106
SC A1 Rotating Electrical Machines: Evaluatie papers 2014 No. Review door: Kwaliteit Bruikbaarheid leesbaarheid Nieuwheid Diepgang A1-101 Krieg 1 1 3 1 1 1 1 nvt A1-102 Meijns 2 2 3 2 1 3 1 1 A1-103 De Leeuw 2 1 2 2 2 1 1 1 A1-104 Bouwmeester 3 3 3 2 2 2 1 1 A1-105 Geraerds 3 2 3 2 3 2 1 2 A1-106 Cancelled A1-107 Meijns 2 1 2 2 1 1 1 1 A1-108 Havenith 2 2 3 3 1 1 1 2 A1-109 Meijns 2 1 2 1 1 1 1 1 A1-110 Bouwmeester 2 2 2 1 1 1 1 1 A1-111 Krieg 3 2 3 3 2 2 2 2 A1-112 Geraerds 3 3 3 2 2 3 2 3 A1-113 Maljaars 3 2 3 3 3 1 1 1 NL actief/relevant voor NL? NL Bijdrage over dit onderwerp? In presentatie voorbereidingsd agen

€¦ · XLS file · Web view · 2014-07-23VFTO simulation and testing for 500 kV and 800 kV GIS disconnectors ... B5-110 Feedback on in-service deployment of the fully digital

Embed Size (px)

Citation preview

SC A1 Rotating Electrical Machines: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1 Developments of rotating electrical machines

A1-101 Krieg 1 1 3 1 1 1 1 nvt

A1-102 Meijns 2 2 3 2 1 3 1 1

A1-103 De Leeuw 2 1 2 2 2 1 1 1

A1-104 Bouwmeester 3 3 3 2 2 2 1 1

A1-105 Geraerds 3 2 3 2 3 2 1 2

A1-106 CancelledA1-107 Meijns 2 1 2 2 1 1 1 1

A1-108 Havenith 2 2 3 3 1 1 1 2

A1-109 Meijns 2 1 2 1 1 1 1 1

A1-110 Bouwmeester 2 2 2 1 1 1 1 1

A1-111 Krieg 3 2 3 3 2 2 2 2

A1-112 Geraerds 3 3 3 2 2 3 2 3

A1-113 Maljaars 3 2 3 3 3 1 1 1

PS2: Life mangement of generators

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

A1-201 Oerlemans 3 3 3 2 2 3 1 2

A1-202 De Leeuw 2 3 2 2 2 3 1 nvt

A1-203 Schwitzky 2 2 3 2 2 2 1 1

A1-204 Krieg 1 2 1 1 3 1 1 1

A1-205 Havenith 3 2 3 1 2 1 1 nvt

A1-206 CancelledA1-207 Maljaars 2 2 1 ? 2 ? 1 nvt

PS3: Rotating machines for dispersed generationA1-301 De Leeuw 2 3 3 2 2 3 1 nvt

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opm

erki

ng

PS1 Developments of rotating electrical machines

Onderzoek beperkt tot twee motoren, niet representief voor de totale populatie.betreft specifieke modellering van veelpolige generatoren

Probleem oplossen door de veroorzaker,te korte afstanden binnen Nederland

Dit probleem is bekend in Nederland

PS2: Life mangement of generators

Open deur verhaal met storende fouten. Enerzijds wordt gebruik gemaakt van kenplaatgegevens anderzijds wordt gesproken over gereviseerde motoren. Kan alleen als het gereviseerde ontwerp gelijk is aan het oorspronkelijke. Voor bepaling van rendement wordt gebruik gemaakt van waarde rendement op de kenplaat. Het feitelijk nut lijkt ver te zoeken.

Er wordt een testprocedure voorgesteld om de maximale hoeveelheid MVAr (+ en -) als functie van MW vast te stellen. Hiermee ontstaan ruimere grenzen dan vandaag de dag worden aangehoudenOm het isolatieconcept van generatoren te verbeteren ten aanzien van uit het net komende transienten worden HF-modellen, bedoeld voor de bepaling van de staptijd responsie van synhrone waterkrachtgeneratoren, vergeleken met metingen van de klemspanning van deze generatoren bij in de praktijk optredende transienten vanuit het net. Spoelen worden opgedeeld in lopende golf modellen voor het gebied van de groef en voor het gebied van de wikkelkop.

The mechanical properties alone do not count, but the magnetic properties have not been tested long. The Dutch machines are not exremely large.

Er wordt een vergelijking gemaakt dus brushless systems (diodewiel) en static systems met brushes, maar er wordt niet veel nieuws verteld.Helder verhaal mbt groeiend formaat generatoren tbv windmolens. Op enkele details na redelijk doordacht. Vragen zijn: hoe vindt dimensionering "gap" tussen modules plaats? En: kan die "gap" niet verkleind worden.Door ontbrekende gasvoorziening (maakt CCGT onmogelijk), de opruk van RES, die olie- en kolengestookte centrales verdringen en de zware HVDC connecties is in het net van Sardinië dringend behoefte aan spanningsondersteuning, kortsluitstroom en roterende massa. De oplossing hiervoor is de inzet van synchrone blindvermogenscompensatie. Standaard twee polige luchtgekoelde synchrone generatoren, als gebruikt in CCGT's, zijn geïdentificeerd als goedkoopste betrouwbare en "proven design" technologie voor inzet als synchrone compensator. Het paper beschrijft verder de eigenschappen van deze generatoren met hun hulpinstallaties en regelingen.

Niet erg relevant voor NL.Wel heel leuk voor de geïnteresseerden in deze technologie.

Betreft conditiebewaking op basis van de combinatie van meerdere parametersLijkt niet echt nieuwe inzichten op te leveren.

PS3: Rotating machines for dispersed generationvooral interessant voor grote aantallen identieke assets

Check dat minimaal 1 paper per PS, reviewer

Dit betreft luchtgekoelde 2 polige turbo generatoren < 200MVA. De stelling is dat de machine bouwers onder druk van kostenbesparing een "minder goede" generator bouwen(bv besparing op kwaliteit van materialen).De paper houdt een pleidooi als tegenzet hierop de bumptest in te zetten om de status van de eindwindingen te monitoren en tijdig maatregelen te nemen voor dat er een grote schade ontstaat.

Diepgaande, complexe wiskundige theorie, alleen voor ingewijden. Om voor anderen dan de auteurs tot een bruikbare implementatie te komen voor het classiciferen van optredende afwijkingen is nog een ernstige "tour-de-force"Only for small electrical machines, the larger machines have a monitoring system with longterm memory. Not enough to damage claimes and it is also no additional tool for maintenance.

"Schade t.g.v. axiale krachtcomponenten in het blikpakket van turbogeneratoren"Interessant faalmechanisme om kennis van te nemen.Mij niet bekend of dit ook speelt in NL.Lastig leesbaar "Ukrainian English"

Tite

l/PS

PS1 Developments of rotating electrical machines

A Novel Technique for Refurbished Induction Motors’ Efficiency Estimation Based on No-Load Tests

Performance of High Efficiency Induction Motors with Power Quality ProblemsOptimization of the ventilation system of a hydrogenerator through laboratory measurements and CFD simulationsReactive Power Capability Tests in Generators in the Colombian Power System

Models of synchronous generators subject to transient voltage surges

CANCELLEDThe impact on large generators through harmonic currents caused by rapid controlTURBO-GENERATOR WELDED ROTOR

Design Improvements in IGBT based Variable Frequency Drive MotorsTREND FOR STATIC EXCITATION SYSTEMS IN LARGE THERMAL GENERATORS - USER’S PERSPECTIVE

Effects of the modularity in PMSM synchronous machine behaviour

Increased grid performance using synchronous condensers in multi in-feed multi-terminal HVDC System

Design and Manufacturing of The World’s Largest 475 MVA/460 MW Adjustable Speed Generator-Motor for Pumped Storage Hydro Electric Power Plant

PS2: Life mangement of generators

Recent endwinding vibration problems in air-cooled turbine generators

Development of a Hydrogenerator Prognosis ApproachEnd-winding vibration monitoring for hydro-generatorsImproved SVM Applied in Fault Diagnosis on Hydropower Generating Unit

BLACK BOX FOR ELECTRICAL MACHINES

CANCELLEDInnovations in turbogenerator stator rehabilitation at site of installation

PS3: Rotating machines for dispersed generationAsset Modelling Challenges in the Wind Energy Sector

SC A2 Transformers: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1 Best practices for asset management

101 M.v.Hattum 3 2 3 2 3 3 Mogelijk Ja102 W. de Leeuw 3 2 2 3 2 2 Mogelijk

103 J.Veens 2 2 2 2 1 1 Nee Nee104 M.v.Hattum 3 2 2 2 2 2 Mogelijk Nee105 J.Veens 2 2 3 3 2 2 Nee Nee106 W. de Leeuw 3 3 3 3 3 3 Mogelijk

107 J.Veens 3 3 2 2 2 3 Nee Ja108 J.Veens 3 3 3 2 3 3 Nee Ja109 J.Veens 3 3 3 2 2 3 Nee Ja110 J.Veens 2 2 2 1 1 1 Nee Nee111 W. de Leeuw 2 1 2 2 1 1 Nee

112 J.Veens 2 3 2 3 3 2 Nee Nee113 J.Veens 3 3 2 3 3 3 Nee Ja114 J.Veens 3 3 3 2 3 3 Nee Ja115 J.Veens 2 2 1 2 3 2 Nee Ja116 M.v.Hattum 3 3 3 3 3 3 Mogelijk Ja

PS2: Transformers for specialized applications201 C.Spoorenberg 2 3 2 3 2 2 Nee Ja202 H.Fonk 2 2 2 1 1 2 Nee Nee203 H.Fonk 2 2 3 3 1 1 Nee Nee204 H.Fonk 2 2 3 3 1 1 Nee Nee205 H.Fonk 3 2 3 2 1 2 Nee Nee206 T.Beumer 2 2 2 2 2 1 Nee Nee207 J.Veens 2 2 2 1 2 2 Nee Nee208 J.Veens 3 2 2 3 3 2 Nee Nee209 M.v.Woerkom 2 2 3 3 2 3 Nee Nee210 J.Veens 2 1 1 1 3 1 Nee Nee211 T.Beumer 2 1 2 1 1 1 Nee Nee

PS3: Field experience with the use of non-conventional materials and technologies301 J.Veens 2 2 3 2 3 2 Nee Nee302 J.Veens 3 3 3 2 3 3 Nee Ja303 J.Veens 3 1 2 2 3 1 Nee Nee304 J.Veens 2 2 3 3 2 3 Nee Ja305306 J.Veens 2 3 3 2 2 2 Nee Ja307 Kees 2 3 2 2 1 2 Nee Ja308

Goed/ erg bruikbaar 3 Nee Neegemiddeld 2 Mogelijk Janiet bruikbaar/negatief advies 1

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

Opm

erki

ng

PS1 Best practices for asset management

Goed idee, uitwerking wat theoretisch, verdient opvolgingWeinig praktische handvaten

(automatisch) patronen herkennen is lastigAls A2-102, maar beter (geen gebruik T-correctie 2-FAL-waarden)Italiaanse rangschikking, met invloed van o.a. bliksemgevoeligheidEvaluatie van gebruik van gezondheidsindex; nuttig effect zichtbaarSystematische werkwijze, pleit voor cultuur van "teardown inspectie"Theoretisch en niet gevalideerd in praktijkNogal algemeen, geen concrete aanknopingspuntenVoor Nederland minder relevant, wel interessantComputer algoritmes en meetmethodes worden slimmerStudie om cellulose-veroudering beter te kwantificerenSlecht verwoord, maar wel interessant idee over vochtgehalte in olie.

PS2: Transformers for specialized applications

Transportmogelijkheden zijn belangrijkDiepgaand materiaal-onderzoek aan monsters in laboratorium

Onderwerp voor transformator-berekenaars

PS3: Field experience with the use of non-conventional materials and technologiesPraktijkervaring van slechts een transformatorLaboratorium-resultatenRussich-theoretisch en vrij droogGiethars naar Um = 72.5 kV; 1e toepassingenCanceledBehoorlijk aantal nieuwe transformatoren met plantaardige olie

Canceled

Check dat minimaal 1 paper per PS, reviewer

K31
This paper is a bit cryptic and the reader has to be extremely well versed in the subject to understand the approach taken. This paper contains nevertheless interesting information and provides some insight into the difficulties in determining the lighting performance for tall structures. Unfortunately the authors ignore (without stating why) the effect of upward strokes from these tall structures and furthermore the calculations are based on lighting statistics which were expressly collected for structures shorter than 60 m high.

Tite

l/PS

PS1 Best practices for asset management

Use of Health Index and Reliability Data for Transformer Condition Assessment and Fleet RankingPost-mortem Analysis of Transformer Insulating Paper and its Relationship to the Determination of Chemical MarkersHealth index as one of the best practice for condition assessment of transformers and substation equipments – Hungarian experiencePower Transformer Management – Investment Planning Considering Loss of Life of the Insulating PaperPattern Recognition Techniques for Determining the Health Index of Oil-Paper Insulation of In-service Power TransformersPost-mortem Investigation of Power Transformers – Profiles of Moisture and Degree of Polymerization - Furan Concentration in the Oil as Ageing Assessment ToolHealth Index: the TERNA’s Practical Approach for Transformers Fleet ManagementTransformer Asset Health Review: Does it really work?Learning from Power Transformer Forensic Investigation and Failure AnalysisAddressing Ground-Induced-Current (GIC) Transformer ProtectionInterpretation of Data from On-line Bushing Monitoring SystemsExperiences with Transformer Damage and Recovery from the Great East Japan EarthquakeApplication of novel algorithms for continuous bushing and OLTC monitoring for increasing network reliabilityManaging an ageing transformer fleet; Norwegian situation, research and initiativesCriterions determining the highest permissible operation temperature of an oil transformer when the humidity of the cellulose insulation increasesTransformer health and risk indexing, including data quality management

PS2: Transformers for specialized applicationsShort Circuit Verification for a 570 MVA, 420 kV single-phase GSU-Transformer by SC-Withstand Tests on a Mock-up UnitPhase Shifting Transformer on Power Control - A BRAZILIAN EXPERIENCE.Research on the Insulation Reliability for the Lead Exit of 1000kV TransformerBasic Research for Fibre Optic Application in HVDC TransformerDesign, Testing and Commissioning of First Phase Shifting Transformer In Indian NetworkControlled shunt reactor 500kV 180MVA with new design. Field experience at NELYM substation.New Phase Shifting Transformers in the Italian transmission network. Design, manufacturing, testing and electromagnetic transients modelling.Charge dynamics in oil/pressboard and HVDC converter transformerDesign recommendations arising from experience with offshore transformersAnalysis of 2 Core Transformer DesignsVariable Shunt Reactors: Applications and System Aspects

PS3: Field experience with the use of non-conventional materials and technologiesFactory and Field Experience with Monitoring of Vegetable Oil TransformerAgeing phenomena of cellulose/oil insulation in natural ester and mineral oilHTSC transformers with localized magnetic fieldDry-type subtransmission transformer: compact and safe indoor substationsNew demands on vacuum interrupters in tap-changer applicationsEXPERIENCE WITH APPLICATION OF NATURAL-ESTER FILLED HV TRANSFORMERS IN MEXICOEXPERIENCE WITH THE FIRST 230 kV SHELL TYPE AUTOTRANSFORMER RETRO-FILLED WITH NATURAL ESTER ON MEXICAN GRIDCommissioning testing and operational experience with a network connected 1 MVA superconducting transformer utilizing 2G HTS Roebel cable

