7/30/2019 2. JSA Erection Aux Boiler
1/13
1
JSA AND RISK ASSESSMENT FORMDoc. No. ITI-HSE-JSA-M-001 Rev. No. 0
Date : August 26t
, 2013 Page 1 of 13
JOB SAFETY ANALYSIS
Company : PT. INDO TEHNIK INDUSTRI Client Reps
Project
Pertamina RFCC Project Cilacap
Prepared By Checked by Reviewed By Approved By
Mechanical
SupervisorHSE
Mechanical
SupervisorHSE GS HSE
Person In Charge Name : Wi Pil Hun Wi Pil Hun Herry Gunarso
Position/Title of Job : Site Manager
Job Activity : Mechanical Erection at Area
12A ( Auxiliary Boiler 151B-
501A/B/C)
Date : 26/08/2013 26/08/2013 26/08/2013 26/08/2013
Pekerjaan : Erection Boiler part, Steam Turbine, FDF, Economizer, Stack , Air Fule Gas Duct, Steel Structure
PPE Safety Helmet, Safety Shoes, Hand Gloves, Dust Masker, Safety Glasses, bodyharnest, Welding masker.
Equipment & Tools Magnetic Water Pass, Scaffolding, Crane 50T, Crane 25T, Trailler,Generator set ,grinding machine,theodolite,kunci pas,mesinimpact,kunci racet,Chipping hammer
No Basic Job Steps Potensi Hazard Hazards Risk Assessment Risk Control Remark
LL SV RR
I. PERSIAPAN1. Aktifitas Flaring Terpapar H2S dan Gas Beracun 5 12 25
(H)Lakukan monitoring kandungan gas H2S
selama kegiatan berlangsung dengan
menggunakan multi gas detector
Gunakan WindShock sebagai acuan arah anginuntuk menghindari arah gas release
Gunakan Elsa / SCBA selama melakukanpengecekan Gas Beracun/ H2S
Pastikan para pekerja sudah diberi pengarahan(Training) mengenai bahaya H2S dan caraPenanganannya.
7/30/2019 2. JSA Erection Aux Boiler
2/13
2
Lakukan ERP dan ERT apabila ada pekerjayang terkena paparan H2S dan segera
dievakuasi kerumah sakit yang telah ditunjuk.
2. Perijinan( permits )
Proses Perijinan( processing permit )
Prosedur pelaksanaan
permit.
( Procedure of permitsprocess)
Pembuatan Perijinan yangkurang benar dapat
menyebabkan
Miscomunication dan
Menimbulkanketerlambatan pekerjaan.
(miss communication can make
make trouble and delay progress)
Pelanggaran prosedur.
(Offence / violation of the rules)
3
3
2
2
6(M)
6
(M)
1.a. Lakukan briefing mengenai prosedur kerja,bahaya yang ada dan pencegahannya serta
scope pekerjaan yang akan dilakukan kepada
pekerja
terlebih dahulu sebelum memulai pekerjaan.( share with management about permits
process and do not start to work before
permits complete and signed )
b. berikan arahan bahwa Pekerjaan baru dapatdilakukan jika ijin kerja telah ditandatangani
oleh departemen / pihak terkait .
Share the rules about working permits to allcomponent of workers to working after
permits complete signed, and aboutpunishment if they make any offence.
c. Lakukan toolbox meeting setiap
sebelum memulai pekerjaan.
(Toolbox meeting before start working)d. Sosialisasikan JSA ke semua pekerja.
(Sosialiszation JSA to workers).
3. MobilisasiMaterial Unit.
(Material
mobilization)
Penggunaan Kendaraan(vehicle)
Kecelakaan pada saatmobilisasi material
(kecelakaan lalulintas)
( Vehicle Crash)
Material yang dibawa roboh/
Terjatuh pada saat mobilisasi(material falling when
mobilization process)
2 2 4(L)
2.a. Memastikan kendaraan yang digunakansesuai dengan aturan yang ditentukan
oleh pihak Pertamina RFCC
Cilacap,dilengkapi dengan flagman.(Make sure the vehicle is properly safe and
accordance with RFCC vehiclerequirements/rules,also complited with
flagman)
b. Membuat perijinan IMK dan SIM Kilang.(make vehicle permits and driver permits
from RFCC)d. Mengikat peralatan kerja / material pada saat
mobilisasi.
