Page 1 Complaints Status of Zones
b) Page 2 to 6 Major Interruptions and Load Restriction Details
c) Page 7 Accidents
d) Page 8 to 9 AE to MD and TA to MD E-mail complaint status
e) Page 10 to 18 Status of Pending Complaints Beyond Time Limit
f) Page 19 to 21 Circle/Division/Sub Division Wise Complaints Details
g) Page 22 Status of Pending Transformer Complaints Beyond Time Limit
h) Page 23 to 26 Status of Pending Transformer Complaints
Umeshaiah
With Warm Regards
GM (CR)94498 44778
BESCOM Helpline
Date:15-09-2017
Dear Sir/Madam, Please find the attached Status of Complaints Received & Pending details as on 14-09-2017
a)
Manager (Ele)
Abstract - Status of Complaints
Opening Balance 2506
Complaints received on 14-09-2017 6809
Total 9315
Cumulative Pending Complaints 2527
Pending Complaints beyond time limit 1448
1
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Status of Complaints as on 14-09-2017(00:00Hrs to 23:59Hrs)C
ateg
ory
Category of Complaints
ZONE
BMAZ BRAZ CTAZ
OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed
A 3 4720 4723 4715 8 5 1235 1240 1184 56 3 397 400 356 44 11 6352 6363 6255 108
B 113 49 162 57 105 2 8 10 5 5 2 2 4 3 1 117 59 176 65 111
C METER COMPLAINTS 58 8 66 5 61 0 1 1 0 1 2 0 2 0 2 60 9 69 5 64
D BILLING ISSUES 604 124 728 206 522 36 5 41 5 36 4 5 9 2 7 644 134 778 213 565
E SAFETY ISSUES 582 49 631 42 589 88 6 94 6 88 108 9 117 6 111 778 64 842 54 788
F 0 16 16 16 0 7 66 73 59 14 18 37 55 31 24 25 119 144 106 38
G THEFT 34 3 37 0 37 34 1 35 5 30 14 1 15 0 15 82 5 87 5 82
H 26 3 29 0 29 14 0 14 0 14 7 0 7 0 7 47 3 50 0 50
I 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1
J PHASE CONVERSION 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1
K 26 2 28 2 26 2 0 2 0 2 0 0 0 0 0 28 2 30 2 28
L 2 0 2 0 2 0 0 0 0 0 0 0 0 0 0 2 0 2 0 2
M 1 0 1 0 1 0 0 0 0 0 1 0 1 0 1 2 0 2 0 2
N GENERAL 636 56 692 76 616 39 4 43 5 38 33 2 35 2 33 708 62 770 83 687
Grand Total 2087 5030 7117 5119 1998 227 1326 1553 1269 284 192 453 645 400 245 2506 6809 9315 6788 2527
Note: BRAZ and CTAZ "A" Category complints are pending due to wind and rain.
New Complaints
on 14-09-2017
New Complaints
on 14-09-2017
New Complaints
on 14-09-2017
New Complaints
on 14-09-2017Pending
complaints
FAILURE OF POWER SUPPLY
VOLTAGE COMPLAINTS
TRANSFORMER FAILURE COMPLAINTS
ALLEGATIONS ON STAFF
NEW CONNECTION/ ADDITIONAL LOAD
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDITIONAL TC/ ENHANCEMENT
2
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Scheduled & Unscheduled Major Interruptions Details (KPTCL)
Scheduled Timings Unscheduled Timings
NIL - - - 5:40
TOTAL NIL 0:00 1 5:40
Duration (in Hrs)
Officer Visited the
spot
Duration (in Hrs)
Officer Visited the
spot
KPTCL
1)66/11KV 220KV Kolar MUSS incoming line tripped due to PGCIL Kolar Line-1 jump cut at Harohalli,Down stream MUSS - Kolar, Bangarpet, Nangli, Srinivaspura, Mulbagal, Tayalur, Vemgal, Vokkaleri.Affected Areas:KL1, KL2, BG1, SP1, MB1, ML1, HK1:Kolar,Bangarpet,Nangli,Srinivaspura,Mulbagal,Tayalur,Vemgal,Vokkaleri,Malur,Devangundi and surrounding areas.(Changeover not arranged),confirmed by Prakash AEE 9448493164.
09:20hrs to 15:00hrs.
Prakash AEE 9448493164.
3
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED Scheduled & Unscheduled Major Interruptions Details (BESCOM)
Scheduled Timings Unscheduled Timings
8:40 2:00
5:51 3:10
7:00 1:50
5:45 7:30
7:00 2:00
6:30 2:30
Duration (inhrs)
officer Visited the
spot
Duration (inhrs)
BESCOM
1)66/11KV Abbigere MUSS F8 feeder VL kept open for 11KV pole replacement workAffected Areas:C3:Kamagondnhalli main road, Abbigere and surrounding areas.(Changeover not arranged),confirmed by Venkatesh AE 9449864541.
09:20hrs to 18:00hrs.
Venkatesh AE 9449864541.
1)66/11KV SRS MUSS F20 Feeder trippedAffected Areas:N4:MEC layout 12th main Raj gopal nagar main road Ganapathi nagar and surrounding areas.(Changeover not arranged),confirmed by Shivakumar JE 9449844706.
22:15hrs to 00:15hrs.
2)66/11KV Hebbal MUSS F6 Feeder 250KVA transformer kept open for maintenance workAffected Areas:E1:Sonappa Block, Munireddy palya, JC Nagar, Benson town and surrounding areas.(Changeover not arranged),confirmed by Muniraj AE 7676750666.
