YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT Page 1 of 13 21 November 2015 All Round Safety Solutions www.arsafetysolutions.com.au 1| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed Section A: Complete for all Broad/Activity Risk Assessments and Safe Work Method Statements Project: Company Name: Project Address/Location Description of works: Use of Crane for Erection of Tilt Panels High Risk Activity: working at heights - involves a risk of a person falling more than 2 metres involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure involves, or is likely to involve, the disturbance of asbestos involves structural alterations or repairs that require temporary support to prevent collapse confined Space tilt or precast concrete on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians in or near water or other liquid that involves a risk of drowning in or near a shaft or trench with an excavated depth greater than 1·5 metres; or a tunnel involves the use of explosives on or near pressurised gas distribution mains or piping on or near chemical, fuel or refrigerant lines on or near energised electrical installations or services contaminated or flammable atmosphere any movement of powered mobile plant area in which there are artificial extremes of temperature involves diving work is carried out on a telecommunication tower Acknowledgement: Position: Date: 26 June 2015 Review date: 26 September 2015 ABN: Signature: Personnel consulted in the development of this SWMS - If a failure, incident, a non-conformance or a non-compliance is identified in the SWMS, works will stop, the SWMS will be reviewed amended and the changes communicated to the workforce, via toolbox meeting. Assessment prepared in consultation with: Name Position Organisation Date Section B: Complete for Safe Work Method Statements only Safe Work Method Statement Name: Adrian Ockford Number: 0435 007 983 Version Number: Ref 001 Required Resources/Trades:(list below) Licensed Crane Operator Licensed MEWP Operator Licensed Dogman/Rigger Training Required: Licence to perform high risk work Competent person to create lift plan if required Crane drivers licence – specific to crane type in use Competent Traffic controller General induction Testing and Tagging: (list equipment and expiry date) Please see Attachment for these details Plant and Equipment Involved: (list below) AT20 Franna Grove 5130 Crane MEWP Mechanical Check: (list below) 11 What Permits/Checklists are Required? Asbestos Confined Spaces Electrical/Gas Isolation Excavation Hot Works MEWP Riser Access Working at Heights Working on Roofs/Ceiling Voids

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

  • Upload
    lamnhu

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 1 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 1| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

Section A: Complete for all Broad/Activity Risk Assessments and Safe Work Method Statements Project: Company Name:

Project Address/Location

Description of works: Use of Crane for Erection of Tilt Panels

High Risk Activity:

working at heights - involves a risk of a person falling more than 2 metres

involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure

involves, or is likely to involve, the disturbance of asbestos involves structural alterations or repairs that require

temporary support to prevent collapse confined Space tilt or precast concrete

on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians

in or near water or other liquid that involves a risk of drowning in or near a shaft or trench with an excavated depth greater

than 1·5 metres; or a tunnel involves the use of explosives on or near pressurised gas distribution mains or piping on or near chemical, fuel or refrigerant lines

on or near energised electrical installations or services contaminated or flammable atmosphere any movement of powered mobile plant area in which there are artificial extremes of temperature involves diving work is carried out on a telecommunication tower

Acknowledgement: Position: Date: 26 June 2015 Review date: 26 September 2015

ABN: Signature:

Personnel consulted in the development of this SWMS - If a failure, incident, a non-conformance or a non-compliance is identified in the SWMS, works will stop, the SWMS will be reviewed amended and the changes communicated to the workforce, via toolbox meeting.

Assessment prepared in consultation with:

Name Position Organisation Date

Section B: Complete for Safe Work Method Statements only Safe Work Method Statement Name: Adrian Ockford Number: 0435 007 983 Version Number: Ref 001 Required Resources/Trades:(list below) Licensed Crane Operator Licensed MEWP Operator Licensed Dogman/Rigger

Training Required: Licence to perform high risk work Competent person to create lift plan if required Crane drivers licence – specific to crane type in use Competent Traffic controller General induction

Testing and Tagging: (list equipment and expiry date) Please see Attachment for these details

Plant and Equipment Involved: (list below) AT20 Franna Grove 5130 Crane MEWP

Mechanical Check: (list below) 11

What Permits/Checklists are Required?