(Tied the material with properly safe)e. Mengikuti aturan kecepatan dan jalur yang
telah ditentukan di dalam kilang
(follow the speed limit rules)
7/30/2019 2. JSA Erection Aux Boiler
3/13
3
4. Penurunan unit
(rangka) direction
kit.(Unloading)
Pengangkatan Material
( Lifting Materials)
Material terjatuh, kejatuhan/
terjepit material pada saat
penurunan(Falling materials, risk forinjury)
Kesalahan penempatan
- Mengganggu akses jalan( Access Blocking)
3 3 19
(M)
3.a. Memastikan Jarak aman pada saat
unloading,dan pasang tag line, koordinasi
yang baik antara signal man dan operator.Signalman selalu mengarahkan operator.(Make sure about lisfting safe distance, and
do not position personel below of the
material,use tag line, good cooperation from
the signal man and operator, signal manalways sign the operator).
b. Menggunakan Alat Pelindung Diri( Use the right PPE for the job exm : Hand
Glove, and helmet )c. Tidak melakukan penempatan di lokasi akses
/ jalan dan pasang barikade disekitar alat
berat yang sedang bekerja hanya yang
berkepentingan yang boleh masuk.( Do not put the materials on the way andshould place the barricade around heavy
equipment)
II.PROSES CHIPPING DAN PADDING
1 Chipping *Berdebu( Dusty )
Batuk.( cough)
2 2 4(L)
Diwajibkan memakai sarung tangan dan masker(Required to wear gloves and masks)
*Lepas pegangan(slippery )
Tangan terlepas dari peganganmesin chipping
( hand winched or stratched)
Mata kemasukanserbuk/serpihan concrete
(kelilipan)
( eye contaminated with dust orgram material)
Jatuh dari ketinggian
(fall from height)
3
3
5
3
4
5
9(M)
12(M)
25
(H)
Gunakan APD (sarung tangan) yang sesuaidengan jenis pekerjaan, contoh : katun atau kulit
( use the right hand gloves, exm : cotton or
leather)
Gunakan APD (kacamata safety)( use safety googles )
Pastikan pekerja dalam keadaan sehat pada waktu
bekerja, Pengukuran tekanan darah pada pekerjayang akan bekerja di ketinggian.
( make sure the worker is in healthy condition,
checking blood pressure for worker who works atheight)
Gunakan full body harness pada saat bekerja
7/30/2019 2. JSA Erection Aux Boiler
4/13
4
2 Padding *Berdebu
( Dusty
Batuk.
( cough)
Mata kemasukan
serbuk/serpihan concrete
(kelilipan)( eye contaminated with dust or
gram material)
Tangan terkena material
grouting
( hand injured from groutingmaterial)
2
3
5
2
4
5
4
(L)
12
(M)
25
(H)
diatas ketinggian >1,8 meter
( make sure using full body harness in every work
at place that higher than 1.8m)
Diwajibkan memakai sarung tangan dan masker(Required to wear gloves and masks)
*Gunakan APD (kacamata safety)
( use safety googles )
*Diwajibkan memakai sarung tangan((Required to wear gloves)
3 Clean up area Material Limbah 1.1. Sampah tercampur.
1.2. Sampah tidakdibersihkandapat menyebabkan
kebakaran dan
kecelakaan pada
pekerjaan berikutnya.
3
3
5
5
15
(H)
15(H)
1.1.1. Pilah pilah sampah sesuai jenisnya.
1.1.2. Membuang sampah pada tempat yang
telah ditentukan.1.1.3. Membersihkan lokasi pekerjaan
setelah selesai bekerja.