12:09hrs to 18:00hrs.
Muniraj AE 7676750666.
2)66/11KV Avaragere MUSS F4 Feeder faulty due to rainAffected Areas:DV1:Shamlur back side nagammakeshwa badavane siddarameshwara badavane bethur road and surrounding areas.(Changeover not arranged),confirmed by Anjanappa AE 9483549210 .
00:00hrs to 03:10hrs.
3)66/11KV Nelamangala MUSS F8 Feeder 11KV PWD road widening workAffected Areas:NM1:Sondekoppa Circle, Kotte bhidhi, Renuka Nagar, KSRTC Bus stand, Nelamangala town and surrounding areas.(Changeover not arranged),confirmed by Suresh AE 9483696600.
11:00hrs to 18:00hrs.
Suresh AE 9483696600.
3)66/11KV Hoody MUSS F8 Feeder HT Wire cut Affected Areas:E4:1st mn near, Anjaneya Swamy Temple, Kaveri nagar Mahadevpura and surrounding areas.(Changeover not arranged),confirmed by Sathish JE 9986291576.
00:15hrs to 02:05hrs.
4)66/11KV Velankini MUSS F9 Feeder Spur line kept open for AB Cable wokAffected Areas:S8:Roopena agarahara, Bommanahalli and surrounding areas.(Changeover not arranged),confirmed by Mahesh AE 9449868446.
13:00hrs to 18:45hrs.
Mahesh AE 9449868446.
4)66/11KV Vijayanagar MUSS F3 Feeder 250KVA Transformer No.103 HT cable faultAffected Areas:N8:BDA complex Nagarbhavi and surrounding areas.(Changeover not arranged),confirmed by Shashidar JE 9449844625.
03:00hrs to 10:30hrs.
5)66/11KV B Station MUSS F16 feeder 250KVA Transformer kept open for maintenance workAffected Areas:E3:Cambridge layout and surrounding areas and surrounding areas.(Changeover not arranged),confirmed by javeed Khan JE 9449874216.
09:00hrs to 16:00hrs.
javeed Khan JE 9449874216.
5)66/11KV NGEF MUSS F12 Feeder trippedAffected Areas:E6:HAL 2nd stage and surrounding areas and surrounding areas.(Changeover not arranged),confirmed by Raghu AE 9449874207.
14:00hrs to 16:00hrs.
6)66/11KV HAL MUSS 250KVA kept open for rabbit wire laying workAffected Areas:S7:Annasandra palya and surrounding areas and surrounding areas.(Changeover not arranged),confirmed by Mahesh JE 9449877000.
13:00hrs to 19:30hrs.
Mahesh JE 9449877000.
6)66/11KV L & T South city MUSS F3 Feeder 100KVA Transformer failureAffected Areas:S12:Opposite SSBT and surrounding areas.(Changeover not arranged),confirmed by Laxmisha AE 9449840484.
15:30hrs to 18:00hrs.
4
2:00 3:00
2:30 3:00
6:15 2:30
- - - - 3:45
- - - - 2:00
- - - - 2:20
BESCOM
7)66/11KV IISC MUSS F6 Feeder line clear taken for pole errection work Affected Areas:C6:Yeshwanthpur and surrounding areas.(Changeover not arranged),confirmed by Raghunath reddy AE 9449864543.
16:00hrs to 18:00hrs.
Raghunath Reddy AE
9449864543.
7)66/11KV Somanahalli MUSS F8 Feeder line faultyAffected Areas:K3:Somanahalli and surrounding areas.(Changeover not arranged),confirmed by Jayaram JE 9880816005.
18:00hrs to 21:00hrs.
8)66/11KV Naganathapura MUSS F11 Feeder HT AB Cable workAffected Areas:S13:Baretana Agrahara and surrounding areas.(Changeover not arranged),confirmed by Prasad JE 9449840480 .
15:30hrs to 18:00hrs.
Prasad JE 9449840480 .
8)66/11KV SRS MUSS F20 Feeder tripped due to rainAffected Areas:N4:Byraveshwara nagara and surrounding areas and surrounding areas.(Changeover not arranged),confirmed by Rangegowda AE 9449844706.
18:00hrs to 21:00hrs.
9)66/11KV Gokula MUSS F1 & F6 Feeder line clear taken for Pole Shifting workAffected Areas:C3:Prestige appartment, HMT industrial area and surrounding areas.(Changeover not arranged),confirmed by Gangadhar AE 9449844804.
12:30hrs to 18:45hrs.
Gangadhar AE 9449844804.
9)66/11KV Nelagedrahalli MUSS F7 Feeder line tripped Affected Areas:K2:Thigalaraplaya, Andrahalli area, Vidmanyanagara. and surrounding areas.(Changeover not arranged),confirmed by Vidya Sagar AE 9449870347.
18:30hrs to 21:00hrs.
10)66/11KV GLSWP MUSS F3 Feeder line tripped Affected Areas:S3:K.R.Garden , Murugeshpalya, Ashoka Avenue, Reema Appt, Srinivasa Residency, and surrounding areas.(Changeover not arranged),confirmed by Manjunath AE 9449877177.
18:30hrs to 22:15hrs.
11)66/11KV MEI MUSS F4 Feeder line clear taken for Tree fallen on the line Affected Areas:N5 :Mallasandra, Brundavan Layout, BHEL Mini Colony, Ramesh Road, Pipe line Road, Dasarahally and surrounding areas.(Changeover not arranged),confirmed by Ramesh AE 9449865418.
19:00hrs to 21:00hrs.
