delivery and add project to the 2018-2021 STIP. Reduce project cost by $20,112 to match final federal award of $16,006 per 1/27/17 award letter.

    2018-2021 Active STIP CLACKAMAS

    Name: 5310 FY17 - Senior & Disabled Key: 19315

    Description Services & Facility Improvements for Elderly & Disabled Customers FY17 Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $20,636.00 $20,636.00

    Fund 1 F160 $16,509.00

    Match $4,127.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0637 Approval Date: 4/30/2018

    Requested Action:

    Slip project to federal fiscal year 2018 for delivery and add project to the 2018-2021 STIP. Reduce project cost by $22,828 to match final federal award of $16,509 per 2/13/17 & 12/14/17 award letters.

    2018-2021 Active STIP CLACKAMAS

    Name: 5310 FY18 - SENIOR & DISABLED Key: 19316

    Description Services & Facility Improvements for Elderly & Disabled Customers FY18 Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $45,693.00 $45,693.00

    Fund 1 F160 $36,554.40

    Match $9,138.60

    Footnote: $41,000 Federal 5310 funds (89.73 match)

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 11 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: 5339 FY15 - Bus and bus facilities (capital) Key: 19318

    Description Bus and bus facility upgrades (FY15) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $57,045.00 $57,045.00

    Fund 1 FF30 $45,636.00

    Match $11,409.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0490 Approval Date: 1/26/2018

    Requested Action: Update project funding to reflect FTA award.

    2018-2021 Active STIP CLACKAMAS

    Name: 5339 FY16 - Bus and bus facilities (capital) Key: 19319

    Description Bus and bus facility upgrades (FY16) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $54,417.50 $54,417.50

    Fund 1 FF30 $43,534.00

    Match $10,883.50

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0491 Approval Date: 1/26/2018

    Requested Action: Update project funding to reflect FTA award.

    2018-2021 Active STIP CLACKAMAS

    Name: 5339 FY17 - BUS AND BUS FACILITIES (CAPITAL) Key: 19320

    Description Bus and Bus Facility Upgrades (FY17) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $81,250.00 $81,250.00

    Fund 1 FF30 $65,000.00

    Match $16,250.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 15-18-2844 Approval Date: 9/19/2017

    Requested Action: Slip other phase to 2018

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 12 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: 5339 FY18 - BUS AND BUS FACILITIES (CAPITAL) Key: 19321

    Description Bus and Bus Facility Upgrades (FY18) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $87,500.00 $87,500.00

    Fund 1 FF30 $70,000.00

    Match $17,500.00

    Footnote: $70,000 Federal 5339 award

    2018-2021 Active STIP CLACKAMAS

    Name: PORTLAND TO MILWAUKIE LIGHT RAIL (FY18) Key: 19350

    Description This project extends light rail from PSU in downtown Portland to Milwaukie and north Clackamas County. It includes a multi-modal bridge carrying light rail, streetcar, buses, bicycles and pedestrians.

    Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS, MULTNOMAH

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $200,000,000.00 $200,000,000.00

    Fund 1 FF31 $100,000,000.00

    Match $100,000,000.00

    Footnote: $100,000,000 Federal 5309 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SUNRISE SYSTEM: INDUSTRIAL AREA FREIGHT ACCESS Key: 19354

    Description Funding for a new two-lane state highway to provide freight access to the Clackamas Industrial Area and a multiuse path connecting to the I-205 multiuse path

    Region: 1

    MPO: Portland Metro MPO Work Type: MODERN

    Applicant: CLACKAMAS COUNTY Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $9,213,195.00 $9,213,195.00

    Fund 1 M230 $8,267,000.00

    Match $946,195.00

    Footnote:

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 13 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OR212: Rock Creek - Richey Rd Key: 19355

    Description Pavement repair and resurfacing. Sidewalk corner ramp upgrades to current standards. Region: 1

    MPO: Portland Metro MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    0.30 to 6.85 6.55 OR-212 CLACKAMAS-BORING REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2018 2019

    Total $1,364,795.00 $173,314.00 $5,334,287.00 $6,872,396.00

    Fund 1 ACP0 $495,125.65 ACP0 $128,596.00 Z001 $4,195,444.00

    Match $56,669.35 $14,718.00 $480,187.00

    Fund 2 L050 $448,650.00 Z001 $26,919.00 ACP0 $591,012.00

    Match $51,350.00 $3,081.00 $67,644.00

    Fund 3 Z002 $280,854.90

    Match $32,145.10

    Footnote: $5,661,945 Total R1 Preservation funds and $1,210,451 HB2017 funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval Date: 5/14/2018

    Requested Action:Increase the Right of Way phase estimate by $143,314, moving funds from project key 18780. Reduce the Construction phase estimate by $100.00.

