4
Organised by T | 61 2 9247 6000 F | 61 2 9247 6333 W | akolade.com.au EARLY BIRD OFFER SAVE $550 Managing Design for Success Forum 2013 Exploring best practice to achieve superior business and project outcomes 20 - 22 March 2013 Waterfront, The Rocks SYDNEY EXPERT SPEAKERS INCLUDE: Paul Sancandi, Senior Consultant, InfraSol Group Paul Murphy, Global Technical Leader – Property and Buildings, GHD Ross de la Motte, Managing Principal, HASSELL Jose Sanchez, National Design Delivery Manager , Stockland Peter Gallart, Building NSW/ACT Design Manager , Baulderstone David Roberts, Chief Engineer , Transport for NSW Projects Division Eugene Marchese, Chairman, Marchese + Partners Mal Jacobsen, Lead Design Manager , Abigroup Contractors Pty Limited Mark Sheldon, Managing Director , Group GSA Paul Nunn, Senior BIM Manager , CSi Global Services Wayne Lamb, Director , ADDGlobal Wesley Benn, Director , ADDGlobal John Basilisco, Head of Design Development and Management, Laing O’Rourke David Madden, Managing Director , MBMpl Bruce White, Technical Director , One Group ID Ted Smithies, Director , Value Network Alan Davis, Associate Director , WSP Built Ecology Robert Phillpot, Director , Aconex Dr. Roy Barton, Principal Consultant, ACVM Lina Fischer, Senior Associate - Construction and Major Projects, Clayton Utz Nick Turton, Associate, ARUP KEY BENEFITS OF ATTENDING POST CONFERENCE WORKSHOPS & SITE VISIT: FRIDAY, 22 ND MARCH 2013 Fulfilment of project objectives and project outcomes including cost saving, value, quality and time Minimising your project’s vulnerability to design related risks Maximising profitability for your business Enhancing your organisation’s reputation for delivering successful projects resulting in repeat and new business WORKSHOP A: 9:00 - 12:30 Managing your in-house and offshore project teams for success Robert Phillpot, Director , Aconex WORKSHOP B: 13:30 - 17:00 Gaining “Value” from value management and value engineering in the design process Dr. Roy Barton, Principal Consultant, ACVM SITE VISIT: BARANGAROO: 13:30 - 16:00 The $6 billion Barangaroo project site overview and visit to Headland Park Hosted by InfraSol Group Event Partner Gold Sponsor Silver Sponsor Networking Cocktail Reception Sponsor

Y Managing Design R for Success...2013/03/22  · T | 61 2 9247 6000 F | 61 2 9247 6333 W | akolade.com.au Organised by Y R Managing Design 0for Success Forum 2013 Exploring best practice

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Organised byT | 61 2 9247 6000 F | 61 2 9247 6333 W | akolade.com.au

    EARLY

    BIRD OFFER

    SAVE $550Managing Design for Success Forum 2013Exploring best practice to achieve superior business and project outcomes

    20 - 22 March 2013 Waterfront, The Rocks

    SYDNEY

    EXPERT SPEAKERS INCLUDE:• PaulSancandi,Senior Consultant,InfraSol Group• PaulMurphy,Global Technical Leader – Property and Buildings, GHD• RossdelaMotte,Managing Principal,HASSELL• JoseSanchez,National Design Delivery Manager,Stockland• PeterGallart,Building NSW/ACT Design Manager,Baulderstone• DavidRoberts,Chief Engineer, Transport for NSW Projects Division• EugeneMarchese,Chairman,Marchese + Partners• MalJacobsen,Lead Design Manager, Abigroup Contractors Pty Limited• MarkSheldon,Managing Director,Group GSA• PaulNunn,Senior BIM Manager,CSi Global Services• WayneLamb,Director,ADDGlobal• WesleyBenn,Director,ADDGlobal• JohnBasilisco,Head of Design Development and Management, Laing O’Rourke• DavidMadden,Managing Director,MBMpl• BruceWhite,Technical Director,One Group ID• TedSmithies,Director,Value Network• AlanDavis,Associate Director,WSP Built Ecology• RobertPhillpot,Director,Aconex• Dr.RoyBarton,Principal Consultant,ACVM• LinaFischer,Senior Associate - Construction and Major Projects, Clayton Utz• NickTurton,Associate,ARUP