12)66/11KV L & T South city MUSS F2 Feedeer 100KVA Transformer failure Affected Areas:S12:Arkere signal ,BG road and surrounding areas.(Changeover not arranged),confirmed by Lakshmish AE 9449810247.
20:00hrs to 22:20hrs.
5
- - - - 1:50
- - - - 3:40
- - - - 2:45
- - - - 1:50
- - - - 1:56
- - - - 1:40
- - - - 0:15
TOTAL 9 51:31 19 49:31
BESCOM
13)66/11KV HBR MUSS F8 Feeder trippedAffected Areas:E9:Nagawara and surrounding areas.(Changeover not arranged),confirmed by Diwakar AE 9449869309.
20:30hrs to 22:20hrs.
14)66/11KV C Station MUSS F9 Feeder faulty Affected Areas:E1:Prominand road, spencer road, Nethaji road, hains road and surrounding areas.(Changeover not arranged),confirmed by Ramesh JE 9449873979.
20:00hrs to 23:40hrs.
15)66/11KV Puttenahalli MUSS F3 Feeder faulty Affected Areas:C7:Yelahanka New Town Akashaya nagar and surrounding areas.(Changeover not arranged),confirmed by Shatish JE 9449864905.
21:00hrs to 23:45hrs.
16)66/11KV Malur MUSS F7 Feeder faultyAffected Areas:ML1: Lakkur, Seethanayakanahalli and surrounding areas.(Changeover not arranged),confirmed by Sridhar JE 9449878117.
22:15hrs to 00:05hrs.
17)66/11KV Anekal MUSS F8 Feeder HT jump cutAffected Areas:AN1: Suranajakkanahalli, Haduru,Indalawadi and surrounding areas.(Changeover not arranged),confirmed by Madan AE 9449872416.
22:30hrs to 00:04hrs.
18)66/11KV L&T South City MUSS F9 Feeder 250KVA Transformer fuse burnt out Affected Areas:S12:B.K.Circle, Nayak Layout, Surabhi Nagar, Kothnur Dinne, Venkateshwara Layout, Gourav Nagar, JP Nagar 7th Phase and surrounding areas.(Changeover not arranged),confirmed by Rangaswami JE 9449810247.
23:05hrs to 00:45hrs.
19)66/11KV ITI MUSS F8 Feeder tripped.Affected Areas:E7:Margondanahalli, Akshaya Nagara, PNT Layout, Anandpura, Surrounding Areas and surrounding areas.(Changeover not arranged),confirmed by MUSS JE.
11:45hrs to 12:00hrs.
6
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED Scheduled & Unscheduled Major Interruptions Details (BESCOM)
officer Visited the spot
Shivakumar JE 9449844706.
Anjanappa AE 9483549210 .
Sathish JE 9986291576.
Shashidar JE 9449844625.
Raghu AE 9449874207.
Laxmisha AE 9449840484.
7
Jayaram JE 9880816005.
Rangegowda AE 9449844706.
Vidya Sagar AE 9449870347.
Manjunath AE 9449877177.
Ramesh AE 9449865418.
Lakshmish AE 9449810247.
8
MUSS JE.
Diwakar AE 9449869309.
Ramesh JE 9449873979.
Shatish JE 9449864905.
Sridhar JE 9449878117.
Madan AE 9449872416.
Rangaswami JE 9449810247.
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Major Interruptions of Load Restriction by KPTCL (14-09-2017)
Discription Timings
2:20
Total 1 2:20
Duration (in Hrs)
KPTCL
1)66/11KV BTM MUSS Each Feeders 1 hour load restrictions due to over load.Affected Areas:S8:"Bommanahalli,Vijay bank layout,Bilekahalli,Arakere,Begur and surrounding areas.(Changeover not arranged),confirmed by Kiran JE 26481906.
06:30hrs to 08:50hrs.
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
AccidentsBMAZ BRAZ CTAZ Total
Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental
- - - - - - - -
Fatal Fatal Fatal Fatal Non- Fatal Fatal Non-Fatal Fatal Non-Fatal Fatal Fatal
- - - - - - - - - - - - - - - -
Non- Fatal
Non- Fatal
Non- Fatal
Non-Fatal
Non-Fatal
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED AE to MD and TA to MD E-mail pending complaints
Circle Date Issue Remarks
1 West 8/9/2017 D0K1BWWV59 D Category 7 Days
2 BRC 8/12/2017 N Category 7 Days 10/1/2017
3 EAST 8/28/2017 Frequent Power cuts. N0E8BYHL51 N Category 7 Days 9/18/2017
4 West 9/5/2017 Rahul Narayan N0N8BZPP37 N Category 7 Days 9/30/2017
5 South 9/5/2017 Karthik K N Category 7 Days
6 South 8/31/2017 Anjanish NS13BZCE84 N Category 7 Days
7 BRC 9/5/2017 Hashim P I DDH1BZQG28 D Category 7 Days
SL NO
Name of Consumer
DocketNo.
Nature of Complaint
Time as per
KERC
Tentative Date
Sankara Narayanan K
Electricity Bill Not generated for 1440 Plots (From April -2016 to
till date)
Not Confirmed
Praveen AAO 9449870329 confirmed that issue is pending from BESCOM corporate office (Revenue section).awaiting for reply.
Subramani P Niranthara Jyothi Issue NDB1BXHG43
Reminded to Sundresh AEE 9448279080 regarding the issue, he suggested to contact NM1 Work unit AEE Prabhakar 9480812483, he told it will be attended on 1st week of October hence awaiting for reply.