Asbestos Confined Spaces Electrical/Gas Isolation Excavation Hot Works MEWP Riser Access Working at Heights Working on Roofs/Ceiling Voids

Page 2: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 2 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 2| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

List applicable legislation, regulations, COP Work Health and Safety Act and Regulation 2011 Electrical Safety Act 2002 and Regulation 2013 National code of practice For precast, tilt-up and Concrete elements in Building construction National Code of Practice - Construction Work November 2013 National Code of Practice - Hazardous Manual Tasks December 2011 National Code of Practice - How to Manage Work Health and Safety Risks December 2011 National Code of Practice - Managing Noise and Preventing Hearing Loss December 2011 National Code of Practice - Managing the Risk of Falls at Workplaces March 2015 National Code of Practice - Managing the Risks of Plant in the Workplace September 2013 National Code of Practice - Work Health and Safety Consultation, Cooperation and Coordination December 2011

Traffic Management Guide for Construction Work – supplement to Code of Practice: Construction Work (supplement to Code of Practice – Construction Work) July 2014 Guide for Operating Cranes and Mobile Plant Near Overhead Electric Lines July 2014 AS 1418 - Cranes, hoists and winches – Tower cranes AS 2550.-2002 Parts 1-5 (Safe Use of Cranes) AS 2550.1 – 2002 - Cranes, hoists and winches – Safe use – General Requirements AS 2550.4 – 2004 - Cranes, hoists and winches – Safe use – Tower Cranes AS 2550.5 – 2002 - Cranes, hoists and winches – Hi Safe use – Mobile Cranes AS 2550.10 – 2006 - Cranes, hoists and winches – Safe use – Mobile elevating work platforms AS 1418.-2002 (Crane, Hoist & Winch – general requirements) AS 3775.2.-2004 (Chain Slings – care and use) AS1666.2.-1995 (Wire-rope Slings – care and use) AS4497.2-1997 (Round slings, Synthetic Fibre – care and use) Workplace Health and Safety Queensland - Mobile Crane Code of Practice 2006 Workplace Health and Safety Queensland - Steel Construction 2004 Crane Industry Council of Australia (CICA) “Crane Safety Manual

Communication Method: Tool Box and Pre starts PPE: (tick) where applicable document specific type

Corrective Actions for Shortfalls in SWMS: Work will cease on this project until new controls have been developed in consultation with relevant stakeholders. Once the activities and controls have been entered into the SMWS, work will recommence on the project activities. Any Corrective Actions will be recorded into the Incidents, Hazards & Corrective Actions Register and this will then be checked against the SMWS.

Page 3: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 3 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 3| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

Section C: Complete for all Task/Activity Risk Assessments and Safe Work Method Statements Item No.

1. ACTIVITY DESCRIPTION (Describe sequence of work or the broad areas

of activity)

2. HAZARDS (See final page for “typical” hazards

listing)

3. CONSEQUENCES (Describe what can go wrong

based on hazard) (Note: Impacts describe how

serious the consequences are)

4. INITIAL RISK RATING (See over page for categories)

5. CONTROL ACTIONS IN PLACE AND ANY ACTIONS PLANNED

(To bring the risk to a low as reasonably practicable – ideally “eliminate” risk, see over page for hierarchy

of controls)

6. RE

SIDU

AL R

ISK

RATI

NG Consi-

quences V. Small to V. Large

Likeli-hood V. Low to V.

High

Risk Rating (Negligible,

Minor, Moderate, Significant,

Critical) 1 Site Pre start induction Unfamiliar with site conditions.

Poor simop’s between work crew.

Plant and personal interaction.

M M 9 • Arrive on site • Park plant/crane in safe area on hard

stand • Report to site office for site specific

induction & directions to works. • Pre- start must be read and signed off

and a JHA will be written for the task with reference to SWMS. All paperwork MUST be reviewed and sign off by site Manager.

• Each worker must have site inductions, red card, and high risk work licence as appropriate to role - permits presented prior to commencing work

• Obey all site safety rules & signage. • Each Worker is required at all times to

wear PPE, including hard hat, riggers gloves and where necessary safety glasses, ear plugs or any other required PPE - If you do not have the required PPE, DO NOT start work.

