Page 1 Complaints Status of Zones
b) Page 2 to 10 Major Interruptions and Load Restriction Details
c) Page 11 Accident
d) Page 12 to 14 AE to MD and TA to MD E-mail complaint status
e) Page 15 to 23 Status of Pending Complaints Beyond Time Limit
f) Page 24 to 26 Circle/Division/Sub Division Wise Complaints Details
g) Page 27 Status of Pending Transformer Complaints Beyond Time Limit
h) Page 28 to 29 Status of Pending Transformer Complaints
Indira J
With Warm Regards
GM (CR)94498 44778
BESCOM Helpline
Date:26-05-2017
Dear Sir/Madam, Please find the attached Status of Complaints Received & Pending details as on 25-05-2017
a)
Manager (Ele)
Abstract - Status of Complaints
Opening Balance 5859
Complaints received on 25-05-2017 6463
Total 12322
Cumulative Pending Complaints 5862
Pending Complaints beyond time limit 4709
1
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Status of Complaints as on 25-05-2017 (00:00Hrs to 23:59Hrs)
Cat
egor
y
Category of Complaints
ZONE TOTALBMAZ BRAZ CTAZ
OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed Pending OB Total Disposed
A 421 4429 4850 4378 472 170 993 1163 1099 64 54 380 434 417 17 645 5802 6447 5894 553
B 189 48 237 32 205 10 5 15 6 9 9 1 10 2 8 208 54 262 40 222
C 176 6 182 2 180 4 0 4 0 4 0 0 0 0 0 180 6 186 2 184
D BILLING ISSUES 1415 142 1557 144 1413 45 5 50 9 41 12 2 14 3 11 1472 149 1621 156 1465
E SAFETY ISSUES 849 40 889 31 858 101 15 116 4 112 136 11 147 10 137 1086 66 1152 45 1107
F 0 50 50 50 8 155 163 157 6 12 89 101 91 10 20 294 314 298 16
G THEFT 13 0 13 1 12 16 0 16 0 16 26 0 26 0 26 55 0 55 1 54
H 63 1 64 0 64 24 0 24 0 24 13 0 13 0 13 100 1 101 0 101
I 8 0 8 1 7 2 0 2 0 2 2 0 2 0 2 12 0 12 1 11
J PHASE CONVERSION 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
K 95 1 96 1 95 5 0 5 0 5 1 0 1 0 1 101 1 102 1 101
L 6 0 6 0 6 3 0 3 0 3 1 0 1 0 1 10 0 10 0 10
M 5 0 5 0 5 5 0 5 -2 7 12 0 12 2 10 22 0 22 0 22
N GENERAL 1795 78 1873 8 1865 67 9 76 9 67 86 3 89 5 84 1948 90 2038 22 2016
Grand Total 5035 4795 9830 4648 5182 460 1182 1642 1282 360 364 486 850 530 320 5859 6463 12322 6460 5862
New Complaints on 25-05-
2017
New Complaints on 25-05-
2017
New Complaints on 25-05-
2017
New Complaints on 25-05-
2017
Pending complaints
FAILURE OF POWER SUPPLY
VOLTAGE COMPLAINTS
METER COMPLAINTS
TRANSFORMER FAILURE COMPLAINTS
ALLEGATIONS ON STAFF
NEW CONNECTION/ ADDITIONAL LOAD
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDITIONAL TC/ ENHANCEMENT
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Scheduled & Unscheduled Major Interruptions Details (KPTCL)
Scheduled Timings Unscheduled Timings
1:00
12:40
2:25
0:25
1:13
TOTAL - 0:00 - 5 - 17:43 -
Duration (in Hrs)
Officer Visited the
spot
Duration (in Hrs)
Officer Visited the
spot
KPTCL
1) 66/11KV Amarjyothi MUSS and Austin Town MUSS Incoming supply failure due to 66/11KV Adugodi incoming Line TrippedAffected Areas:S2: S3: S4: E3: E6: Austin Town, Murgesh palya, Indira nagar , Domlur 2nd stage and surrounding areas.(Changeove not arranged) Confirmed by Anusha MUSS JE 25352497.
23:45hrs(24-05-2017 to
00:45 hrs(25-05-
2017)
Anusha MUSS JE 25352497
2) 66/11KV Subramanya MUSS 20MVA Power Transformer No1 tripped due to Supporting insulator flashover Affected Feeders-F2,F4,F5,F6,F7,F8,F10 & F11Affected Areas:S5: Krishna Mill,Part of Kanakapura Main Road, Konananakunte Cross, Srinivasa Industrial Estate. Subramanyapura, Behind K.R.Hospital, Bangarappa Layout and surrounding areas.(Changeove not arranged) Confirmed by Rajanna MUSS JE 26668188.
05:20hrs to 18:00 hrs
Rajanna JE-MUSS
26668188
3) 66/11KV NRS MUSS Bank 3 and Bank 5 tripped Affected Feeders-F8,F9,F11,F12,F13- F23,F24,F25,F20,F4,F10,F30,F33Affected Areas:N1:C1:W3: 3rd, 4th Block & 5th , Bashyam Circle, SSI area, Rajkumar Road.Prakashnagar, Mudappa Garden,venus breweries and surrounding areas.(Changeove not arranged) Confirmed by Naveen MUSS AE 9448487980.
11:30hrs to 13:55 hrs
Naveen AE MUSS
9448487980
4) '66/11KV L.R Bande MUSS Bank 2 tripped Affected Areas:C5: Kavalbyrasandra,KG Halli and surrounding areas.(Changeove not arranged) Confirmed by Prasanna MUSS JE 9448365144.
12:15hrs to 12:40 hrs
Prasanna MUSS JE
9448365144
5) 66/11KV Banasawadi MUSS 20MVA Power Transformer No.3 tripped due to oil leakage Affected Areas:E8: Banasawadi, Babusa Palya,RS Palya and surrounding areas.(Changeove not arranged) Confirmed by Ravi MUSS JE 9448365130.
12:07hrs to 13:20 hrs
Ravi MUSS JE
9448365130
3
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Scheduled & Unscheduled Major Interruptions Details (BESCOM)
Scheduled Timings Unscheduled Timings
B 4:15 17:30
B
5:40 3:45
B 2:15 2:00
B
2:00 1:30
B4:00 5:15
Duration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
BESCOM
1) 66/11KV Chandra Layout MUSS F9 Feeder LT line spacer workAffected Areas:N8: Gnanajothi Nagara, ullal main rd and surrounding areas.(Changeove not arranged) Confirmed by Mallikarjun AE 9449869450.
10:00hrs to 14:15 hrs
Mallikarjun AE
9449869450
1) 66/11KV L.R Bande F9 Feeder 250KVA Transfomer failure. Affected Areas:C5: Periyar nagar, Coffee board colony, Muslim colony, Amar layout, Dubai Layout, Ambedkar Layout and surrounding areas.(Changeove not arranged) Confirmed by . Manjunath AE 9449810251.
22:00hrs (24-05-2017) to
15:30 hrs (25-05-2017)
Manjunath AE
9449810251
2) 66/11KV Nimhans MUSS F3 Feeder line clear taken for maintenance workAffected Areas:S1: Kidwai hospital, Nimhans accidental hospital, part of 8th main Byrasandra1st to 10th cross, Tippu convent, S.M.Nagar main road, Indiragandhi Children Hospital, T B Santorium and T B Santorium Slum and surrounding areas.(Changeove not arranged) Confirmed by Srinivas AE 9449840401 .
11:20hrs to 17:00 hrs
Srinivas AE 9449840401
2) 66/11KV HSR MUSS F2, F7, F8 and F18 Feeder Line tripped due to rain Affected Areas:S8: S11: 23rd main, 1st Sector, 5th 2nd Sector, HSR Layout and surrounding areas.(Changeove not arranged) Confirmed by Ravi JE 9448494009.