SC A3 High Voltage Equipment: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1:

101 goed goed goed goed goed ja

102 goed goed goed goed goed neen

103 goed goed goed goed goed ja

104 slecht slecht goed slecht slecht neen

105 goed goed goed goed goed ja

106 goed goed goed goed goed ja

107 goed goed goed goed goed ja

108 goed minder goed goed goed minder

109 goed goed goed goed goed ja

110 goed goed goed goed goed ja

111 goed minder goed goed goed neen

112 goed minder goed niet goed neen

113 goed goed goed goed goed ja

114 goed goed goed goed goed ja ja

115 goed goed goed goed goed minder

PS2: 201 goed goed goed goed goed ja

202 goed minder goed goed goed minder

203 goed goed goed goed goed ja

204 goed goed goed goed goed ja

205 goed goed goed goed goed ja ja

206 minder niet goed niet minder neen

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

PS3: 301 minder minder goed niet redelijk ja

302 goed goed goed niet goed ja

303 goed goed goed goed goed ja

304 goed goed goed goed goed neen

305 goed goed goed goed goed neen

306 goed goed goed goed goed ja ja

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opm

erki

ng

PS1:

luchtspoelen voor blindvermogenscompensatie, interessant voor TenneTvery fast traneients (VFTO) in UHV GIS (China)

India: beschrijving specificatie TRV voor 1200 kV schakelaarHelsinki: evaluatie van 110 kV-net en mogelijke toepassing van FCLVSL: ontwikkeling transportabele referentie voor comptabale HVDC spanningsmeting

Spanje: online beinvloeding van laststroom door schakelbare 220 kV seriespoelenTerna: SF6 CTs met composite insulation; reductie explosiegevaar, salt layer tests

Nieuw, flexibel, test circuit voor bus transfer door rail scheiders (Zwitserland)

PS2:

Canada: ervaring met 20 jaar synchroon schakelen (TenneT)UK: kwalificatie van een synchroon schakle-systeem (TenneT)Anton Janssen: verlengde gebruiksduur van degelijke drukluchtschakelaars

Schakelen van lange railsecties met scheiders, interessant voor Tennet, René Smeets co-auteur (Duitsland)

Spanje: diagnostische test techniek, draadloos, middels verandering van de meet-nauwkeurigheid van CVTs

USA: ontwerpcriteria voor spanningsdelers tbv power quality meting met zeer hoge precisieUSA; tamelijk commercieel verhaal over rogowski spoelen op basis van printplaten tbv stroommetingUSA: ontwikkeling van een switch om compensatiespoelen te schakelen ipv een synchroon gestuurde schakelaar René Smeets: test ciruits voor HVDC schakelaars plus modelering van boog-circuit interactieAnton Janssen: resultaten WG A3.28 (UHV) plus beschouwingen over modelleren van transiente verschijnselen

Canada: draadloze diagnostische test van gelijkloop multi-kamer schakelaars (TenneT) middels voor- en herontstekingenCanada: accelerated failure time estimation modelleert restlevensduurafhankelijk van het gebruik

Roemenie: levsnduurverlenging t.o.v. vrij korte gebruiksduur volgens het regulatorisch regime

PS3:

Duitsland: toepassingen van vacuum in situaties met klein-inductieve stromenUSA: pleidooi voor moderne inschakelweerstanden ipv synchroonschakelenJapan: lessons learnt from Great east Japan EarthquakeJapan: testen van composite insulators onder zware sneeuw of vervuilingRené Smeets: testen en boog-gedrag bij zeer zware generator-schakelaars

Check dat minimaal 1 paper per PS, reviewer

Anton Janssen co-auteur, algemene opmerkingen over condities die al grotendeels binnen CIGRE WGn in behandeling zijn

K37
This paper is a bit cryptic and the reader has to be extremely well versed in the subject to understand the approach taken. This paper contains nevertheless interesting information and provides some insight into the difficulties in determining the lighting performance for tall structures. Unfortunately the authors ignore (without stating why) the effect of upward strokes from these tall structures and furthermore the calculations are based on lighting statistics which were expressly collected for structures shorter than 60 m high.

Tite

l/PS

PS1:

PS2:

PS3:

SC B2 Overhead lines: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1: Minimizing the impact of new overhead lines

B2_101 Maurice Janssen 2 2 3 2 2 ja nee nee

B2_102 kees Koreman 2 3 3 1 2 ja ja nee

B2_103 Toon Ross 2 1 2 2 2 Ja Nee Nee

B2_104 Henk SandersB2_105 Andries vd WalB2_106 Maurice Janssen 2 1 2 2 1 nee nee nee

B2_107 Andries vd WalB2_108 Anton Janssen 2 2 2 2 2 Ja Ja nee

B2_109 cees de jong 2 3 2 2 1 ja ja nee

B2_111 Rob MeijersB2_112 Jan Hollaar 3 2 3 2 2 ja nee nee

B2_113 Henk SandersB2_114 Maurice Janssen 2 1 1 2 3 nee nee nee

B2_115 Pleun Sintnicola 3 1 3 2 2 1 1 1

B2_110 Kees Koreman 3 3 2 1 2 JA ja ja

PS2: Reliability and design optimization

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

B2_201 Eef beukers 2 2 2 2 2 nee Nee Nee

B2_202 Toon Ross 2 2 2 1 3 Ja Nee Nee

B2_203 Anton Janssen 2 2 2 2 2 nee Nee Nee

B2_204 Kees Koreman 2 2 1 2 1 JA nee nee

B2_205 Jan Hollaar 2 3 3 2 2 ja nee nee

B2_206 Eef Beukers 3 3 2 3 2 JA Nee Nee

B2_207 Kees Koreman 2 2 2 3 2 JA nee nee

B2_208 Han Stegeman 2 2 2 3 2 JA JA nee

B2_209 Bram Kasse 3 3 2 3 2 JA Nee Nee

B2_210 Rob Meijers

PS3: Installation and long term performance

B2_301 Toon Ross 2 2 2 2 2 Ja Ja nee

B2_302 Andries vd WalB2_303 Han Stegeman 2 2 2 3 2 JA nee nee

B2_304 Pleun SintNicola 2 2 1 1 2 2 1 1

B2_305 Bram Kasse 2 2 2 1 3 JA Nee Nee

B2_306 cees de jong 2 1 2 2 2 Nee nee nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opm

erki

ng

PS1: Minimizing the impact of new overhead lines

Algemeen verhaal over compact lijnontwerp.

PS2: Reliability and design optimization

Beschrijft risico van potentiaaltrechters bij opstijgpunten. Richt zich op valkuilen, bv dat een lokale aardfout niet altijd de hoogste EPR veroorzaakt.bijdrage in de vorm van presentatie nieuwe NEN 3654 (mutual influence power systems and pipelines?)model voor het kwantificeren van capacitieve en inductieve beinvloeding van hoogspanningslijn op buisleidingen. De beschreven rekenmethode sluit niet aan op de dagelijkse praktijk in Nederland en levert ook geen bijdrage om deze te verrijken.

Om nieuwe hoogspanningslijnen optimaal op de omgeving te laten aansluiten besteedt men veel aandacht aan het minimaliseren van de visuele impact t.g.v. de tracé-keuze, het mastbeeld, de kleur van de masten en het toepassen van doffe (niet blinkende) geleiders. Verder wordt alle moeite gedaan om met de tracé-keuze en tijdens de constructie zeldzame dieren, planten en bomen te ontzien én, geluidshinder te voorkomen evenals aardverschuivingen.Presentatie van inovatief onderzoek naar capaciteitsvergroting van een 220 kV lijn naar een 400 kV lijn in Ierland. De invloed van zwaardere geleiders op de vrije ruimtes in de mastconstructie en onder de geleiders wordt onderzocht. Enkele mogelijke oplossingen worden gepresenteerd door het mastlichaam te verhogen, de mastkop te vervangen door een alternatieve mastkop en het toepassen van isolerende composiete materialen. Het is zeker zinvol hiervan kennis te nemen in Nederland. Ook in Nederland is toekomstige capaciteitsvergroting aan de orde, waarbij minimale mastaanpassingen nodig zijn.

Moeilijk leesbare paper over verbeteren van mastweerstand. Veel nadruk op meettechniek. Moeilijk te vertalen naar Nederlandse situatie.

Beschrijving van gebruik asymmetrische belastingen bij het ontwerp van Wintrack lijn. Specifiek voor Nederlands gebruik en kan worden opgenomen in de nieuwe versie van de NNA. Ben benieuwd naar reactie vanuit andere landen.

stelt verschillen vast tussen veel gebruikte wiskundige modellen voor kettinglijnen en d

beschrijft studies en ontwikkelingen om ice disasters te voorspellen en net de-icing te

PS3: Installation and long term performance

Paper beschrijft verschillende varianten die tot de mogelijkheden behoren om deze rivier oversteek te maken. Verschillende geleidersoorten, kettiglijn parameters en ophanging hun impact op de masten, veiligheidsfactoren, mast afstanden, zeeg, en minimale toelaatbare doorvaarhoogte,normen etcetera zijn hierbij in ogenschouw genomen. Wat is het meest economische aanvaardbare alternatief.

Het ontwerp, het testen, de pilot en de eerste toepassing van een compacte 500 kV-lijn met een 2 à 3-maal groter transportvermogen over grote afstanden (d.w.z. lagere Z=√L/C) wordt behandeld. Het concept is al decennia oud, maar nu dus uitvoerig qua details van de uitvoering beproefd. Het mastbeeld betreft een omgekeerde delta, vrijhangend tussen de twee getuide staanders. De afstandhouders in de bundelgeleiders zijn asymmetrisch om een optimaal elektrisch veld te verkrijgen. Merkwaardig genoeg is de toepassing op een 617 km lange lijn een compromis tussen het geschetste ontwerp en de normale praktijk, waarbij niet ingegaan wordt op de redenen vachter het compromis.

Red Electrica Espana [REE] is de Spaanse TSO. Deze TSO beschrijft in dit paper de onderhoud- en vervangings strategie van isolatoren in haar gebied. REE in zijn huidige vorm is ontstaan door overname van vele verschillende bedrijven. Daardoor is er weinig standaard waar wel behoefte aan is. In de kunstgebieden en eilandgroepen is vervuiling een grote oorzaak van uitval. Het gebruik van composite isolatoren in deze kustgebieden verbeterde de situatie. Paper beschrijft de wijze van verzamenlen benodigde data en analyse ervan voor vervanging en onderhoud van de isolatoren in gedefinieerde gebieden.gebruik van zowel meteo stations als een gedistribueerde temperatuursensor (over de gehele lijnlengte) om actuele belastbaarheid van geleiders te bepalen\DLR is ook voor nederland interessant, het is één van de ervaringen waarbij de gebruikte methode wordt toegelicht, het integreren van de gegevens in het Dispatch real time operations systeem is nieuwDoor de toename van leveranciers voor glasisolatoren is vraag ontstaan naar aanvullende testeisen. Dit document geeft een onderbouwd voorstel voor deze testen waardoor een betere beoordeling van kwaliteit mogelijk is.

Beschrijving van metingen aan hogetempratuurgeleidersystemen met doorhang compensatie. In Nederland is een proeftraject voorzien van dit soort geleiders. Hierbij zijn gelijksoortige onderwerpen aan de orde geweest als in de paper. Verdieping van deze onderwerpen is wenselijk zolang de behoefte er is om dit soort systemen grootschaliger in te zetten.

concept om met een"open-fase" tijdelijk DC bedrijf of "Corner-Grounded Delta Operation" lijn opwaardering te versnellen.

Beschrijft welke waarden/eigenschappen beperkend zijn voor de belastbaarheid van ACSR geleiders. En geeft voordelen aan van een ACCC geleider.

Check dat minimaal 1 paper per PS, reviewer

Introductie van de invloed van hogere gebruikstemperaturen op laag gelegeerd kopergeleiders op het fenomeen kruip en rek. Koper geleiders worden steeds minder toegepast in Nederland. Een nadere studie lijkt me daarom niet zinvol

Tite

l/PS

PS1: Minimizing the impact of new overhead lines

The Impact of Transition Points on Overhead Line Earthing System Performance

Risk assessment of a 400 kV overhead line in a heavy industrial environment

Induced Voltages on Near-by Pipelines by AC Power Lines

Application of New Technology Solutions for Minimizing Land Use for Overhead Transmission Lines – Indian ExperienceConversion of AC multi-circuit lines to AC-DC hybrid lines with respect to the environmental impactExamples of Transmission Line Tower Configurations and Solutions such as 765 kV insulated Cross Arms to minimize the Impact of new EHV LinesDevelopment of insulating cross-arms for compact HV lattice tower structuresMinimizing the Environmental Impact of New Overhead Transmission Lines in Japan

Voltage uprate studies of the Irish 220 kV network to 400 kV operation

New Design Pylons as Solution to Minimize the Impact of New Overhead LinesCorona performance of 400 kV bundle conductors and insulator stringsSharing the transmission grid with storks and other birdsIMPULSE RESISTANCE FOR TYPE “A” GROUNDING SYSTEMS ON TRANSMISSION TOWERS

Heliborne construction and maintenance of Lines

Improved wind model to verify the stability of Wintrack

braced post-insulator setsPS2: Reliability and design optimization

Optimization and Design of the 400 kV Double Circuit Overhead Line Crossing the Hoogly River in West-Bengal, India

Derivation and Analysis of the Relation between Conductor Sags in Inclined and Levelled Spans Based on Known Data of the LatterOptimization of HSIL Non-conventional 500 kV Transmission Line

Research and Engineering Application of Power Grid Large-Scale Ice-Disaster Prevention and Treatment TechnologyNew conductor types application for overhead transmission lines design optimization and reliability improvementREE’s insulator global maintenance policy

Dynamic Assessment of Overhead Line Capacity for integrating Renewable Energy into the Transmission Grid

Impact of quality of glass cap-and-pin insulators on life cycle costs and proposals for screening tests

Protection of the 400 kV OHL support foundation structure against a disaster caused by the Dunajec River meandering

PS3: Installation and long term performance

220-kV field study of different high temperature low sag conductors

Creep behaviour of High Temperature Low Sag conductorsPhase Displacement as a Prospective Means for Right-of-Way Upgrading

Video based defect detection for ground wire of transmission linesLimits of allowed ampacity of EHV/UHV overhead lines

Integrating Enhanced Dynamic Line Rating into the Real-time State Estimator Analysis and Operation of a Transmission Grid Increases Reliability, System Awareness and Line Capacity

Creep and fatigue into copper micro alloys for overhead transmission lines

SCB3 SYSTEM TECHNICAL PERFORMANCE: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1:B3-101 Frank Baldinger 2 2 3 2 2 2 ?

B3-102 Henk Eleveld 3 1 2 3 2 2 nee

B3-103

B3-104 Ebbo de Meulemees 2 3 1 2 2 2 nee

B3-105 Ebbo de Meulemees 2 2 2 2 1 2 nee

B3-106 Frank Baldinger 2 1 3 2 1 2 3

B3-107 Piet Knol 3 3 3 3 3 3 3

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ov

erdi

t ond

erw

erp?

B3-108 Auke 2 1 3 1 1 1 nee

B3-109 Auke 3 2 3 2 2 1 nee

B3-110 Mark Rienks 2 3 2 2 2 ja ?

B3-111B3-112 Imre 3 2 3 3 2 ja ?