6

2 Traffic Management Vehicles or mobile plant – crane exclusion zone

Injury to persons, damage to other plant on site/vehicles on site

L VH 20 • Appropriate traffic management must be in place where required

• Travel as per Statutory Road Rules & permits

• Flag person • Flashing hazard lights • A boarding, gantry or scaffolding • Warning signs and barriers • Pedestrian exclusion zone • A Traffic Management Plan in

accordance with code of practice and Australian Standards

• All traffic controllers to be ticketed. • Road closure permits to be obtained

where required.

Page 4: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 4 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 4| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

• Mobile plant to be fitted with operating flashing lights & reverse beepers.

• Provide appropriate fencing and/or barricades as per site risk assessment

• Apply appropriate signage and pedestrian control

• Dogman/Rigger to guide crane into position 3 Pedestrian traffic L VH 20 • All persons working in vicinity of mobile

plant to be wearing high visibility clothing.

• Provide appropriate fencing and/or barricades as per site risk assessment

• Apply appropriate signage and pedestrian control.

4 Prestart checks Permits not acquired Crane not suited to tasks Equipment is not suited to tasks

Injury persons Tipping of crane/unstable during lift

L VH 20 • Ensure all permits have been issued for the task

• Ensure correct equipment is ready for the task

• Check capacity of crane to perform tasks required on site

16

5 Overhead power lines Underground services

Electrocution Damage to underground services Structural damage

L VH 20 • Check proximity of overhead power lines

• Have site map with location of services clearly marked

• Check the ground conditions and ascertain if there are any underground services where the crane is to be set up

16

6 Obstructions to access/egress to site

L VH 20 • Conduct site inspection to ensure access/egress is adequate for the task activities.

16

7 Communication breakdown L VH 20 • Setup good communications (safe and adequate) between the crane operator and those assisting in the operation including check of radios, batteries, whistles and hand signals

• Note: Audible and visual signals should comply with AS 2550.1 or the most recent equivalent

16

8 Congested work area - structural collapse due to unsafe propping of panels

L VH 20 • Work area to be cleared of any debris before work commencing.

• Ensure that sufficient clear space is available for the safe propping or panel bracing of the precast or tilt- up elements.

16

Page 5: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 5 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 5| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

9 Planning Works Process Structural collapse caused through works not being planned properly

Damage to crane Damage to structures Injury to persons

VL VH 25 • Prior to lifting any tilt-up or precast element, the erector must be provided with:

- project design engineers certificate of compliance

- manufacturers certificate of compliance

- component schedule must be provided by the precaster and must include - Project name and address - Element designation - Element mass - Concrete strength required at the

time of erection for the element and, where applicable, the bracing footing

- Type, capacity and length of the lifting inserts

- A diagram of the rigging system(s) between crane and precast element for both rotation and erection.

(Shop drawings may be used to form the component schedule).

• The planning process should take into account:

- Site limitations - Local street access - Element size - Crane size, mobility and access - Casting sequence - Overhead obstructions, including

overhead power lines. • The erector must nominate one person

in the erection crew to be directly responsible for the direction and co-ordination of the erection sequence and to ensure it is erected in accordance with the designers and manufacturer’s instructions

• This person must hold a rigging certificate of competency in either the Intermediate Rigging or Advanced Rigging certificate classes.

20

Page 6: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 6 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 6| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

• At least one of the erection crew, preferably the rigger in charge of the crew, should have been trained in the Industry Standard for Precast and Tilt-Up Concrete for Buildings.

10 Location crane Crane not sited in appropriate

area Crane not suited to tasks

VL VH 25 • crane selection, access and siting in accordance with AS 2550 or the most recent equivalent

20

11 Crane not located with sufficient area to slew/rotate safely

VL VH 25 • the crane should be located with consideration given to the erection sequence of the concrete

• elements to avoid any possibility of the rear of the crane slewing into braces supporting previously

• erected concrete elements

20

12 Crane strikes other crane (where two or more cranes are working on site)

VL VH 25 • where two or more cranes are operating they should be sited so as to prevent them operating in each other’s airspace.