    2018-2021 Active STIP CLACKAMAS

    Name: OR212: UPRR Structure - Rock Creek Key: 19356

    Description Repave roadway and upgrade sidewalk corner ramps to current standards. Region: 1

    MPO: Portland Metro MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    5.20 to 8.19 2.99 OR-212 CLACKAMAS REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2018 2019

    Total $1,329,610.00 $124,917.00 $4,261,282.00 $5,715,809.00

    Fund 1 L050 $672,975.00 Z001 $62,502.33 Z001 $3,622,776.07

    Match $77,025.00 $7,153.67 $414,642.93

    Fund 2 Z240 $389,078.25 ACP0 $49,586.00 ACP0 $200,872.27

    Match $44,531.75 $5,675.00 $22,990.73

    Fund 3 Z230 $131,005.80

    Match $14,994.20

    Footnote: $ 5,058,336 Total R1 Preservation funds and $657,473 HB2017 funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval Date: 5/14/2018

    Requested Action: Increase the Right of Way phase estimate by $55,261, adding funds from project key 18780.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 14 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Canby (M J Lee) Ferry Bank Stabilization and ITS Key: 19641

    Description Stabilize north side roadway approach; install ITS improvements Region: 1

    MPO: Non-MPO Work Type: SPPROG

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016 2019 2020 2016

    Total $235,000.00 $25,000.00 $108,059.50 $402,305.50 $770,365.00

    Fund 1 M950 $188,000.00 M950 $20,000.00 OTH0 $83,875.50 M950 $321,844.40

    Match $47,000.00 $5,000.00 $80,461.10

    Fund 2 M950 $19,347.00

    Match $4,837.00

    Footnote: Federal Ferry Boat Program Project

    Most Recent Amendment ApprovedAmendment No: 18-21-1079 Approval Date: 5/29/2018

    Requested Action:Increase the Preliminary Engineering phase by $90,000, the Right of Way phase by $5,000 and the Other phase by $120,937.50. Decrease the Construction phase by $177,852.50.

    2018-2021 Active STIP CLACKAMAS

    Name: I-205: Stafford Rd - OR99E Key: 19786

    Description Complete the environmental assessment and project development to add a third lane in each direction between Stafford Road and OR43 and a forth lane on the Abernethy Bridge to help separate through traffic.

    Region: 1

    MPO: Portland Metro MPO Work Type: MODERN, OPERAT

    Applicant: ODOT Status: PLANNING ACTIVITY

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    3.30 to 9.50 6.20 I-205 EAST PORTLAND FREEWAY REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2016

    Total $15,000,000.00 $15,000,000.00

    Fund 1 Z460 $11,527,500.00

    Match $972,500.00

    Fund 2 OTH0 $2,500,000.00

    Match

    Fund 3

    Match

    Footnote: $2.5M Freight funds approved by OTC 03-17-16, $10M Freight funds approved by OTC on 8/17/17 & $2.5M Metro's Regional Flexible Funds bonded through TriMet per IGA 31954. Total project cost estimated at $499.6 (including bridge widening & seismic retrofit)

    Most Recent Amendment ApprovedAmendment No: 18-21-0874 Approval Date: 5/31/2018

    Requested Action: Increase the Planning phase by $2,500,000, adding TriMet funds.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 15 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Wilsonville mass transit program (15-17) Key: 19911

    Description Category A vehicle replacement - 1 vehicle Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: CITY OF WILSONVILLE Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $425,001.00 $425,001.00

    Fund 1 ACP0 $381,353.40

    Match $43,647.60

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 15-18-2843 Approval Date: 9/19/2017

    Requested Action: Slip to 2018

    2018-2021 Active STIP CLACKAMAS

    Name: OR217/OR224: bridge rail retrofit Key: 19918

    Description Bridge rail retrofit bridges 16134, 16143, 09623 Region: 1

    MPO: Portland Metro MPO Work Type: BRIDGE

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    2.39 to 2.45 0.06 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

    2.41 to 2.57 0.16 OR-217 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON

    2.95 to 3.09 0.14 OR-224 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON

    2.95 to 3.09 0.14 OR-224 BEAVERTON-TIGARD REGION 1 ACT WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2017 2018

    Total $325,000.00 $1,627,000.00 $1,952,000.00

    Fund 1 Z001 $291,622.50 Z240 $1,459,907.10

    Match $33,377.50 $167,092.90

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 15-18-1144 Approval Date: 10/5/2016

    Requested Action: Add new project per June 2016 OTC approval.