    KEYBENEFITSOFATTENDING

    POSTCONFERENCEWORKSHOPS&SITEVISIT: FRIDAY,22NDMARCH2013

    • Fulfilmentofprojectobjectivesandprojectoutcomes includingcostsaving,value,qualityandtime

    • Minimisingyourproject’svulnerabilitytodesign relatedrisks

    • Maximisingprofitabilityforyourbusiness

    • Enhancingyourorganisation’sreputationfordelivering successfulprojectsresultinginrepeatandnewbusiness

    WORKSHOPA:9:00-12:30Managingyourin-houseandoffshoreprojectteamsforsuccess RobertPhillpot,Director,Aconex

    WORKSHOPB:13:30-17:00Gaining“Value”fromvaluemanagementandvalueengineeringin thedesignprocess Dr.RoyBarton,Principal Consultant,ACVM

    SITEVISIT:BARANGAROO:13:30-16:00The$6billionBarangarooprojectsiteoverviewandvisitto HeadlandPark HostedbyInfraSolGroup

    EventPartner GoldSponsor SilverSponsor NetworkingCocktailReceptionSponsor

  • MANAGINGDESIGNFORSUCCESSFORUM2013

    2 T | 61 2 9247 6000 F | 61 2 9247 6333 E |[email protected] W| akolade.com.au

    Businesses need to adapt and evolve by implementing BIM solutions to address their business needs • WhyadoptionandimprovementofBIMprocessesareessentialfor the AEC industry • HowBIMhelpsbuildersandownersmakethebestfinancialand environmental management decisions over the life of their projects • HowthewidespreadadoptionofBIMwillresultinmore sustainable design PaulNunn,Senior BIM Manager,CSi Global Services

    MANAGINGDESIGNFORINFRASTRUCTURE15:50 Managingdesignfortransportprojects Successfully managing the design of transport infrastructure projects • Worksbrief/servicesbriefpreparationanddevelopment • Transportprojects’keyprocessesformanagingdesign • Standardrequirementsfordesignbyconsultantsandcontractors • Updateoncurrenttransportworksprogramme DavidRoberts,Chief Engineer,Transport for NSW Projects Division16:30 ClosingremarksfromtheChairandendofconference16.40 SPONSOREDNETWORKINGCOCKTAILRECEPTIONBY: Laing O’Rourke

    DAYTWO:THURSDAY21stMARCH20138:00 Registrationopens9:00 OpeningremarksfromtheChair RossdelaMotte,Managing Director,HASSELL

    GLOBALPARTNERINGANDSUSTAINABILITYINMANAGINGDESIGN9:10 HowtoofferaFullBIMSolutiontoyourclientsrightnow - A New Partnering Model How partnering with a specialist BIM modelling, documentation and coordination consultancy can alleviate the challenges faced by design firmstoday,givingthemgreatercapacity,reducingcosts,increasing their technical capabilities • Partneringstrategiestohelpfirmsadapttotheevolvingworldof BIM • ManagingBIMprojects • Managingtheconnectivityofmodelinginformationacross multi-disciplines • ManagingdesignriskswithBIM WayneLamb,Director,ADDGlobal WesleyBenn,Director,ADDGlobal9:50 Managingsustainabilityindesign Effective management of sustainability in the design and construction phases will deliver to the client’s sustainability goals and expectations • Developingasustainabilitybrief • Managingtheimplementationofsustainabilityduringthedesign and construction phases • Assuringsustainabilityindesignandinconstruction AlanDavis,Associate Director,WSP Built Ecology10:30 Morningtea

