• 15 Sediment Gages • ~2,000 samples per year • 7 Cooperators • 5 Technicians in 3 offices • Project Oriented
– Dam Removal – Restoration
• OPERATIONAL NOT A RESEARCH focus – i.e. 5 Sediment Acoustic sites
slow addition
13
5 4
4
2
14 mi2 drainage area Up-looker used Nearly 100 % fines in suspension No near field corrections
1,636 mi2 drainage area
Up to ~25 % sands in suspension
Side-looker: on-going problems with debris on instrument
Wake zone?
Partial cleanup of data (negative slopes taken out)
Results with only two cells used -no near field correction -wake zone?
FISP Funded 2011-2012
Automation Software Development
Beta Sediment Stationary Add-in by
Boldt, Szupiany, Czuba, and Oberg into
VMT by Parsons, Jackson, Czuba, Mueller, and Oberg
Beta Add-in Animation
Previous Peak 37.24’ Previous Peak 34.56’
Previous Peak 39.01’ Previous Peak 26.04’
Slide Number 1Slide Number 2Slide Number 3Sediment Concentration and Attenuation Coefficient �Two October Storms at Kickapoo (05579630)Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10AutomationBeta Add-in�AnimationSlide Number 13Slide Number 14Next Steps for OSW?Slide Number 16Additional ComplicationsMeasured, and Water and Sediment �Corrected BackscatterMultiple �Water Corrected Backscatter ReadingsThe SAME Multiple Readings, but for�Sediment Corrected Backscatter