23:00hrs (24-05-2017) to
02:45 hrs(25-05-2017)
Ravi JE 9448494009
3) 66/11KV EPIP MUSS F17 Feeder VL kept open for tree trimming workAffected Areas:S7: PurvaRivera ApartmentCHINNAPPANHALI, KUNDALAHALLI and surrounding areas.(Changeove not arranged) Confirmed by Kumar Niak AEE 9449844667.
14:30hrs to 16:45 hrs
Kumar Niak AEE
9449844667
3) 66/11KV Sarakki MUSS F10 Feeder HT AB Cable faulty Affected Areas:S6: JP nagar 4th phase and surrounding areas.(Changeove not arranged) Confirmed by Ramachandra JE 9449867660.
23:45hrs (24-05-2017) to
01:45 hrs (25-05-2017)
Ramachandra JE
9449867660
4) 66/11KV NGEF MUSS F10 Feeder line clear taken for tree trimming workAffected Areas:E10: Sadananda nagar, krishnaiyana palya, C-DAC, NPCL,Metro, BMRCL, Suddhagunte palya, Byrasandra, Bhuvaneshvari nagar and surrounding areas.(Changeove not arranged) Confirmed by Zharappa AE 9449874691.
14:10hrs to 16:10 hrs
Zharappa AE 9449874691
4) 66/11KV Banaswadi MUSS F14 Feeder Line faulty Affected Areas:E8: Ganeash Temple, MM Garden, Flower Garden, Prakruthi township, Balaji L/O and surrounding areas.(Changeove not arranged) Confirmed by Madhushekar JE 9449869318.
00:30hrs to 02:00 hrs
Madhushekar JE
9449869318
5) 66/11KV IISC MUSS F2 Feeder 250KVA Transformer kept open for pole erection workAffected Areas:C2: Sadashiva nagar,Sanky tanky road and surrounding areas.(Changeove not arranged) Confirmed by Jitendra AE 9449864535.
15:10hrs to 19:10 hrs
Jitendra AE 9449864535
5) 66/11KV B Station F30 Feeder HT AB Cable faulty Affected Areas:E3: jeevan kendra layout keshava raja layout part of cambridge raod and surrounding areas.(Changeove not arranged) Confirmed by Santhosh AE 9449874687.
01:00hrs to 06:15 hrs
Santhosh AE 9449874687
4
Scheduled Timings Unscheduled TimingsDuration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
B 3:45 1:05
B 1:30 1:48
B 2:15 2:02
B 3:10 7:35
B 1:50
B 6:00
BESCOM
6) 66/11KV Kadugodi MUSS F3 Feeder VL kept open for procession Affected Areas:HK1: Samethanahalli,Hosakote and surrounding areas. (Changeove not arranged) Confirmed by Murali AE 9449871163.
15:15hrs to 19:00 hrs
Murali AE 9449871163
6) 66/11KV ITI MUSS F10 Feeder tripped due to 11KV wire cutAffected Areas:E7: Hoysala Nagara,Ramamurthy nagar and surrounding areas.(Changeove not arranged) Confirmed by Srinivas JE 9449874263 .
06:30hrs to 07:35 hrs
Srinivas JE 9449874263
7) 66/11KV Bidadi MUSS F6 Feeder line clear taken for GOS replacement workAffected Areas:BD1: Bidadi and surrounding areas.(Changeove not arranged) Confirmed by Girish AE 9449866756.
18:40hrs to 20:10 hrs
Girish AE 9449866756
7) 66/11KV RMZ MUSS F6 Feeder HT jump cutAffected Areas:S11: Kasavanahalli and surrounding areas.(Changeove not arranged) Confirmed by Manjunath JE 9449868575.
06:45hrs to 08:33 hrs
Manjunath JE 9449868575
8) 66/11KV L.R Bande MUSS F8 Feeder line clear taken for GOS replacement work Affected Areas:C5: Ganesha block, Athmananda colony, Sulthan palya, Brindavan layout, Sanaulla layout and surrounding areas.(Changeove not arranged) Confirmed by Bhaskar JE 9035733236.
12:45hrs to 15:00 hrs
Bhaskar JE 9035733236
8) 66/11KV HSR MUSS F20 Feeder single phaseAffected Areas:S13: Kudlu Village and surrounding areas.(Changeove not arranged) Confirmed by Madappa JE 9449840468 .
09:20hrs to 11:22 hrs
Madappa JE 9449840468
9) 66/11KV BTM MUSS F4 Feeder line clear taken for tree trimming workAffected Areas:S8: Hongasandra, MiCo layout , Adarsha layout, Pragathilayout. & Vinayaka layout. and surrounding areas.(Changeove not arranged) Confirmed by Vishwas AE 9449840470.
13:50hrs to 17:00 hrs
Vishwas AE 9449840470
9) 66/11KV Malgodi MUSS F5 & F7 Feeder faulty due to UG Cable faulty Affected Areas:S13: Anand Reddy Layout,KIADB Layout and surrounding areas.(Changeove not arranged) Confirmed by Srinivas Reddy AE 9449840463 .
09:45hrs to 17:20 hrs
Srinivas Reddy AE
9449840463
10) 66/11KV Pottery Road MUSS F12 Feeder HT Jump cutAffected Areas:E1: Sonnappa Block, Pillanna Garden 3rd Stage and surrounding areas.(Changeove not arranged) Confirmed by Hoobaiah AE 9449844721.
09:40hrs to 11:30 hrs
Hoobaiah AE 9449844721
11) 66/11KV Byadarahalli MUSS F2 Feeder 250KVA Transformer No.219 failure.Affected Areas:N6: Sanjeevini Nagara,Sunkadakatte and surrounding areas.(Changeove not arranged) Confirmed by Sumangala JE 9741270000.
10:00hrs to 16:00 hrs
Sumangala JE 9741270000
5
Scheduled Timings Unscheduled TimingsDuration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
B 2:20
B 16:30
B 1:20
B 5:30
B 1:50
B 1:00
BESCOM
12) 66/11KV Byadarahalli MUSS F11 Feeder tripped due to over loadAffected Areas:N6:K2: Muneshwanagara,Lakshman Nagara,Mohan theatre area,Sollapuradamma nshwaranagara, Hosahalli and surrounding areas.(Changeove not arranged) Confirmed by Sumangala JE 9741270000
10:15hrs to 12:35 hrs
Sumangala JE 9741270000
13) 66/11KV Chinthamani MUSS F10 & F7 Feeder faultyAffected Areas:CM1: KR Badavane,NR Badavane,Venkatagiri Kote,Mehebhubnagara,Bagyapali ,MG RD,Gajananan ,Prabakarlayut,Kannampalli,Ashwini Badavane,Surrounding Areas and surrounding areas.(Changeove not arranged) Confirmed by Murali JE 9482135108
00:00 hrs to 16:30 hrs
Murali JE 9482135108
14) 66/11KV ITI MUSS F10 Feeder faultyAffected Areas:E7: Hoysala Nagara,Ramamurthy nagar and surrounding areas.(Changeove not arranged) Confirmed by Sampangi JE 9449874263.
11:30hrs to 12:50 hrs
Sampangi JE 9449874263
15) 66/11KV Jayadeva MUSS F20 Feeder 250KVA Transformer No.121 kept open due to 3 poles broken Affected Areas:S6: BTM 2nd Stage,30th cross and surrounding areas.(Changeove not arranged) Confirmed by Khadar JE 9449844835.
12:30hrs to 18:00 hrs
Khadar JE 9449844835
16) 66/11KV ITI MUSS F14 Feeder HT wire cutAffected Areas:E7: Ayyappanagar, Seegehalli, Deja view park, Bethal nagar, White city layout, Mallappa layout, Alpha garden and surrounding areas.(Changeove not arranged) Confirmed by Prasanna JE 9945304141.
14:20hrs to 16:10 hrs
Prasanna JE 9945304141.
17) 66/11KV Pottery Road MUSS F5 Feeder trippedAffected Areas:E5: Kariyanapalya,OILMILL and surrounding areas. (Changeove not arranged) Confirmed by Munivenkatappa AE 9449844721.
15:00hrs to 16:00 hrs
Munivenkatappa AE
9449844721.
