YaraTrinidad Revamp project
Content
Introduction Yara/YPO: – Small history of Yara – Yara International A.S.A. – Small history of YPO – Introduction of myself
Tringen 1 Energy Efficiency Project – Electrical Upgrade subproject
– Project Goal – Main Equipment – ABB – Norms and Standards – Pictures/drawings/screenshots
Small history of Yara
1905 – Norsk Hydro Elektrisk Kvaelstofaktieselskab (Hydro Norsk) – Sam Eyde, Kristian Birkeland & Marcus Wallenberg. – Vision : ‘Create feeding plants to feed people’.
25 March 2004 – Yara demerged from Norsk Hydro and listed on the Oslo Stock
Exchange as Yara International A.S.A. Presence in +/- 50 countries
– + 160 plants, terminals & warehouses Sales to + 120 countries
Yara International A.S.A. demerges from Norsk Hydro
Norsk Hydro
• Bauxite & Alumina • Casthouse Products • Welded tubes • Rolled products • Extruded products • Precision tubing • Building systems
Yara International A.S.A.
• Fertilizers • Environmental
solutions • Chemicals • Carbon Dioxide • Dry ice • Technical Nitrates • Animal Nutrition
Small history YPO
1929: founded as technical department for NSM NSM licensing Begin 90’s HAE-L&E
Hydro Agri Europ Licensing and Engineering Late 90’s: HTP
Hydro Technology and Projects Another name change: GPS
General project support Change to current name YPO
Yara Project Office – Yara Upstream – Internal engineering department
Introduction of myself
Perry Jaspers – Born April 15, 1975 – Not married, one son – Graduated at KUL as Master of Science, Electro-Mechanics,
option Electrical Energy in 1999 – PM at Vanparijs-Maes from 1999-2005 – Started at YPO in 2005 as Electrical Engineer – Currently Principal Engineer Electrical and Automation, heading
the electrical department
Project Goal
Increase of Electrical Capacity of Tringen 1 Ammonia Plant from 7.5 MVA to 15 MVA
Rationalization of motor and steam turbine driven loads – Less energy required to run motors compared with steam
turbine – Some steam turbine driven loads upgraded to dual drives with
motor as
Main Equipment - ABB
MV Switchgear – ABB Unigear ZS1 LV switchgear – ABB MNSiS RTU SCADA system Opportunities :
– 5 year migration plan for replacement of all LV MCC with MNSiS
Motor relays preconfigured inside each motor controller for easy
installation
Interface meetings (YPO – YTL – ABB Belgium – ABB Czech -….)
Norms and Standards
IEC Arc Proof <-> ANSI/IEEE Arc Resistant – IEC was chosen
• Maintenance • Footprint • Dimensions
Pictures during installation
Single line MV
Single line LV
FAT
RTU – Screen Shots
RTU – Screen Shots (cont’d)
RTU – Screen Shots (cont’d)
RTU – Screen Shots (cont’d)
RTU – Screen Shots (cont’d)
Thank you for your attention.