    VALUEMANAGEMENTANDVALUEENGINEERINGINTHEDESIGNPROCESS11:00 PANEL DISCUSSION: Attaining“Value”fromvaluemanagementandvalueengineering inthedesignprocess Moderator: Dr.RoyBarton,Principal Consultant,ACVM Panellists: PaulNunn,Senior BIM Manager,CSi Global Services - BIM Solution Provider’s Perspective JoseSanchez,National Design Delivery Manager,Stockland - Owner’s perspective JohnBasilisco,Head of Design Development and Management, Laing O’Rourke - Design & Construct Contractor’s Perspective

    DAYONE:WEDNESDAY20thMARCH20138:00 Registrationopens9:00 OpeningremarksfromtheChair JohnBarrow,Director,InfraSol Group

    THEBUSINESSOFMANAGINGDESIGN9:10 Managingdesignforthe7StagesoftheProjectLifeCycle How to manage design for optimal project and business outcomes • Designinthe7StagesoftheProjectLifeCycle • Achievingprojectobjectivesandprojectoutcomesincludingcost, value,qualityandtime • Reducedprojectrisksandgreaterbusinessprofitability • Positivereputationandrepeatbusiness PaulSancandi,Senior Consultant,InfraSol Group9:50 Managingdesignasanownerandoperator The challenges and expectations of managing the design of a large portfolio of residential community, retirement living, retail, office and industrial assets. • Developingtheowner’sbrief • Expectationsfromconsultants • Expectationsfromcontractors • Stockland’sapproachtomanagingdesign JoseSanchez,National Design Delivery Manager,Stockland10:30 Morningtea

    THEFOUNDATIONOFASUCCESSFULDESIGN11:00 Thefoundationofasuccessfuldesign-outline/conceptdesign AwelldevelopedanddetailedOutline/ConceptDesignStageisthe foundation of a successful design •Developingthefunctionaldesignbrief •Maximisingthevalueandreturnfortheclient-CaseStudies •TheOutline/ConceptDesignReport EugeneMarchese,Chairman,Marchese + Partners11:40 CASE STUDY Managingdesign–Adesign&constructperspective Workingwithclientstofindoptimumvaluebalancebetweencost, aesthetics and functional criteria • RespondingtotheHeadlandParkDesignandConstructTender • Developingtheoptimumsolutionwiththeclient • Managinganddeliveringthedesign • AwalkthroughthePark PeterGallart,Building NSW/ACT Design Manager,Baulderstone12.20 Networkingluncheon

    ESSENTIALSINMANAGINGDESIGN13.20 Managingdesignriskandsafetyindesign • StatusofWorkHealth&SafetyLegislationinAustraliainrelationto Safety in Design (SID) • Obligations,rolesandresponsibilitiesinrelationtoSIDundercurrent legislation • WhatdesignriskandSIDmeantoyou • Safetyinconstructionobligations • IntegratingSIDintoyourprojectfromconcepttooperation BruceWhite,Technical Director,One Group ID14:00 Essentialcost/assetmanagementpracticesinmanagingdesign How to best ensure there are “no surprises” in the initial capital cost and the whole of life cost for projects • Strategiccostplanning • Costplanningpracticesinmanagingdesign • Assetmanagementinmanagingdesign DavidMadden,Managing Director,MBMpl14.40 Afternoontea

    BIMANDMANAGINGDESIGNFORINFRASTRUCTURE15:10 BIM(BuildingInformationModeling)andtheprocessof transformationindesign

  • POST-CONFERENCEWORKSHOPS:DAYTHREE:FRIDAY22ndMARCH2013WorkshopA9:00–12:30 Managingyourin-houseandoffshoreprojectteamsforsuccessHow to use online project management collaboration tools to manage your in-house and offshore project teams to achieve successful project and business outcomes • DevelopingtheManagingDesignPlan • Thechallengesofmulti-partycollaboration • Designdocumentationcontrol • BIM(BuildingInformationModelling) • Workflowsandaudittrails • Effectivereportingandmonitoringofprogress • Totalprojectlifecyclemanagement RobertPhillpot,Director,Aconex