6
Scheduled Timings Unscheduled TimingsDuration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
B 3:10
B 2:20
B 4:15
B 3:40
B 1:00
B 2:30
BESCOM
18) 66/11KV Telecom MUSS F12 Feeder ABC cable faulty Affected Areas:W3: Gori palya,Ranganatha colony, rayapuram, J J R nagar and surrounding areas.(Changeove not arranged) Confirmed by Jayaram JE 9449840366 .
14:50hrs to 18:00 hrs
Jayaram JE 9449840366 .
19) 66/11KV Velankini MUSS F4 Feeder faultyAffected Areas:S8: Hongasandra, GB Palya , Laxmi layout and surrounding areas. (Changeove not arranged) Confirmed by Vishwas AE 9449840470.
16:10hrs to 18:30 hrs
Vishwas AE 9449840470.
20) 66/11KV A station MUSS F8 Feeder Trunk cable faultyAffected Areas:C2: Sheshadripuram, Sri Puram, Ganesha Block and surrounding areas. (Changeove not arranged) Confirmed by Narasimha Murthy AE 9449864498.
16:15hrs to 20:30 hrs
Narasimha Murthy AE 9449864498
21) 66/11KV L.R bande MUSS F9 Feeder 250 KVA Transformer No-141 and 143 FailureAffected Areas:C5: D.J Halli and surrounding areas.(Changeove not arranged) Confirmed by Manjunath JE 9449810251.
15:30hrs to 19:10 hrs
Manjunath JE 9449810251
22) 66/11KV Hebbal MUSS F11 Feeder trippedAffected Areas:C4: KEB Layout, Sanjaynagar, AECS Layout, Amarjyothi layout, Hoysala Apartment, Foodworld Sanjaynagar and surrounding areas. (Changeove not arranged) Confirmed by Sudha AE 9449864892.
17:00hrs to 18:00 hrs
Sudha AE 9449864892
23) 66/11KV RBI MUSS F12 Feeder HT wire cutAffected Areas:S6: PuttenahalliI, Brigade millenium, JP nagar 7th phase and surrounding areas. (Changeove not arranged) Confirmed by Suresh JE 9449844719 .
17:30hrs to 20:00 hrs
Suresh JE 9449844719
7
Scheduled Timings Unscheduled TimingsDuration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
B 3:40
B 1:45
B 1:15
B 1:55
B 2:30
B 1:30
BESCOM
24) 66/11KV Nimhans MUSS F3 Feeder 250KVA Transformer failureAffected Areas:S1: Bhairasandra 1st cross to 8th cross,LIC colony and surrounding areas.(Changeove not arranged) Confirmed by Srinivas AE 9449840401 .
16:30hrs to 20:10 hrs
Srinivas AE 9449840401
25) 66/11KV Mulbagilu MUSS F8 Feeder faultyAffected Areas:MB1: Avani,Mulbagilu and surrounding areas. (Changeove not arranged) Confirmed by Narayan JE 9632050918.
17:15hrs to 19:00 hrs
Narayan JE 9632050918.
26) 66/11KV Kadugodi MUSS F2 Feeder HT jump cutAffected Areas:E4: Kadugodi and surrounding areas.(Changeove not arranged) Confirmed by Naveen AE 9449874205.
18:00hrs to 19:15 hrs
Naveen AE 9449874205.
27) 66/11KV Velankini MUSS F4 Feeder pot head flash overAffected Areas:S8: Hongasandra, GB Palya , Laxmi layout and surrounding areas.(Changeove not arranged) Confirmed by Vishwas AE 9449840470.
19:15hrs to 21:10 hrs
Vishwas AE 9449840470.
28) 66/11KV Somanahalli MUSS F2 Feeder trippedAffected Areas:K3: Kaglipura,Ramesh nagar and surrounding areas.(Changeove not arranged) Confirmed by Thimmarayappa JE 9449866749.
19:10hrs to 21:40 hrs
Thimmarayap
pa JE 9449866749
29) 66/11KV KHB MUSS F11 Feeder troubleAffected Areas:C7: LIG Block, 5th phase, Kogilu Layout,part of Yelahanka new town and surrounding areas. (Changeove not arranged) Confirmed by Venugopal AE 9449864908.
19:15hrs to 20:45 hrs
Venugopal AE 9449864908.
8
Scheduled Timings Unscheduled TimingsDuration (inhrs)
officer Visited the
spot
Duration (inhrs)
officer Visited the spot
B 2:45
B 1:30
B 1:00
B 1:20
B
9 28:50 33 114:55
BESCOM
30) 66/11KV ITI MUSS F6 Feeder Line faultyAffected Areas:E7: KR Puram Extension, Govt college, VB L/o, Police Qtrs, Vinayaka Layout, RMS Colony, Bhattarahalli, Medahalli and surrounding areas.(Changeove not arranged) Confirmed by Dhananjaya JE 9449874693.
21:00hrs to 23:45 hrs
Dhananjaya JE
9449874693.
31) 66/11KV SIR MV MUSS F11 Feeder Line faultyAffected Areas:K2: SMV L/O, 5th Block and surrounding areas.(Changeove not arranged) Confirmed by Srinivas JE 9449870320.
22:00hrs to 23:30 hrs
Srinivas JE 9449870320.
32) 66/11KV Chandra Layout MUSS F5 Feeder VL kept open due to 250KVA Transformer groundingAffected Areas:N2: Attigupe Part,BCC layout, RPC Layout Part, Kalyan Layout, Remco Layout. and surrounding areas. (Changeove not arranged) Confirmed by Muniraju JE 9449844702.
22:30hrs to 23:30 hrs
Muniraju JE 9449844702.
33) 66/11KV BTM MUSS F9 Feeder HT Jump cutAffected Areas:S10: Nyanappanahalli, Begur Wood, Vishwa priya Layout, Chikka begur and surrounding areas. (Changeove not arranged) Confirmed by Suresh JE 9449844812.
22:30hrs to 23:50 hrs
Suresh JE 9449844812.
9
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED Major Interruptions of Load Restriction by KPTCL (25-05-2017)
Description Timings
2:14
3:10
12:00
KPTCL
Duration (in Hrs)
1) 66/11KV Gollahalli MUSS each Feeder 1 hour load restiction due to overload Affected Areas:S10 S12 AN1: Weavers Colony, pilliganahalli Royal Ermitage, gottigere B1 to B8 Blocks of L&T Souty City Appartments and surrounding areas.(Changeove not arranged) Confirmed by Macwert MUSS AE 9448462046.
From 19:16hrs to 21:30 hrs
2) 66/11KV ITI MUSS each feeders 1 hour load restriction due to over loadAffected Areas:E4:E7: E10:HK1: Mahadevapura R.H.B Colony,Chinnappa Layout, Doddanekundi,Mahadeva Pura,Ring road,Ramurthynagar, Margondanahalli,Jinkethimmanahalli, NRI Layout, KR Puram Extension, Akshaya Nagara,PNT Layout,Devasandra, Kalkere main road,BWSSB, ITI, RM Nagar main road,Ayyappanagar, Seegehalli, and surrounding areas.(Changeove not arranged) Confirmed by Raju MUSS JE 9448365138.
From 07:20hrs to 10:30 hrs
3) 66/11KV EPIP MUSS each feeders 1 hour load restriction due to over loadAffected Areas:E4:S7: Whitefield,Kundalahalli gate, Sliver spring road, Light spro road, ITPL main road,Kundalahalli village, Rhyan school road, Dream meadows,Knight Bridge apts,Puravankara Apartment, BEML Layout, Thubarahalli, Siddapura,PurvaRivera Apartment,Rohan Vasantha Apartment,Shriram Samruddhi Apt,Sterling Apts,Kalyani Tech park,Divyasree Tech Park,Srivari Developers, AECS Layout and surrounding areas.(Changeove not arranged) Confirmed by Mahadev MUSS AE 9480812569.
