Page 1: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 1/128

Page 2: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 2/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 2 of 128

Document Control

Department Document Type Document Title

WP Standard General Specification of MainLaying Materials for Waterworks

Issue Approval

Prepared By Approved By

Eng. Osama Samaan Sleem FadayelEngineer (Material Specifications)

Eng. Eid Auwid Khlaif Al-IdmatEngineer (Material Specifications)

Eng. Ali Al_obaidlyHead, Materials Standards & Specifications Section

Eng. Mohd Thani E.J. AL-MaadeadManager, Water Planning Department

Signature: signed origin l filed sep r tely Signature: signed origin l filed sep r tely

Issue Record

Issue No. Date Reason for re-issuing Standard

0.0 12/04/2015 First issue of the Standard.

1.0 19/8/2015 Updated & modified the Table of Contents

2.03.0

4.0

5.0

Key Words : Standard, Specification, materials, Manufacturer, Quality body

certifier, ISO, BS, EN, WRc , Ductile Iron Pipes, Fittings &

Accessories, valves , Pumps, Water Meter, Copper, Polyethylene

Pipes & Fittings and corrosion protection materials .Review Frequency : Annually

When the document has been approved to publish on the intranet a copy of this Document Control

page should be sent to the QA section who is custodian of KM quality management system.

Page 3: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 3/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 3 of 128

Table of Contents

Contents Page

Title Page 1Document Control & Issue Record Page 2Contents of General Specification of Main Laying Materials for Waterworks 3Purpose 8Scope 8Responsibilities & Authorities 8 Abbreviations & Terminologies 8

Section - 1 General 91.1 Suitability of Materials 9

1.2 Transport & storage of materials 10

1.3 Manufacturer ‘s Certification 11

1.4 Standards 11

1.5 Material Coating & Internal Components 11

1.6 Fasteners 121.7 Inspection 12

1.8 Packing 13

1.9 Technical clarification 13

1.10 Samples 13

1.11 Alternative Materials 13

Section - 2 Ductile Iron Pipes and Fittings 14

2.1 General 14

2.2 Joints 14

2.3 Length of pipes 14

2.4 Marking 14

2.5 Certificate of Test 152.6 External & Internal Coating of Ductile Iron Pipes & Fittings During

Manufactory15

2.7 Factory Applied Polyethylene External Coating 16

2.8 Protection of Above Ground & Inside chambers D.I. Pipes & Fittings 16

2.9 special protection of D.I. Pipes & Fittings 17

2.10 Pipe Cutting 17

2.11 Packing 17

Section - 3 Slip-On Coupling and Flange Adaptors and Dismantling Joints andStep Couplings

18

3.1 General 18

3.2 Slip-on couplings 183.3 Mechanical Collar’s 18

3.4 Flange adapters 18

3.5 Dismantling Joints 18

3.6 Step couplings 18

3.7 External And Internal Coating of Slip-on Couplings, Step Couplings,Flange Adapters And Dismantling Joints During Manufacture

19

3.8 Fasteners 19

3.9 Identification Metal Strip 19

3.10 Packing 19

Section - 4 Corrosion Protection of Ductile Iron Pipes, Fittings & Accessories 20

4.1 Pipe Wrapping Tape 20

4.2 Wrapping Procedure 20

Page 4: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 4/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 4 of 128

4.3 Storage 21

4.4 Packing 21

4.5 Wrapping Tape Property 21

4.6 Primer 22

4.7 Packing 224.8 Wrapping Tape Visco Elastic Poly Iso Butene 234.9 Wrapping Procedure 234.10 Storage 244.11 Packing 254.12 Wrapping Tape Property 254.13 Polyethylene sleeving 26

4.14 Marking 27

4.15 Packing 28

4.16 PVC Black self adhesive tape 28

4.17 Joint molding putty 28

4.18 Packing 28

4.19 Storage 29

4.20 Trench Marker Tape 294.21 Marking 29

4.22 Packing 29

4.23 Lubricant 30

4.24 Packing 30

4.25 Slip-on Couplings, Flange Adapters and Dismantling Joint duringInstallation

30

4.26 Heat Shrink Sleeve 30

4.27 Packing 30

Section - 5 Bedding and Surround Material’s 31

5.1 General 31

5.2 Imported Granular Material and Selected Excavated Material 31Section - 6 Gate valves 33

6.1 General 33

6.2 Motorised Actuator 33

6.3 Testing 34

6.4 Hand-wheel 35

6.5 Marking 35

6.6 Materials of Gate Valves 35

6.7 Gear box 36

6.8 Flanges 36

6.9 Gate valve stem seals 36

6.10 Material Coating & Internal Components 366.11 Accessories 37

6.12 Packing 37

Section - 7 Butterfly Valve 38

7.1 General 38

7.2 Motorised Actuator 38

7.3 Testing 39

7.4 Hand-Wheel 39

7.5 Markings 40

7.6 Materials 40

7.7 Flanges 41

7.8 Coatings 417.9 Valve Keys 42

Page 5: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 5/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 5 of 128