    WorkshopB13:30–17:00Gaining“Value”fromvaluemanagementandvalueengineeringinthedesignprocessThis intensive workshop will seek to clarify the distinction between the process of value management and value engineering as well as suggesting the optimum times to apply each of the concepts and how the most can beachievedoutoftheincorporatingtheseprocessesforthebenefitoftheproject. The workshop will cover the following key points in getting the best ”value” out the project design: • Valuemanagementandvalueengineering-isthereadifference? • KeysuccessfactorsforVMandVEandtheAustralianStandard • WhenshouldVM&VEbeappliedduringthedesignprocess? • Developing“Valuestatements”-apracticalsession Dr.RoyBarton,Principal Consultant,ACVM

    SITEVISIT:Barangaroo13:30–16:00The $6 billion Barangaroo project site overview and visit to Headland Park.An insight into the largest CBD building and urban development project in Australia. • OverviewpresentationbytheBarangarooHeadlandPark Management Team of the Barangaroo Development at the Level 21 Barangaroo Delivery Authority’s offices overlooking the entire Barangaroo site • SitevisittotheHeadlandParkProjectSitetoseethein-progress foreshore and civil works under construction by Baulderstone. • Aninsighttothedesignandconstructionoftheunderground future cultural space Hosted by InfraSol Group

    Morningteaandafternoonteawillbeprovided. Lunchisprovidedfordelegatesattendingallworkshops/sitevisit.

    3T | 61 2 9247 6000 F | 61 2 9247 6333 E |[email protected] W| akolade.com.au

    20 - 22 March 2013 SYDNEY

    RossdelaMotte,Managing Principal,HASSELL - Architect’s Perspective NickTurton,Associate,ARUP – Engineering Consultant’s Perspective TedSmithies,Director,Value Network - Value Engineering Practitioner’s Perspective

    MANAGINGCONTRACTOR’SPERSPECTIVE11:40 CASE STUDY ManagingDesign-ManagingContractor’sperspective CasestudyonQueenslandChildren’sHospital(QCH) The challenges and approach to managing the design of a large and complex building project • QCHprojectoverview • ManagingthedesignforQCH • DeliveringthedesignforQCH • Discussingchallengesandoutcomes MalJacobsen,Lead Design Manager,Abigroup Contractors Pty Limited12.20 Networkingluncheon

    MANAGINGDESIGNINAMULTI-DISCIPLINARYENVIRONMENT13.20 Managingdesigninamulti-disciplinaryenvironment How to successfully deliver design for infrastructure or building projects within a multi-disciplinary environment: • Winningtheprojectcommission • Planningthedesignprocess • Deliveringthedesign • Successfuloutcomes PaulMurphy,Global Technical Leader,GHD

    ALEGALOUTLOOK14.00 Contractualobligationsandrightsrelatingtodesign Balancing the interests of Owners, design consultants and contractors • Fitnessforpurposeofdesign • ChallengesofnovationofdesignconsultantsfromOwnerstocontractors • AchievingtheOwner’sdesiredoutcomes LinaFischer,Senior Associate - Construction and Major Projects, Clayton Utz14:40 Afternoontea

    THEROLEOFARCHITECTURETODAY15:10 TheBusinessofArchitecture Architects today take on different roles and responsibilities depending upon clients and delivery methods • Architectsasleadconsultants • Architectsasleaddesigners • Architectsasdesigners • Futuredirections MarkSheldon,Managing Director,Group GSA

    THEBENCHMARKFORSUCCESS15.50 PreparingaWinningProposal 16 Tips on preparing a winning design proposal • Understandingtheproposalrequirements • Assessingtheproposal • Preparingandcoordinatingtheresponse • Thefinalsubmission PaulSancandi,Senior Consultant,InfraSol Group 16:30 ClosingremarksfromtheChairandendofconference

    INCREASE YOUR CLIENT BASE ANDGENERATENEWBUSINESS!