From 08:00hrs to 20:00 hrs
10
Description Timings
KPTCL
Duration (in Hrs)
2:30
5:30
3:45
Total 6 29:09
KPTCL
4) 66/11KV Naganatha Pura MUSS each Feeder 1 hour load restriction due to 20MVA Power Transformer No.2 over loadAffected Areas:S8:S11:S13: Hosur main road,Singasandra,Singasadra,Kudlu Gate,AECS Layout A Block , Singasandra VILLAGE. Hongasandra , G B Palya , Omshakthi Lay out , Bommanahalli ( begur main road). Bomanahalli industrial area. Kudlu gate, BTR garden, Concord layout , Muneshawara Layout, Haralukunte , Hosapalya , YelluKuntae.AECS L/O B Block & Cikka Begur Gate.Beretana Agrahara, Parappana Agrahara. and surrounding areas.(Changeove not arranged) Confirmed by Ramesh MUSS AE 9448365146.
From 10:00hrs to 12:30 hrs
5) 66/11KV Byadrahalli MUSS F11 Feeder load restriction due to overloadAffected Areas:N6: Mohan theatre area,Gajjana nagar,Sajjan roa compound, Sollapuradamma layout,Vishwaneedam farm and surrounding areas.(Changeove not arranged) Confirmed by Namappa AEE 9449844656.
From 16:00hrs to 21:30 hrs
6) 66/11KV ITI MUSS each feeder 45 minutes load restriction due to 31.5MVA Power Transformer Bank 2 over loadAffected Areas:E4: E7: E10: Mahadevpura,Ram Murthy Nagar,KR Puram, Ayyappa Nagar,Kaggadaspura and surrounding areas.(Changeove not arranged) Confirmed by Raju MUSS JE 9448365138.
From 18:45hrs to 22:30 hrs
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Accidents:BMAZ BRAZ CTAZ Total
Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental Departmental Non-Departmental
- - - - - - 1
Fatal Non- Fatal Fatal Non- Fatal Fatal Fatal Non- Fatal Fatal Fatal Non-Fatal Fatal Fatal
- - - - - - 1 - - - - - - - 1 -
A farmer name Shashikumar was electrocuted when he came in contact with live wire which
was cut fallen on ground.The incident occurred in Dibburahalli village, Shidlaghatta
taluk, Chikkaballapur district, awaiting for AEE email reply
Non- Fatal
Non-Fatal
Non-Fatal
Non-Fatal
12
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED AE to MD and TA to MD E-mail pending complaints as on 25-05-2017
Sl. No Circle E-mail Dated Consumer Name Subject Docket Number Nature of Compalint Remarks
1 North 26-09-2016 Kumar Consumer requesting for permanent connection N0C8AZZQ85 N Category 7 Days Not confirmed
2 West 07-10-2016 Narayan Consumer Not receiving EB Bill from JUNE onwards D0K1BAQK91 D Category 7 Days 5/31/2017
3 South 21-12-2016 Mayank Frequent power cut N Category 7 Days Not confirmed
4 EAST 1/23/2017 Tasmiya Issue- Frequent low voltage and fluctuation B0E9BHJG39 B Category 7 Days Not confirmed
5 WEST 3/12/2017 Nagesh N0W7BKYZ07 D Category 7 Days Not confirmed
6 WEST 14.03.2017 Vikas Hirawat N0K2BLET40 N Category 7 Days Not confirmed
7 West 15.03.2017 Aravindavalli K N0W7BLGX85 N Category 7 Days 5/26/2017
8 North 3/28/2017 Hussian N0C5BMGB09 N Category 7 Days Not confirmed
9 South 3/30/2017 karan E0S9BMJR82 E Category 15 Days Not confirmed
10 NORTH 4/5/2017 Sidharth R Krishna N0C4BMUC86 Ncategory 7 Days Not confirmed
Time as per KERC
Tentative Date Taken for relve the issue
Compliant reminded to Sri .Thyaka Nayak-AEE-9449841574 regarding this issue, said that, bring a letter EHT clearance from KPTCL, then permanent connection will be given by BESCOM same as been informed to the consumer, he already given application for EHT clearance from KPTCL and tentative date is not given by the KPTCL as per consumer and he appealed to consumer court regarding this issue.
Sri.Kashiram Pawar, AEE -9449844687 confirmed that complaint has been forwarded to IT section and work in under process so it will take one more week, Need to Contact AEE or AAO on (31-05-2017)
N0S6BKAK62, N0S6BKYV64
Confirmed by Sri.Ramesh, AEE- 9449844660,Issue : frequent power cuts ,Feeder problem and the work Estimation has been done and awaiting for work order, Date cannot be confirmed approximately it will take 6 months (AUG-2017).
confirmed by AAO -Meera -28486198 confirmed that the complaint detailed report already submitted to division office and audit section but time cannot be estimated and AAO will through email hence awaiting for mail reply
#605, P-1, IDEAL HOMES TOWNSHIP, R R NAGAR, BANGALORE. (A/C id :8757119000 , Consumer getting
late payment charged since Jun
confirmed by AAO -Meera -28486198 confirmed that the complaint detailed report already submitted to division office and audit section but time cannot be estimated and AAO will through email hence awaiting for mail replyIssue : Removing of the interest amount and Requested to
provide the bill based on our actual consumption since August 2013
Address : VIP EXTRUSIONS ,267/29 to 269/29, Pipe Line Road,Mahadeshwara Nagar,Vishwaneedam
Post,Sunkadakatte, Bangalore - 560091
RR Number : N6P797, MR Code : 21
Reminded to Sri.Prakash -AAO-9449840342 regarding the issue ,AAO will check the isssue and will send detail Email report.Hence awaiiting for mail reply.
Issue: Wrong Connection given in LT3 instead of LT5 (Requesting to Change of tariff )
Address : # 505, "Bakshi", Banashankari 6th Stage, 2nd Block, R.R.Nagaar Post, Bangalore - 560 098
Reminded to AAO-28486198 regarding the issue ,AAO-28486198 suggested to call back between 3 PM and 4M to resolve the issue.
Issue: Consumer is requesting for compensation because he made payment before the due date but still they have
disconnected the power suplly Address: [ E-mail Complaint ] NO.22, I Floor, 10th Cross, KHB Road, Kavalbyraandra
New Extension,BANGALORE – 560 032
AEE already send a Email regarding the issue but consumer not agreed to close the docket.
Plot No. 106 , 5 th Cross , Kathriguppe Link Road,I Main Rama Rao Layout,Banashankari III StageBengaluru-
560085.Issue: shifting the Transformer
Spoken to Sri .Harindra swamy.M.K -AEE-9449844669 regarding the issue, he told consumer has to visit the sub division and same as informed to consumer
{Email compliant ae to md} First Cross Shantivana bhadrappa lo frequent power cuts
Reminded to Sri.Uday Kumar.M.B -AEE-9449844644 ,will check the issue and will give detailed Email report, awaiting for Email reply.
13
Sl. No Circle E-mail Dated Consumer Name Subject Docket Number Nature of Compalint RemarksTime as per KERC
Tentative Date Taken for relve the issue
11 EAST 4/7/2017 Sidharth R Krishna N category 7 Days Not confirmed
12 West 4/11/2017 Sankara Narayanan K N0N7BNGE92 D Category 7 Days Not confirmed
13 North 4/11/2017 Manjunath 12NC1115 N Category 7 Days Not confirmed
14 West 14.04.2017 Raghu D0S5BNLO16 D Category 7 Days Not confirmed
15 West 14.04.2017 VIP FRLS D Category 7 Days Not confirmed
16 West 4/21/2017 Sandeep CS D0W3BNUG78 D Category 7 Days Not confirmed
17 North 4/24/2017 K Aravind K0C7BNUG29 K Category 7 Days Not confirmed
18 EAST 4/26/2017 Prashanth N Category 7 Days 5/24/2017
19 EAST 4/27/2017 D0E4BNIP08 D Category 7 Days Not confirmed
20 South 4/28/2017 Guru Ganesh N0S7BOGY09 N Category 7 Days Not confirmed
21 South 4/27/2017 VV Sreenivasa Rao N0S6BOKP37 N Category 7 Days 5/24/2017
22 South 30.04.2017 Deepak N0S7BOQN27 N Category 7 Days Not confirmed
23 North 30.04.2017 Kiran N0N8BOQT20 N Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
24 South 5/10/2017 Ravishankar N0S3BPQM57 N Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
25 South 5/3/2017 Bhaskar D0S6BOYM49 D Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
26 North 14-05-22017 Raghavan N0C2BPXL66 N Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
27 SOUTH 5/14/2017 thomas N Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
28 SOUTH 5/15/2017 Mohan Raj DS12BQBD14 D Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
#E-701,AISHWARYA LAKE VIEW RESIDENCY,6TH CROSS,KAGGADAS PURA MAIN ROAD C V RAMAN NAGAR,BANGALORE-560093, - - 560093. KAR, IND (Address correction Add coma before C V Raman Nagar,
Del
NHH1BNCI55Reminded to Sri.S Bhimappa-AEE- 9448279036,will check the issue and will send deatiled Email report.Hence awaiting for AEE Email reply.