B3-113 Piet Knol 2 3 2 2 2 ja ja

B3-114 Henk Eleveld 3 2 3 2 3 2 2

B3-115 Gert Spriensma 2 2 2 2 2 nee nee

B3-116 Simon Rotsteeg 2 2 3 2 2 ja nee

B3-117 Imre/All 3 2 3 2 2 ja ja

B3-118

PS2: B3-201 Gert Spriensma 2 2 2 2 1 ja nee

B3-202 Ton Visser 2 1 2 2 2 nee nee

B3-203 Ebbo de Meulemees 2 2 2 2 1 2 nee

B3-204B3-205

B3-206 Ton G 2 2 3 2 1 2 2

Martijn van Meggelen

B3-207

B3-208

B3-209 Auke 3 3 3 3 2 ja ja

B3-210 Ton G 3 3 3 2 2 ja nee

B3-211 Imre 3 2 3 3 2 ja nee

B3-212 Gert Spriensma 3 2 3 2 2 ja nee

B3-213 Dirk Boender 1 2 1 2 2 nee ?

B3-214 Martijn van Meggel 2 3 3 2 1 ja ja

B3-215 Dirk Boender 2 2 3 2 2 ja ?

B3-216 Dirk Boender 2 2 1 2 3 ja ja, B3-117

B3-217 Jan 2 2 3 2 2 ja nee

B3-218 Ton Visser 2 2 2 2 2 nee ?

B3-219 Simon Rotsteeg2 2

1 12

nee nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opmerking/bijzonderheden

3

Johan

nee

nee

Er zijn toch

2

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

Computer ondersteund ontwerpen van open lucht onderstations. Relevant voor nieuwbouw situaties en mogelijk ook voor uitbreidingen van bestaande stations. Gestructureerde werkwijze en processen. Interessant voor ontwerpers van stations.

Het artikel beschrijft de actieve regeling van reactive power control. Het betreffende net heeft kennelijk weinig inherente stabiliteit. Het net verschilt aanmerkelijk van de Nederlandse situatie, maar het kan toch nuttig zijn voor netstrategen om kennis van de methodiek te nemen.

Het uitgangspunt van het artikel is interessant: DCB en een vergaande integratie van IED.Het resultaat is standaardisering en een significante reductie van ruimte.Het artikel gaat echter verloren in een overvloed aan details, waardoor het moeilijk is de interessante details te ontwaren.Het artikel mist een duidelijke focus. Richt zich zowel op 220-110 als op 10 kV stations. Het stuk leunt vooral op de toepassing van de vermogenssschakelaar met geïntegreerde aarder en scheider. Van de laatste wordt niets toegelicht. Is wel essentieel voor een component met een veiligheidsfunctie. Het resultaat is de ruimtebesparing, alle andere aspecten blijven onbelicht. Verder wordt een geïntegreerd concept voor beveiliging en automatisering beschreven waar ik weinig van kan bakken.

The content is like a brochure/leaflet, describing that Alstom sucessfully applies calculation tools and that this resulted in more compact GIS designThe content is like a brochure/leaflet, describing that calculation tools are successfully applied and that this resulted in more compact GIS design.Interesting topics are just mentioned, but not backed up by evidence, or adequate information, such as reduced LCA.The major interesting point is the section about the increased requirements for bus transfer switching by disconnectors, although interesting details or backgound is not provided.Some details are provided (some graphs with results). However challenging details are missing.

Heel lang paper. Er wordt veel over bekabeling gesproken. Minder over de engineering van de software. Ik vind het weinig diepgang hebben en weinig echte nieuwheid, maar ja op TSO niveau kun je dat verwachten. Ik denk dat ik mogelijk wel een sponteneous contribution lever in Parijs. Ik wil de discussie wel aangaan.

Heldere samenvatting mbt toepassing van 66kV tov 33kV in Off Shore windfarms de technisch inhoudelijke aspecten TOV reactive power, toplogie worden betrokken in de evaluatie waarmee een compleet en helder inzicht in de technieche en economiches aspecten bij de toe te passen bedrijfspanning van een off shore grid gebaseerd op 500MW

n.v.t

n.v.t.

ja

ja

nee

nee

India: Enorme uitbreiding E-verbruik (125GW nu, >437GW in 2027) en grote afstanden opwekking<=> verbruik => ontwikkeling 765kV AC en 500-800kV DC -netten. Behandeld worden o.m. schakelproblemen transformatoren en compensatiespoelen (oplossing: controlled switching). Verder: problemen met defecten aan stroomtransformatoren direct na ingebruikname. Oorzaak: slechte spanningsverdeling door fabricagefouten. Voorts externe overslagen over transformatordoorvoeringen door vuil en tenslotte problemen met een scheider (mechanisch probleem aandrijving).

India: Case study betreffende praktijkervaring met een 132kV/33kV-stationsontwerp gebaseerd op IEC61850. Zowel stationsautomatisering (SAS) als process bus volgens IEC61850. Behandeld worden stationsontwerp (secundair) en communicatie van/naar bedrijfsvoeringscentrum. Voorts configuratie en de instelling/vergendeling van de componenten en het testen. Tenslotte de positieve ervaringen met het station.

Dit interessante paper beschrijft de secundaire installatie van een 110 kV station uitgevoerd met zowel de stations- als procesbus. Deze laatste is vooral interessant. Hoewel de uiteindelijke resultaten niet uitgediept worden wordt wel een stappenplan aangereikt hoe te komen te een opzet met IEC 61850 in een TSO. Ook van belang is hetgeen beschreven is over de testomgeving.

Over de geschiedenis en toekomst van gasgeisoleerde stations. Gaat ook over alternatieven voor GIS en gasmixen.Paper die een modern besturingssysteem beschijft met daarin alle beschikbare technologie in een kompleet syteem operationeel in een proefproject, men claim mulitivender mogelijk beperkt tot IED'sveel generieke termen en algemene globale functinaliteit hoog smart gehalte

Het artikel beschrijft een aardfoutdetectie door middel van een druktoename-sensor in GIS. Dit werkt alleen in het Japanse systeem met impedantie aarding en zeer kleine aardfoutstroom. Niet relevant voor Nederland.Het tweede systeem beschrijft het detecteren van drukdaling in GIS door middel van zeer nauwkeurige sensoren. Hiermee wordt onnodige inspectie vermeden en kan sneller geacteerd worden bij kleine lekkages. Interessant.

Het artikel beschrijft een methode om met een simpele keuze v voor vervuidling 'type A' of 'type B' een advies te kunnen geven voor inpandig dan wel buitenopgestelde apparatuur t.b.v. HVDC 600-800-1000 kV schakelstation.

gemodulariseerde MV onderstations. Leek document zonder al te veel diepgang en bruikbaarheid. Kan me wel voorstellen, dat dit voor Ierland erg bijzonders was. In NL minder toepasbaar denk ik.

ja

nnb

nee

nee

nee

niet beschikbaarTheo

nee

niet beschikbaar

Paper geeft een overzicht van een uitwerking van een project waarbij diverse stationsconfiguraties zijn beschouwd en geëvalueerd

Het artikel beschrijft alternatieven hoe een schakelstation op een ongewijzgd grondoppervlak kan worden opgewaardeerd zonder dat dit gevolgen heeft voor de beschikbaarheid en betrouwbaarheid. De alternatieven zijn: opneembare vermogenschakelaar; hybride modules en scheider vermogenschakelaars. Met praktijkvoorbeelden worden de keuzes toegelicht.

Paper beschrijft een nieuwe theoretische maar (nog ) experimentele analyze tool tav substation design mbt tot mogelijke corona , RIV en Audible noice invloeden als gevolg van design fouten, vervuiling van de componenten, lucht kwaliteit e.d. Aanvullende verificatie is benodigd maar wat mij betreft is deze analyze tool niet van toegevoegde waarde indien men de substations op voorhand met behulp van correcte substation design tools ontwikkeld.

The risk management method determines 7 steps and 4 gates with risk evaluations.The topic and first pages seem interesting, but the article never reaches the point that some can learn or apply.The provided example just states that the method worked without providing details.

Aardig verhaal over de implementatie van lessons learned uit de experimentele fase. Veel open deuren; meer een verkoopprospect waarin verteld wordt wat er verbeterd is dan een technisch diepgaand en interessant verhaal.

"Paper beschrijft de ontwikkeling in partiële deelontlading meting van HV GIS. Hiervoor is als proef een bestaand PD meting systeem van een 400/220kV station uitgerust met een nieuwe versie die o.a. elektromagnetische verstoringen uit de omgeving compenseert waardoor een betrouwbaarder beeld ontstaat, tevens is de architectuur aangepast van de PD meting waarbij meer intelligentie op een lager niveau wordt toepast "

n.v.t.

ja

ja

nee

nee

ja

ja

ja

nee

Spanje: beschrijving calamiteitenplan van Iberdrola Distributie dat bestaat uit een aantal mobiele containers met MS-schakelmaterieel, bediening en beveiliging, eigenbedrijfstransformator en telecomvoorzieningen. Omvat ook een transformator op een oplegger met de benodigde bedienings- en beveiligingsapparatuur. Gebouwd worden één mobiele transformator 132kV/MS (20, 15 en 13kV) en acht mobiele stations. Verder interessante informatie over 'polytransformatoren', in te zetten bij calamiteiten met transformatoren. Polytransformatoren hebben een aantal overzetverhoudingen (bijv. 220kV/132-66-45kV en 132kV/66-45kV)Paper beschrijft de implementatie van een goed bruikbaar on line PD-Monitoring systeem in een HV GIS station met transformatoren. Grenzen/beperkingen van de monitoring worden goed beschreven.

De gebruikerservaring van een pilot met niet conventionele meettransformatoren (bijv. optische CT) is uitgevoerd, waarbij de gemeten waarden over een bepaalde periode zijn vergeleken met de conventionele meetwaarden.

Het artikel beschrijft een methode hoe bij een gestoorde condensatorbank (in de verschillende uitvoeringsvormen) in een korte tijde de defecte condensator-unit kan worden gelocaliseerd.Op sommige punten onduidelijk (b.v. permissible outage), indeling in klassen is (te) kwalitatief en ongemotiveerdPaper beschrijft de definitie van life cycle management waarbij men aangeeft dat dit proces niet start bij de inbedrijfname maar juist bij de basis engineering van bijv. een nieuw station, specificatie van systemen, inkoop etc. Vervolgens wordt beschreven dat alle informatie tezamen via een centrale database (zoals EMS/DMS) kan worden gemonitord en daarmee het toestand afhankelijk onderhoud beter ondersteund kan worden. Moraal van het verhaal is dat het vooral een geïntegreerd proces is.

Duidelijk stuk, met heldere praktijkvoorbeelden 220, 110 en 38kV. Kostenvergelijking blijft wat kwalitatief. Uitwerking van risico's van overnameprogramma's zou een welkome aanvullig zijn.

Diepgaand stuk over betrouwbaarheid.Definities en de functie van beschouwde HV delen in relatie tot het er mee verbonden HV net zijn onduidelijk. Er lijken in tabel IV waarden inconsistent (b.v. GD13 0,0 min/year interruption entire load; en toch is dat niet de beste optie)

The paper (from Thailand) describes a co-ordinately set up of a 2-year research project (2012-2013) Program Development for High Voltage Substation Performance Evaluation, to improve efficiency of performance evaluation. Performance evaluation plays an important role in asset management for decision making. Substation Renovation Index and Priority Importance Index result in the ranking of substations to be renovated first.

nee

nee

Check dat minimaal 1 paper per PS, reviewer

Paper beschrijft een verbeterde aardnet design tool waarbij met dezelfde risico inschatting tav "touch en step potential " een aanzienlijk kosten reduktie in materiaal en installatie kosten zijn voorzien. Paper is vooral gefocussed op veiligheid van de mens, in het geheel niet op het blijven functioneren van apparatuur nadien.

minder hoogdravend werkje; lijkt wel een projectbeschrijving weinig vernieuwend. Leuk om te lezen meer niet.

Titel/PS

Christchurch Reactive Power Controller

A New Generation of Highly Integrated Smart Substation

Design optimisation case study with Process Bus

Software for optimization and time reduction in substation design, using BIM Technologies, advanced information systems and knowledge management

Self-healing control technology for smart distribution systems and its application

Development of GIS technologies to meet new requirements at 420 kV level and above

Key parameters for the optimization of a Wind Farm: Impact on the offshore substation

POWERGRID Experience on Operation of 765kV Transmission System

?

Model-Based, Substation-Centric Distribution Automation

Selection between indoor or outdoor DC yards

Low Cost and Fast Deployment Distribution Substations

Development and Operational Experience of Substation Automation System implementation along with 9-2 LE compliant Process Bus with conventional CTs and PTs

First "Digital Substation" 110 kV, using the IEC 61850 (-8-1 and-9-2LE) for measurement, protection and control switching devices in Russia

Limitations, trends and potentials in the design of modern gas-insulated high voltage switchgear

Practical use of monitoring/diagnostic systems to realize more efficient maintenance, stable electric power supply and optimized refurbishment

Standardisation of MV substation configurations in HV/MV substations

Managing Risk in Design and Installation of Substations

?

?

Safety Design Improvement of Grounding System by Compression Ratio and Ground Rod Layout Methods : Case Study of Metropolitan Electricity Authority’s Power Distribution System

Renovation and up-rating of Substations applying new technologies of equipment of High Voltage obtaining greater availability of electric power and compaction of the dimensions of the Substations

Equipotential surfaces and electric fields for substation Corona Efect definition

New Solutions Ensuring Safe Maintenance and High System Reliability in AIS Substations

UHF partial discharge monitoring: return of experience installed in 400 kV GIS

Risk assessment of internal fault in compact substations under the aspect of new network topologies

Iberdrola Emergency Plan, design and use experiences

PD Monitoring System for HV Substations

From IEC 61850 based substations with sampled values to billing metering

Life-cycle Management of HV Substation Equipment

Fault Location in Capacitor Banks – How to Identify Faulty Units Quickly and Restore the Bank to Service

Optimized replacement strategy of substations equipment considering risk management

Substation renovations & refurbishments; a comparison of full station redevelopment versus partial station upgrades

Reliability of HV/MV substations with air-isolated and gas-insulated switchgear

Management Experience on Ageing High Voltage Substation Equipment in Thailand

Design Experience of Substation Upgrade Project in Qatar

Safety design improvement of grounding system by compression ratio and ground rod layout methods : case study of Metropolitan Electricity Authority’s power distribution system

SC B4 HVDC and power electronics: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1: HVDC systems and applications

B4-101 kees koreman 3 1 3 2 2 nee nee nee

B4-102 kees koreman 3 2 2 2 2 nee nee nee

B4-103 Yanny Fu 3 1 3 2 2 nee nee nee

B4-104 Jan Langedijk 2 2 3 2 2 nee nee nee

B4-105 Yanny Fu 3 1 3 3 3 nee nee nee

B4-106 Yanny Fu 3 2 3 2 2 ja nee nee

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

B4-107 Jan Maas 3 2 3 3 3

B4-108 Jan Maas 3 3 3 2 2 ja ja

B4-109 Yanny Fu 2 1 2 2 2 nee nee nee

B4-110 Roald de Graaf 2 2 3 1 1 nee nee nee

B4-111 Frank van Overbeeke 3 3 2 3 3 ja nee ja

B4-112 Frank van Overbeeke 2 2 2 2 2 ja nee

B4-113 Jan Langedijk 3 2 3 2 2 nee nee nee

B4-114 peter Vaessen 2 1 3 2 2 nee nee nee

ja: Ik stel voor om te vragen wat de bestaande ervaring is met fault blocking converters en hoe groot het kostprijsverschil is in vergelijking met een vergelijkbare "gewone" voltage source converter.