• where this is not possible, procedures must be established to prevent unplanned contact between cranes

20

13 Ground conditions Recent civil works on ground e.g. trenching, backfill

Injury persons Tipping of crane/unstable during lift

VL VH 25 • ground support conditions and the location of any excavations or underground services likely to be adversely effected by imposed crane loads

• Compaction test to be done and report from a civils engineer

• Extra timber pads or road plates under outrigger pads

• Steel plates, packing (pigstying or cribbing) will be used if operator has concerns regarding stability of crane

• Dogman/Rigger to guide crane into position

20

14 Erection Platform Structural Collapse VL VH 25 • Before erection commences ensure that the erection platform (e.g. floor slab, suspended slab, surrounding ground) can safely carry the construction and erection loads.

• Backfilled excavations and trenches should be identified and assessed.

20

Page 7: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 7 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 7| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

• Additional measures such as the provision of timber mats, may need to be taken to ensure that any backfilling can support the construction and erection loads

15 Delivery of precast elements Electrical hazards Unstable ground conditions

VL VH 25 • The precaster must ensure that the transporter has detailed instruction on how to enter the site.

• Ensure that there are no dangers such as backfilled excavations or overhead services/underground services

• Ensure all deliveries to site have enough clearance between load and overhead services Distance from 132,000 volts 3m, 132,000 to 330,000 volts 6m, 330,000 volts and over 8m

• The area to receive the delivery vehicle should be firm and level.

20

16 Panel modification compromising structural integrity

VL VH 25 • Modifications to precast elements should only be carried out with the approval of the project design engineer.

20

17 Inadequate temporary storage facilities, including racking systems, suspended floors or beams

VL VH 25 • Collapse may occur when concrete elements are inappropriately stored on suspended floors or beams.

• Approval from an engineer is required before the temporary storage of concrete elements on suspended slabs or beams.

• Where this approval is not obtained, the concrete element must be returned to ground level.

20

18 Panel inspection Structural collapse VL VH 25 • Upon delivery to site manufacturer’s certificate of compliance (birth certificates) must be obtained.

• Nominated person in charge to take control of the installation/erection.

• Nominated person in charge to ensure precast elements are erected in accordance with the designers & manufacturer’s instructions.

• Shop drawings & installation plans must be on site prior to installation.

• Panels must be checked regularly for defects including cracks, or structural damage of any type.

20

Page 8: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 8 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 8| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

19 Pre start check / set up crane (with Fly Jib - as required)

Failure of crane during tasks due to poor maintenance/failure to perform proper checks prior to commencing work

VL VH 25 • Complete Daily Pre- start check list • Check Spill kits kept in cranes to contain

spills. • Check condition of fire extinguisher • Make sure safety boots are free of mud

and oils • Only a certified operator may operate the

crane (except where an operator is in training under correct guidance).

• Crane to have a current “Green Sticker” • ensure required documentation is available

in the crane. • The operator should also be aware of the

Plant Risk Assessment for the crane. • Check crane computer and all crane

functions. • Configure crane and attachments using

manufacturer’s procedures performed by competent Dogman/Rigger only

• Extra timber pads or road plates under outrigger pads - refer Engineers report

• ensure no safety tags on plant • inspect all fluid levels • inspect for fluid leaks • windows and mirror clean • check signage including working load limits

and data plate • inspect structural damage on boom/jib • inspect crane for signs of damage • check tyre conditions (safe and legal) • wheel nuts, spare wheel • inspect robe drums (where applicable) • inspect log book (present and current) • check load charts (present and appropriate

to crane) • inspect ropes, sheaves, hook and block,

load chart, boom, pins, weightometer wires and anchorages (where practicable)

• manual extension jib • visible and current registration licenses and

authorisations • check warning lights/systems are

operational • fire extinguisher/ 2 way radio check • check brakes and communications • Lift study to be completed prior to significant

20

Page 9: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 9 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 9| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

lifts • Compliance with SWL and radius charts • Lifting gear to be inspected prior to use