Abhinav Chourasia
As per email reply from AEE issue resolved. same has been inform to consumer confimred to hold the docket upto 18/09/2017.
Damage to residential property due to NEGLIGENCE by Bescom
Complaint against AEE Roopesh MC 9449844897 in police station,Enquiry under progress and AEE told that he will send reply only after enquiry completed by police, suggested to call back on 30/09/2017.
Single phase issue and loose connection due to cutout problem
(Repeated issue)NS10BZPP61 Not
Confirmed
AET Kokila 9880304598 confirmed that All the Jumps are renewed and there is no loose connection ans suggested to close the docket but consumer not agreed with AET email reply.
Frequent power cut (Requesting for 24HRS power supply) Not
ConfirmedReminded to AEE Chandrashekhar-9449841593, awaiting for AEE email reply.
Bill Discrepency due to wrong meter instalation
Not Confirmed
AAO P.R.Raghavendra (I/C) 9449865136 confirmed that consumer has to pay Rs.22,948 after bill revise. Consumer number switched off since 10-09-2017.
Circle Date Issue RemarksSL NO
Name of Consumer
DocketNo.
Nature of Complaint
Time as per
KERC
Tentative Date
8 BRC 9/7/2017 BBG1BZWN53 B Category 7 Days
9 South 9/8/2017 Srivatsa Aithal Frequent Power Outages N Category 7 Days
10 South 9/11/2017 Swasthik M S N0S8CAHD85 N Category 7 Days
11 South 9/10/2017 Prasanna ES10CAFB48 E Category 7 Days
12 South 9/13/2017 Rupeesh ES13CAMA19 E Category 15 Days
13 South 8/9/2017 Sathish ES13BWWD80 E Category 15 Days
14 Kolar 9/11/2017 Frequent Power Cut NKG1CAGF76 N Category 7 Days
15 South 9/13/2017 Ramachandran CS10CAMC99 C Category 7 Days
16 EAST 9/14/2017 Subrahmanyan N0E4CANI49 N Category 7 Days
17 South 9/14/2017 Guru Lakshan Grounding N0S5CANX96 N Category 7 Days 9/16/2017
Ramesh Tankasala
RR-AEH 1210, Voltage varies from 255 to 270 between 9.00 PM
to 9.00am.(High voltage )
Not Confirmed
Reminded to Ramakrishna T AEE-9448279065, awaiting for the email reply.
NS10BZXN17 Not Confirmed
Kokila-AET-9880304598 confirmed that the consumer has to submit the request letter in division office but consumer not agreed to give request letter.Hence awaiting for email reply from AET to close the docket.
Frequent Power Outages Not Confirmed
Reminded to Shivaji Rao-AEE-9449844668, awaiting for email reply to close the docket.
Tree branches fallen on HT wire Not Confirmed
Suresh.M-JE-9449868456 confirmed that the tree branches were removed but consumer want to remove the full tree from her premises.
Transformer getting blown out frequently
Not Confirmed
Informed to AE Raghavendra Prasad-9449840480 and awaiting for reply.
Due to loose connection in the transformer and there are sparks
and noisesNot
ConfirmedEmail has been sent to AEE,EE,SE and awaiting for mail reply.
Hanumantha gowda Patil
Not Confirmed
Email has been sent to AEE,EE,SE and awaiting for reply.
Inspect and check meter correctness
Not Confirmed
Reminded to AET Kokila 9880304598, awaiting for email reply.
Frequent Power Cut Not Confirmed
Reminded to AEE M.M.Sali 9449844674, awaiting for email reply.
AE Venkatesh- 9449840421 confirmed that that the issue will be cleared with in 16/09/17.
Status of Pending Complaints Beyond Time Limit
BMAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
A
6hrs 0 2 1 5 8
6hrs 0 0 0 0 0
Line breakdown (pole broken) 10 hrs 0 0 0 0 0
B
7 days 7 3 1 0 11
120 days 0 0 0 0 0
Opening of neutral (High Voltage) 1 hr 30 6 8 0 44
C
Inspect and check correctness 7 days 16 5 2 0 23
replaced slow, creeping or stuck meters 10 days 2 0 0 0 2
replaced burnt meters if cause not attributable to consumer 7 days 1 0 0 0 1
replaced burnt meters in all other cases 24 hrs 4 1 0 0 5
D BILLING ISSUES
24 hrs 81 61 21 17 180
7 days 35 44 8 11 98
Reconnection of supply following disconnection On the same day 45 14 5 2 66
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
VOLTAGE COMPLAINTS
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
METER COMPLAINTS
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
Category of Complaints
E SAFETY ISSUES
Straightening of bent pole (Grounding /Return supply in neutral) 3 days 50 42 18 16 126
15 days 23 16 27 3 69
15 days 3 2 2 1 8
Tree trimming 7 days 53 40 34 17 144
F
Water Supply
24 hrs
0 0 0 0 0Domestic 0 0 0 0 0Industry 0 0 0 0 0Mixed load 0 0 0 0 0Irrigation Pumpset(IP Set) 0 0 0 0 0
G THEFTTheft 1 Month 3 12 0 1 16
Hooking Under Nirantara Jyothi Yojane 15 days 0 1 0 0 1
H Allegations on staff 1 Month 2 1 3 1 7
I
Release of supply where service is feasible from existing network 1 month 0 0 0 0 0
45 days 1 0 0 0 1
IP sets 30 days 0 0 0 0 0
JConversion of LT single phase to LT 3 phase 30 days 0 0 0 0 0
Conversion from LT to HT and vice-versa 30 days 0 0 0 0 0
replacedment of damaged pole (Wire Sagging/Providing intermediate pole)
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