III.Assembly Auxiliary Boiler Part
1.
2.
Persiapan erection
( Prepare erection
area)
Persiapan install
scaffolding
( Prepare installscaffolding)
*Berdebu
( Dusty )
*Tersandung(Stumbling)
*Terjepit
(wedge)
Batuk.
( cough)
*Cidera tulang belakang(Back bone injury)
TanganTerjempit /Tergores
/Tertusuk benda tajam
(besi/kawat bendrat)(hand winched or stratched)
2
3
2
3
4
(L)
9
(M)
Diwajibkan memakai sarung tangan dan masker(Required to wear gloves and masks)
Gunakan APD (Sarung tangan) yang sesuai
dengan jenis pekerjaan
(Use the right hand gloves exm : Cotton orleather)
Gunakan APD (Kacamata safety)
7/30/2019 2. JSA Erection Aux Boiler
5/13
5
*Salah penyetelan(miss assembly )
Membahayakan orang lain( harm others)
3 4 12(M)
(use safety googles)
Cek claim,pipe serta kunci racet,sarung tanganwajib digunakan.(Check the claim, as well as key racet pipe,
gloves must be used.)
IV.INSTALASI SCAFFOLDING
1. Mobilisasi
materialscaffolding
( materialscaffolding
mobilization )
Penggunaan kendaraan
( moving vehicle )
Kecelakaan pada saat mobilisasi
material/kecelakaan lalu lintas( vehicle crash )
Material yang dibawa
roboh/terjatuh pada saatmobilisasi
( material falling when
mobilization process )
3
3
3
2
9
(M)
6
(M)
Memastikan kendaraan yang digunakan sesuai
dengan aturan yang ditentukan oleh pihak GSE&C (memiliki IMK) dan dilengkapi dengan
flagman( make sure the vehicle is properly safe and
accordance with GS E&C vehicle requirementsor rules, also complited with flagman )
Pastikan driver telah memiliki SIM Kilang dantelah mengikuti pelatihan cara mengemudi yang
aman( make sure the driver have driving permits,
know about safety driving and in health
condition )
Lakukan Induksi atau pengenalan area dan jaluryang akan dilalui oleh kendaraan tersebut
sebelum memasuki lokasi
( give information and orientation about areaand vehicle lane in the location )
Pastikan seluruh komponen kendaraan berfungsidengan baik seperti alarm mundur, kaca spion
dan wiper.( make sure for all component for safety can be
used when needed exm: parking alarm, mirror
and wiper)
Mengikat peralatan kerja/material pada saatmobilisasi
( tied the material with properly safe )
Mengikuti aturan kecepatan dan jalur yang telah
ditentukan di dalam area project( follow the speed limit rules )
7/30/2019 2. JSA Erection Aux Boiler
6/13
6
Kendaraan tidak boleh masuk
dalam area project
( vehicle did not allowed to passthe gate project area )
3 3 9
(M) Memastikan kendaraan yang digunakan sesuai
dengan aturan yang ditentukan oleh pihak GSE&C (memiliki IMK) dan dilengkapi denganflagman
( make sure the vehicle is properly safe and
accordance with GS E&C vehicle requirements
or rules, also complited with flagman )
Pastikan driver telah memiliki temporary SIMKilang dan telah mengikuti pelatihan cara
mengemudi yang aman( make sure the driver have temporary driving
permits, know about safety driving and in health
condition )
2. Unloading
materialscaffolding
( unloadingmaterial
scaffolding)
Proses penempatan
( positioning)
Kesalahan penempatan
mengganggu akses jalan( access blocking)
Material terjatuh/kejatuhan/terjepit material pada saat
penurunan( falling materials,
risk for injury )
2
3
2
4
4
(L)
19(H)
Tidak melakukan penempatan di lokasi
akses/jalan dan pasang barikade( do not put the materials on the way and should
place the barricade )
Lakukan koordinasi yang baik oleh driver dan
pemberi aba-aba agar kendaraan dapat
ditempatkan di tempat yang sesuai( make sure for good coordination and preparefor signalmen when positioning)
Kenali seluruh peralatan dan fasilitas yang