Issue: Electricity Bills not received due to Software problem Address : #No. 202, Block 6D, Provident Sunworth, Kumbalagudu RR Number : K1D32168
As per AEE email reply, Complaint addressed to AEE BBMP Mahalakshmi Puram Sub division BBMP, to clarify whether the mobile tower is legal or illegal and power supply to be arranged or not as the complaint received from residents of Ramakrishna and Parimala Nagar vide this office letter No. AEE/AE(T)/N7/2017-18/177-82 dtd 18-04-2017. The action will be initiated after getting information from AEE BBMP, Mahalakshmi Puram
Issue: Power supply stoppage for illegal mobile tower Address : #152 and #153, Ramakrishna Nagar, 4th Block,
Nandini Layout, Bangalore-560096
Informed to Sri.Parashuramappa-AEE-9449844655 and awaiting for Email reply.
Consumer requesting to waive off the Late payment panalty charged for rupes 1998675.33 on 2013 , Account ID:
8525338000
As per Nagabhushan Reddy.T 080-26666868/9449840838 complaint has been informed to AE-Ventakesh as per AE its GIS problem ticket has already raised in Back end team hence issue will be resolved by 10 to 15 days. Hence awaiting for reply
Consumer requesting to waive off the Late payment panalty charged for rupes 1998675.33 on 2013 , Account ID:
8525338000D0K2BNKL70
Called Sri. Karuyappa-AEE-9449844892@12:23 to inform the complaint but not responding to call. Hence could not get the complaint status
3/1,6TH CROSS RR NO: W3P4004 Issue: Back billing charges.
AAO 9916729666 confirmed that consumer already received the notice to pay the back billing charges in JAN 2017 but consumer not ready to admit [pay] and going for appeal.
RR No: YHT205 Issue:Name transfer address: No.1B, P.M.Layout, Chikkabommasandra, New town, Yelahanka,
Bangalore.
Name transfer from Sowmya K to K Aravind.Sri.G Subbalakshmi -AAO-9449841635, confirmed that need NOC from previous consumer but consumer confirmed that required documents were submitted in OCT 2016. Reminded to AAO and awaiting for the Email reply.
E-mail Complaint, TA to MD Complaint ] #13, C T Point, Infantery Road, Bengaluru ( As per BESCOM officials
there is high consumption from the consumer more than the scanction load so consumer needs clarification on
Electricity Load Calculation, RR No's: 2EC45978 and 2EC45977 )
N0E2BOII68 Complaint has been informed to AEE-9449844672 he will send a detailed report about the isue hence awaiting for the reply
Muzzaffar Nadeem Jami
Address : #A211, Midth Town Abutment, Varthur, Bengaluru
Account ID : 2969235549 , MR Code: 6
AAO insisit to inform complaint to Senior Assistant Madhusudhan-9986084659, called SA but not responding to call.
#100 Annapoorneshwari Nilaya 2nd main Siddapura near Kundalahalli Bangalore 560066
Issue:- Frequent Powercut
Reminded to Sri. Kumar Nayak AEE 9449844667 awaiting for Email reply.
Issue: Request for replacement of existing overhead LT Lines with AB Cables
Address: Eshwara Layout, Ward No : 195, JP Nagar 7th Phase, Bangalore
As per AEE-9449844660 , he send AE to do spot inspection and he will send a detailed report about the issue.suggested to call back on 24-05-2017 for further updates.
AE to md complaint #203 Sri Village Apartment 3rd Main Road GM palya BEML factory HAL Bangalore frequent
power cuts
Reminded to Sri. Kumar Nayak AEE 9449844667 awaiting for Email reply.
AE TO MD Complaint Email compliant No1236 6th A Cross SVG Nagar Near Parking flat Moodalapalya
Bangalore (consumer requesting to get correct interruption timings to help desk from concerened area eng
Issue:- Frequent power cutAddress:- 196, 6th Main, Near TVS service center,
Amarajyothi layout, Murgesh Palya
Issue : ECS bill not generated on potal consumer getting reminder message
Account ID : 8769396000 Issue : 1.Consumer Not receiving regular payment for purchased solar power
2.Power consumption meter is not workingAddress : Flat 201, Nritya Apartments, No. 16, 18th
Cross,Malleswaram, Bangalore 560055Account ID : 5490253000TA to Md compliant] Load Enhancement and Non-Receipt
of Regular Bills Account ID 0141900000 ,receiving a monthly invoice of Rs 1000 per month, which is
considerably lower than our regular monthly payments to BESCOM prior to the enhancement of load.
N0S3BPZG36
[Ta to Md Complaint] RR no: S12EH13202 To avail solar water heater installation benefit in monthly energy bills
from the date of serving of installation as solar system was installed 08-11-2013
14
Sl. No Circle E-mail Dated Consumer Name Subject Docket Number Nature of Compalint RemarksTime as per KERC
Tentative Date Taken for relve the issue
29 South 15.05.2017 (R A Radhakrishnan NS10BQBT41 N Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
30 EAST 5/16/2017 Parsa Idris H0E5BQEQ18 H Category 1 Month Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
31 EAST 16.05.2017 Mohammed Hussain D0E4BOHZ54 D Category 7 Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
32 South 16.05.2017 N0S4BQEB61 N Category 7 Days Not confirmed E-mail Sent to AEE, EE, SE and awaiting for reply
33 EAST 17.05.2017 Viswanath N0E1BQHV57 N Category Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
34 EAST 18/05/2017 N0E8BQLU22 N Category 7Days Not confirmed E mail Sent to AEE,EE, SE and awaiting for reply
35 West 5/20/2017 **** Mudinnapalya known as G S Enterprises, (high voltage) B0K2BQOT20 B Category 7 Days Not confirmed
36 EAST 22.05.2017 Jagadish N0E7BQVD77 N Category 7Days Not confirmed E-mail Sent to AEE , EE, SE and awaiting for reply
37 EAST 24.05.2017 Rahul A0E7BRBX09 A Category 1 day Not confirmed E-mail Sent to AEE , EE, SE and awaiting for reply
38 North 24.05.2017 Sandip Roy, IAAS C0C4BRBY76 C Category 7Days Not confirmed E-mail Sent to AEE , EE, SE and awaiting for reply
39 Ctaz 25.05.2017 Roshan R EMG1BLKC83 E Category 15 Days Not confirmed E-mail Sent to AEE , EE, SE and awaiting for reply
40 EAST 25.05.2017 B0E8BREL16 B Category 120 Days Not confirmed E-mail Sent to AEE , EE, SE and awaiting for reply
Issue: Providing Power / Electricity to Plots
Issue: Allegation against Staff (Consumer has complained against Meter reader Khan-9945180707 regarding Miss
Behaviour and Man Manhandling)
Address: Ananda Bairavi Apartment ,Hennur main road
Issue: Minimum bill generated.
Address: #151, B blk, SSVR Lotus pond Varthur, Bangalore.