Transformer FAILURE COMPLAINTS
ALLEGATIONS ON STAFF
NEW CONNECTION/ ADDitIONAL LOAD
Release of supply where network expansion/ enhancement required for providing connection
PHASE CONVERSION
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
Category of Complaints
K
Title transfer of ownership (Name Transfer/Change of Address) 7 days 16 1 1 0 18
Change of category (Wrong Application Tariff) 7 days 0 0 1 0 1
LRefund of deposits 60 days 0 0 0 0 0Issue of certificates 1 day 0 1 0 0 1
MAdditional TC 1 Month 0 0 0 0 0TC Enhancement 15 days 0 0 0 0 0
N GENERAL 7 days 149 102 38 31 320
Grand Total 521 354 170 105 1150
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDITIONAL TC/ENHANCEMENT
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
Status of Pending Complaints Beyond Time Limit
BRAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
A
Urban
6hrs
-
0 0 0 0
6hrs 0 0 0 0
Line breakdown (pole broken) 10 hrs 0 0 0 0
Rural -
24 hrs 0 0 0 0
24 hrs 0 0 0 0
Line breakdown (pole broken) 24 hrs 0 0 0 0
B VOLTAGE COMPLAINTS
7 days 7 days 0 0 2 2
120 days 120 days 0 0 0 0
Opening of neutral (High Voltage) 1 hr 1 hr 0 0 0 0
C METER COMPLAINTS
Inspect and check correctness 7 days 7 days 0 0 0 0
replaced slow, creeping or stuck meters 10 days 10 days 0 0 0 0
replaced burnt meters if cause not attributable to consumer 7 days 7 days 0 0 0 0
replaced burnt meters in all other cases 24 hrs 24 hrs 0 0 0 0
D BILLING ISSUES
24 hrs 24 hrs 12 8 3 23
7 days 7 days 1 3 3 7
Reconnection of supply following disconnection On the same day 24 hrs 0 0 0 0
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
15
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
Category of Complaints
E SAFETY ISSUES
Straightening of bent pole (Grounding /Return supply in neutral) 3 days 3 days 12 3 11 26
replacedment of damaged pole (Wire Sagging/Providing intermediate pole) 15 days 15 days 6 4 19 29
15 days 15 days 5 0 6 11
Tree trimming 7 days 7 days 2 2 1 5
F
Urban
Water Supply
24 hrs
0 0 0 0
Domestic 0 0 0 0
Industry 0 0 0 0
Mixed load 0 0 0 0
Irrigation Pumpset(IP Set) 0 0 0 0
Rural
Water Supply
72 hrs
0 0 0 0
Domestic 0 0 1 1
Industry 0 0 0 0
Mixed load 0 0 0 0
Irrigation Pumpset(IP Set) 0 0 0 0
G THEFT
Theft 1 Month 1 Month 5 0 3 8
Hooking Under Nirantara Jyothi Yojane 15 days 15 days 0 0 7 7
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
TRANSFORMER FAILURE
COMPLAINTS
16
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
Category of Complaints
H ALLEGATIONS ON STAFF Allegations on staff 1 Month 1 Month 0 1 1 2
I
Release of supply where service is feasible from existing network 1 month 1 month 0 0 0 0
45 days 45 days 0 0 0 0
IP sets 30 days 30 days 0 0 0 0
J PHASE CONVERSION
Conversion of LT single phase to LT three phase 30 days 30 days 0 0 0 0
Conversion from LT to HT and vice-versa 30 days 30 days 0 0 0 0
K
Title transfer of ownership (Name Transfer/Change of Address) 7 days 7 days 2 0 0 2
Change of category (Wrong Application Tariff) 7 days 7 days 0 0 0 0
L
Refund of deposits 60 days 60 days 0 0 0 0
Issue of certificates 1 day 1 day 0 0 0 0
M
Additional TC 1 Month 1 Month 0 0 0 0
TC Enhancement 15 days 15 days 0 0 0 0
N GENERAL 7 days 7 days 10 6 14 30
Grand Total 55 27 71 153
NEW CONNECTION/ ADDITIONAL LOAD Release of supply where network expansion/ enhancement required for
providing connection
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDitIONAL TC/ENHANCEMENT
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
12
Status of Pending Complaints Beyond Time Limit
CTAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
A
Urban
6hrs
-
0 0 0
6hrs 0 0 0Line breakdown (pole broken) 10 hrs 0 0 0
Rural -
24 hrs 0 0 0
24 hrs 0 0 0
Line breakdown (pole broken) 24 hrs 0 0 0
B VOLTAGE COMPLAINTS
7 days 7 days 0 0 0
120 days 120 days 0 0 0
Opening of neutral (High Voltage) 1 hr 1 hr 1 0 1
C METER COMPLAINTS
Inspect and check correctness 7 days 7 days 2 0 2
replaced slow, creeping or stuck meters 10 days 10 days 0 0 0replaced burnt meters if cause not attributable to consumer 7 days 7 days 0 0 0
replaced burnt meters in all other cases 24 hrs 24 hrs 0 0 0
D BILLING ISSUES
24 hrs 24 hrs 0 1 1
7 days 7 days 0 0 0
Reconnection of supply following disconnection On the same day 24 hrs 0 0 0
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
18
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
Category of Complaints
E SAFETY ISSUES
Straightening of bent pole (Grounding /Return supply in neutral) 3 days 3 days 30 1 31
replacedment of damaged pole (Wire Sagging/Providing intermediate pole) 15 days 15 days 43 10 53
15 days 15 days 2 0 2
Tree trimming 7 days 7 days 1 1 2
F
Urban
Water Supply
24 hrs
0 0 0Domestic 0 0 0Industry 0 0 0Mixed load 0 0 0Irrigation Pumpset(IP Set) 0 0 0
Rural
Water Supply
72 hrs