B4-115 Frank van Overbeeke 3 2 3 2 2 nee nee ja

B4-116 kees koreman 2 1 2 3 3 nee nee nee

B4-117 Jan Langedijk 3 3 3 2 3 ja nee ja

PS2: Facts systems and applicationsB4-201 Frank van Overbeeke 2 2 3 3 3 ja jaja: Ik stel

voor om te vragen hoe men zich voorstelt om het resultaat van een simulatie met dit model, dat in de planningsfase wordt gebruikt, door te vertalen naar het uiteindelijke product dat door een leverancier wordt geleverd. Stel dat die leverancier hele andere regelalgoritmes toepast, wat is dan de waarde van de eerdere simulatie ? Hebben de auteurs eervaring met

B4-202 peter Vaessen 3 1 2 2 2 nee nee nee

B4-203 Ton Geraerds 3 3 3 2 2 nee nee nee

B4-204 Ton Geraerds 2 2 2 1 2 nee nee nee

B4-206 kees koreman 2 2 1 3 3 nee nee nee

B4-207 Frank van Overbeeke 1 2 1 2 3 nee nee nee

PS3: Power electronic equipment developmentsB4-301 Yanny Fu 3 3 3 3 3 nee nee nee

B4-302 Yanny Fu 3 3 3 3 3 nee nee nee

B4-303 Yanny Fu 3 3 3 3 3 nee nee nee

B4-304 Yanny Fu 3 3 3 3 3 nee nee nee

B4-305 kees koreman 2 1 3 2 2 nee nee nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opm

erki

ng

PS1: HVDC systems and applications

Deze bijdrage beschrijft de financiële optimalisatie van een HVDC verbinding tussen Panama en Colombia. Dit project is al sinds 2003 in de ontwikkelingsfase maar is nog niet in de aanbestedingsfase. Het ontwerp is nu geoptimaliseerd met betrekking tot transportcapaciteit, spanning en lijn ontwerp.

Deze bijdrage geeft een overzicht van de upgrading activiteiten voor de HVDC verbinding in Nieuw Zeeland. Specifieke onderwerpen: refurbishment en aardbeving bestendig ontwerpDit paper beschrijft planning studies m.b.t. de 1st +/-800kV, 4000MW, 2092km LCC HVDC OHL verbinding tussen Belo Monte in noord en Estreito in zuid in Brazilië. Aspecten zoals load flow, dynamische gedragen en transiente gedragen worden besproken, even als beïnvloeden van de parallel AC lijnen en de 2de +/-800kV LCC HVDC parallel OHL lijn. De 2092km lang OHL lijn maakt significant kostpost van de verbinding en optimalisatie van de mastenontwerpen is belangrijk aspect waarbij de ervaringen van bestaande +/-600kV HVDC OHL "guy" type mastenontwerp wordt gebruikt.De beschreven 800kV LCC HVDC OHL verbinding is niet relevant voor NL.

This Brazilian paper describes the early operation of the Madeira River Transmission project. This project comprises 2 HVDC Bipoles rated at 600 kV, 3.150 MW each and 2 500/230 kV Back-to-Back Blocks each. The paper describes in stages the main difficulties dealt with during commercial operation of BtB blocks and Bipole #1

Dit SGCC paper beschrijft research werk over aspecten zoals systeem ontwerp & engineering, key converter equipment en lijn & mast ontwerp voor de geplande zes +/-1100kV, 11GW/14GW, >3000km LCC HVDC OHL verbindingen voor 2020 in China. De beschreven 1100kV LCC HVDC research werk is niet relevant zijn voor NL.

Dit paper beschrijft de betrouwbaarheidse statistics van 14 LCC HVDC (11xOHL + 3xBtB) projecten met een totaal vermogen van 50GW en circuit lengte van 12500km in periode 2006 - 2012 in SGCC's verzorgingsgebied van China. Het blijkt uit de analyse dat de oorzaak van onvoorziene energieonbeschikbaarheid te wijten aan: 1) converter transformatoren, 2) lijnen, 3) smoerspoelen, 4) koelingsystemen voor thyristoren, 5) besturing & beveiligingssystemen, 6) overige DC veld equipment.

TWENTIES is een Europees R&D project gericht op integratie van grootschalige windenergie in het net. Het totale budget is € 56 miljoen,- en er doen 26 Europese partners mee. Het is georganiseerd rond 6 grootschalige demo-projecten die in de periode 2010-2013 zijn uitgevoerd. Deze paper beschrijft één van deze demoprojecten: een offshore DC grid om meerdere offshore windparken in het net te integreren. Door koppelingen te maken op zee tussen afzonderlijke HVDC verbindingen van windparken kunnen fluctuaties onderling worden uitgemiddeld, en kan het ingevoede vermogen zodanig over de aanlandingspunten verdeeld worden dat congestie wordt voorkomen. Tevens worden oscillaties uitgedempt. In normaal bedrijf worden de ingevoede vermogens tussen de verschillende aanlandingspunten verdeeld cf. een statiek-lijn die het verband tussen spanning en vermogen weergeeft. De verdeling kan veranderd worden door aanpassing van de referentiespanning van de diverse statieklijnen. Zo kan het ingevoede windvermogen geredispatched worden en congestie voorkomen worden. Tevens zijn HVDC beveiligingen getest: een differentiaalbeveiliging voor een kabel met een lokale back-up beveiliging, met inzet van DC breakers. Tenslotte nog een verhaal over de economische voordelen van DC Grids op de Noordzee.

Twee Duitse TSO's, Amprion en TransnetBW, willen een bestaand HVAC circuit gaan ombouwen naar HVDC, op basis van VSC technologie. Met HVDC kan meer vermogen over dezelfde lijn getransporteerd worden over langere afstanden met minder verliezen. Fase 1 van het ''Ultranet'' project is ombouw naar HVDC van een 400 km lange 380 kV lijn van het Midden-Westen naar het Zuid-Westen van Duitsland. De drie fasen worden dan benut voor +380 kV, -380 kV en 0. De transportcapaciteit wordt hiermee verhoogd van 1,6 GW naar 2,1-2,7 GW. Fase 2 van Ultranet is de ombouw van een 380 kV-lijn naar het noorden die middels een T-aftakking op de lijn van fase 1 aangesloten, zodat een multiterminal HVDC lijn ontstaat. Omdat de HVDC circuits op dezelfde masten hangen als de HVAC circuits die ook in bedrijf zijn, is het gevaar van ''intersystem faults'' niet denkbeeldig. De paper gaat vooral over het gedrag van de beveiliging bij zulke storingen, en de onderlinge beinvloeding van de systemen in normaal bedrijf. Op basis van simulatie is een keuze gemaakt voor een besturings- en beveiligingsconcept dat de gevolgen hiervan zoveel mogelijk mitigeert.

Dit paper beschrijft ontwerp aspecten van een DMR (Dedicated Metallic Return) voor de +/-800kV, 3000MW, 1305km LCC HVDC OHL verbinding tussen noord-west en zuid-oost van India. Het doel om een DMR te gebruik is om de retourstroom te voeren wanneer één van de twee 800kV geleiders buiten bedrijf is of de onbalansstroom te voeren tijdens nomaal bedrijf, ook om voor te bereiden voor toekomstige uitbreiding tot 6000MW met een parallel +/-800kV converter. DMR kan ook helpen reduceren van geeiste OHL "corridor" land en corrosie problemen geassorcieerd met aard retourstroom met electrode. Er worden verschillende DMR ontwerpen op 800kV masten gepresenteerd, onduidelijk wat de stroom rating van deze DMR is en de DMR lijn verlies wordt niet besproken. De beschreven 800kV LCC HVDC OHL verbinding is niet relevant zijn voor NL.

Dit paper vergelijkt het steady-state en dynamische systeemgedrag van LCC-HVDC met dat van VSC-HVDC. De vergeleken aspecten zijn: nominaal actief vermogen, netwerkeigenschappen, P en Q(V)-regeling, dynamisch gedrag, milieu-effecten, economische aspecten. Deze vergelijking heeft voor de HVDC verbinding tussen Spanje en Frankrijk tot de keuze voor VSC-HVDC geleid.

In deze paper wordt een kosten/baten analyse gepresenteerd van een offshore HVDC netwerk waarmee windparken onderling gekoppeld worden. Met een uitgebreide Monte Carlo berekening wordt gekeken naar de kans op een storing, de gemiddelde hersteltijd en de gemiste opbrengst aan elektrische energie. De hogere investering door een offshore koppelnet wordt volgens deze berekening terugbetaald uit de grotere opbrengst van geleverde energie (c.q. vermeden kosten van curtailment). Belangrijke conclusie is dat een netwerk bestaande uit point-to-point DC verbindingen met beveiliging aan de AC kant gunstiger is dan een DC netwerk beveiligd door DC circuit breakers (op basis van de huidige prognose van de kosten van DCCBs).

In deze paper wordt een aantal manieren bediscussieerd om een vertakt (offshore) HVDC netwerk te beveiligen. De auteurs noemen onder andere het belang van "fault blocking" DC/AC converters; dit zijn converters die gecontroleerd kunnen afschakelen bij een fout aan de DC kant. Als bij een fout wordt geaccepteerd dat het DC netwerk enkele honderden ms uit bedrijf is om een herconfiguratie door te voeren, zijn er minder of helemaal geen DC circuit breakers nodig. De analyse is alleen kwalitatief en verre van volledig.

In this paper system study and basic design of Java-Sumatra HVDC link is described. It's the first HVDC link PLN, state-owned utility company in Indonesia is planning to go in commercial operation in 2017. A system study is of high importance because the capacity of the HVDC link is large ( 3.000 MW, DC +/- 500 kV) and has enormousimpact to the connected AC networks on both sides Sumatra and Java Islands if a failure occured on the DC. The basic design is based on 2 groups per pole for ensuring reliability and availability.

Overzicht van ABB en BPA (US) over de geschiedenis en keuze voor de verdere upgrade van het Celilo converterstation rating na eerdere upgrades is ±500kV and 3100MW. Er wordt een goede analyse gegeven voor de gevolgen van drie keuzes, vergroten stroom, verhogen spanning of beiden (complete upgrade). Er is gekozen voor de laatste variant waarbij alle componenten worden vervangen en de converterhallen worden hergebruikt, hiermee wordt de rating ±560kV and 3800MW. Mooi overzicht van de geschiedenis en de motivatie voor de keuze die uiteindelijk gemaakt is.

PS2: Facts systems and applications

Deze paper rapporteert over een Joint Industry Project van DNV en het Swedish Transmission Research Institite met een aantal industrieën en netbeheerders om tot een Technology Qualification te komen voor offshore HVDC systemen. De paper beschrijft vooral het generieke proces. Het project zou in 2014 klaar moeten zijn maar het wordt niet duidelijk wat er dan eigenlijk klaar is. Zo wordt er niet verteld of dit procces bijvoorbeeld de belangrijkste technische aandachtspunten (specifiek voor offshore) in beeld brengt.

de bijdrage geeft een beschrijving van een synthetisch testcircuit voor thyristor modules in HVDC toepassingen. De keuze voor een synthetisch circuit heeft tot doel de complexe operationele testen uit te voeren zonder gebruik van hoogvermogen testinstallaties. Het voorgestelde circuit is getest en vastgesteld wordt dat de IEC testen voor thyristor based modules kunnen worden uitgevoerd.

This paper reports a summary of th ereliability performance of HVDC systems in operation worldwide during 2011 and 2012. The summary was developed through data prepared by utilities that operate the HVDC systems and submitted to Advisory Group B4.04 of Cigré SC B4. The data in this report together with data published in previous reports provide a continuos record of reliability for the majority of HVDC systems in the world since they first went into operation.

In deze paper bespreken de auteurs een model van een Voltage Source Converter dat gebruikt kan worden in PSSE simulaties. Middels vergelijking met PSCAD berekeningen laat men zien dat het model betrouwbare resultaten oplevert bij berekening van transiënte verschijnselen. E wordt nogal gemakkelijk van uitgegaan dat het regelsysteem van een VSC een vaste architectuur heeft waarin alleen de parameters maar ingevuld hoeven te worden. Het lijkt mij dat deze architectuur per leverancier kan verschillen en bovendien nog steeds verder ontwikkeld wordt. Verder is het de vraag of de leverancier ooit aan de klant zal toestaan om zelf de parameters van de regelaars in te vullen omdat die van grote invloed zijn op de performance van het systeem en dus een relatie hebben met garantie.

PS3: Power electronic equipment developments

Onderzoek van Hydro Quebec naar de toepasbaarheid van een zogenaamde smart power line (SPL) met geisoleerde bundelgeleiders, back to back schakelmodules, en beveiliging en meetinrichting. De SPL is bedoeld als "de-iceing" installatie, actuator voor vermogenssturing en meetsensor. De ontwikkeling van de installatie en onderdelen hiervan wordt beschreven en de voorbereidingen voor installatie van een experimenteel prototype in het high-power lab van IREQ.

Het Indische net (nu 130GW, in 2017 200GW) bestaat uit 5 regio's, deels AC en deels DC gekoppeld. Opwekking en verbruik zijn ongelijk verdeeld; dit leidt tot extreme belasting van interregionale transportverbindingen. Met name transiente verschijnselen, waaronder fluctuaties van RES brengen de energieverzorging daarmee in gevaar. Daarom is dynamisch blindvermogen,bestaande uit mechanisch geschakelde condensatoren en smoorspoelen een must. Het paper beschrijft de studie naar grootte (400-800MVAr) en locaties (16) van deze bronnen in het west-Indische net. Hoewel niet direct projecteerbaar op het (kleine) Nederlandse net is het zeker voor Europa met de groei aan RES en lange afstand transporten interssant.

CEPCO (Japan) heeft 3*150MVAr STATCOM geïnstalleerd nabij een nieuwe thermische centrale. Het paper beschrijft de simulaties en beproevingen om de effecten op subtransiente torsie slingeringen in de turbine/generator-as en transiente netstabiliteit, harmonischenen overspanningen aan te tonen. Om torsie slingeringen te beperken moesten parameters van de regeling worden aangepast. Goede voorstudies en FAT hebben de IBS versneld.

deze bijdrage geeft de modellering inclusief verificatie van een offshore windpark in th UK. De modellering spitst zich toe op de STATCOM die geplaatst is in het Point of Common Coupling. Het ontwikkelde model vertoont goede overeenkomst met actuele metingen en is zeker toepasbaar bij de onwikkeling van winsparken en de analyse van bestaande OWPP's waar problemen opgetreden zijn.

Dit is een paper die gaat over actieve compensatie van harmonischen met een bepaalde techniek die ingrijpt op de pulsbreedtemodulatie van een spanningsbronomvormer. De auteurs stellen voor dat dit toegepast zou kunnen worden in converters van decentralle opwekkers, bijvoorbeeld windturbines. Het Engels is slecht leesbaar en de theorie is veel te diepgravend voor een Cigre paper. Dit had beter gebracht kunnen worden op een heel andere conferentie.