20 Start Up – accidental movement

Injury to persons Damage to plant/vehicles/crane

VL VH 25 • Ensure vehicle is in neutral • Ensure park/emergency brake is applied • Test vehicle monitoring systems • Start engine – check operation of gauges –

electrical charge, oil pressure, coolant • Warm motor and components

20

21 Emergency situation Injury to persons Fire hazard Damage to plant/damage to load

VL VH 25 • Operator shall be familiar with the operation of the fire suppression system

• Operator will be trained in the shutdown procedure in an emergency situation

• Emergency Plan will be in place

20

CONTENT REMOVED TO ENSURE COPYRIGHT

Page 10: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 10 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 10| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

Attachment A Figure 9. Preferred concrete panel rigging configurations Courtesy of: SAI Global, AS 3850 - 2003 Tilt-up Concrete Construction

Page 11: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 11 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 11| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

By signing this SWMS, you are acknowledging that you have read and understand the steps involved in the work activity, the known hazards, level of risk and controls that must be implemented to mitigate the risks. As per the Construction Work Code of Practice (Safe Work Australia) the following list contains names of workers that have been consulted on the content of the SWMS, the date the consultation occurred and the signature of each worker acknowledging their participation in this consultation and the opportunity to discuss the proposed measures.

Name Signature Date

Page 12: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 12 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 12| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

Likelihood Consequences [Excerpt from LL Group risk matrix guidance]

Health and Safety Environment/Corporate Social Responsibility

5 Very High

Almost certain to occur in identified circumstances without controls Number and regularity of report incidents or risks indicates trend, expecting with near certainty it will occur again Quantified very high exposure without controls

5 Very Large

Fatality due to injury or occupational illness; kidnapping of employee; evacuation of employees due to threat of fatality

Irreversible and/or offsite damage; clean up or remedy from damage result is remediation work lasting >12 months; regulatory notification compulsory with public investigation likely; impact on local community leads to community outrage

4 High

Strong anecdotal evidence that it is likely to occur in identified circumstance without any controls Number and regularity of report incidents or risks indicates trend, but not expecting with near certainty it will occur again Quantified high exposure without controls

4 Large Permanent disabling injury or occupational illness

Long term environmental damage, pollution or degradation; discovery of environmental risk with limited offsite impacts; clean up, remediation or rehabilitation will require <36 months

3 Med May occur in identified circumstances without controls Number and regularity of incidents from risk is infrequent Quantified moderate exposure without controls

3 Medium Lost time injury or occupational illness Medium term environmental damage; discovery of environmental risk with limited onsite impacts; clean up, remediation or rehabilitation will require <12 months

2 Low Could occur in identified circumstances without controls 1 or 2 incidents arising from the risk Quantified low exposure without control

2 Small Offsite medical treatment Short term environmental damage, pollution or degradation event; discovery of environmental risk with limited onsite impacts clean up, remediation or rehabilitation will require up to 1 month

1 Very Low Highly unlikely to occur in identified circumstances without controls No evidence of incidents No quantified or known exposure to the risk without controls

1 Very Small Onsite first aid treatment Minor onsite environmental damage, pollution, or degradation event; clean up,

remediation or rehabilitation will require <24 hrs

Risk Matrix Consequences [Rated by impact]

Hierarchy of Risk Control Very Small Small Medium Large Very Large

1 2 3 4 5 Consider the Hierarchy of Risk Control when selecting control actions to ensure the most effective control possible is used

rather than the lower level control actions

Like

lihoo

d Very High 5 5 10 15 20 25

High 4 4 8 12 16 20 Medium 3 3 6 9 12 15

Low 2 2 4 6 8 10 Very Low 1 1 2 3 4 5

Critical = 21-25

Significant = 15-20

Moderate = 9-14 Minor = 3-8

Negligible = 1-2

Page 13: YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENTarsafetysolutions.com.au/wp-content/uploads/2015/11/SAMPLE_SWMS... · SWMS YOUR COMPANY LOGO HERE RISK ASSESSMENT ... Orbit / Template:

YOUR COMPANY LOGO HERE SWMS RISK ASSESSMENT

Page 13 of 13 21 November 2015 All Round Safety Solutions

www.arsafetysolutions.com.au 13| Orbit / Template: SWMS/Risk Assessment V1 | 29 May 2014 | Uncontrolled when printed

FALLS Fall on same level (trip/slip) Fall >2m (greater than) Fall <2m (less than) Fall into trench >1.0m (greater than) Fall into trench <1.0m (less than) Falling objects Subsidence

PEDESTRIANS, TRAFFIC AND PARKING Car and heavy vehicle interaction Increased local traffic and/or reduced parking spaces People and vehicle interaction e.g. car parks, driveways, loading

docks etc. ACTIVITIES AND SERVICES

Alcohol Bus outings Catering/food and beverage service Entertainment Gym and fitness Hairdressing and/or beauty Men’s sheds Swimming pools, spas etc.

AIR QUALITY Creation of dust from earthworks, construction, demolition works etc. Emissions from construction plant and traffic Greenhouse gas emissions Ozone depleting substances (refrigerants) Vapours from contamination soils

ASBESTOS AND HAZARDOUS BUILDING MATERIALS Damage or works to structures containing asbestos Disposal of asbestos and other hazardous building wastes Work in areas where asbestos encapsulated

CONSERVATION, HABITAT, FLORA AND FAUNA Damage/destruction to protected habitats Hit/bitten/stung by animal/insect Protected species and/or habitat Sensitive ecosystems located at work area or nearby Visual impact

COMMUNITY/NEIGHBOURHOOD Community and other large meetings Goods/material delivery hours and infrastructure Complaints re. site related activities e.g. construction, parking etc. Materials used pose future issues or sustainability opportunities Media interest, protesters Noise and public amenity

DANGEROUS GOODS/CHEMICALS/SUBSTANCES Contact by workers or community with chemicals Fuel and chemical spills Sewage collection and domestic waste water disposal Storage/use of dangerous goods/chemicals

ELECTRICAL Contact with live hidden electrical wires Contact with visible electrical wires Contact with live electrical boards Cords, cables and power boards etc. Tool or equipment potential faults

EMERGENCY AND FIRE/EXPLOSION Ignition of materials Combustion of fuel/gas/vapour/waste

GROUND SURFACES Gradient e.g. steep Loose surface e.g. gravel Slippery/wet Uneven

HITTING/STRIKING Hitting/struck by stationary object Hitting/struck by moving object or machines Stepping/kneeling/sitting on objects

LIGHT AND LIGHTING Insufficient Spill

MANUAL TASKS Back/neck/shoulder injury Repetitive strain Other strains/sprains Posture/physical workload

MICROBIOLOGICAL Contact with fungi, bacteria, parasites, viruses Effects from cooling towers on site or adjacent site Infection impacting large groups

NOISE AND VIBRATION Exposure to single sudden sound Long term exposure to sound Exposure to mechanical vibration

PEOPLE AND BEHAVIOURS Children/elderly Clothing and footwear Crowds Disabled Intoxication Mobility scooters and walking frames Prams and strollers Uncontrolled behaviour e.g. violence

OTHER

STORMWATER AND EROSION Disposal of collected stormwater Generation of runoff/sediment from assets, sites and roadways Runoff and potential erosion from stockpiles/excavations areas. Uncontrolled stormwater/sediments entering receiving

environments TEMPERATURE

Contact hot objects, fire, flame etc. Contact cold objects, liquefied gas, dry ice etc. Sunstroke, heat exhaustion

WASTE MANAGEMENT Generation of solid/liquid waste from construction or demolition Collection and temporary storage of wastes General litter and waste recycling Waste disposal and/or transportation Liquid and solid waste spills from concrete/paint

wash-out VEHICLES/MOBILE EQUIP/MACHINERY/TOOLS

Cranes exclusion zones Crane lifting plans Plant rollover Mechanical failure

WEATHER Cold/frost/ice Electrical storm Heat/high humidity Rain UV Windy

WORK RELATED Excessive hours Fatigue Unrealistic deadlines Other

Examples of hazards and risk factors which can contribute to risk. [Typical but not all inclusive]