0 0 0Domestic 0 2 2Industry 0 0 0Mixed load 0 0 0Irrigation Pumpset(IP Set) 6 2 8
G THEFTTheft 1 Month 1 Month 2 2 4Hooking Under Nirantara Jyothi Yojane 15 days 15 days 4 2 6
H ALLEGATIONS ON STAFF Allegations on staff 1 Month 1 Month 4 0 4
I
Release of supply where service is feasible from existing network 1 month 1 month 0 0 0
45 days 45 days 0 0 0
IP sets 30 days 30 days 0 0 0
J PHASE CONVERSIONConversion of LT single phase to LT three phase 30 days 30 days 0 0 0
Conversion from LT to HT and vice-versa 30 days 30 days 0 0 0
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
Transformer FAILURE
COMPLAINTS
NEW CONNECTION/ ADDitIONAL LOAD
Release of supply where network expansion/ enhancement required for providing connection
19
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
Category of Complaints
KTitle transfer of ownership (Name Transfer/Change of Address) 7 days 7 days 0 0 0
Change of category (Wrong Application Tariff) 7 days 7 days 0 0 0
L REFUND/ ISSUE OF CERTIFICATES
Refund of deposits 60 days 60 days 0 0 0
Issue of certificates 1 day 1 day 0 0 0
M ADDitIONAL TC/ENHANCEMENT
Additional TC 1 Month 1 Month 0 0 0
TC Enhancement 15 days 15 days 0 0 0
N GENERAL 7 days 7 days 19 10 29
Grand Total 114 31 145
TRANSFER OF OWNERSHIP AND CONVERSION
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
Division/ Sub Division Wise Complaints of BMAZ (14-09-2017)
ZONE CIRCLE DIVISIONB
MA
Z
South 1641
Jayanagar 394
S1 71S2 47S5 54S6 163S9 59
Kormangala 443S3 90S4 208S7 145
HSR 804
S8 165S10 285S11 232S12 73S13 49
East 1507
Indiranagar 740
E3 59E4 169E6 132E7 313
E10 67
Shivajinagar 634
E1 159E2 47E5 79E8 155E9 194
Vidhanasoudha 133W3 41W4 33W5 59
North 1042
Peenya 244N4 74N5 146N7 24
Malleswaram 195
C1 16C2 49C3 85C6 45
Hebbal 603
C4 131C5 155C7 134C8 183
West 840
Rajajajinagar 318
N1 8N2 43N3 49N6 112N8 106
R.R. Nagar 209
W1 76W2 57W6 42W7 34
Kengeri 313K1 136K2 101K3 76
Total 5030 5030 5030
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
Division/ Sub Division Wise Complaints of BRAZ ( 14-09-2017)
ZONE CIRCLE DIVISIONB
RA
Z
BR
C472
232DB1 61
NM1 171
Yelahanka Division 240
DH1 54
HK1 183
NG1 3
Ram
anag
ar C
ircl
e
437
Ramanagar Division 85
BD1 21
CP1 32
CP2 6
RM1 12
RM2 14
Magadi 87
MA1 25
KD1 15
TV1 47
Kanakapura division 40
KP1 21
KP2 9
HA1 5
SA1 5
Chandapura division 225
AN1 35
JN1 48
CH1 57AT1 85
Kol
ar C
ircl
e
417
Kolar division 166
KL1 125
KL2 22
SP1 19
Chikkaballapura 65
BP1 21
CB1 15
CB2 3
GB1 24
GD1 2
KGF Division 169
BG1 17
KG1 40
ML1 77
MB1 35
Chinthamani division 17
CM1 6
CM2 4
SG1 3SG2 4
Total 1326 1326 1326
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
Nelamanagala Division
Division/ Sub Division Wise Complaints of CTAZ ( 14-09-2017)
ZONE CIRCLE DIVISIONC
TA
Z
TU
MK
UR
321
TUMKUR 173
TK1 43
TK2 9
TK3 6
TK4 18
GU1 17
NT1 5
KU1 75
TIPTUR 63
TP1 24
TU1 24
CN1 15
MADHUGIRI 85
MG1 15
SR1 20
SR2 14
KR1 22
PG1 13
KH1 1
DA
VA
NG
ER
E
132
DAVANGERE 52
DV1 41
DV2 2
DV3 1
AG1 0
JL1 2
CG1 5
SB1 1
HARIHARA 29
HR1 16
HN1 5
HH1 8
CHITRADURGA 29
CD1 14
CD2 0
HL1 6
HD1 9
HIRIYURU 22
HY1 14
CK1 6
MK1 2
Total 453 453 453
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
Beyond Transformer Failure Complaints
Sl No. Docket No Zone Circle Division Address
1 Dileep FTK1BZCE60 8/31/2017 17:55 CTAZ TUMKUR TUMKUR IRRIGATION Major
2 Nanjundeshwara FPG1BZNW08 9/4/2017 20:01 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
3 Govind FKR1BZXU21 9/8/2017 13:20 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
4 Ramesh FKR1BZXU32 9/8/2017 13:21 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
5 Vijay Kumar FKR1BZXU40 9/8/2017 13:22 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
6 Dharshan FBG1CAHH06 11-09-2017 18:52 BRAZ KOLAR KGF DOMESTIC Major
7 Girishnaik FHD1CAIK33 12-09-2017 9:08 CTAZ DAVANAGERE CHITRADURGA DOMESTIC Major
8 Prasad FHD1CAIN08 12-09-2017 10:12 CTAZ DAVANAGERE CHITRADURGA IRRIGATION Major
9 Kalappa FHD1CAIN17 12-09-2017 10:15 CTAZ DAVANAGERE CHITRADURGA Hosadurga DOMESTIC Major
10 Basha FHD1CAIN27 12-09-2017 10:17 CTAZ DAVANAGERE CHITRADURGA IRRIGATION Major
11 Praksah FKR1CAIU66 12-09-2017 12:53 CTAZ TUMKUR MADHUGIRI IRRIGATION Minor
Name of Consumer
Date of Complaints Received
Time of Complaints Received
Sub Division
Nature of complaint
Major /Minor Repair
TK1('R)
Anupanahalli Village, Tumkur Taluk
PG1('R)
Doddenhalli Village, Turvekere Taluk
KR1('R)
Nagarahalli Village, Koratagere Taluk
KR1('R)
Giddobanahally Village, Koratagere
Taluk
KR1('R)
Bhaktarahally Village, Koratagere Taluk
BG1('R)
Hunasanahalli, Bangarpet Taluk
HD1('R)
Kondapur, Hosadurga Taluk
HD1('R)
Hebballi Village, Hosadurga Taluk
HD1('R)
HD1('R)
Kondapura, Hosadurga Taluk
KR1('R)
Devarahally, Hosadurga Taluk
Beyond Transformer Failure Complaints
Remarks
25 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by Harish JE 9449844261 .