berada di area penempatan( identify for all equipment building and facilityin the area )
Pastikan lokasi penempatan bukan akses pekerja
lalu-lalang( make sure to not blocking manpower access )
Memastikan jarak aman pada saat unloading,dan pasang tag line
( make sure about lifting safe distance, do notposition personel below of the material, and use
tag line )
Pastikan material yang akan diangkat tidakmelebihi kapasitas angkat
( make sure to not lifting more than capacity )
7/30/2019 2. JSA Erection Aux Boiler
7/13
7
Gunakan Alat Pelindung Diri (safety helmet)
( use the right PPE for the job )
Barikade area sekitar pekerjaan
( install barricade to protect from another
manpower activities )
3. Perancangan
scaffolding( installscaffolding)
Proses perancangan
scaffolding(scaffolding installingprocess )
Tangan terjepit/tergores/tertusuk
benda tajam( hand winched or stratched)Mata kemasukan
serbuk/serpihan besi (kelilipan)
( eye contaminated with dust or
gram material)
Kejatuhan material( falling materials )
Jatuh dari ketinggian
(fall from height)
3
3
4
5
3
4
4
5
9
(M)
12
(M)
16(H)
25
(H)
Gunakan APD (sarung tangan) yang sesuai
dengan jenis pekerjaan, contoh : katun atau kulit( use the right hand gloves, exm :cotton /leather)Gunakan APD (kacamata safety)
( use safety googles )
Pastikan tidak ada pekerja yang melintas padasaat pemasangan scaffolding dan beri tanda
dengan warning sign awas ada pekerjaan diatas( make sure no worker across under scaffolding
and make sure warning sign awas ada
pekerjaan diatas avaliable )
Pasang barikade di area pekerjaan( place the barricade in working area )
Gunakan safety helmet
( use safety helmet)
Pastikan pekerja dalam keadaan sehat pada
waktu bekerja
( make sure the worker is in healthy condition )
Pasang perancah scaffolding dengan baik danbenar
( make sure the scaffolding is properly safe andaccordance with GS E&C scaffolding
requirements or rules )
Gunakan full body harness pada saat bekerjadiatas ketinggian >1,8 meter
( make sure using full body harness in every
height work above >1,8 meters )
7/30/2019 2. JSA Erection Aux Boiler
8/13
8
Salah dalam pemasanganscaffolding dapat menyebabkan
perancah roboh( unproper scaffolding
installation can make scaffolding
collapse )
4 4 20(H)
Pastikan full body harness sudah dikaitkan
dengan benar
( make sure full body harness hook are properlyinstalled)
Hentikan pekerjaan jika turun hujan dan petir( if drizzle start,stop working)
Pastikan dalam pemasangan scaffolding telahbenar dan pastikan klem telah terikat dengan kuat
( make sure the clem of scaffolding is properlyinstalled)
Pastikan bahwa scaffolder telah memiliki
lisensi/sertifikat dan ahli dibidangnya( make sure the scaffolder have license orcertificate and accomplished in scaffolding)
Pastikan scaffolding dilengkapi dengan bracing,
ladder, toe board dan base plate( make sure the scaffolding completed by
bracing, ladder, toe board and base plate )
Sebelum digunakan perancah scaffolding harus
dilakukan pengecekan dan diberi tagging denganketerangan sbb:
kuning : dalam proses pembuatan
hijau : dapat digunakan
merah : tidak boleh digunakan
( before using, make sure the scaffolding ischecked and tagged)
V.Erection Auxiliary Boiler Part di Area 12A
1. MobilisasiAuxiliary boiler
part (Auxiliaryboiler part
mobilization)
PenggunaanKendaraan
(Vehicle tansportation)
Kendaraan Tabrakan/menabrak/ Tergelincir pada
saat mobilisasi( Vehicle Crash )
3 3 9(M)
Sebelum digunakan pastikan kendaraandalam kondisi baik dan dilakukan
pengecekan rutin.(vehicle inspection)
Memastikan bahwa Driver telah
memiliki Ijin mengemudi (sesuai dengan jeniskendaraan ) dan surat-surat kendaraan.