[ E-mail Complaint, TA to MD Complaint ] #465-A , 6th Block, 17th G Main, Near Park, Koramanagala, Bengaluru
( Frequent TC Blasts )
Issue: Consumer request to dont shift the Electric pole (Pole Number : SE-46-JCN-ATS-TC31-05 )
Address : #8/1, Anajaniah Temple road, JP Nagar, Muni ready Palya Bangalore -06
RR Number : 1ELG67306 TO 1ELG67314 and 1EEH54591
Shinokumar Thottupurathu
Mohanan
[E-mail Complaint] #516, Sycon Cressida, Horamavu Main Road, Bengaluru-560043. ( Account Id: 6397998000, RR
Number: MS8EH63677, Refund of excess amount collected in April 2014, Consumer needs clarification regarding ASD amount of Rs 23600 ) [E-mail Co
Spoken with consumer ,As consumer facing frequent ly low voltage from 6.30 am during moring times .Email sent to AEE , EE, SE and awaiting for reply.
Address : #160, 10th main, NRI Layout, Ramamurthynagar, Bangalore 560016.
House number #29 , 3rd cross kenchappa layout , T.c playa main road
551, Dollars Colony,13th Cross, 6th Main, RMV 2nd Stage,Bangalore - 560094 Account ID : 2680505000 ; RR
No C4EH46536
Issue:Replacement of damaged pole (Screen Shot Attached )
Address : Near Marabally Village ,Madhugiri Taluk,Tumkur District
Francis Kuriakose
Issue: Low Volatge
Address : #NO 32 ,EverGreen ,6TH Street ,1 ST Block, Prakuruthi Township, Bapusapalaya, Kalayan Nagar
Bangalore 560043
Status of Pending Complaints Beyond Time Limit
BMAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
A
6hrs 164 53 128 123 468
6hrs 0 1 3 0 4
Line breakdown (pole broken) 10 hrs 0 0 0 0 0
B
7 days 18 11 3 0 32
120 days 0 0 0 0 0
Opening of neutral (High Voltage) 1 hr 38 27 10 1 76
C
Inspect and check correctness 7 days 78 17 12 14 121
replaced slow, creeping or stuck meters 10 days 8 1 0 2 11
7 days 8 0 0 3 11
replaced burnt meters in all other cases 24 hrs 11 0 0 4 15
D BILLING ISSUES
24 hrs 224 199 60 69 552
7 days 236 236 70 69 611
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
VOLTAGE COMPLAINTS
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
METER COMPLAINTS
replaced burnt meters if cause not attributable to consumer
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
16
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
Category of Complaints
D BILLING ISSUES
Reconnection of supply following disconnection On the same day 41 29 11 14 95
17
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
Category of Complaints
E SAFETY ISSUES
3 days 75 30 32 14 151
15 days 84 33 34 41 192
15 days 32 12 7 11 62
Tree trimming 7 days 151 18 39 41 249
F
Water Supply
24 hrs
0 0 0 0 0Domestic 0 0 0 0 0Industry 0 0 0 0 0Mixed load 0 0 0 0 0Irrigation Pumpset(IP Set) 0 0 0 0 0
G THEFTTheft 1 Month 0 3 3 0 6
Hooking Under Nirantara Jyothi Yojane 15 days 0 0 0 0 0
H Allegations on staff 1 Month 11 6 5 5 27
I
1 month 0 1 0 0 1
45 days 2 0 0 0 2
IP sets 30 days 0 1 0 0 1
Straightening of bent pole (Grounding /Return supply in neutral)
replacedment of damaged pole (Wire Sagging/Providing intermediate pole)
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
Transformer FAILURE COMPLAINTS
ALLEGATIONS ON STAFF
NEW CONNECTION/ ADDitIONAL LOAD
Release of supply where service is feasible from existing network
Release of supply where network expansion/ enhancement required for providing connection
18
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban South East North West Total
Category of Complaints
JConversion of LT single phase to LT 3 phase 30 days 0 0 0 0 0
Conversion from LT to HT and vice-versa 30 days 0 0 0 0 0
K7 days 37 20 17 3 77
Change of category (Wrong Application Tariff) 7 days 5 8 4 0 17
LRefund of deposits 60 days 0 0 1 1 2Issue of certificates 1 day 0 1 2 0 3
MAdditional TC 1 Month 0 1 0 0 1TC Enhancement 15 days 3 0 0 0 3
N GENERAL 7 days 863 365 86 108 1422
Grand Total 2089 1073 527 523 4212
PHASE CONVERSION
TRANSFER OF OWNERSHIP AND CONVERSION
Title transfer of ownership (Name Transfer/Change of Address)
REFUND/ ISSUE OF CERTIFICATES
ADDITIONAL TC/ENHANCEMENT
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
Status of Pending Complaints Beyond Time Limit
BRAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
A
Urban
6hrs
-
0 0 0 0
6hrs 0 0 0 0
Line breakdown (pole broken) 10 hrs 0 0 0 0
Rural -
24 hrs 2 4 9 15
24 hrs 0 0 0 0
Line breakdown (pole broken) 24 hrs 0 0 0 0
B VOLTAGE COMPLAINTS
7 days 7 days 1 0 0 1
120 days 120 days 0 0 0 0
Opening of neutral (High Voltage) 1 hr 1 hr 3 2 2 7
C METER COMPLAINTS
Inspect and check correctness 7 days 7 days 0 1 1 2
replaced slow, creeping or stuck meters 10 days 10 days 0 0 0 0
replaced burnt meters if cause not attributable to consumer 7 days 7 days 0 1 0 1
replaced burnt meters in all other cases 24 hrs 24 hrs 0 0 1 1
D BILLING ISSUES
24 hrs 24 hrs 15 5 1 21
7 days 7 days 12 2 6 20
Reconnection of supply following disconnection On the same day 24 hrs 0 0 0 0
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
19
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
Category of Complaints
E SAFETY ISSUES
Straightening of bent pole (Grounding /Return supply in neutral) 3 days 3 days 12 5 14 31
15 days 15 days 10 3 14 27
15 days 15 days 7 1 8 16
Tree trimming 7 days 7 days 2 1 2 5
F
Urban
Water Supply
24 hrs
0 0 0 0
Domestic 0 0 0 0
Industry 0 0 0 0
Mixed load 0 0 0 0
Irrigation Pumpset(IP Set) 0 0 0 0
Rural
Water Supply
72 hrs
0 0 0 0
Domestic 0 1 0 1
Industry 0 0 0 0
Mixed load 1 0 0 1
Irrigation Pumpset(IP Set) 1 1 1 3
G THEFT
Theft 1 Month 1 Month 0 0 4 4
Hooking Under Nirantara Jyothi Yojane 15 days 15 days 1 0 6 7
replacedment of damaged pole (Wire Sagging/Providing intermediate pole)
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
TRANSFORMER FAILURE
COMPLAINTS
20
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural BRC Ramanagar Kolar Total
Category of Complaints
H ALLEGATIONS ON STAFF Allegations on staff 1 Month 1 Month 4 4 3 11
I
Release of supply where service is feasible from existing network 1 month 1 month 0 1 0 1
45 days 45 days 0 0 1 1
IP sets 30 days 30 days 0 0 0 0
J PHASE CONVERSION
Conversion of LT single phase to LT three phase 30 days 30 days 0 0 0 0
Conversion from LT to HT and vice-versa 30 days 30 days 0 0 0 0
K
Title transfer of ownership (Name Transfer/Change of Address) 7 days 7 days 1 3 1 5
Change of category (Wrong Application Tariff) 7 days 7 days 0 0 0 0
L
Refund of deposits 60 days 60 days 0 0 0 0
Issue of certificates 1 day 1 day 1 0 0 1
M
Additional TC 1 Month 1 Month 3 0 1 4
TC Enhancement 15 days 15 days 0 0 1 1
N GENERAL 7 days 7 days 19 10 23 52
Grand Total 95 45 99 239
NEW CONNECTION/ ADDITIONAL LOAD Release of supply where network expansion/ enhancement required
for providing connection