    2018-2021 Active STIP CLACKAMAS

    Name: US26: WEBBER - E CHERRYVILLE Key: 20210

    Description Repave roadway, upgrade ADA to current standards, and upgrade guardrail/signs as needed. Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    30.40 to 32.50 2.10 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019 2021

    Total $569,598.00 $3,797,314.00 $4,366,912.00

    Fund 1 Z001 $511,100.29 Z001 $3,407,329.85

    Match $58,497.71 $389,984.15

    Footnote:

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 16 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: US26: ZIGZAG - RHODODENDRON Key: 20211

    Description Repave roadway, upgrade ADA to current standards, and upgrade guardrail/signs as needed. Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    42.54 to 44.10 1.56 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019 2019 2020

    Total $215,019.00 $9,951.00 $1,433,459.00 $1,658,429.00

    Fund 1 Z001 $192,936.55 Z001 $8,929.03 Z001 $1,286,242.76

    Match $22,082.45 $1,021.97 $147,216.24

    Footnote:

    2018-2021 Active STIP CLACKAMAS

    Name: OR35: US26 - WHITE RIVER Key: 20213

    Description Design for roadway repaving, ADA upgrades, signs, and guardrail replacement as needed. Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    57.20 to 61.70 4.50 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $421,980.00 $421,980.00

    Fund 1 Z001 $378,642.65

    Match $43,337.35

    Footnote: Design only project - R1 Shelf Program = $351,000, Preservation Program = $70,980

    2018-2021 Active STIP CLACKAMAS

    Name: OR43: Arbor Dr - Hidden Springs Rd Key: 20329

    Description Construct a new cycle track and sidewalk along OR-43 from Arbor Dr to Hidden Springs Rd and construct about 7,500 sq ft. of new road extending Hidden Springs Rd to Old River Rd.

    Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED

    Applicant: CITY OF WEST LINN Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    8.04 to 9.22 1.18 OR-43 OSWEGO HIGHWAY REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2019 2020

    Total $841,248.00 $439,779.00 $4,837,176.00 $6,118,203.00

    Fund 1 Z301 $563,720.28 Z001 $294,695.75 Z230 $2,999,999.62

    Match $64,520.31 $33,729.25 $343,363.38

    Fund 2 OTH0 $213,007.41 OTH0 $111,354.00 OTH0 $1,224,579.00

    Match

    Fund 3 Z001 $241,583.67

    Match $27,650.33

    Footnote: $1,100,000 Federal MTEP Award and $3,000,000 Metro RFFA Urban STBG

    Most Recent Amendment ApprovedAmendment No: 18-21-0962 Approval Date: 6/19/2018

    Requested Action:

    Update the project name to OR43: Arbor Dr - Hidden Springs Rd. Update the project location mile points from 8.02-9.10 to 8.04-9.22.

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 17 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SYSTEMIC SIGNALS AND ILLUMINATION (CLACKAMAS) Key: 20336

    Description Safety projects at various locations. Work may include illumination, intersection work, bike and pedestrian improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements.

    Region: 1

    MPO: Portland Metro MPO Work Type: SAFETY

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018 2018 2020

    Total $175,600.00 $19,500.00 $2,900.00 $900,900.00 $1,098,900.00

    Fund 1 ZS30 $161,938.32 ZS30 $17,982.90 ZS30 $2,674.38 ZS30 $830,809.98

    Match

    Fund 2 OTH0 $13,661.68 OTH0 $1,517.10 OTH0 $225.62 OTH0 $70,090.02

    Match

    Footnote: $ 1,013,405 Federal ARTS award

    2018-2021 Active STIP CLACKAMAS

    Name: EAST SYSTEMIC SIGNALS AND ILLUMINATION (MOLALLA) Key: 20337

    Description Install illumination, advance intersection warning signs with street names, transverse rumble strips on approaches, and increase triangle sight distances at the intersections of OR-213 at Toliver and OR-211 at Ona Way.

    Region: 1

    MPO: Non-MPO Work Type: SAFETY

    Applicant: CITY OF MOLALLA Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    11.80 to 11.81 0.01 OR-211 WOODBURN/ESTACADA REGION 1 ACT CLACKAMAS

    15.71 to 15.73 0.02 OR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018 2020

    Total $43,700.00 $2,900.00 $82,100.00 $128,700.00

    Fund 1 ZS30 $40,300.14 ZS30 $2,674.38 ZS30 $75,712.62

    Match

    Fund 2 OTH0 $3,399.86 OTH0 $225.62 OTH0 $6,387.38

    Match

    Footnote: $ 118,687 Federal ARTS award

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 18 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: East Systemic Signals and Illumination (ODOT) Key: 20339

    Description Illumination, intersection work, bike and pedestrian improvements, ADA upgrades, signal work, signs, warnings, striping, medians, utility relocation, and other safety improvements at various locations.

    Region: 1

    MPO: Non-MPO, Portland Metro MPO Work Type: SAFETY

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    0.14 to 16.10 15.96 OR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

    0.68 to 5.36 4.68 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

    5.38 to OR-211 EAGLE CREEK/SANDY REGION 1 ACT CLACKAMAS

    7.41 to 22.89 15.48 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018 2020

    Total $552,100.00 $66,900.00 $2,590,075.00 $3,209,075.00

    Fund 1 MS30 $509,146.62 ZS30 $66,900.00 ZS30 $2,590,075.00

    Match $42,953.38

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-1046 Approval Date: 6/4/2018

    Requested Action:

    Increase the Preliminary Engineering phase estimate by $2,700 and the Construction phase estimate by $30,375, moving funds and scope from project key 20400. Add new project location from project key 20400, mile point 5.38 on OR-211.