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by Ramanjaneyya JE 9449843639.
100KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq -9449843930
63KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq -9449843930
63KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq 9449843930
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE hussen 8904480106.
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Mallana 9449843949
Pending Transformer Failure Complaints
Sl No. Docket No Zone Circle Division Address
1 Dileep FTK1BZCE60 8/31/2017 17:55 CTAZ TUMKUR TUMKUR IRRIGATION Major
2 Nanjundeshwara FPG1BZNW08 9/4/2017 20:01 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
3 Govind FKR1BZXU21 9/8/2017 13:20 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
4 Ramesh FKR1BZXU32 9/8/2017 13:21 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
5 Vijay Kumar FKR1BZXU40 9/8/2017 13:22 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
6 Dharshan FBG1CAHH06 11-09-2017 18:52 BRAZ KOLAR KGF DOMESTIC Major
7 Girishnaik FHD1CAIK33 12-09-2017 9:08 CTAZ DAVANAGERE CHITRADURGA DOMESTIC Major
8 Prasad FHD1CAIN08 12-09-2017 10:12 CTAZ DAVANAGERE CHITRADURGA IRRIGATION Major
9 Kalappa FHD1CAIN17 12-09-2017 10:15 CTAZ DAVANAGERE CHITRADURGA Hosadurga DOMESTIC Major
10 Basha FHD1CAIN27 12-09-2017 10:17 CTAZ DAVANAGERE CHITRADURGA IRRIGATION Major
Name of Consumer
Date of Complaints Received
Time of Complaints Received
Sub Division
Nature of complaint
Major /Minor Repair
TK1('R)
Anupanahalli Village,
Tumkur Taluk
PG1('R)
Doddenhalli Village, Turvekere Taluk
KR1('R)
Nagarahalli Village, Koratagere Taluk
KR1('R)
Giddobanahally Village,
Koratagere Taluk
KR1('R)
Bhaktarahally Village,
Koratagere Taluk
BG1('R)
Hunasanahalli, Bangarpet Taluk
HD1('R)
Kondapur, Hosadurga Taluk
HD1('R)
Hebballi Village, Hosadurga Taluk
HD1('R)
HD1('R)
Kondapura, Hosadurga Taluk
Sl No. Docket No Zone Circle Division AddressName of Consumer
Date of Complaints Received
Time of Complaints Received
Sub Division
Nature of complaint
Major /Minor Repair
11 Praksah FKR1CAIU66 12-09-2017 12:53 CTAZ TUMKUR MADHUGIRI IRRIGATION Minor
12 Mr Manthesh FCK1CAKW33 9/13/2017 11:10 CTAZ DAVANAGERE HIRIYURU DOMESTIC Major
13 Kumar FTK1CALB04 9/13/2017 12:28 CTAZ TUMKUR TUMKUR DOMESTIC Major
14 Shashi.V FBG1CALD40 9/13/2017 13:30 BRAZ KOLAR KGF DOMESTIC Major
15 Girish FBG1CALD62 9/13/2017 13:35 BRAZ KOLAR KGF DOMESTIC Major
16 Chandrappa FGB1CAND21 14-09-2017 11:26 BRAZ KOLAR IRRIGATION Major
17 Ramesh FGB1CAND53 14-09-2017 11:32 BRAZ KOLAR IRRIGATION Major
18 *** FGB1CAND71 14-09-2017 11:34 BRAZ KOLAR IRRIGATION Major
19 *** FKR1CANG33 14-09-2017 11:59 CTAZ TUMKUR MADHUGIRI DOMESTIC Minor
20 *** FKR1CANG46 14-09-2017 12:01 CTAZ TUMKUR MADHUGIRI IRRIGATION Minor
KR1('R)
Devarahally, Hosadurga Taluk
CK1('R)
Bangaradevarahatt, Chalkere Taluk
TK1('R)
Kyathsandra,Tumkur Taluk
BG1('R)
Badagutlahalli, Bangarpet Taluk
BG1('R)
Badagutlahalli, Bangarpet Taluk
CHIKKABALLAPURA
GB1('R)
Kamareddy Halli Village, Gouribidanur
Taluk
CHIKKABALLAPURA
GB1('R)
Bandarahalli Village, Gouribidanur
Taluk
CHIKKABALLAPURA
GB1('R)
Halehalli,Gouribidanur Taluk
KR1('R)
Chikkarasanahally, Koratagere Taluk
KR1('R)
Arasapura Tanda, Koratagere Taluk
Sl No. Docket No Zone Circle Division AddressName of Consumer
Date of Complaints Received
Time of Complaints Received
Sub Division
Nature of complaint
Major /Minor Repair
21 *** FKR1CANG69 14-09-2017 12:04 CTAZ TUMKUR MADHUGIRI IRRIGATION Minor
22 *** FMG1CANI31 14-09-2017 12:24 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
23 Basha FSP1CANJ12 14-09-2017 12:35 BRAZ KOLAR KOLAR Kiruvara Village IRRIGATION Major
24 *** FPG1CANK42 14-09-2017 12:58 CTAZ TUMKUR MADHUGIRI Major
25 *** FPG1CANK54 14-09-2017 13:00 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
26 *** FPG1CANK69 14-09-2017 13:04 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
27 *** FCK1CANM47 14-09-2017 13:34 CTAZ DAVANAGERE HIRIYURU Major
28 *** FSR2CANN12 14-09-2017 13:49 CTAZ TUMKUR MADHUGIRI DOMESTIC Major
29 Praksah FAT1CANT56 14-09-2017 15:56 BRAZ RAMANAGARA CHANDAPURA DOMESTIC Major