(make sure for driver and vehicle have permitsfrom RFCC)
7/30/2019 2. JSA Erection Aux Boiler
9/13
9
Tangan Terjepit, Terkilir /Kejatuhan Material.
( Windched hand, Sprain / falling
material)
3 3 9(M)
Pastikan Pekerja sudah diberi instruksi
pekerjaan dan aturan kerja
aman(Induksi) sertamengerti Prosedur pekerjaan.
(Make sure to give orientation and safety
instruction for the activities)
Pastikan material yang akan diangkat tidakmelebihi kapasitas angkat
( Make sure to not lifting more than capacity)
Pastikan Meterial Terikat dengan baik padasaat mobilisasi dan tidak melebihi kapasitas.
( Make sure to tied the material strongly orsafely)
2. Memuat danpemasangan
Auxiliary boiler
part (Auxiliaryboiler part
loading &erection )
Sumber Panas padaPeralatan
( Heat source from
heavy equipment )
Pengangkatanmaterial.(Lifting Steel
Structure)
Peralatan (AlatBerat)
(Heavy Equipment)
Ledakan / Kebakaran(Explosion / fire)
Tertimpa material( Affected Material )
Tangan Terjepit, Tergores/terkilir
( Windched hand, Sprain / falling
material)
Crane Terbalik/ Terguling.(Craine Rollover)
3
3
4
3
5
5
4
4
15(H)
15(H)
16
(H)
12(M)
Pastikan Dilakukan Gastest sebelummelakukan pekerjaan panas (IKP)
(make sure to do Gastest procedure before start
hot works)Pastikan ijin kerja sudah dibuat dan ditanda
tangani oleh PIC terkait.(Make sure hot work permits complete and has
been signing)
Pastikan Posisi Pekerja tidak berada dibawahmaterial yang diangkat.(Make sure to all manpower to not stay belowof material)
Pastikan Pekerja sudah diberi instruksipekerjaan pada saat Tool Box meeting danmengetahui cara kerja yang aman.
(give all information to all employee aboutsafety procedure)
*Gunakan tali untuk mengendalikan beban.
Pastikan Crane beroperasi dalam radius bebanyang sesuai lifting plan dan rigging plan yang
disetujui.(Make sure Crane operates within a radius
corresponding load lifting and rigging planapproved plan.)
Pastikan Beban Material yang diangkat tidakmelebihi kapasitas angkat Crane.(Make sure to not lift more than maksimum
load capacity)
Pastikan Posisi (Out Rigger Jack )Crane padadudukan yang kokoh dan Level.
(Make sure about Out rigger jack position is
7/30/2019 2. JSA Erection Aux Boiler
10/13
10
Sling Putus. 3 5 15(H)
sturdy and level)
Pastikan Operator Telah Memiliki SIO danSertifikat pada Crane.(Make sure about operator licence and crain/heavy equipment certificate)
Pastikan crane memiliki SIA dan safety tag. Sinyalman /rigger wajib memmakai rompi Pastikan Sling dan Assesoris pada Crane
dalam kondisi yang baik dan sesuai dengankapasitas.