    2018-2021 Active STIP CLACKAMAS

    Name: RUMBLE STRIPS (ODOT) Key: 20341

    Description Install centerline rumble strips and install shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205, I-405, OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224, HWY-173 (Timberline), OR-212, OR-281, and OR-282.

    Region: 1

    MPO: Portland Metro MPO Work Type: SAFETY

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, HOOD RIVER, MULTNOMAH,

    WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2019

    Total $150,600.00 $950,854.00 $1,101,454.00

    Fund 1 MS32 $150,600.00 ZS30 $950,854.00

    Match

    Footnote: $ 1,101,454 Total ARTS funding

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 19 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: US-26: SE Kelso Rd - Frog Lake Sno Park Key: 20362

    Description Rehabilitation and replacement of culverts. Region: 1

    MPO: Non-MPO Work Type: CULVRT

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    21.10 to 57.60 36.50 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    57.60 to 62.15 4.55 US-26 WARM SPRINGS REGION 1 ACT CLACKAMAS

    57.70 to 57.80 0.10 US-26 MT HOOD REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019 2020

    Total $491,003.00 $2,455,015.00 $2,946,018.00

    Fund 1 ACP0 $359,819.99 ACP0 $2,014,451.96

    Match $41,183.01 $230,563.04

    Fund 2 Z240 $80,757.00 Z001 $188,433.00

    Match $9,243.00 $21,567.00

    Footnote: $300,000 Culvert and $2,646,018 HB2017 funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0895 Approval Date: 5/1/2018

    Requested Action:

    Update the project location mile points and the project name. Increase the Preliminary Engineering phase by $401,003 and the Construction phase by $2,245,015. Slip the Preliminary Engineering phase to federal fiscal year 2019 for delivery.

    2018-2021 Active STIP CLACKAMAS

    Name: RURAL INTERSECTION AND CURVE WARNING (CLACKAMAS) Key: 20398

    Description Install and or update advance warning signs, intersection signs, and other street signs and safety treatments at various rural intersections, roadway departures and curves throughout Clackamas County.

    Region: 1

    MPO: Portland Metro MPO Work Type: SAFETY

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018 2019

    Total $278,500.00 $2,900.00 $1,488,769.00 $1,770,169.00

    Fund 1 ZS30 $256,832.70 ZS30 $2,674.38 ZS30 $1,372,942.77

    Match

    Fund 2 OTH0 $21,667.30 OTH0 $225.62 OTH0 $115,826.23

    Match

    Footnote: $ 1,632,450 Federal ARTS award

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 20 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OR224 AT LAKE/HARMONY Key: 20454

    Description Replace overhead flasher with ground mounted advance flashers. Region: 1

    MPO: Portland Metro MPO Work Type: OP-SSI

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    2.40 to 2.50 0.10 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020 2021

    Total $55,128.00 $53,950.00 $109,078.00

    Fund 1 Z240 $49,466.35 Z001 $48,409.34

    Match $5,661.65 $5,540.66

    Footnote: $ 109,078 Total Operations allocation

    2018-2021 Active STIP CLACKAMAS

    Name: OR99E: CLACKAMAS RIVER (MCLOUGHLIN) BRIDGE Key: 20472

    Description Design for a future construction project to paint structure. Region: 1

    MPO: Portland Metro MPO Work Type: BRIDGE

    Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    11.13 to 11.27 0.14 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $250,000.00 $250,000.00

    Fund 1 Z002 $224,325.00

    Match $25,675.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 15-18-2161 Approval Date: 6/14/2017

    Requested Action: Advance Preliminary Engineering to current STIP.

    2018-2021 Active STIP CLACKAMAS

    Name: I-205 at OR43 Key: 20475

    Description Design for full illumination rebuild Region: 1

    MPO: Portland Metro MPO Work Type: OP-SSI

    Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    8.70 to 8.90 0.20 I-205 EAST PORTLAND FREEWAY REGION 1 ACT CLACKAMAS

    11.20 to 11.40 0.20 OR-43 OSWEGO HIGHWAY REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $143,044.00 $143,044.00

    Fund 1 Z233 $128,353.38

    Match $14,690.62

    Footnote: R1 Shelf Program - $ 143,044 Total Operations allocation for design only.