30 Manthesh FAT1CANT72 14-09-2017 16:00 BRAZ RAMANAGARA CHANDAPURA DOMESTIC Major
KR1('R)
Agrahara,Koratagere Taluk
MG1('R)
Avaragallu,Madhugiri Taluk
SP1('R)
PG1('R)
Kenchammanahalli Village,
Pavagada Taluk
WATER SUPPLY
PG1('R)
Shylapura Village, Pavagada Taluk,
PG1('R)
Rangasamudra Village,
Pavagada Taluk
CK1('R)
Basapura Village, Chalkere taluk
MIXED LOAD
SR2('R)
Ranganathapura, Sira Taluk
AT1('R)
Mattanhalli, Anekal Taluk
AT1('R)
Rajiv Gandhi Nagara,
Anekal Taluk
Sl No. Docket No Zone Circle Division AddressName of Consumer
Date of Complaints Received
Time of Complaints Received
Sub Division
Nature of complaint
Major /Minor Repair
31 Kumar FAT1CANT98 14-09-2017 16:05 BRAZ RAMANAGARA CHANDAPURA IRRIGATION Major
32 *** FAT1CANU11 14-09-2017 16:06 BRAZ RAMANAGARA CHANDAPURA IRRIGATION Major
33 *** FAT1CANU13 14-09-2017 16:07 BRAZ RAMANAGARA CHANDAPURA IRRIGATION Major
34 Shashi FAT1CANU30 14-09-2017 16:09 BRAZ RAMANAGARA CHANDAPURA DOMESTIC Major
35 Girish FTP1CANW79 14-09-2017 16:57 CTAZ TUMKUR TIPTUR IRRIGATION Major
36 *** FTP1CANY46 14-09-2017 17:29 CTAZ TUMKUR TIPTUR IRRIGATION Major
37 Chandrappa FKL2CAOA75 14-09-2017 18:07 BRAZ KOLAR KOLAR IRRIGATION Major
38 Ramesh FTK1CAOF99 14-09-2017 19:13 CTAZ TUMKUR TUMKUR IRRIGATION Major
AT1('R)
Doddathimmasandra
Village, Anekal Taluk
AT1('R)
Thindlu, Anekal Taluk
AT1('R)
Thindlu, Anekal Taluk
AT1('R)
Chikkakere, Anekal Taluk
TP1('R)
Nonavinakere, Tiptur Taluk
TP1('R)
Nonavinakere, Tiptur Taluk
KL2('R)
Beeramanahalli, Kolar Taluk
TK1('R)
Janupanahally, Tumkur Taluk
Pending Transformer Failure Complaints
Remarks
25 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by Harish JE 9449844261 .
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by Ramanjaneyya JE 9449843639.
100KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq -9449843930
63KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq -9449843930
63KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Mahamad Rafiq 9449843930
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE hussen 8904480106.
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AEE Thirupathi nayak 9448279039
Remarks
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Mallana 9449843949
25 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by INCH AE Shivakumar 9449877309
250 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by Sathish AE 9449844354
63 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by Mohan JE 7899351665
100 KVA Transformer failured, it will be replaced on 15-09-2017, confirmed by Mohan JE 7899351665
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Chandrappa 9483730519.
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Chandrappa 9483730519
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Shivaprasad 9483730523
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Hussain Peer 9449843936
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Puttanna 9449843921
Remarks
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Mallana 9449843949
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Narasimha Murthy 9449843792
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Nagarathna 9742463865
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Ramanjayya V 9449843639
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Ramanjayya V 9449843639
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Ramanjayya V 9449843639
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Satishkumar 9449756619
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO Venkatesh Murthy 9449843725
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
Remarks
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by AE Raghunandan-9449866797
63 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO kumar 9449844047
100 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO kumar 9449844047
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by JE Reddy 9449878261
25 KVA Transformer failure, It will be replaced on 15-09-2017, confirmed by SO T.K.Harish 9449844261