7.10 Accessories 42

7.11 Packing 42

Section - 8 Air Valves 43

8.1 General 43

8.2 Air Valves construction materials 43

8.3 Single air valve large orifice type 43

8.4 Single air valve small orifice type 43

8.5 Double air valve 43

8.6 Coatings 44

8.7 Markings 44

8.8 Packing 45

Section - 9 Fire Hydrants 46

9.1 General 46

9.2 Marking 46

9.3 Materials 46

9.4 Connections 47

9.5 Coatings 47

9.6 Testing 489.7 Stand pipes 48

9.8 Accessories 48

9.9 Packing 49

9.10 Above Ground Fire Hydrant (pillar type) 49

9.11 Marking 49

9.12 Coating 50

9.13 Testing 50

9.14 Accessories 51

9.15 Packing 51

Section - 10 Check Valve 52

10.1 General 5210.2 Check Valves construction materials 53

10.3 Coatings 53

10.4 Markings 53

10.5 Packing 54

Section - 11 Other Types of Valves 55

11.1 General 55

11.2 Coatings 55

11.3 Markings 56

11.4 Flow Control Valves 56

11.5 Material Specification 57

11.6 Pressure Regulating Valves/ Pressure Reducing Valves 5711.7 Material Specification 58

11.8 Altitude Valves 58

11.9 Material Specification 59

11.10 Packing 59

Section - 12 Pumps 60

12.1 General 60

12.2 Scope 60

12.3 Conflicts & Deviations 60

12.4 Applicable Standards and Codes 60

12.5 Technical Submittal: 61

12.6 Design Considerations 6112.7 General Requirements: 62

Page 6: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 6/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 6 of 128

12.8 Pump Construction Requirements: 63

12.9 Accessories 67

12.10 Protection of Moving Parts 68

12.11 Pumps Coating 68

12.12 Inspection & Testing 69

12.13 Site Acceptance Test:- 70

12.14 Retention of Pump Efficiency for Sustainable Performance: 70

12.15 Spare Parts, Tools And Accessories 71

12.16 Maintenance 71

12.17 Vibration, Noise And Temperature Monitoring 72

12.18 Temperature Monitoring: 72

12.19 Vibration Monitoring: 73

12.20 Guarantee & Warranty 73

12.21 Nameplates, Marking & Labeling 73

12.22 Packing 73

Section - 13 Surface Boxes & Manhole Covers, Marker Posts & IndicatorPlates

74

13.1 General 7413.2 Gate valve surface boxes (up to 300mm Ø valves) 74

13.3 Gate valve manhole covers (400mm Ø valves and above) 75

13.4 air valve manhole covers 75

13.5 Butterfly valve manhole covers 75

13.6 Stopcock and ferrules (SC) surface box 75

13.7 Under ground fire hydrant manhole covers 76

13.8 Washout manhole covers 76

13.9 Marker post 76

13.10 Indicator plate 77

13.11 Aluminum Indicator Plate 77

13.12 Packing 77Section - 14 Copper Tubes 78

14.1 General 78

14.2 Sheathing 78

14.3 Tube Sizes 78

14.4 Packing 78

Section - 15 Copper Fittings, Ferrules, Stopcocks & Poly Adapters 79

15.1 General 79

15.2 Marking 79

15.3 Materials 79

15.4 Universal swivel ferrule 80

15.5 Marking 8015.6 Stopcocks 81

15.7 Marking 81

15.8 Saddles 81

15.9 Packing 81

Section - 16 Electronic Flow Meters District 82

16.1 General 82

16.2 Flow Sensor and Transmitter 82

16.3 Pressure Gauge 84

16.4 Pressure Transmitters and Differential Pressure Transmitters 85

16.5 Asset Management System 86

Section - 18 S.S. Repair clamps & under pressure Drilling Tees 8717.1 General 87

Page 7: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 7/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 7 of 128