    Most Recent Amendment ApprovedAmendment No: 15-18-2261 Approval Date: 6/14/2017

    Requested Action: Advance PE from 2018 to 2017

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 21 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SE Jennings Ave at SE Addie St (Clackamas) Key: 20476

    Description Install traffic separators with associated striping, illumination, and signal coordination work. Region: 1

    MPO: Portland Metro MPO Work Type: SAFETY

    Applicant: CITY OF PORTLAND Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2020

    Total $14,300.00 $23,100.00 $37,400.00

    Fund 1 ZS30 $14,300.00 ZS30 $23,100.00

    Match

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0880 Approval Date: 6/19/2018

    Requested Action:

    Reduce the project by $859,100, moving scope and funds to project keys 20304, 20334, and 20335. Update project name to SE Jennings Ave at SE Addie St (Clackamas) to reflect reduced scope.

    2018-2021 Active STIP CLACKAMAS

    Name: OR213 AT MP 15.71 (TOLIVER RD) Key: 20478

    Description Design roundabout at intersection of OR-213 and Toliver road. Region: 1

    MPO: Non-MPO Work Type: SAFETY

    Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    15.70 to 15.72 0.02 OR-213 CASCADE SOUTH REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $700,000.00 $700,000.00

    Fund 1 ZS32 $700,000.00

    Match

    Footnote: $ 700,000 Total Safety allocation

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 22 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Region 1 Bike Ped Crossings Key: 20479

    Description Bike and pedestrian improvements on 82nd Ave (OR-213), McLoughlin (OR-99E), Powell (US-26) OR8 at Baseline. Includes RRFBs, medians, illumination, crosswalks, tree trimming/removal, bike lane striping, sidewalks, ADA upgrades, and other improvements.

    Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED, SAFETY

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    2.07 to 2.07 0.00 US-26 MT HOOD REGION 1 ACT MULTNOMAH

    5.60 to 5.60 0.00 OR-213 CASCADE NORTH REGION 1 ACT MULTNOMAH

    6.87 to 11.14 4.27 OR-99E PACIFIC HWY EAST REGION 1 ACT CLACKAMAS

    7.38 to 7.38 0.00 US-26 MT HOOD REGION 1 ACT MULTNOMAH

    16.57 to 16.57 0.00 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2017 2019 2020

    Total $581,600.00 $74,000.00 $1,643,400.00 $2,299,000.00

    Fund 1 MS30 $276,660.00 ACP0 $74,000.00 MS30 $1,643,400.00

    Match $23,340.00

    Fund 2 ZS30 $281,600.00

    Match

    Footnote: $1,149,000 Total Safety allocation and $1.150,000 AT leverage funds. Draft K20520 and K20521 combined into this project.

    Most Recent Amendment ApprovedAmendment No: 18-21-0579 Approval Date: 2/12/2018

    Requested Action: Slip the Right of Way phase to federal fiscal year 2019 for delivery.

    2018-2021 Active STIP CLACKAMAS

    Name: I-205: Abernethy Bridge - SE 82nd Dr Key: 20508

    Description Remove and replace asphalt surface to repair rutted pavement. Region: 1

    MPO: Portland Metro MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    9.31 to 13.80 4.49 I-205 EAST PORTLAND FREEWAY REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018 2020

    Total $810,000.00 $994.00 $5,136,294.00 $5,947,288.00

    Fund 1 Z002 $746,982.00 Z001 $916.67 Z001 $4,736,690.33

    Match $63,018.00 $77.33 $399,603.67

    Footnote: $5,947,288.00 total IM allocation

    Most Recent Amendment ApprovedAmendment No: 18-21-0171 Approval Date: 12/28/2017

    Requested Action: Increase PE funding

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 23 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OR224 Clackamas Hwy: MP 31.8 - 32.8 Key: 20675

    Description Resurface section of roadway. Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    31.80 to 32.80 1.00 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2018

    Total $96,052.00 $1,167,744.00 $1,263,796.00

    Fund 1 G20E $86,187.46 G20E $1,047,817.00

    Match $9,864.54 $119,927.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-0972 Approval Date: 6/8/2018

    Requested Action:Increase the Construction phase estimate by $399,331, adding additional Federal Lands Access program (FLAP) funds.

    2018-2021 Active STIP CLACKAMAS

    Name: E SALMON RIVER RD: US26 - MT HOOD NATIONAL FOREST Key: 20780

    Description Repave and restripe roadway, replace guardrails Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020 2020

    Total $50,000.00 $443,099.00 $493,099.00

    Fund 1 OTH0 $27,711.00 OTH0 $242,497.00

    Match

    Fund 2 G20E $19,999.92 G20E $180,000.17

    Match $2,289.08 $20,601.83

    Footnote:

    2018-2021 Active STIP CLACKAMAS

    Name: LOLO PASS ROAD Key: 20781

    Description Stabilize and improve Lolo Pass Rd by extending existing revetment (barrier) and by repaving road Region: 1

    MPO: Non-MPO Work Type: PRESRV

    Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019 2020

    Total $188,017.00 $3,864,386.00 $4,052,403.00

    Fund 1 OTH0 $165,728.00 G20E $3,221,921.65

    Match $368,763.35

    Fund 2 G20E $19,999.92 OTH0 $273,701.00

    Match $2,289.08

    Footnote:

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 24 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: MOLALLA AVE: BEAVER CREEK RD TO OR213 Key: 20810

    Description Project includes 10 ft wide ADA compliant sidewalks, street trees, and pedestrian level street lighting along the west side of the corridor. Project also includes continuous bike lanes, transit amenities, street furnishing, and improved access management.

    Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED

    Applicant: CITY OF OREGON CITY Status: PROJECT SCHEDULED FOR CONSTRUCTION

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018 2019 2020

    Total $1,401,389.00 $521,023.00 $6,062,967.00 $7,985,379.00

    Fund 1 OTH0 $1,401,389.00 OTH0 $521,023.00 OTH0 $6,062,967.00

    Match

    Footnote: RFFA 19-21 Award. Proposed for defederalization through $3,800,632 fund swap with TriMet

    2018-2021 Active STIP CLACKAMAS

    Name: I-5 OVERCROSSING: SW BARBER - SW TOWN CENTER LOOP Key: 20816

    Description Design a 14 ft wide pedestrian and bicycle bridge spanning 290 ft over SW Boones Ferry Rd and I-5, connecting SW Barber St with SW Town Center Loop West. Project includes retaining walls, public art, utility relocation and stormwater runoff treatment

    Region: 1

    MPO: Portland Metro MPO Work Type: BIKPED

    Applicant: CITY OF WILSONVILLE Status: PROJECT FUNDED THROUGH FINAL PLANS

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $1,727,405.00 $1,727,405.00

    Fund 1 Z230 $1,155,000.07

    Match $132,194.93

    Fund 2 Z301 $395,000.43

    Match $45,209.57

    Footnote: RRFA 19-21 Award of $1,550,000 Federal ($395,000 TAP and $1,155,000 STP)

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS PURCHASE (2019) Key: 20818

    Description Bus Purchase Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $4,286,416.00 $4,286,416.00

    Fund 1 FF30 $3,429,133.00

    Match $857,283.00

    Footnote: $ 3,429,133 Federal 5339 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 25 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS PURCHASE (2020) Key: 20819

    Description Bus Purchase Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $4,372,144.00 $4,372,144.00

    Fund 1 FF30 $3,497,716.00

    Match $874,428.00

    Footnote: $3,497,716 Federal 5339 funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS PURCHASE (2021) Key: 20820

    Description Bus Purchase Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $4,459,587.00 $4,459,587.00

    Fund 1 FF30 $3,567,670.00

    Match $891,917.00

    Footnote: $ 3,567,670 Federal 5339 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2019) Key: 20821

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $48,376,958.00 $48,376,958.00

    Fund 1 FF91 $38,701,566.00

    Match $9,675,392.00

    Footnote: $ 38,701,566 Federal 5307 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 26 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2020) Key: 20822

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $49,025,747.00 $49,025,747.00

    Fund 1 FF91 $39,220,597.00

    Match $9,805,150.00

    Footnote: $39,220,597 Federal 5307 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2021) Key: 20823

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $49,687,511.00 $49,687,511.00

    Fund 1 FF91 $39,750,009.00

    Match $9,937,502.00

    Footnote: $ 39,750,009 Federal 5307 funds

    2018-2021 Active STIP CLACKAMAS

    Name: COMMUNITY JOB CONNECTORS (2019) Key: 20824

    Description To improve access to jobs and job-related activities for the low-income workforce and to transport residents in urbanized and non-urbanized areas to suburban employment opportunities.

    Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $1,774,800.00 $1,774,800.00

    Fund 1 FF90 $887,400.00

    Match $887,400.00

    Footnote: $ 887,400 Federal 5307 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 27 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: COMMUNITY JOB CONNECTORS (2020) Key: 20825

    Description To improve access to jobs and job-related activities for the low-income workforce and to transport residents in urbanized and non-urbanized areas to suburban employment opportunities.

    Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $2,320,296.00 $2,320,296.00

    Fund 1 FF90 $1,160,148.00

    Match $1,160,148.00

    Footnote: $ 1,160,148 Federal 5307 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: COMMUNITY JOB CONNECTORS (2021) Key: 20826

    Description To improve access to jobs and job-related activities for the low-income workforce and to transport residents in urbanized and non-urbanized areas to suburban employment opportunities.

    Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $2,876,702.00 $2,876,702.00

    Fund 1 FF90 $1,438,351.00

    Match $1,438,351.00

    Footnote: $1,438,351 Federal 5307 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2019) Key: 20827

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $31,227,907.00 $31,227,907.00

    Fund 1 FF91 $24,982,326.00

    Match $6,245,581.00

    Footnote: $ 24,982,326 Federal 5337 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 28 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2020) Key: 20828

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $31,852,465.00 $31,852,465.00

    Fund 1 FF91 $25,481,972.00

    Match $6,370,493.00

    Footnote: $ 25,481,972 Federal 5337 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2021) Key: 20829

    Description Capital Maintenance For Bus And Rail Region: 1

    MPO: Non-MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $32,489,514.00 $32,489,514.00

    Fund 1 FF91 $25,991,611.00

    Match $6,497,903.00

    Footnote: $ 25,991,611 Federal 5337 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET ELDERLY & DISABLED PROGRAM (2019) Key: 20836

    Description Services And Facility Improvements In Excess Of ADA Requirements Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $2,398,905.00 $2,398,905.00

    Fund 1 F160 $1,919,124.00

    Match $479,781.00

    Footnote: $ 1,919,124 Federal 5310 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 29 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: TRIMET ELDERLY & DISABLED PROGRAM (2020) Key: 20837

    Description Services And Facility Improvements In Excess Of ADA Requirements Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $2,446,883.00 $2,446,883.00

    Fund 1 F160 $1,957,506.00

    Match $489,377.00

    Footnote: $ 1,957,506 Federal 5310 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: TRIMET ELDERLY & DISABLED PROGRAM (2021) Key: 20838

    Description Services And Facility Improvements In Excess Of ADA Requirements Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $2,495,821.00 $2,495,821.00

    Fund 1 F160 $1,996,656.00

    Match $499,165.00

    Footnote: $ 1,996,656 Federal 5310 funds

    2018-2021 Active STIP CLACKAMAS

    Name: Bus & Rail Preventive Maintenance (RFFA-2018) Key: 20839

    Description Capital maintenance for bus & rail (Regional Flexible Fund Allocation Fund Exchange) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT MULTNOMAH

    REGION 1 ACT CLACKAMAS

    REGION 1 ACT WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2018

    Total $2,623,599.00 $2,623,599.00

    Fund 1 Z230 $2,354,155.38

    Match $269,443.62

    Footnote: $2,354,155 Federal STP funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0016 Approval Date: 10/11/2017

    Requested Action: Slip funding to 2018

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 30 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2019) Key: 20840

    Description Capital Maintenance For Bus & Rail (Regional Flexible Fund Allocation Fund Exchange) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $1,779,189.00 $1,779,189.00

    Fund 1 Z230 $1,596,466.00

    Match $182,723.00

    Footnote: $ 1,596,466 Federal STP funds

    2018-2021 Active STIP CLACKAMAS

    Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2020) Key: 20841

    Description Capital Maintenance For Bus & Rail (Regional Flexible Fund Allocation Fund Exchange) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $4,906,561.00 $4,906,561.00

    Fund 1 Z230 $4,402,657.00

    Match $503,904.00

    Footnote: $ 4,402,657 Federal STP funds

    2018-2021 Active STIP CLACKAMAS

    Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2021) Key: 20842

    Description Capital Maintenance For Bus & Rail (Regional Flexible Fund Allocation Fund Exchange) Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $2,793,658.00 $2,793,658.00

    Fund 1 Z230 $2,506,749.00

    Match $286,909.00

    Footnote: $ 2,506,749 Federal STP

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 31 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: Portland to Milwaukie Light Rail (2019) Key: 20843

    Description This project extends light rail from PSU in downtown Portland to Milwaukie and north Clackamas County. It includes a multi-modal bridge carrying light rail, streetcar, buses, bicycles and pedestrians.

    Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    REGION 1 ACT MULTNOMAH

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $117,515,849.00 $117,515,849.00

    Fund 1 FF30 $65,664,144.00

    Match $51,851,705.00

    Footnote:

    Most Recent Amendment ApprovedAmendment No: 18-21-1106 Approval Date: 6/20/2018

    Requested Action: Increase project cost by $49,509,141.

    2018-2021 Active STIP CLACKAMAS

    Name: LOW - NO ZERO EMISSION BUS PROJECT (2019) Key: 20847

    Description Fund procurement and deployment of 5 battery electric buses and associated charging infrastructure to be deployed from Merlo garage on a Westside route to be determined.

    Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $4,517,494.00 $4,517,494.00

    Fund 1 FF30 $2,117,750.00

    Match $2,399,744.00

    Footnote: $ 2,117,750 Federal 5339 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: LOW - NO ZERO EMISSION BUS PROJECT (2020) Key: 20848

    Description Fund procurement and deployment of 5 battery electric buses and associated charging infrastructure to be deployed from Merlo garage on a Westside route to be determined.

    Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $106,658.00 $106,658.00

    Fund 1 FF30 $50,000.00

    Match $56,658.00

    Footnote: $ 50,000 Federal 5339 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 32 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: OPEN TRIP PLANNER Key: 20850

    Description Add to current Open Trip Planner (OTP) other transit planning function to incorporate first/last mile connections by ridehailing and bike share. Already OTP supports connections to transit by bike.

    Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $14,779.00 $14,779.00

    Fund 1 FF12 $10,000.00

    Match $4,779.00

    Footnote: $ 10,000 Federal 5312 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART MOBILITY MANAGEMENT (2019) Key: 20863

    Description RideWise Travel Trainer Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $39,607.00 $39,607.00

    Fund 1 F160 $31,686.00

    Match $7,921.00

    Footnote: $ 31,686 Federal 5310 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART MOBILITY MANAGEMENT (2020) Key: 20864

    Description RideWise Travel Trainer Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $39,607.00 $39,607.00

    Fund 1 F160 $31,686.00

    Match $7,921.00

    Footnote: $ 31,686 Federal 5310 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 33 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SMART ADA STOP ENHANCEMENTS (2019) Key: 20865

    Description Bus stop enhancements Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $57,045.00 $57,045.00

    Fund 1 F160 $45,636.00

    Match $11,409.00

    Footnote: $ 45,636 Federal 5310 Funding

    2018-2021 Active STIP CLACKAMAS

    Name: SMART SENIOR & DISABLED PROGRAM (2019) Key: 20866

    Description Services & Facility Improvements for Elderly & Disabled Customers Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $51,250.00 $51,250.00

    Fund 1 F160 $41,000.00

    Match $10,250.00

    Footnote: $ 41,000 Federal 5310 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART SENIOR & DISABLED PROGRAM (2020) Key: 20867

    Description Services & Facility Improvements for Elderly & Disabled Customers Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $51,250.00 $51,250.00

    Fund 1 F160 $41,000.00

    Match $10,250.00

    Footnote: $ 51,250 Federal 5310 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 34 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SMART SENIOR & DISABLED PROGRAM (2021) Key: 20868

    Description Services & Facility Improvements for Elderly & Disabled Customers Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $51,250.00 $51,250.00

    Fund 1 F160 $41,000.00

    Match $10,250.00

    Footnote: $ 41,000 Federal 5310 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2019 Key: 20869

    Description Bus and Bus Facility Upgrades Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $87,500.00 $87,500.00

    Fund 1 FF30 $70,000.00

    Match $17,500.00

    Footnote: $ 70,000 Federal 5339 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2020 Key: 20870

    Description Bus and Bus Facility Upgrades Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $96,000.00 $96,000.00

    Fund 1 FF30 $75,000.00

    Match $21,000.00

    Footnote: $ 75,000 Federal 5339 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 35 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2021 Key: 20871

    Description Bus and Bus Facility Upgrades Region: 1

    MPO: Portland Metro MPO Work Type: TR-CAP

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $105,200.00 $105,200.00

    Fund 1 FF30 $80,000.00

    Match $25,200.00

    Footnote: $ 80,000 Federal 5339 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: SMART bus replacement and technology 2019 Key: 20872

    Description Maintenance and bus fleet replacement and software Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: LOCAL Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2019

    Total $373,448.00 $373,448.00

    Fund 1 FF91 $298,758.00

    Match $74,690.00

    Footnote: $ 298,758 Federal 5307 Funds

    Most Recent Amendment ApprovedAmendment No: 18-21-0308 Approval Date: 12/28/2017

    Requested Action: Change MPO field to state Portland MPO

    2018-2021 Active STIP CLACKAMAS

    Name: SMART BUS REPLACEMENT AND TECHNOLOGY 2020 Key: 20873

    Description Maintenance and Bus Fleet Replacement & Software Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: SMART Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2020

    Total $373,448.00 $373,448.00

    Fund 1 FF91 $298,758.00

    Match $74,690.00

    Footnote: $ 298,758 Federal 5307 Funds

    OnlineSTIP_ODOT_2017.10.03.v1.1 Page 36 of 664 As of 7/6/2018 6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects

    2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP

  • 2018-2021 Active STIP CLACKAMAS

    Name: SMART BUS REPLACEMENT AND TECHNOLOGY 2021 Key: 20874

    Description Maintenance and Bus Fleet Replacement & Software Region: 1

    MPO: Portland Metro MPO Work Type: TRANST

    Applicant: LOCAL Status: NON-CONSTRUCTION PROJECT

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACT CLACKAMAS

    Current Project Estimate

    Planning Prelim. Engineering Right of Way Utility Relocation Construction Other Project Total

    Year 2021

    Total $373,448.00 $373,448.00

    Fund 1 FF91 $298,758.00

    Match $74,690.00

    Footnote: $ 298,758 Federal 5307 Funds

    2018-2021 Active STIP CLACKAMAS

    Name: REGIONAL MPO PLANNING (2019) Key: 20875

    Description Funding for Metro to meet Metropolitan Planning Organization mandates, established through the federal regulations. Region: 1

    MPO: Portland Metro MPO Work Type: PLANNG

    Applicant: METRO Status: PLANNING ACTIVITY

    Location(s)

    Mileposts Length Route Highway ACT County(s)

    REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON

    Current Project Estimate

    Planning Prelim. Engineering Right of Way