Upload
otto-merrill
View
20
Download
0
Embed Size (px)
DESCRIPTION
WP5 Pilot implementations targeting clean vehicle usage. Martino Soragni – Province of Reggio Emilia. 5.1 - Detailed Specification of the local Pilots. 5.1.1 Local implementation / operating models (1st June 2011) - PowerPoint PPT Presentation
Citation preview
WP5WP5Pilot implementations targeting clean vehicle usagePilot implementations targeting clean vehicle usage
Martino Soragni – Province of Reggio EmiliaMartino Soragni – Province of Reggio Emilia
5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots
• 5.1.1 Local implementation / operating models (1st June 2011)
– Preparation of a template for distribution to partners developing a pilot project (25p each) → common framework with 4.1.1
Contents: useful information to design each PP operating model• Implementation timeline (preparation, demonstration,
monitoring and evaluation) • Main actors and local stakeholders involved (their role) →
information flow• Introduction, Pictures, Tender documents, EVs technical
specifications, References… in order to reach 25p!
5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots
• 5.1.2 Prepare Procurement / Leasing document (1st June 2011)
– PP3 will collect all the documents concerning the public tendering procedure for the acquisition/renting of the EVs necessary to run the pilots in:
• Klagenfurt;• Reggio Emilia;• Bolzano;• Ljubljana;• Györ.
– Short deliverable (1p each) describing the documents → common framework with 4.1.2
5.2 - Preparing the roll out –User/Staff Training5.2 - Preparing the roll out –User/Staff Training
• 5.2.1 Training Materials (1st June 2011) (25p PPT)
• 1) For USERS:– How to properly drive an EV (car/pedelec) - different models with
different characteristics;– How to properly charge an EV (slow and quick charge, high and low
voltage, safety measures when charging or handling batteries);– How to plan a trip (distance, autonomy, nr. of charging points available
along the trip);– Costs (for renting, charging, customer fees);– Where to make restitution / to have assistance in the city;– Parking facilities (costs and location of parkings, additional services
available for EVs);– Map describing the city areas accessible with EVs;
5.2 - Preparing the roll out –User/Staff Training5.2 - Preparing the roll out –User/Staff Training
• 5.2.1 Training Materials (1st June 2011) (25p PPT)
• 2) For FLEET MANAGERS:– Knowledge on the set of different renting contracts (medium/long
term contracts, daily/week contracts, client guarantees);– What includes the renting fee (insurance, taxes, maintenance);– Main different conditions of renting EVs to big companies or to
single clients/privates (how to technically manage the charge of a car fleet, power needed);
– How operates an EV engine (basic components);– How mange a charging spot: how to provide the supply of
(renewable) energy;
5.2 - Preparing the roll out –User/Staff Training5.2 - Preparing the roll out –User/Staff Training
• 5.2.1 Training Materials (1st June 2011) (25p PPT)
• 3) For VEHICLE DEPOTS:– How to provide regular daily, monthly and yearly maintenance of
the EVs;– Agreements with spare parts suppliers;– Management the electric grid (use of renewable energies,
planned and extraordinary maintenance);– …
5.2 - Preparing the roll out – User/Staff Training5.2 - Preparing the roll out – User/Staff Training
• 5.2.2 Test vehicles (May 2011)Reggio Emilia Status quo:
– 5 EVs (Piaggio Porter Glass Van) rented out for 2 years from TIL srl;
– Service provider selected through a public tender (Bid-at-three procedure) according to CE “Control and audit guidelines”;
– TIL srl will also be responsible for the implementation of the PV charging station;
– Rental contract includes insurance, taxes and maintenance costs.
5.2 - Preparing the roll out – User/Staff Training5.2 - Preparing the roll out – User/Staff Training
• 5.2.3/.4 Test vehicles (May 2011)Status quo:– Klagenfurt– Bolzano
• 5.2.6/.7 Demonstration (May 2011)
Status quo:– Ljubljana– Györ
• 5.2.5/.8/.9 Solar Rally Upper Austria
Status quo
5.3 Demonstration phase5.3 Demonstration phase
• 5.3.1 Demonstration log (March 2013)– Report and collect information about the events occurred
throughout the local pilot demonstration phase
• 5.3.2 Producer briefing cars&heavy and ultralight vehicles (October - December 2011)– 1 day event involving EVs producers– Type of event?– Location?