    To ensure that your business receives excellent return on investment on your marketing spend, pleasecontactthecorporatepartnershipsteamat0292476000todiscuss

    further or alternatively, email [email protected]

    WHOSHOULDATTEND

    • Architects• CostPlanners• Design&Build Contractors• DesignDirectors• DesignManagers• DevelopmentDirectors• DevelopmentManagers

    • Engineers• ManagingContractors• Owners/Developers/Clients• ProjectDirectors• ProjectManagers• TechnicalDirectors• TechnicalManagers

  • 4

    VIP CODE MANAGINGDESIGNFORSUCCESSFORUM2013

    T | 61 2 9247 6000 F | 61 2 9247 6333 E |[email protected] W| akolade.com.au

    ENG08REGISTRATIONFORM

    Phone: 61292476000

    5EASYWAYS TOREGISTER

    SAVE!Choose between:

    Fax: 61292476333

    Email: [email protected]

    Online:www.akolade.com.au

    DATES&VENUE (Please tick)

    CANCELLATION POLICY: Should you be unable to attend, a substitute delegate is always welcome at no extra charge. Alternatively a full refund, less a $200 service charge (including GST), will be made for cancellations received in writing up to 15 working days prior to the event. Regrettably no refunds can be made less than 15 working days prior to the event.

    IMPORTANTNOTE: Attendance will only be permitted upon receipts of full payments. Please note that programme and speakers are subject to change without notice. Akolade will not be responsible for any event re-scheduled or cancelled.

    Name

    Job Title

    Phone Email

    Name

    Job Title

    Phone Email

    Name

    Job Title

    Phone Email

    DELEGATEDETAILS (Please complete in block letters) Today’s date

    Company

    Postal Address POBox/StreetAddress

    City

    Delegate 1

    Delegate 2

    Delegate 3

    State Postcode

    EASYPAYMENTOPTIONS ABN96149066991 EFT:TransferyourpaymentstoAkoladePtyLimitedat CommonwealthBankofAustraliaBSB062099AccountNo.10685915.PleasequoteENG08ontheEFT.

    CHEQUE:PleasemakeoutchequetoAkoladePtyLimited. PleasequoteENG08onthecheque.

    CREDIT CARD: Please charge my VISA *DINERS MASTERCARD *AMEX

    * A credit card fee of 2.5% will apply for Diners or Amex

    in the amount of $______________________

    Card No: Expiry Date:

    Cardholder’s Name: Signature:

    Akoladeconducts in-depthresearchand puts together leading edgeconferences, professional training,workshop and large scale eventsaddressingtheOilandGas,Mining,Infrastructure, Transport & Logistics,Law, Finance, IT&T, Healthcare, PharmaceuticalandPropertysector.

    1:EARLYBIRDDISCOUNT. Register and pay by a deadline indicated above to achieve up to 20% SAVINGS on the Standard Rate. Registrations received without payment are ineligible for an Early Bird Discount and will be charged at the Standard Rate.

    2:TEAMDISCOUNT. ( i ) Register 3 delegates and receive a $1000 DISCOUNT off the Standard Price (ii)Register4delegatesandreceivethe5thticketFREEofftheStandardPrice

    All group registrations must be from the same company, at the same time and for the same event. Registrants must choose between the most advantageous discount option. Onlyonediscountisavailableatthetimearegistrationismade.

    Mail: Akolade Pty Ltd Suite 2, Level 3, 20 Loftus St. SYDNEY, NSW, 2000 Australia

    SYDNEY20 - 22 March 2013 Waterfront27CircularQuayWestThe Rocks, Sydney NSW 2000 Phone: +61 1300 115 116

    REGISTRATIONFEE (includingGST)

    Conferenceonly

    Conferenceplus1workshop

    Conferenceplus2workshops

    SiteVisit-Barangaroo

    EARLY BIRD DISCOUNTSRegisterandbookbefore:

    26Oct2012 16Nov2012 07 Dec 2012 21 Dec 2012 11 Jan 2013

    $2968.90 $3078.90 $3188.90 $3298.90 $3408.90

    $3298.90

    $399.00 including GST

    *SpecialrateavailableforSMEcompanies,pleasecalloursalesteamtoenquireaboutdiscounts.

    $3408.90 $3518.90 $3628.90 $3738.90 $3848.90

    $3518.90

    $2308.90 $2418.90 $2528.90 $2638.90 $2748.90 $2858.90

    STANDARDPRICE