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDitIONAL TC/ENHANCEMENT
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
12
Status of Pending Complaints Beyond Time Limit
CTAZ ZONE
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
A
Urban
6hrs
-
0 0 0
6hrs 0 0 0Line breakdown (pole broken) 10 hrs 0 0 0
Rural -
24 hrs 6 1 7
24 hrs 0 0 0
Line breakdown (pole broken) 24 hrs 0 0 0
B VOLTAGE COMPLAINTS
7 days 7 days 4 0 4
120 days 120 days 0 0 0
Opening of neutral (High Voltage) 1 hr 1 hr 2 0 2
C METER COMPLAINTS
Inspect and check correctness 7 days 7 days 0 0 0
replaced slow, creeping or stuck meters 10 days 10 days 0 0 0replaced burnt meters if cause not attributable to consumer 7 days 7 days 0 0 0
replaced burnt meters in all other cases 24 hrs 24 hrs 0 0 0
D BILLING ISSUES
24 hrs 24 hrs 5 1 6
7 days 7 days 4 1 5
Category of Complaints
FAILURE OF POWER SUPPLY
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Fuse off Call (Single Phase/Grounding/Spark at Transeformer/Spark at pole/Wire Snapping or Cut)
Line breakdown (Grounding at pole or TC /Spark in line due to Tree branches touching the lines)
Voltage variations where no expansion or enhancement of network is involved (Voltage Fluctuations/Flickering)
Voltage variations where up-gradation of distribution system is required (Low Voltage For Long Period)
Where field report is not required (Arrears/Excess Billing/ECS/Online Payment/Printing of Bill)
Where field report is required (Bill not received/Meter not read by MR/Wrongreading taken by MR)
22
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
Category of ComplaintsD BILLING ISSUES
Reconnection of supply following disconnection 24 hrs 0 0 0On the same day
23
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
Category of Complaints
E SAFETY ISSUES
Straightening of bent pole (Grounding /Return supply in neutral) 3 days 3 days 36 8 44
replacedment of damaged pole (Wire Sagging/Providing intermediate pole) 15 days 15 days 39 10 49
15 days 15 days 10 5 15
Tree trimming 7 days 7 days 0 0 0
F
Urban
Water Supply
24 hrs
0 0 0Domestic 0 0 0Industry 0 0 0Mixed load 0 0 0Irrigation Pumpset(IP Set) 0 0 0
Rural
Water Supply
72 hrs
1 0 1Domestic 1 0 1Industry 0 0 0Mixed load 0 0 0Irrigation Pumpset(IP Set) 5 0 5
G THEFTTheft 1 Month 1 Month 1 4 5Hooking Under Nirantara Jyothi Yojane 15 days 15 days 6 3 9
H ALLEGATIONS ON STAFF Allegations on staff 1 Month 1 Month 6 3 9
I
Release of supply where service is feasible from existing network 1 month 1 month 0 0 0
45 days 45 days 1 0 1
IP sets 30 days 30 days 1 0 1
J PHASE CONVERSIONConversion of LT single phase to LT three phase 30 days 30 days 0 0 0
Conversion from LT to HT and vice-versa 30 days 30 days 0 0 0
Shifting of Poles (Line passing close to the Building/Shifting of Transformer Center)
Transformer FAILURE
COMPLAINTS
NEW CONNECTION/ ADDitIONAL LOAD
Release of supply where network expansion/ enhancement required for providing connection
24
Category Sub CategoryDuration Pending Complaints Beyond Time Limit
Urban Rural Tumkur Davangere Total
Category of Complaints
KTitle transfer of ownership (Name Transfer/Change of Address) 7 days 7 days 0 1 1
Change of category (Wrong Application Tariff) 7 days 7 days 0 0 0
L
Refund of deposits 60 days 60 days 1 0 1
Issue of certificates 1 day 1 day 0 0 0
M
Additional TC 1 Month 1 Month 8 1 9
TC Enhancement 15 days 15 days 1 1 2
N GENERAL 7 days 7 days 65 16 81
Grand Total 203 55 258
TRANSFER OF OWNERSHIP AND CONVERSION
REFUND/ ISSUE OF CERTIFICATES
ADDitIONAL TC/ENHANCEMENT
Any complaint not covered specifically in the above (Billing Complaints due to Server Problem/Frequent Power Cut)
Division/ Sub Division Wise Complaints of BMAZ ( 25-05-2017)
ZONE CIRCLE DIVISIONB
MA
Z
South 1910
Jayanagar 514
S1 100S2 148S5 117S6 99S9 50
Kormangala 323S3 74S4 115S7 134
HSR 1073
S10 357S11 277S12 44S8 395
East 1520
Indiranagar 863
E3 51E4 200E6 88E7 467E10 57
Shivajinagar 503
E1 88E2 23E5 70E8 142E9 180
Vidhanasoudha 154W3 65W4 58W5 31
North 793
Peenya 260N4 86N5 140N7 34
Malleswaram 209
C1 25C2 130C3 25C6 29
Hebbal 324
C4 69C5 92C7 67C8 96
West 572
Rajajajinagar 252
N1 24N2 57N3 21N6 94N8 56
R.R. Nagar 87
W1 10W2 16W6 43W7 18
Kengeri 233K1 65K2 102K3 66
Total 4795 4795 4795
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
Division/ Sub Division Wise Complaints of BRAZ ( 25-05-2017)
ZONE CIRCLE DIVISIONB
RA
Z
BR
C
445
191
DB1 63
NM1 103
TV1 25
Yelahanka Division 254
DH1 76
HK1 160
NG1 18
Ram
anag
ar C
ircl
e
373
Ramanagar Division 126
BD1 58
KD1 6
MA1 24
CP1 12
CP2 8
RM1 8
RM2 10
Kanakapura division 34
KP1 24
KP2 5
HA1 5
SA1 0
Chandapura division 213AN1 60
CH1 104AT1 49
Kol
ar C
ircl
e
364
Kolar division 71
KL1 50
KL2 10
SP1 11
Chikkaballapura 88
BP1 7
CB1 12
CB2 31
GB1 31
GD1 7
KGF Division 116
BG1 21
KG1 35
ML1 24
MB1 36
Chinthamani division 89
CM1 59
CM2 14
SG1 1SG2 15
Total 1182 1182 1182
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
Nelamanagala Division
Division/ Sub Division Wise Complaints of CTAZ ( 25-05-2017)
ZONE CIRCLE DIVISIONC
TA
Z
TU
MK
UR
413
TUMKUR 176
TK1 32
TK2 11
TK3 3
TK4 12
GU1 23
NT1 13
KU1 82
TIPTUR 82
TP1 39
TU1 26
CN1 17
MADHUGIRI 155
MG1 27
SR1 35
SR2 29
KR1 22
PG1 38
KH1 4
DA
VA
NG
ER
E
73
DAVANGERE 26
DV1 10
DV2 1
DV3 7
AG1 1
JL1 2
CG1 4
SB1 1
HARIHARA 11
HR1 4
HN1 7
HH1 0
CHITRADURGA 17
CD1 10
CD2 4
HL1 2
HD1 1
HIRIYURU 19
HY1 12
CK1 2
MK1 5
Total 486 486 486
Total Complaints
Total Complaints
Sub Division Code
Total Complaints
27
Beyond Time transformers failure complaints
Docket No Zone Circle Division Sub Division Address Remarks
1 palaksha FTU1BNKE47 4/14/2017 15:16:00 CTAZ TIPTUR-DV IRRIGATION Major
2 FNT1BOZU88 5/4/2017 12:39:00 CTAZ Major
3 Ravicm FCM2BPHI89 5/7/2017 16:53:00 BRAZ KOLAR IRRIGATION Major
4 Rakesh FCN1BPVO02 13-05-2017 08:26 CTAZ IRRIGATION Major
5 Vasanth Kuma FTV1BQFS65 17-05-2017 00:03 BRAZ BRC IRRIGATION Major
6 Suman FKH1BQGF22 17-05-2017 04:29 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
7 Manjunath FAT1BQOU70 20-05-2017 00:47:00 BRAZ CHANDAPURA DOMESTIC Major
8 Paveen FGU1BQOU92 20-05-2017 00:57:00 CTAZ TUMKUR TUMKUR DOMESTIC Major
9 Anil Kumar FAT1BQRI21 21-05-2017 01:46 BRAZ IRRIGATION Major
10 *** FTU1BQUG34 21-05-2017 23:37:00 CTAZ IRRIGATION Major
11 Shivakumar FNT1BQUG24 21-05-2017 23:35:00 CTAZ IRRIGATION Major
12 Srinivas FHK1BQVM01 5/22/2017 14:20:00 BRAZ BRC YALAHANKA MIXED LOAD Major
SL NO
Name of Consumer
Date of Complaints Received
Time of Complaints Received
Nature of complaint
Major /Minor Repair
TUMKUR CIRCLE
TU1('R)
Puttamadehalli village, Turuvekere
taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Krishna pujar 9449843981.