Dit Alstom paper beschrijft een nieuw hybrid 120kV DC circuit breaker ontwikkeld in het kader van EU gesudsideerd demonstratie project (TWENTIES) voor toepassing in DC grid. Eerst wordt de worst case DC kortsluitstroom berekend op basis van een 5-terminal DC grid. De peak kortsluitstroom varieert tussen 5kA tot 80kA afhankelijk van de foutlokaties. Daarna wordt de werkprincipes van AC en DC circuit breakers met elkaar vergelijken. Dan wordt de technologiekeuze van dit prototype DC CB beschrijven: een hybrid DC CB (combinatie van mechanisch en vermogenselectronisch). Tenslot wordt een testresultaat van onderbreking van een 5.3kA peakstroom binnen 4ms gepresenteerd. De bereikt ratings van dit prototype DCCB zijn:-nominal spanning/stroom 120kV/1500A, -kortstondig toelaatbaar stroom 3000A/1min., -kortstluisstroom 7500A, -dielektrische vastheid in openstand 650kV.Dit onderwerp kan relevant zijn voor NL op termijn.

Check dat minimaal 1 paper per PS, reviewer

Dit ABB paper beschrijft de ontwikkeling van een nieuw halfgeleider device genaamde BIGT (Bi-mode Insulated Gate Transistor) welke bezonder geschikt is voor toepassing in hybrid DC circuit breaker. De prestatie van BIGT is significant beter dan IGBT voor toepassingen bij steeds hoger combinaties van spanning en stroom ratings, bovendien zal BIGT een kleine geleidingsverlies hebben dan IGBT. Het werkprincipe van ABB's hybrid HVDC breaker met BIGT wordt vervolgens uitgelegd. De prestatie daarvan wordt aangetoond door de testresultaten van onderbreking van een kortsluitstroom met 19.1kA peak binnen 5ms. Dit onderwerp kan relevant zijn voor NL op termijn.

Dit ABB paper beschrijft de ontwikkeling van een nieuw mechanische 80kV HVDC breaker ontwikkeld voor toepassing in DC grid. Het werkprincipe van deze mechnische HVDC breaker wordt uitgelegd. De toepassing van een snel mechanische aandrijving in combinatie met een actief ladingscircuit voor parallel resonantiecircuit maakt het snel afschakkelen van een DC kortsluitstroom mogelijk. De verlies van een mechnische HVDC breaker in gesloten stand is altijd veel lager dan een vermogenselktronische of hybrid breaker. De werking van deze mechanische HVDC breaker wordt aangetoond door de testresultaten van onderbreking van een kortsluitstroom met 10.5kA peak binnen 5ms. Dit onderwerp kan relevant zijn voor NL op termijn.

Dit ABB paper beschrijft een prototype hybrid HVDC breaker met een nominaal stroom 2.6kA en max. onderbreking stroom 16kA. De hybrid HVDC breaker bestaat hoofdzakelijk uit 3 onderdelen: een hoofde halfgeleider breaker, een mechanische UFD (Ultra Fast Disconnector) en een halfgeleider LCS (Load Commutation Switch). Afhangkelijk van de DC spanning wordt de hoofde halfgeleider schakelaar opgebouw door modulaire cellen in series ingeschakeld, 80kV per cell. Het karakteristieken van deze 3 onderdelen worden uitgelegd. Vervolgens worden de toepassingen van hybrid HVDC breaker in verschillende typen HVDC verbindingen besproken: punt-punt, multi-terminal en DC grid. Een case studie wordt gepresenteerd met toepassing van hybrid HVDC breaker in een uitbreiding van een punt-punt naar een 3 terminal HVDC verbinding in half "H" brug VSC "asymetric bi-pole" uitvoering. De snel DC fault clearance capability met tegelijkertijd blindvermogen leveren/absorberen aan de AC zijde worden aangetoond. Dit onderwerp kan relevant zijn voor NL op termijn.

Deze bijdrage geeft de simulatie van de werking van STATCOM's in het Jeju Island netwerk. De simulaties worden vergeleken met actuele data tijdens een verstoring van het systeem. De simulaties vertonen een zeer goede gelijkenis met de werkelijkheid wat tot de conclusie leidt dat de modellering goed is uitgevoerd.

Tite

l/PS

PS1: HVDC systems and applications

Optimizing the electrical design of the Colombia-Panamá interconnection

New Zealand HVDC Pole 3 Project - Challenges and novel solutions

Final project planning conception for the first 800 kV HVDC link of Belo Monte

Operational experience of Madeira River Project in the Brazilian interconnected power system under initial configuration

Research work of ±1100 kV UHVDC technology

The operation statistics and analysis of HVDC transmission systems in state grid corporation of China 2006-2012

TWENTIES: conclusions of a major R&D and demonstration project on offshore DC grids

Special requirements regarding VSC converters for operation of hybrid AC/DC overhead lines

Design challenges for ±800kV, 3000MW HVDC Champa –Kurukshetra transmission link with Dedicated Metallic Return (DMR) – User’s perspectiveDrivers for technology selection in an embedded HVDC link

Reliability analysis of design options for offshore HVDC networks

Designing fault tolerant HVDC networks with a limited need for HVDC circuit breaker operation

The first HVDC project in Indonesia:system study and basic design of Java-Sumatra HVDC link"Celilo Pacific DC intertie upgrade presentation

Technology Qualification of Offshore HVDC Transmission Systems

New synthetic test circuit for the operational test of HVDC thyristor valve

A survey of the reliability of HVDC systems throughout the world during 2011 - 2012PS2: Facts systems and applications

Generic VSC models for project planning studies

Smart Power Line (SPL) experimental research project

Dynamic Compensation in Indian Power system – Siting & sizing

Factory test and Commissioning test of 450MVA-STATCOM project

Comparison of field measurements and EMT simulation results on a multi-level STATCOM for grid integration of London Array wind power plant

PS3: Power electronic equipment developments

Development and test of a 120 kV direct current circuit breaker

A novel control method in grid Interconnection of DG based on adaptive pulse voltage source inverter (VSI) and compare with two other control methods for harmonic compensation and power quality improvement

The Bimode Insulated Gate Transistor (BIGT), an ideal power semiconductor for power electronics based DC breaker applications

A low loss mechanical HVDC breaker for HVDC Grid applications

hybrid HVDC breaker – A solution for future HVDC system

Effects of STATCOMs on power system in Jeju Island

SC B5 Protection and Automation: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1: New protection and automation schemes based on enhanced communication possibilities

101 JL 3 3 3 2 2 ja nee ja

102 Frank Baldinge 3 3 1 2 3 ja ja nee

103104 Tamiru Shire 2 1 2 2 1 ja nee

105 Frank Koers Matig Goed Ja Nee

106 Frans Comos 3 1 2 2 3 nee nee nee

107 Tamiru Shire 2 2 2 2 3 nee nee

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

Op lange termijn

Oppervlakkig

Voor TenneT

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

108 JL 2 3 3 2 2 ja nee ja

109110 PJA 3 3 3 3 2 Ja Nee Ja

111 Frank Baldinge 3 3 3 3 3 Ja Ja ja

112 Martin 2 2 1 3 3 2 1 1

113 Jacques van 3 3 3 3 2 ja

114 Evita Parabirsi 3 3 3 1 1 ja nee nee

115 M. Popov 2 2 3 1 2 2 nee ja

116 Frans Comos 3 3 3 2 3 nee nee nee

PS2: Expectations from stakeholders about IEC 61850201 Martin 1 1 1 1 1 1 1 1

202 PJA 2 2 2 2 2 Ja Ja Nee

203 Evita Parabirsi 3 3 3 2 1 ja ja ja

204 M. Popov 3 3 3 1 2 2 nee nee

205 Frank Koers 2 2 3 1 1 nee nee nee

206 Jacques van 3 3 3 2 2 2

207 Frank Koers 3 3 3 2 2 ja nee neee

208 Tamiru Shire 2 2 3 2 2 ja nee

209 Jacques van 3 2 3 2 2 2

210 Johan Morren 2 1 2 1 1 Nee nee Nee

211 PJA 3 3 3 2 2 Ja Nee Ja

212 Johan Morren 2 1 2 1 1 Nee nee Nee

213 M. Popov 1 2 2 1 1 2 nee nee

214 Frans Volberd 2 2 2 2 2 2 Nee Nee

215 Frans Volberd 2 2 2 2 2 2 Nee Nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

Opm

erki

ng

PS1: New protection and automation schemes based on enhanced communication possibilities

(Canada) discuss multi-terminal line current differential protection (87L) using Ethernet-over-TDM (Time-Division-Multiplexing, SONET and SDH) for phase current data exchange and/or negative- and zero-sequence current as well. A terrestrial time system for synchronization (time-over-TDM) is proposed, which is more reliable by keeping several GPS clocks in the system networked in a ring topology. The paper describes the use of TDM to transport Ethernet traffic in a deterministic and predictable way with fully enineered payths and time slots for channel usage. This Ethernet-over-TDM method is equivalent to an isolated Ethernet network fully dedicated to a given application or service. In particlar, it allows a guarentee of bandwith and allows predicting the worst-case signal delivery time. The Ethernet over TDM scheme is immune to GPS problems and therefore recommended for protection applications.

In de toekomst zeker relevant. TUDelft gaat ook fundamenteel onderzoek doen naar Netwerk stabiliteit op basis van PMUs

Proposed an algorthm for coordinated action of different OLTC in a grid based on communication through Goose. The need for such a system is not substantiated in the paper. Furthermore the paper under estimated the voltage control provisions which are currently in place. The case study doesnot demonstrate if the outcome would have been otherwise if OLTC with Goose communication was in use.

De paper beschrijft een new combineerd algorithme om net instabiliteit te herkennen en het zeer groot netwerk op te splitsen in verschillende eilandnetten met elk een eigen opwekking en verbruik.Complexiteit is om een stabile netwerk te vormen na een netsplitsing.Verschillende theoritische netsplisingen zijn beschreven

De ontwikkeling van de algoritmen voor de berekening van een “centralized system of emergency automation”(CSEA) worden beschreven. Hiermee wordt de stabiliteit, overbelasting etc van het in de gaten gehouden. In geval van een dreigende fout wordt met een vereenvoudigde en snellere “calculation of control action (CA)” ingegrepen. Door de snelheid van de CA kan het net stabiel bedreven worden.

Presents islanding detection method/algorithm and comparion with other exisiting methods. The paper overal achieved the message it wanted to convey. Perhaps the presented algorithm is already in use in existing relais and the only contribution from the paper is the idea to add communication capability between the units.

PS2: Expectations from stakeholders about IEC 61850

(Spain) introduces the Integrated Maintenance Centre of Installations (CMI2) established within REE ( TSO Spain since 1985), which help human resources both in field and in control centre, to deal with management and maintenance process of lines and cables, HV equipments, secondary system devices, in a coordinative way. The paper describes the role of the new CMI2 in the asset management and maintenance process, its links with the CST (Telecommunications Supervision Centre - commissioned in 2004) and the experience about the support given to the Control Centres of the System Operator. The main goal of the center would be to coordinate the different activities of maintenance executed in field covering mainly the activities of technical support for both, maintenance and operation organizations. The center was commimissioned in October 2012 located in HG of REE in Madrd.

Deze notitie behandeld het verder digitaliseren van schakelstations. Met name het gebruik van de procesbus wordt behandeld waarbij een praktijkvoorbeeld in Denemarken word gebruikt. In dit praktijkvoorbeeld is een lijn- kabelverbinding middels digitale stroomtransformatoren, merging units en beveiligingen het gebruik van de procesbus behandeld.

B5 workshop van afgelopen voorjaar ging deels over het zelfde onderwerp. Zeker relevant in de toekomst voor NL. De IP/MPLS technologie zal de toekomst gaan worden. Dus aandacht is zeker nodig.

Wams met PMU staat in de kinderschoenen in Nederland. Paper beschrijft hoe gebruik kan maken van het communicatie netwerk. Vervolgens beschrijft men de verschillende back up's die dan kunnen vervallen. Op zich geen gekke gedachte maar nu nog wishfull thinking

Dit paper beschrijft een aantal tests die zijn uitgevoerd met langsdifferentiaalbeveiliging met communicatie over een WDM (Wave length Divison Multiplexing) netwerk en een IP-netwerk. Het is een goed te lezen stuk wat de problemen die daarbij optreden in kaart brengt en een mogelijke oplossing.

Samenvatting: Paper gaat over de verschillende manieren waarop RES wordt aangesloten, afhankelijk van het opgesteld vermogen/spanningsniveau. En de beveiligingsstrategie die gebruikt is voor deze manieren van aansluiten. Ook het beveiligen van RES in islanded mode is kort toegelicht. Verder wordt er kort ingegaan op het testen van multi-functionele numerieke relais.

The paper is good and can be applicable for the Netherlands. However, the idea is not new. I published a paper in Japan at IPST2009, and currently there is an ongoing work at TU DelftVoor de stabiliteit te garanderen in het zuid Koreaanse 765kV-net wordt binnen 5 cycli afgeschakeld mbv differentiaal relais. Tevens vindt een optimalisatie plaats om niet het totale generatorvermogen af te schakelen (4000MW toekomst 6000MW).

Algemene warrige beschrijving hoe men omgaat met IEC 61850. Men laat diverse afdelingen aan het woord en laat aanpassingen toe in het protocol. Men geeft een overzicht van de protocol lijsten die men aangepast heeft.Deze notitie geeft een overzicht /tussenstand van de activiteiten op het gebied van IEC 61850 waar de werkgroep WGB5.50 mee bezig is. `Vanuit de gebruiker wordt gekeken naar de huidige stand en de wensen die er zijn ten aanzien van interoperabiliteit, engineering en testgereedschappen en documentatie.

This stuff are known to Dutch Utilities

Check dat minimaal 1 paper per PS, reviewer

Samenvatting: Paper gaat over de test-procedure die wordt toegepast door utilities voordat protection en automation systems worden geimplementeerd. Door de toepassing van IEC61850 in volledig geautomatiseerde stations zullen er stappen in de normale test-procedure veranderen. Deze veranderingen worden ge-highlight, zoals dat wordt ervaren in Brazil.

This is an interesting paper, however, this strongly reflects the problem in some specific area. It may be useful, but it should be seen if this is really aplicable for Dutch situationDe paper beschrijft de ontwikkeling van een geintegreede tool voor IEC 61850 onderstation.Requirements voor een dergelijke geintergreede tool, engineering tot en met testing en onderhouds wordt beschreven. De tool lijkt te mooi voor een complex probleem. ik vraag mij sterk af of de beschreven tool echt werkt en voldoende flexible is voor diverse vendors of IEC 61850 devices

In deze paper wordt de noodzaak tot verregaande standaardisatie van de IEC61850 norm omschreven, speciaal voor toepassing in Smart Grids. Ook wordt het belang van een ''open'' engineering tool omschreven.De focus van deze paper is het standaardisatie process voor de implementatie van de interopeability tussen verschilllende IEC 61850 devices. De focus is om typische toepassingen voor een IEC 61850 station vast te leggen.Balans gezocht tussen standardiatie en flexibiliteit van de standaard.

The paper explores the possibility of mapping vendor-specific protection settings file format to standard SCL format incoorporated in IEC61850 to facilitate interoperatbility. The paper has not identified the associated risks of the proposal and has not gave attention to today's developments specially "standardatie van IED's door aanbesteding" which might put a question on the need for such a tool. Besides maintenance and fault analysis still requires vendor specific tool, thus the argument that it will reduce training may not be true in practice.