Make sure for sling and craine accessories issafe and appropriate with material weight
(right tool for right job)
3. Setting Auxiliary
boiler part
Ketinggian(Heigth)
Personel terluka karenaTerjatuh
(Injury because Falling from
heights)
Tertimpa Material
Tangan Terjepit
3
3
3
5
9
(M)
15
(H)
Pastikan pekerjaan diatas ketinggian lebih dari1,8 m harus menggunakan Full Body Harnessdan menggunakan Perancah sesuai dengan
Assesorisnya(Make sure to using Full Body Harness for
working more than 1.8m heights)
Pastikan Posisi Pekerja tidak berada dibawahmaterial pada saat penyetingan.(Make sure to not positioned manpower/anyperson below of materials)
Pastikan Pekerja sudah diberi instruksipekerjaan pada saat Tool Box meeting dan
mengetahui cara kerja yang aman.(Share for the procedure and safety work stepson the toolbox meeting before start working)
4. Pengelasan padaAir flue gas duct
& Joint stack. (Air
& flue gas duct
and joint stack
welding work)
Sumber Panas padaPeralatan
Jari tangan tercepit (Handfinger pincched )
Tersandung atau Terpeleset(Tripping or Slippery)
Bahaya asap (Fume hazard )Luka Bakar( Skin burn )Kebakaran / Ledakan ( Fire /Explosion )
Bahaya terhadap lingkungan (Environmental impact )
Cahaya yang menyebar padasaat pengelasan ( Flash light
from welding activity )
Tersetrum ( Electrical shock )
2 3 6 Alat pemadam api harus ada di lokasi kerja,dengan sertifikat yang berlaku dan tanda
pemeriksaan mingguan. (and weekly inspection
tag / stand by )
Sebelum memulai kegiatan semua peralatanlistrik harus diperiksa. (Before start activity allelectrical appliances should be inspected )
Mesin las harus disyahkan dan diperiksa olehpihak yang ditunjuk oleh perusahaan. (Welding
machine should be approved and inspected bycompany autority )
Semua kabel harus tersusun rapi dan benar(Allcable has to be arranged properly)
Tidak ada genangan air di lokasi kerja. (No
7/30/2019 2. JSA Erection Aux Boiler
11/13
11
Gas bocor( Gas leakaged ) stagnant water on work location )Sirkulasi udara harus dijaga (LEV-Local
exhaust ventilation jika digunakan). (Proper aircirculations has to be maintained LEV ifneeded)
Standby orang yang mengawasi jika ada api /kebakaran. (Stand by fire watch)
Welder jangan pernah menggulung kabeldisekitar tubuhnya pada saat melakukan
pengelasan. (Welders must never coil cablesaround their body when welding )
Kabel clamp untuk massa harus ditempatkkandi dekat pengelasan ( Welding return clamp
should be placed near on weld location)
Atur kegiatan dan ambil istirahat untuk welderjika diperlukan (Organize work activity andrest periods for welders if needed )
Pegangan electrode harus dilengkapi denganisolasi yang kuat. ( Electrode holder must be
provided with a handle of tough insulating)
Sediakan penutup yang tahan api sepertiasbestoss sheet (Provide fire resistant cover of
fire blanket at working area )Jangan gunakan plastic terpal atau kanvas
(Dont used plastic tervalin or canvas )
Stand by medis dan tim untuk keadaan daruratdi lokasi kerja (Stand by medic and emergencyresponse team at work location)
Gas test harus dilakukan sebelum dan padasaat pengelasan dilakukan. (Gas test shall be
done before or during welding activity )
5 Penggerindaan(Grinding work)
Percikan api padasaat penggerindaan
Spatter / gram berterbangan(Flying particles)
Mata gerinda tidak terarah.(Grinding wheel in motion)
Tersetrum (Electrical shock)Kebakaran / Ledakan (Fire /Explosion)
2 3 6 Hanya orang yang terlatih harus melakukanpekerjaan tersebut. (Only trained personnelshould be carrying out the job)
Sediakan penutup yang tahan api di lokasi kerja(Provide fire resistant cover fire blanket at
working area)Pergunakan alat pelindung diri yang sesuaipada saat melakukan pekerjaan termasukpelindung muka. (Suitable PPE should be used
during performing the job including face
shield)Perlengkapan keselamatan mesin gerinda
7/30/2019 2. JSA Erection Aux Boiler
12/13
12
berfungsi (Verify grinding machine safety
device operated)
Jauhkan jika ada material atau chemical yangmudah terbakar dari lokasi kerja. (Kept away ifany flammable material or chemical from
working area)
Semua alat-alat listrik harus diperiksa sebelummelakukan pekerjaan. (All electrical appliancesshould be check before start activity)
Periksa mata gerinda pada saat berhenti. (Checkgrinding disc on regular interval)
Lepaskan sambungan koneksi jika mesingerinda tidak digunakan. (Disconnected
electrical connection if grinding machine not
used)
Tempatkan mesin gerinda di tempat yangaman. (Keep grinding machine at safe area)
Lindungi peralatan kabel, tray atau peralatanyang lain. (Protect close equipment cable, tray
or others equipment)
Semua panel listrik harus dipasang ELCB30mA. (All electrical panels should be
provided with ELCB 30A)Pergunakan hanya mata gerinda yang di
syahkan. (Use only approved grinding disc
type)Sediakan penutup yang tahan api dilokasi kerja.