Chidananda murthy
TUMKUR CIRCLE
TUMKUR DIVISION
NT1('R)
Bettadahalli village, Nittur taluk
WATER SUPPLY
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Somashekar 9449844175.
CHINTAMANI DIVISION
CM2('R)
Yerakotte village, Chintamani taluk
63 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Seenappa 9448962702.
TUMKUR CIRCLE
TIPTUR DIVISION
CN1('R)
Medanahalli village, chikkanayakanahalli
taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE H.G.Murthy 9449844042.
NELAMANGALA TV1('R)
Cholanayakanahalli Village, Magadi Taluk
63 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by Vasanth Kumar AE 9916617455 .
KH1('R)
Kodigenahalli Village, Madhugiri
Taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by Pampa pathi AE 9449843856
RAMANAGARA AT1('R)
Janthagondanahalli village, Dommasandra.
100 KVA Transaformer failured, it will be replaced on 26-05-2017, confirmed by Manjunath JE 9449866798 .
GU1('R)
Kalpalya village, Gulur.
63KVATransaformer failured, it will be replaced on 26-05-2017, confirmed by AE Praveen 9449878457 .
RAMANAGARA CIRCLE
CHANDAPURA DIVISION
AT1('R)
Janatha gondanahalli village, Anekal taluk
25KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by JE Manjunath 9449866798.
TUMKUR CIRCLE
TIPTUR DIVISION
TU1('R)
Sopanahalli Village, Turuvekere taluk
100KVATransformer failure, it will be replaced on 26-05-2017, confirmed by AE Umeshwaraiah 9148699176.
TUMKUR CIRCLE
TUMKUR DIVISION
NT1('R)
Anekatte village, Nittur taluk
100KVATransformer failure, it will be replaced on 26-05-2017, confirmed by AE Yogendra 9449844052.
HK1('R)
Samethanahalli hosakote tq
Anugondanahalli hobali
100KVATransformer failure, it will be replaced on 29-05-2017, confirmed by Kadugodi AE Murali 9449871163
27
Beyond Time transformers failure complaints
Docket No Zone Circle Division Sub Division Address Remarks
1 palaksha FTU1BNKE47 4/14/2017 15:16:00 CTAZ TIPTUR-DV IRRIGATION Major
2 FNT1BOZU88 5/4/2017 12:39:00 CTAZ Major
3 Ravicm FCM2BPHI89 5/7/2017 16:53:00 BRAZ KOLAR IRRIGATION Major
4 Rakesh FCN1BPVO02 13-05-2017 08:26 CTAZ IRRIGATION Major
5 Vasanth Kuma FTV1BQFS65 17-05-2017 00:03 BRAZ BRC IRRIGATION Major
6 Suman FKH1BQGF22 17-05-2017 04:29 CTAZ TUMKUR MADHUGIRI IRRIGATION Major
7 Manjunath FAT1BQOU70 20-05-2017 00:47:00 BRAZ CHANDAPURA DOMESTIC Major
8 Paveen FGU1BQOU92 20-05-2017 00:57:00 CTAZ TUMKUR TUMKUR DOMESTIC Major
SL NO
Name of Consumer
Date of Complaints Received
Time of Complaints Received
Nature of complaint
Major /Minor Repair
TUMKUR CIRCLE
TU1('R)
Puttamadehalli village, Turuvekere
taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Krishna pujar 9449843981.
Chidananda murthy
TUMKUR CIRCLE
TUMKUR DIVISION
NT1('R)
Bettadahalli village, Nittur taluk
WATER SUPPLY
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Somashekar 9449844175.
CHINTAMANI DIVISION
CM2('R)
Yerakotte village, Chintamani taluk
63 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE Seenappa 9448962702.
TUMKUR CIRCLE
TIPTUR DIVISION
CN1('R)
Medanahalli village, chikkanayakanahalli
taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by AE H.G.Murthy 9449844042.
NELAMANGALA TV1('R)
Cholanayakanahalli Village, Magadi Taluk
63 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by Vasanth Kumar AE 9916617455 .
KH1('R)
Kodigenahalli Village, Madhugiri
Taluk
25 KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by Pampa pathi AE 9449843856
RAMANAGARA AT1('R)
Janthagondanahalli village, Dommasandra.
100 KVA Transaformer failured, it will be replaced on 26-05-2017, confirmed by Manjunath JE 9449866798 .
GU1('R)
Kalpalya village, Gulur.
63KVATransaformer failured, it will be replaced on 26-05-2017, confirmed by AE Praveen 9449878457 .
28
9 Anil Kumar FAT1BQRI21 21-05-2017 01:46 BRAZ IRRIGATION Major
10 *** FTU1BQUG34 21-05-2017 23:37:00 CTAZ IRRIGATION Major
11 Shivakumar FNT1BQUG24 21-05-2017 23:35:00 CTAZ IRRIGATION Major
12 Srinivas FHK1BQVM01 5/22/2017 14:20:00 BRAZ BRC YALAHANKA MIXED LOAD Major
13 Krishnappa FSR2BQZC09 5/23/2017 15:00:00 CTAZ Minor
14 DEVARAJU FGB1BRAB76 5/23/2017 20:50:00 BRAZ KOLAR CIRCLE IRRIGATION Minor
15Lakshmikanth ConsumerFHH1BRCN45 5/24/2017 16:46 CTAZ DAVANEGERE DOMESTIC Minor
16 Shivaprakash FGU1BRFR29 5/25/2017 20:57 CTAZ DOMESTIC Minor
RAMANAGARA CIRCLE
CHANDAPURA DIVISION
AT1('R)
Janatha gondanahalli village, Anekal taluk
25KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by JE Manjunath 9449866798.
TUMKUR CIRCLE
TIPTUR DIVISION
TU1('R)
Sopanahalli Village, Turuvekere taluk
100KVATransformer failure, it will be replaced on 26-05-2017, confirmed by AE Umeshwaraiah 9148699176.
TUMKUR CIRCLE
TUMKUR DIVISION
NT1('R)
Anekatte village, Nittur taluk
100KVATransformer failure, it will be replaced on 26-05-2017, confirmed by AE Yogendra 9449844052.
HK1('R)
Samethanahalli hosakote tq
Anugondanahalli hobali
100KVATransformer failure, it will be replaced on 29-05-2017, confirmed by Kadugodi AE Murali 9449871163
TUMKUR CIRCLE
MADHUGIRI DIVISION
SR2('R)
Uyeldore village Bukkapattana hobli
Sira taluk
WATER SUPPLY
63KVATransaformer failured, it will be replaced on 29-05-2017, confirmed by Section officer Venkatesh Murthy 9449843725
CHIKKABALLAPURA DIVISION
GB1('R)
Gowribidanur Manchenahalli hobli
minakanagurki village
63KVATransaformer failured, it will be replaced on 29-05-2017, confirmed by Vimala AE 9886226176
HARIHARA DIVISION
HH1('R)
chirastasnahalli Harappanahalli Telgi
stn Telgi hobli Davanadere
63KVATransaformer failured, it will be replaced on 26-05-2017, confirmed by AE Virupashappa 8197164885 .
TUMKUR CIRCLE
TUMKUR DIVISION
GU1('R)
Narasimadevarahatti village gubbi
25KVA Transformer failure, it will be replaced on 26-05-2017, confirmed by JE Chandra narasayya -9449844232