Een vanuit EPRI geschreven paper over de migratie van Utilities naar IEC61850. De impact op het business proces, engineerings proces en de security worden onder de loep genomen.Het paper verschrijft een onderzoek dat diverse Japanse netbeheerders (TSO's) gezamenlijk gedaan hebben naar toepassing van IEC61850 met apparatuur van verschillende leveranciers. Er worden een aantal issues benoemd zoals engineeringstools

Deze notitie geeft een overzicht wat Statnett van IEC61850 verwacht en gebruikt . Er wordt ingegeaan op de samenwerking met leveranciers op het gebied van aanbestedingen, onderhoud, testen en documentatie Paper beschrijft ervaringen van diverse netbeheerders in Nieuw-Zeeland met IEC61850

Paper geeft aan dat IEC61850 zich als communicatie protocol bewezen heeft. Het is nu tijd om nieuwe wensen in te vullen zoals gebruiksgemak, top down engineering, life time management, en process efficiency. Paper beschrijft het concept van een Operation&Maintenance Support System (OMSS) ter onndersteuning van de optimale operatie.

Tite

l/PS

PS1: New protection and automation schemes based on enhanced communication possibilities

Line current differential protection and the age of Ethernet-based wide-area communications

A New PMU based Power Swing Detector to Enhance Reliability of Distance Relays

CancelledB5-104 Automatic voltage control of OLTC power transformers between substations

B5-105 A novel heuristic approach for power system controlled separation wide-area-protection applications

B5-106 Brand new centralized emergency automation in UPS of East and the experience of its exploitation

B5-107 Improving relaying for islanding detection

The Integral Maintenance Centre as support, coordination ans asset management tool

CancelledB5-110 Feedback on in-service deployment of the fully digital substation

Principles for Practical Wide-Area Backup Protection with Synchrophasor Communications

Practical Use Challenge of WDM & IP Communication Technologies for Protection Systems

A New Approach on Protection with Large Amounts of RES

B5-115 Real-time monitoring, control and protection by implementation of the PMUS in North- East of Romanian

B5-116 Development of intelligent generator special protection system (iG-SPS) to improve transient stability in

PS2: Expectations from stakeholders about IEC 61850Practical approach to the technical specification of IEC 61850 systems

B5-202 IEC 61850 based substation automation systems - Users expectations and stakeholders interactions

Demonstration and analysis of IP/MPLS communication for delivering power system protection solutions using IEEE C37.94, IEC61850 Sampled Values, and IEC61850 GOOSE protocols

Brazilian Utilities experience in Acceptance, Commissioning and Maintenance Testing techniques for Protection and Auromation Systems based in IEC-61850

B5-204 Modernizations of automation systems of hydraulic generating units in Brazil

B5-205 The integrated tool for substation automation system based on IEC61850

IEC 61850 interoperability at information level. A challenge for all market players

B5-207 Increasing interoperability by IEC 61850 profiling – requirements and experience from end-user and

B5-208 Improving IEC 61850 interoperability and simplifying IED configuration through the standardisation of protection settings

Utility Perspectives and Challenges on Implementing IEC 61850

Requirements for IEC 61850 in terms of Logical Node Design and Engineering Tool Compatibility

B5-211 Expectations and specifications of IEC 61850 based- Digital substation automation system used by Statnett

IEC 61850 and Distribution Network Utilities Perspective: Trials, Tribulations and Experiences from New Zealand

B5-213 IEC61850 experiences and expectations from the renovated substations project in MEA’s distribution system substationB5-214 Next step for IEC 61850: a unified power utility automation language why and how

B5-215 A functionally integrated architecture for online monitoring and real-time diagnostics and management of substation assets as a tool for optimized maintenance management

document.xlsx 67van 94

SC C2 SYSTEMS OPERATION AND CONTROL: Evaluatie papers 2014No

.

Revi

ew d

oor:

Kwal

iteit

Brui

kbaa

rhei

d

lees

baar

heid

Nieu

whe

id

Diep

gang

Tite

l/PS

PS1:

C2-101 Susana de Graaff 2 2 2 2 2 nee nee nee

C2-102 Susana de Graaff 2 2 3 2 3 yes nee nee

C2-103 Susana de Graaff 3 2 3 2 3 yes nee ?

C2-104 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-105 Susana de Graaff 3 2 1 2 3 yes nee nee

C2-106 Susana de Graaff 2 3 3 3 2 yes yes yes

C2-107 Susana de Graaff 3 2 3 3 3 yes nee nee

C2-108 Susana de Graaff 2 2 2 1 2 nee nee nee

C2-109 Susana de Graaff 2 3 2 3 2 yes nee nee

C2-110 Susana de Graaff 2 2 1 2 3 yes nee nee

C2-111 Susana de Graaff 2 2 2 3 2 yes nee nee

C2-112 Susana de Graaff 3 3 2 3 2 yes nee nee

C2-113 Susana de Graaff 2 3 3 2 2 yes yes yes

C2-114 Susana de Graaff 2 2 3 2 3 yes nee nee

C2-115 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-116 Susana de Graaff 2 3 2 2 2 yes nee nee

C2-117 Susana de Graaff 2 2 2 3 3 nee nee nee

C2-118 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-119 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-120 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-121 Susana de Graaff 3 2 3 2 3 yes nee nee

C2-122 Susana de Graaff 2 3 2 3 2 yes nee nee

C2-123 Susana de Graaff 3 2 3 3 2 yes nee nee

C2-124 Susana de Graaff 2 2 2 3 2 yes nee nee

PS2: C2-201 Susana de Graaff 2 2 2 2 3 yes nee nee

C2-202 Susana de Graaff 2 2 2 3 2 yes nee nee

C2-203 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-204 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-205 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-206 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-207 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-208 Susana de Graaff 2 3 2 3 2 yes yes ?

C2-209 Roy Besselink 2 2 2 2 2 yes yes nee

C2-210 Susana de Graaff 2 2 1 2 2 nee nee nee

C2-211 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-212 Susana de Graaff 3 2 2 3 2 yes yes nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

NL a

ctief

/rel

evan

tvo

or N

L?

NL B

ijdra

ge o

ver

dit o

nder

wer

p?

In p

rese

ntati

e vo

orbe

reid

ings

dage

n

Opm

erki

ng (p

aper

Su

mm

ary)

Paper C2-101 proposes a mixed state estimation strategy for power systems, combining a hierarchical and a distributed structure. Local estimations can be taken from PMU measurements. This estimation scheme was tested in the 500kV network of the Colombian power system.

Paper C2-102 describes the experiences gained with the application of DLR in the Transmission System of Australia and New Zealand, addressing operational and market issues. The thermal model, the validation tests results and future plans are presented. This paper shows the approaches of different network operators in the two countries.

Paper C2-103 focuses on how to effectively integrate DLR in the processes of the network operators and maximize the usage of the network. This paper highlights the experience of the Belgian TSO, regarding the usability of forecasting of DLR to increase the flexibility of using the network when determining capacity to the market or accommodating RES.

Paper C2-104 presents the development of a parallel computational tool designed to perform static and dynamic security assessment of large scale power systems both for real-time and off-line studies. This tool is being tested with the Brazilian Interconnected Power System.

Paper C2-105 provides an overview of the French TSO operational voltage control framework illustrated with experienced situations, description of methodologies and tools, operational processes and automatisms, and main benefits.

Paper C2-106 outlines the intraday studies performed by CORESO since July 2013 within a coordinated process that also involves TSC, including TSOs from both Central Western and Central Eastern Europe.

Paper C2-107 focuses on voltage stability assessment. A comparison between an advanced generation unit model and a conventional model is made using the P/V analysis to determine the margins to different critical system states, as defined in ENTSO-E Operation Handbook.

Paper C2-108 describes the challenges to compute TTC in the fast growing Indian transmission system with still a large expansion foreseen, where the delicate balance between network security and market facilitation has to be struck in a transparent manner.

Paper C2-109 summarises the experiences of the Power System Operation Corporation in India, using synchrophasor data for several purposes both online, offline, and for improving the performance of the grid. In this paper several events are presented.

Paper C2-110 presents a model for Stability monitoring and control of generation based on the synchronized measurements in nodes of its connection. The model can be used in calculating the limits on the power output of each generator in the network for the steady state, quasi-steady-, and post emergency mode.

Paper C2-111 outlines the AGREGA Project held in Spain, aiming the preparation of the electric system to the introduction of a market player "the aggregator" with a coordination role to facilitate the implementation of demand response products in end consumers, in this case medium size industry.

Paper C2-112 presents the application of dynamic rating to Italian overhead lines. The algorithm combines the CIGRE thermal model of conductors and complex multi-span mechanical model of the line, increasing the completeness of the model. The operational benefits for the Italian TSO are shared.

Paper C2-113 outlines the work of the Regional Security Coordination Initiatives (RSCI) in Europe to maintain operational security and to comply with the legal framework. This works includes developing and implementing common strategies, coordinated procedures and long-term methods.

Paper C2-114 describes a new approach to assess the aggregated inertial contribution from wind generation in the Great Britain power system under time varying wind speeds on an hourly basis and across the regions, and also as a result of turbulence and wind speed variation across wind farms.

Paper C2-115 illustrates the analysis of four events, power system oscillations, captured by synchrophasor measurements in the Western Electricity Coordinating Council in the Western United States.

Paper C2-116 presents a new simulation platform developed in USA that combines electromechanical transient stability with the effect of protection relays, allowing a complete analysis of system dynamics and the design of wide-area control and protection algorithms, including cascading events.

Paper C2-117 outlines an "Integrated Stability Control" system used in Nagano region in Japan for the operation of a long-distance transmission system and shares actual operational experiences. Such platform allows operating in a more complex operational environment.

Paper C2-118 describes the system used in Mexico to perform online security assessment. The system is designed for steady-state voltage security assessment, calculating PV curves and defining power transfer limits and reactive power margins. Remedial actions are also considered. To the worst cases, a transient stability assessment is performed.

Paper C2-119 studies the potential of implementing dynamic control of voltages, active and reactive power flows in Qatar Transmission System, considering conventional practices with mid-term solutions, as the usage of FACTS. Optimisation techniques and optimal power flow are studied.

Paper C2-120 provides insight on the activities in the United Arab Emirates power sector concerning dispatching and regulatory aspects due to the integration of renewable energy sources, which are amendments recommended into the grid code.

Paper C2-121 presents the synchrophasor system of the power transmission grids of Ireland. The application of PMUs and its advantages to power system operational challenges is outlined, such as Special Protection Schemes, network models improvement, evaluation of control systems, disturbance analysis, and synchronisation of islands, among others.

Paper C2-122 discusses the possibility to use coordinated Q-V controllers (CQVC) to perform secondary voltage control at the power plant level and elaborates on studies related to the application of several coordinated controllers in the power system. CQVC can also be used to pricing reactive power production costs.

Paper C2-123 describes how the Italian TSO defines, evaluates and tests its restoration strategy in coordination with the neighbouring TSOs, in particular with Swissgrid, minimising the switching actions and restoration time. A very complete preparation is performed, including operational procedures, DTS training for operators and static and dynamic network analysis.

Paper C2-124 presents the development of a wide area monitoring and control (WAMAC) system in the Korean system for a two-step load shedding scheme due to voltage stability issues, reducing the amount of load shedding for most of the cases. This SPS was tested successfully with an RTDS.

Paper C2-201 focuses on large wind power outages verified in China and proposes a preventive strategy, which includes coordinative reactive power control among wind turbines and reactive power compensation devices together with the requirements of High Voltage Ride Through (HVRT) capabilities of wind turbines.

Paper C2-202 addresses the high development of electrical powered heating in France and its high thermo-sensitive demand. A new market mechanism (NEBEF) that has been designed to value explicit DSM is described.

Paper C2-203 describes the German case where RES are reaching significant proportion on distribution grid levels and presents a new P-Q controller for distribution systems in order to control power flows in the points of connection with the transmission system, providing some degree of control and aggregating flexibility.

Paper C2-204 explains the challenges to be faced by the TSO in the future regarding more frequent alternatives of power flow as well as higher security constraints. An alternative suggested to be adopted to avoid costly network reinforcements or to minimize costs of generation re-dispatch is the implementation of phase-shifting transformers (PST).

Paper C2-205 describes modifications introduced in the regional SCADA system configuration, in Japan, that used to be provided at each control centre and developed an integrated regional SCADA system using a private IP network that can be used as a backup system when the control centre suffers from a disturbance.

Paper C2-206 shows examples of the coordinated function/methods between the transmission and distribution operation systems. Besides, it is presented the new functions capable of continuous stable power supply in the substantial connection with photovoltaic power generation.

Paper C2-207 describes that the introduction of RES on the distribution network in the South African System has provoked a number of changes regarding the responsibilities of the distribution control room and new information exchange requirements. Additionally the frameworks how RES have to be connected to the grid are presented.

Paper C2-208 discusses the integration of processes of the Dutch power system operator, presenting the complexity of its implementation in the light of the requirements, IT infrastructure and users´ needs. Emphasis is given to near-real-time processes for which the complexity is greater. Best practices from consumers’ point of view and future developments are presented

Paper C2-209 presents the future DG/RES operational challenges, which are categorized under five headings: organizational (state of the art and future trends), operations (congestion in grids and voltage control), observability & controllability (system security and technical capabilities), technical capabilities and regulating commercial aspects.

Paper C2-210 describes some proposed health indices related to adequacy and power system security. Four indices are related to adequacy and 4 others to security. The paper considers three evaluation domains into health, margin and risk domains based on the reliability criteria and the results of interviews with experts in Korea.

Paper C2-211 presents an interactive method of network reconfiguration algorithm that combines Optimal Power Flow (OPF) and short-circuit analysis to split busbars in order to limit fault currents. The algorithm is to make decisions on where busbar splitting or line opening needs to be applied to reduce fault current level within the CB ratings.

Paper C2-212 presents a risk assessment methodology that has been implemented by the Portuguese TSO to allow a more efficient use of the network capacity. Results are shown and future developments and improvements are proposed.

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

SC C3 SYSTEM ENVIRONMENTAL PERFORMANCE: Evaluatie papers 2014N

o.

Revi

ew d

oor:

Kwal

iteit

Brui

kbaa

rhei

d

lees

baar

heid

Nie

uwhe

id

Diep

gang

PS1:

C2-101 Susana de Graaff 2 2 2 2 2 nee nee nee

C2-102 Susana de Graaff 2 2 3 2 3 yes nee nee

C2-103 Susana de Graaff 3 2 3 2 3 yes nee ?

C2-104 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-105 Susana de Graaff 3 2 1 2 3 yes nee nee

C2-106 Susana de Graaff 2 3 3 3 2 yes yes yes

C2-107 Susana de Graaff 3 2 3 3 3 yes nee nee

C2-108 Susana de Graaff 2 2 2 1 2 nee nee nee

C2-109 Susana de Graaff 2 3 2 3 2 yes nee nee

NL

actie

f/re

leva

ntvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntati

e vo

orbe

reid

ings

dage

n

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

C2-110 Susana de Graaff 2 2 1 2 3 yes nee nee

C2-111 Susana de Graaff 2 2 2 3 2 yes nee nee

C2-112 Susana de Graaff 3 3 2 3 2 yes nee nee

C2-113 Susana de Graaff 2 3 3 2 2 yes yes yes

C2-114 Susana de Graaff 2 2 3 2 3 yes nee nee

C2-115 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-116 Susana de Graaff 2 3 2 2 2 yes nee nee

C2-117 Susana de Graaff 2 2 2 3 3 nee nee nee

C2-118 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-119 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-120 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-121 Susana de Graaff 3 2 3 2 3 yes nee nee

C2-122 Susana de Graaff 2 3 2 3 2 yes nee nee

C2-123 Susana de Graaff 3 2 3 3 2 yes nee nee

C2-124 Susana de Graaff 2 2 2 3 2 yes nee nee

PS2: C2-201 Susana de Graaff 2 2 2 2 3 yes nee nee

C2-202 Susana de Graaff 2 2 2 3 2 yes nee nee

C2-203 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-204 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-205 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-206 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-207 Susana de Graaff 2 2 2 2 2 yes nee nee

C2-208 Susana de Graaff 2 3 2 3 2 yes yes ?