(Provide fire resistant cover fire blanket at
working area)
6 Merapikan
Peralatan
Pekerjaan
Material yang
berantakan
Tersandung/Terpeleset 2 2 4
(L)
Pastikan penempatan material tidak
mengganggu akses lain
Rapikan segala peralatan dan materialsebelum dan setelah selesai bekerja
VI.PROSES GROUTING
1Proses grouting *Berdebu
( Dusty ) Batuk.( cough)
2 2 4(L)
Diwajibkan memakai sarung tangan dan masker(Required to wear gloves and masks)
Clean up area Material Limbah 1.1. Sampah tercampur. 3 5 15
(H)
1.1.1. Pilah pilah sampah sesuai jenisnya.
1.1.2. Membuang sampah pada tempat yang
telah ditentukan.
7/30/2019 2. JSA Erection Aux Boiler
13/13
13
1.2. Sampah tidakdibersihkan
dapat menyebabkankebakaran dankecelakaan pada
pekerjaan berikutnya.
3 5 15
(H)
1.1.3. Membersihkan lokasi pekerjaan
setelah selesai bekerja.
Note :
Distribusi
1. Asli disimpan Penanggung jawab Pekerja2. Salinan disimpan Lead HSE
Safety Hazard Identification/Risk Assessment
SEVERITY LIKELIHOOD
1 Negligible Tidak ada ada yag luka, sangat kecil pengaruh kekeuangan,
performa kerja tidak terpengaruh
1 Improbable Sangat jarang terjadi, tapi mungkin
2 Minor Cukup dengan P3K, Pengaruh di lapangan dapat langsungditangani, berpengarug sedang dikeuangan,
2 Unlikely Dapat terjadi kadang-kadang
3 Moderate Memerlukan perawatan medis, pengaruh dilapangan dapat
diatasi dengan pengawasan dari luar, kerugian keuangantinggi
3 Occasional Mungkin terjadi setiap waktu
4 Major Luka yang serius, kemunduran waktu konstruksi, Pengaruh
sampai luar lapangan tanpa efek detrimental, kerugian
keuangan sangat tinggi.
4 Probable Terjadi sangat sering
5 Catastrophic Kematian, pelepasan bahan berbahaya sampai luar lapangan
dengan efek detrimental, kerugian keuangan dalam jumlahyang sangat besar
5 Frequent Kejadian diperkirakan terjadi sangat rutin
RISK RANKING
Likelihood (LL) Severity (SV)
1.Improbable 2.Unlikely 3.Occasional 4.Probable 5.Frequent
1 Negligible 1 2 3 4 52 Minor 2 4 6 8 10
3 Moderate 3 6 9 12 15
4 Major 4 8 12 16 20
5 Catastrophic 5 10 15 20 25
Score/Risk Ranking (RR) : 15 Low (rendah)612 Medium (sedang)
1325 High (tinggi)
Recommended