C2-209 Roy Besselink 2 2 2 2 2 yes yes nee

C2-210 Susana de Graaff 2 2 1 2 2 nee nee nee

C2-211 Susana de Graaff 2 2 2 3 3 yes nee nee

C2-212 Susana de Graaff 3 2 2 3 2 yes yes nee

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

PS1:

Opm

erki

ng (p

aper

Su

mm

ary)

Paper C2-101 proposes a mixed state estimation strategy for power systems, combining a hierarchical and a distributed structure. Local estimations can be taken from PMU measurements. This estimation scheme was tested in the 500kV network of the Colombian power system.

Paper C2-102 describes the experiences gained with the application of DLR in the Transmission System of Australia and New Zealand, addressing operational and market issues. The thermal model, the validation tests results and future plans are presented. This paper shows the approaches of different network operators in the two countries.

Paper C2-103 focuses on how to effectively integrate DLR in the processes of the network operators and maximize the usage of the network. This paper highlights the experience of the Belgian TSO, regarding the usability of forecasting of DLR to increase the flexibility of using the network when determining capacity to the market or accommodating RES.

Paper C2-104 presents the development of a parallel computational tool designed to perform static and dynamic security assessment of large scale power systems both for real-time and off-line studies. This tool is being tested with the Brazilian Interconnected Power System.

Paper C2-105 provides an overview of the French TSO operational voltage control framework illustrated with experienced situations, description of methodologies and tools, operational processes and automatisms, and main benefits.

Paper C2-106 outlines the intraday studies performed by CORESO since July 2013 within a coordinated process that also involves TSC, including TSOs from both Central Western and Central Eastern Europe.

Paper C2-107 focuses on voltage stability assessment. A comparison between an advanced generation unit model and a conventional model is made using the P/V analysis to determine the margins to different critical system states, as defined in ENTSO-E Operation Handbook.

Paper C2-108 describes the challenges to compute TTC in the fast growing Indian transmission system with still a large expansion foreseen, where the delicate balance between network security and market facilitation has to be struck in a transparent manner.

Paper C2-109 summarises the experiences of the Power System Operation Corporation in India, using synchrophasor data for several purposes both online, offline, and for improving the performance of the grid. In this paper several events are presented.

Paper C2-110 presents a model for Stability monitoring and control of generation based on the synchronized measurements in nodes of its connection. The model can be used in calculating the limits on the power output of each generator in the network for the steady state, quasi-steady-, and post emergency mode.

Paper C2-111 outlines the AGREGA Project held in Spain, aiming the preparation of the electric system to the introduction of a market player "the aggregator" with a coordination role to facilitate the implementation of demand response products in end consumers, in this case medium size industry.

Paper C2-112 presents the application of dynamic rating to Italian overhead lines. The algorithm combines the CIGRE thermal model of conductors and complex multi-span mechanical model of the line, increasing the completeness of the model. The operational benefits for the Italian TSO are shared.

Paper C2-113 outlines the work of the Regional Security Coordination Initiatives (RSCI) in Europe to maintain operational security and to comply with the legal framework. This works includes developing and implementing common strategies, coordinated procedures and long-term methods.

Paper C2-114 describes a new approach to assess the aggregated inertial contribution from wind generation in the Great Britain power system under time varying wind speeds on an hourly basis and across the regions, and also as a result of turbulence and wind speed variation across wind farms.

Paper C2-115 illustrates the analysis of four events, power system oscillations, captured by synchrophasor measurements in the Western Electricity Coordinating Council in the Western United States.

Paper C2-116 presents a new simulation platform developed in USA that combines electromechanical transient stability with the effect of protection relays, allowing a complete analysis of system dynamics and the design of wide-area control and protection algorithms, including cascading events.

Paper C2-117 outlines an "Integrated Stability Control" system used in Nagano region in Japan for the operation of a long-distance transmission system and shares actual operational experiences. Such platform allows operating in a more complex operational environment.

Paper C2-118 describes the system used in Mexico to perform online security assessment. The system is designed for steady-state voltage security assessment, calculating PV curves and defining power transfer limits and reactive power margins. Remedial actions are also considered. To the worst cases, a transient stability assessment is performed.

Paper C2-119 studies the potential of implementing dynamic control of voltages, active and reactive power flows in Qatar Transmission System, considering conventional practices with mid-term solutions, as the usage of FACTS. Optimisation techniques and optimal power flow are studied.

Paper C2-120 provides insight on the activities in the United Arab Emirates power sector concerning dispatching and regulatory aspects due to the integration of renewable energy sources, which are amendments recommended into the grid code.

PS2:

Paper C2-121 presents the synchrophasor system of the power transmission grids of Ireland. The application of PMUs and its advantages to power system operational challenges is outlined, such as Special Protection Schemes, network models improvement, evaluation of control systems, disturbance analysis, and synchronisation of islands, among others.

Paper C2-122 discusses the possibility to use coordinated Q-V controllers (CQVC) to perform secondary voltage control at the power plant level and elaborates on studies related to the application of several coordinated controllers in the power system. CQVC can also be used to pricing reactive power production costs.

Paper C2-123 describes how the Italian TSO defines, evaluates and tests its restoration strategy in coordination with the neighbouring TSOs, in particular with Swissgrid, minimising the switching actions and restoration time. A very complete preparation is performed, including operational procedures, DTS training for operators and static and dynamic network analysis.

Paper C2-124 presents the development of a wide area monitoring and control (WAMAC) system in the Korean system for a two-step load shedding scheme due to voltage stability issues, reducing the amount of load shedding for most of the cases. This SPS was tested successfully with an RTDS.

Paper C2-201 focuses on large wind power outages verified in China and proposes a preventive strategy, which includes coordinative reactive power control among wind turbines and reactive power compensation devices together with the requirements of High Voltage Ride Through (HVRT) capabilities of wind turbines.

Paper C2-202 addresses the high development of electrical powered heating in France and its high thermo-sensitive demand. A new market mechanism (NEBEF) that has been designed to value explicit DSM is described.

Paper C2-203 describes the German case where RES are reaching significant proportion on distribution grid levels and presents a new P-Q controller for distribution systems in order to control power flows in the points of connection with the transmission system, providing some degree of control and aggregating flexibility.

Paper C2-204 explains the challenges to be faced by the TSO in the future regarding more frequent alternatives of power flow as well as higher security constraints. An alternative suggested to be adopted to avoid costly network reinforcements or to minimize costs of generation re-dispatch is the implementation of phase-shifting transformers (PST).

Paper C2-205 describes modifications introduced in the regional SCADA system configuration, in Japan, that used to be provided at each control centre and developed an integrated regional SCADA system using a private IP network that can be used as a backup system when the control centre suffers from a disturbance.

Paper C2-206 shows examples of the coordinated function/methods between the transmission and distribution operation systems. Besides, it is presented the new functions capable of continuous stable power supply in the substantial connection with photovoltaic power generation.

Paper C2-207 describes that the introduction of RES on the distribution network in the South African System has provoked a number of changes regarding the responsibilities of the distribution control room and new information exchange requirements. Additionally the frameworks how RES have to be connected to the grid are presented.

Paper C2-208 discusses the integration of processes of the Dutch power system operator, presenting the complexity of its implementation in the light of the requirements, IT infrastructure and users´ needs. Emphasis is given to near-real-time processes for which the complexity is greater. Best practices from consumers’ point of view and future developments are presented

Paper C2-209 presents the future DG/RES operational challenges, which are categorized under five headings: organizational (state of the art and future trends), operations (congestion in grids and voltage control), observability & controllability (system security and technical capabilities), technical capabilities and regulating commercial aspects.

Paper C2-210 describes some proposed health indices related to adequacy and power system security. Four indices are related to adequacy and 4 others to security. The paper considers three evaluation domains into health, margin and risk domains based on the reliability criteria and the results of interviews with experts in Korea.

Paper C2-211 presents an interactive method of network reconfiguration algorithm that combines Optimal Power Flow (OPF) and short-circuit analysis to split busbars in order to limit fault currents. The algorithm is to make decisions on where busbar splitting or line opening needs to be applied to reduce fault current level within the CB ratings.

Paper C2-212 presents a risk assessment methodology that has been implemented by the Portuguese TSO to allow a more efficient use of the network capacity. Results are shown and future developments and improvements are proposed.

Tite

l/PS

PS1:

PS2:

SC C4 SYSTEM TECHNICAL PERFORMANCE: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

C4-101 S. Cobben 2 1 2 2 2 1 1

M. Berende 2 1 2 2 2 Nee Nee

F. van Erp 2 2 2 2 2 2 nee

C4-102 S. Cobben 3 3 3 2 2 2 1

F. van Erp 2 2 2 2 2 2 nee

C4-103 S. Cobben 1 3 2 2 2 2 1

F. van Erp 1 1 1 1 1 1 nee

M. Berende 1 1 2 2 2 Ja Nee

C4-104 F. van Erp 2 2 2 2 2 2 nee

P. van Oirsouw 2 2 2 1 1 3

C4-105 I. Tannemaat 2 2 2 2 2 ja nee

C4-106 F. van Erp 2 2 2 2 1 2 nee

P. van Oirsouw 3 2 3 3 2 3

C4-107 A. Ishchenko 2 2 2 3 2 1 1

C4-108 F. van Erp 2 2 2 2 2 2 nee

P. van Oirsouw 3 2 3 3 2 3

C4-109 M. Berende 2 2 2 2 3 Ja Nee

C4-109 P. van Oirsouw 2 1 2 2 3 1

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

PS1: Power system technical performance in the advent of large deployment of power converter connected generation

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

C4-110 J. van Waes 2 2 2 2 2 Nee Nee

C4-111 A. Ishchenko 3 3 2 3 2 3 2

C4-112 I. Tannemaat 3 3 3 3 2 ja ja

C4-113 S. Cobben 2 2 2 1 2 1 2

M. Berende 2 1 2 2 2 Nee Nee

C4-114 S. Cobben 3 3 3 2 2 2 1

C4-115 S. Cobben 2 2 2 2 2 3 1

F. van Erp 2 1 2 1 1 2 nee

M. Berende 2 1 2 2 1 Ja Nee

PS2: Methods and techniques for the evaluation of lightning performance and insulation coordinationC4-201 C. Engelbrecht 3 2 2 3 3 ja nee

C4-202 I. Tannemaat 3 2 2 3 2 nee nee

C4-203 I. Tannemaat 3 2 3 3 2 nee nee

C4-204 I. Tannemaat 2 2 2 3 2 ja nee

M. Berende 2 2 2 3 2 Ja Nee

C4-205 I. Tannemaat 1 1 2 2 2 ja nee

M. Berende 2 2 2 2 2 Ja Nee

C4-206 C. Engelbrecht 2 3 2 3 3 ja ja

C4-207 C. Engelbrecht 1 1 2 1 1 nee nee

PS3: Advanced methods, models and tools for the analysis of power system technical performanceC4-301 A. Ishchenko 2 2 2 2 2 1 1

C4-302 I. Tannemaat 3 1 3 2 2 nee nee

C4-303 P. van Oirsouw 2 3 2 2 2 3

C4-304 A. Ishchenko 2 2 3 2 1 1 1

C4-305 A. Ishchenko 2 2 2 2 2 2 2

C4-306 I. Tannemaat 2 1 2 2 2 nee nee

C4-306 M. Berende 2 1 2 2 2 Nee Nee

C4-307 I. Tannemaat 2 1 2 2 2 nee nee

C4-308 S. Cobben 3 3 3 2 2 2 1

C4-309 J. van Waes 2 2 3 2 2 2 ja

C4-310 S. Cobben 3 3 3 2 2 2 1

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

SC C4 SYSTEM TECHNICAL PERFORMANCE: Evaluatie papers 2014

Titel/PS

PS1: Power system technical performance in the advent of large deployment of power converter connected generationFlicker assessment and mitigation in wind farms connected to distribution grids

Impact of large wind farms on power quality. First experiences gained in the Argentinian power system

Considerations on power quality requirements for integration of renewable sources (photovoltaic andwind power) into the transmission grid

New challenges caused by the new energy sources in the Brazilian power system

Aspects to arranging the test conditions under challenging electricity market situation and the AC-DCsystem performance during the site acceptance tests of Fenno-Skan 1 upgrade and Fenno-Skan bipolecontrols

Impact of multi-terminal HVDC grids on AC system stability and operation

Methods for risk assessment of SSCI stability issues between renewable generation and seriescompensated transmission systemsFrequency response of the US Eastern interconnection under conditions of high wind generation

Short-term fluctuations of PV output in Japan - Evaluation method of fluctuations in case of large-scaleintegration

EMC considerations and planning for an offshore HVDC

PS2: Methods and techniques for the evaluation of lightning performance and insulation coordination

PS3: Advanced methods, models and tools for the analysis of power system technical performance

Reliability assessment of power generation systems with interconnections of isolated islandsincorporating large wind parks and photovoltaic plants

Medium-term dynamic studies for a large island power system with high levels of wind

The impact of wind and solar power generation on Romanian power quality

Impact of first wind farm in the Kingdom of Thailand on power quality and mitigation solutionGuidelines for monitoring power quality in contemporary and future power networks – results fromCIGRE/CIRED JWG C4.112

Evaluation of leader progression model and EGM for analyzing lightning performance of transmission line

VFTO simulation and testing for 500 kV and 800 kV GIS disconnectorsHigh energy line surge arresters to improve reliability and protection against switching surges on a 500kV transmission lineNew technologies of lightning currents registration with high resolution

Protection of power transformers connected to gis against lightning overvoltages

Principles of insulation coordination and recent activity on reduction of insulation level in Japan

Effectiveness of line surge arrester application on the 132 kV Kuala Krai – Gua Musang Line

Simulation of voltage collapse caused by GMDs – Problems and solutions

Development of advanced GIC analysis tools for the Manitoba Power GridRTE experiences with the insertion of long EHVAC insulated cables system performance assessment

Frequency domain studies for the Malta-Sicily interconnector

Influence of offshore wind farms layout on electrical resonances

Involvement of electric utilities in the development of EMT simulation tools

Modeling and evaluation of geomagnetic storms in the electric power system

Application of geomagnetic disturbance vulnerability assessments using the eskom main transmissionsystem modelHarmonic analysis of wind farm clusters using HV-AC underground cables in the Irish transmissionnetworkFrequency domain analysis of the influence of compensation wires and earthing resistances in mixedoverhead/ underground HV transmission lines

Opmerking

flicker in weak network, not comparable with NL

Flicker due to wind farms at very long distribution feeders (not in NL)

Several PQ aspects also related to wind

Only general rermarks, no research

Only limited overview of Grid Code requirements for windfarm connection

Paper describes the work that has been performed for testing an AC/DC system.

Enige regelstrategien worden toegelicht.

Voorstel voor regeltechniek; studie naar gevolgen voor operation en security van het on-shore AC system

Studie naar de mogelijkheid om windparken te laten meedoen aan de frequentie-vermogensregelingInteresting assessment of impact of PV fluctuations on load-frequency control

PS1: Power system technical performance in the advent of large deployment of power converter connected generation

Artikel maakt inzichtelijk de relatie van Flicker tot kortsluitimpedantie en X/R verhouding;Somt maatregelen op die genomen kunnen worden;Geeft een conclusie die door andere onderzoeken nader moet worden bekeken.

Men gebruikt het capacitief/inductief gekoppelde meetsysteem zoals in eerder papers is beschreven;Windfarms ongeveer 77 en 80 MW op 132kV-net;Geeft inzicht in relaties tussen meetresulaten spanningskwaliteitsaspecten en omgevingsparameters;Onduidelijk over wat men als referentie waarden gebruikt, zijn het plannings- of compatibiliteitswaarden?

Geeft een overzicht van de diversiteit aan eisen;Geeft een te beknopte versie van een werkmethode, CIGRE assessment techniques is reeds verder uitgewerkt.Weinig concreets.

Geeft een overzicht van zaken die moeten worden geregeld bij grootschalige inpassing van windenergie en de moeilijkheden die daarbij komen kijken, case Brazilie.Aardig overzichtsartikel over inpassing windparken: dynamische stabiliteit en transient gedrag; leidend tot nieuwe technische eisen

Analyse van subsynchrone resonantie van transportnetten in VS met serie-ingeschakelde condensatoren en wind turbines. Theoretisch interessant, maar weinig van toepassing voor NL.

Simulaite resulaten en achtergronden van inertia control en govenor control op windturbines worden gegeven.

Studie naar reductie van fluctuaties door PV op landelijke schaal; geen aandacht voor problematiek op distributieniveau

more about data and analyze of data than research

(Too) extensive PQ monitoring in RomaniaImpact of wind on PQ and possible solution

General paper about monitoring but is important topic in NL

General overview of current PQ monitoring practicesPS2: Methods and techniques for the evaluation of lightning performance and insulation coordination

Cheap solution for lightning registration in OH lines

Extensive insulation coordination study for GIS substations

PS3: Advanced methods, models and tools for the analysis of power system technical performance

Dit Griekse paper beschrijft een probabilistische methode voor de beoordeling van de operationele prestaties van systemen met een groot aandeel van duurzame energie opwekking en verbindingen met (geïsoleerde) decentrale opwek systemen. De hier beschreven betrouwbaarheidsanalyses zijn vooral interessant voor landen met een relatief hoog aandeel van decentrale opwek.

Dynamische analyse van transportnet van Ierland met grote hoeveelheden windenergie. Berekeningen worden voor het toekomstige scenario van 2018 uitgevoerd (daardoor 'medium-term' in de titel). In de lijst van literatuur staan links naar uitgebreide verslagen met meer details.Covers the topic EMC on offshore platforms. The current standards are not providing every information that is needed for these kind of situations at an offshore platform.

Somt een overzicht op van power quality aandachtpunten over diverse landen. Ingeweiden vinden niets nieuws.

With many UHV AC and DC lines being brought into service during recent years, it is becoming apparent that the methods used in the past (notably the electrogeometrical method) has not resulted in adequate designs. More sophisticated methods, which models the flight path of leader development, is now considered essential for achieving good shielding designs against direct lightning strikes. Although not providing a definitive answer, this paper gives some valuable background information and give a glimpse of future developments.

In NL the applicable voltages are not applied, so this specific topic is (as mentioned in the paper) not relevant.Although the paper is informative and interesting to read, in the NL transmission line arresters (TLA) are not applied. The paper however adresses more topics than TLA (safety distances etc.).

Paper describes the development of measurement device, which gives some insight. There are however similar devices developed and in use. For research within the NL there are currently no plans. This would be nice to look at, i.e. to study Wintrack lightning performance.

This is an issue in NL regarding insulation coordination. The applied model however rises questions (ideal transformer for lightning overvoltages???)

Recently in Japan an extensive insulation coordination study was performed with the aim of achieving reduced insulation levels. In broad lines this process was the same as that followed in the Netherlands with the recent revision of the “Nota isolatie koördinatie”. This paper focuses on insulation co-ordination for GIS which and provides an interesting insight in the data available, methods followed and conclusions for doing such a broad based study. The paper concentrates on the modeling aspects but unfortunately very little information is given on the statistical aspects and acceptable failure rates considered.

Gedetailleerde simulatie van Geomagnetic Disturbances (GMD) met gebruik van EMTP-RV (programma voor berekening van electromagnetische transienten). Theoretisch onderzoek, niet duidelijk of dat echt een praktisch probleem is.Describes modeling techniques for geomagnetic storms, and mitigation techniques. The results are compared to actual field measurementsErvaring bij lange HVAC kabels: harmonisch gedrag en gedrag bij inschakelen van een losse kabel en van een kabel met een transformator (inrush)

Evaluation of network vulnerability in case of geomagnetic stormDescribes modeling techniques for geomagnetic storms, and mitigation techniques

Analysing harmonics and dividing distrtion to customers

Nice paper on resonances which is always interesting topic

Beschrijving van activiteiten rond de ontwikkeling van EMTP-RV. Diepgang: op het niveau van advertentie brochure. Interessant voor software-ontwikkelaars.Analyse van impedantie-frequentiespectrum (m.b.t. resonantie) van 245 kV 118 km kabel verbinding tussen Malta en Sicilie.Describes modeling techniques for geomagnetic storms. There is however no evaluation of the results, e.g. a comparison with measurements.

Dit paper is onderdeel van een grotere studie i.s.m. TenneT, TUD en TU/e, waarbij het effect van kabels in het 380kV net geanalyseerd wordt. De impedantiematrix inclusief de aarde als retourgeleider worden hier geanalyseerd voor een breed frequentiebereik. Vastgesteld wordt welke parameters bepalend zijn. Bijzonder is dat het hier om een 380kV verbinding gaat met zowel kabel als lijnsecties. Metingen en berekeningen worden vergeleken in een goed leesbaar paper. De nadruk ligt op modelvalidatie. Voor de toekomst zou het ook interessant zijn om naar het hele systeem te kijken of te beschrijven: welke problemen zijn te verwachten en in welke (bedrijfsvoerings-) situaties?

SC D1 Materials and Emerging Test Techniques: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1: Electrical insulation systems under DC voltage101 PM 3 2 2 3 2 nee nee

102 PM 3 2 3 2 3 nee nee

103 PM 3 2 3 2 2 nee nee

104 PM 3 2 3 2 2 nee nee

PS2: Emerging test techniques and diagnostic tools201 PM 2 2 2 1 2 nee nee

202 PM 2 2 3 1 2 misschien misschien

203 PM 2 1 2 1 2 nee nee

204 PM 3 1 3 3 2 nee nee

205 PM 3 2 3 3 2 misschien misschien

206 PM 3 2 2 1 2 nee nee

207 PM 2 1 2 3 1 misschien misschien

208 PM 3 2 3 2 3 misschien misschien

209 PM 3 3 2 3 2 ja wellicht

210 PM 3 2 2 3 3 nee nee

211 PM 3 2 2 3 2 nee nee

212 PM 3 3 3 2 2 wellicht wellicht

213 PM 3 2 1 2 2 nee nee

214 PM 2 2 2 1 1 nee nee

215 PM 3 2 3 3 2 wellicht wellicht

216 PM 3 2 2 2 2 wellicht wellicht

217 PM 3 2 2 1 2 nee nee

PS3: Properties and potential applications of new materials301 PM 3 2 2 2 2 wellicht wellicht

302 PM 3 2 3 2 3 wellicht wellicht

303 PM 2 3 3 3 2 wellicht wellicht

304 PM 2 1 2 2 1 nee nee

305 PM 3 2 3 3 2 wellicht wellicht

306 PM 3 2 3 3 3 wellicht wellicht

307 PM 3 2 3 2 2 nee nee

308 PM 3 2 2 2 2 wellicht wellicht

309 PM 3 3 3 2 3 wellicht wellicht

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

SC D1 Materials and Emerging Test Techniques: Evaluatie papers 2014

Opm

erki

ng

PS1: Electrical insulation systems under DC voltage

Alleen van belang voor fabrikanten van DC GIS and GILAlleen van belang voor fabrikanten van DC GIS and GILAlleen van belang voor fabrikanten van isolatiecompounds (voor DC)

PS2: Emerging test techniques and diagnostic toolsWellicht van enig belang voor DNV, HapamWellicht interessant voor Smit. Er wordt in deze paper overigens niets nieuws verteld.Wellicht van enig belang voor DNV, HapamWellicht van enig belang voor Smit. Het is mij overigens niet duidelijk wat de voordelen van de voorgestelde methode zijn boven die van de DP.

Wellicht van enig belang voor DNV, HapamWellicht van enig belang voor Smit.

Wellicht interessant voor snelle pd metingen on-site en bij productieNieuwe methode voor detecteren van waterbomenTest criteria voor UHV equipmentWellicht interessant voor TenneT nieuwbouw

Handboek asset management met een paar niet veelzeggende case studies

Wellicht interessant voor Smit

PS3: Properties and potential applications of new materialsWellicht interessant voor TU Delft, hoogspanningWellicht interessant voor SmitWellicht interessant voor TU Delft, hoogspanning en voor Smit

Eindelijk een mogelijke vervanger voor SF6?Gasmengsel ter vervanging van SF6; fundamentele studie

Gasmengsel ter vervanging van SF6, fundamentele studieGeavanceerde veldsturing met functional materials; wellicht interessant voor Eaton

Check dat minimaal 1 paper per PS, reviewer

Ontwerpcriteria voor composiet isolatoren in hybride AC/DC hoogspanningslijnen. Wellicht interessant voor (het Duitse deel van) TenneT

De inhoud van deze paper komt neer op een waarschuwing en tegelijkertijd een handleiding voor eenieder die capacitieve vochtsensoren op een betrouwbare manier wil gebruiken in olie.

Interessant voor TenneT, E-bedrijven die on-line partiële ontladingen willen meten en calibreren

Wellicht interessant voor asset managers; lees ook 205 over capacitieve vochtsensoren

K26
This paper is a bit cryptic and the reader has to be extremely well versed in the subject to understand the approach taken. This paper contains nevertheless interesting information and provides some insight into the difficulties in determining the lighting performance for tall structures. Unfortunately the authors ignore (without stating why) the effect of upward strokes from these tall structures and furthermore the calculations are based on lighting statistics which were expressly collected for structures shorter than 60 m high.

Tite

l/PS

PS1: Electrical insulation systems under DC voltage

PS2: Emerging test techniques and diagnostic tools

Wellicht van enig belang voor Smit. Het is mij overigens niet duidelijk wat de voordelen van de voorgestelde methode zijn boven die van de DP.

PS3: Properties and potential applications of new materials

SC D2 Information Systems and Telecommunication: Evaluatie papers 2014N

o.

Rev

iew

doo

r:

Kw

alite

it

Bru

ikba

arhe

id

lees

baar

heid

Nie

uwhe

id

Die

pgan

g

PS1:

D2-101 L. Lhassani 1 1 1 1 1 Niet relevant Niet

D2-102 L. Lhassani 1 1 1 1 1 Niet relevant Niet

D2-103 L. Lhassani 2 2 3 3 3 Relevant Gewenst

D2-104 L. Lhassani 3 3 3 3 3 Relevant Gewenst

D2-105 L. Lhassani 2 1 2 3 1 Niet relevant Niet

D2-106 L. Lhassani 3 3 3 3 3 Relevant Gewenst

D2-107 L. Lhassani 3 2 3 2 2 Relevant Niet

D2-108 L. Lhassani 3 2 2 3 3 Relevant maar specifiek. Niet

D2-109 L. Lhassani 3 3 3 3 3 Relevant Gewenst

PS2: D2-201 L. Lhassani 2 2 2 2 1 Relevant Gewenst

D2-202 L. Lhassani 3 2 3 2 2 Relevant Gewenst

D2-203 M. Bongers 3 3 3 2 3 Relevant Gewenst

PS3: D2-301D2-302 M. Bongers 3 3 3 2 3 Relevant Gewenst

D2-303 L. Lhassani 2 2 1 3 1 Niet relevant

D2-304 L. Lhassani 2 1 2 2 1 Niet relevant

D2-305 L. Lhassani 3 3 3 2 3 Relevant

D2-306 L. Lhassani 2 2 3 1 1 Niet relevant

D2-307 L. Lhassani 3 2 3 2 1 Niet relevant

D2-308 M. Bongers 2 2 2 2 1 Niet Relevant

D2-310 M. Bongers 1 1 1 3 1 Niet Relevant

D2-311D2-312 M. Bongers 2 1 3 1 1 Niet Relevant

Goed/ erg bruikbaar 3

gemiddeld 2

niet bruikbaar/negatief advies 1

NL

actie

f/rel

evan

tvo

or N

L?

NL

Bijd

rage

ove

rdi

t ond

erw

erp?

In p

rese

ntat

ie

voor

bere

idin

gsda

gen

B3
Auteur: Eerstgenoemde naam is "kartrekker", en vult het formulier in

Opm

erki

ng

PS1:

Weinig gericht op de praktijk.Weinig gericht op de praktijk.Interessant als achtergrond voor PLC.

Beschrijvend stuk over het project. Weinig diepgang (Techniek en proces)

Data-interchange voor de elektriciteitsmarkt.Toepassing van en ervaring met glasvezels inde HS-kabels.

PS2: Zeer interessant onderwerp maar helaas hier weing diepgang.Beschrijving van het proces van implementatie van Governance.Zeer relevant.

PS3: CANCELD

Toepassing van het eTOM-businessmodel voor 'Service Problem management'

Een interessant aspect is het gevruik van Vsat (satelliet-) communicatie.

CANCELD

Check dat minimaal 1 paper per PS, reviewer

Beschrijving van achtergrond en toepassing van de CDMA-technologie (Bijdrage van Alliander)Beschrijving van de uitdagingen die gepaard gaan met het gebruik van de Smart meters.

Beschrijft goed MPLS/IP netwerken en keuze waarom Elia nog geen relays op MPLS/IP aansluit

Document gaat over verschillende type netwerken voor smart grids. Keuzes binnen Nederland zijn hier door Stedin, Alliander en Enexis gemaakt. Daarom niet relevant voor NL.Gaat voornamelijk over WiMax en verificatie van een WiMax netwerk. Document gaat niet echt in op trends

Tite

l/PS

PS1:

Stydy and Practice of Cyber Security - Smart GridsStudy on Just-in-Time Decision of Demand Respond Based on Complex Event ProcessingPowerline communications for connecting distributed energy resourcesSecurity of communications in voltage control for Grids connecting DER: impact analysis and anomalous behavioursControl and Measurement System to Evaluate Solar Power Grid-tie Inverter PerformanceDSO’s Strategic Choice for Private Telecom Networks

Future Smart Meters and Meter Data Management

Technical specification for the utilisation of web services for the electronic data interchanges on the Internal Electricity MarketA new experience of Optical Phase Conductor (OPPC) in Red Eléctrica de España

PS2: IT platforms of Japanese electric power companiesExperiences and practices in the implementation of IT governance in Mexican electrical utilitySecurity in remote services used by EPUs

PS3:

Experiences with an IP/MPLS Network in Utility Environment

Security in remote services used by EPUsBeyond Chesf’s telecommunications information security analysisManaging adapted packet network architectures for smart IP-based servicesChallenges in Establishment of Large OPGW based Communication Network - Indian ExperienceSmart Grid Network through Integrated SCADA System-Karnataka Model- A case StudyTelecommunication Networks for Smart Grids Deployment

Trends of Communication Networks in Japanese Electric Power Utilities

Security in remote services used by EPUs