17.2 Marking 87

17.3 Materials 88

17.4 Lengths of the clamp 88

17.5 Flanges 88

17.6 Packing 88

Section - 18 Concrete and Ancillary Items 89

18.1 General 89

18.2 Pre-cast concrete chamber sections 89

18.3 Impregnated fiber board 89

Section - 19 Polyethylene Pipes & Fittings for Service Connections (MDPE) 90

19.1 General 90

19.2 Polyethylene Pipes (Material) 91

19.3 Length and Size 92

19.4 Fittings 92

19.5 Stop Valve: 92

19.6 Flanged Fittings: 92

19.7 Saddle Straps 93

19.8 Ferrule 9319.9 Joints 93

19.10 Marking 93

19.11 Packaging 94

19.12 Packing 94

19.13 Handling & Storage 94

Section - 20 uPVC Duct 95

20.1 General 95

20.2 Marking 95

20.3 Packing 95

Section - 21 Water Service Cabinet 96

21.1 GENERAL 9621.2 Water Service Cabinet (Standard – Flushed Type) 96

21.3 Water Service Cabinet (Standard – Surface Mounted Type) 96

APPENDIXES 97

I. Typical Drinking Water Quality 98

II. Site Environmental Conditions 102

III. Drawings 103

1. Water Meter Service Cabinet 103

2. Precast Concrete Chamber Slab Construction Details 108

3. Marker Post, Backing Plates, and Plate 113

4. Surface Box & Manhole Cover 116IV. WORLDWIDE KNOWN QUALITY BODY CERTIFIER 119

V. PRE - ARRANGEMENT INSPECTION 122

Page 8: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 8/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 8 of 128

1. Purpose

This Standard provides “Materials Standards & Specifications Section’s Engineers” thespecification of materials used for water works.

2. Scope

This Standard is applicable to all materials used for waterworks.

3. Responsibilities & Authorities

Responsibilities and authority for ensuring that the steps in this guideline shall be carried outare specified at relevant steps in the guideline and include:

Manager, Water Planning Department

Head, Materials Standards & Specifications Section

Materials Standard Engineer.

Materials Specification Engineer.

If the responsible personnel listed above are absent, these responsibilities shall bedesignated to the relevant staff.

4. Abbreviations & Terminology

KM : Qatar General Electricity and Water CorporationKAHRAMAA : Qatar General Electricity and Water Corporation

WP :Water PlanningMSS :Materials Standards & Specifications Section GIS :Geographical Information SystemNDS :Planning & Network Development Section

Term Description

BSBritish Standard- one of the international standard used inGeneral Specifications for main laying materials for waterworks

ISOInternational Standards Organization - one of the internationalstandards used in General Specifications for main layingmaterials for waterworks.

WRCWater Research Council- international body who certifies thenon-toxicity of material if contact with potable water.

Manufacturer A company whose business is manufacturing a certain product

Material An item intended to be used in a certain construction works orprojects.

Specification A detailed exact statement of particulars, especially astatement prescribing materials, dimensions and quality ofwork for something to be built, installed or manufactured.

Page 9: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 9/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 9 of 128

Section - 1

General

1.1 SUITABILITY OF MATERIALS

1.1.1 All materials in direct contact with potable water must have a health certificate issued by

Worldwide Known Quality Body Certifier (See Appendix ‘IV’) in accordance with requirement

of BS6920 “Suitability of Non-Metallic Products for use in direct contact with Water Intended

for Human Consumption with regards to their effect on the quality of Water”.

1.1.2 All pipe-laying materials shall be suitable for use with the range of chemical characteristics of

the water and complies with KAHRAMAA Water Quality Requirements & GCC Standards as

detailed in Appendix ‘I’.

1.1.3 All materials shall be suitable for using and storing in the environmental conditions detailed in

Appendix ‘II’ with minimum working water temperature at 50º C, unless otherwise specified, all

works shall conform to PN16 standards and other standards noted elsewhere in this specification.

1.1.4 The Tenderer shall supply materials from any of the latest approved KAHRAMAA

manufacturers list and furnish to Water Network Planning Department for review and approval.

1.1.5 All the relevant Technical documents of the materials/manufacturers must be in Original OR

Notarized copy and shall be submitted from the Manufacturer for Technical Evaluation.

1.1.6 All materials shall be inspected and tested to ensure compliance with KAHRAMAA

requirements and General Specifications for Main laying Materials. The testing shall be carriedout according to relevant standards approved by Water Network Planning Department.

1.1.7 All The Engineer may test any materials before they leave the manu facturer’s premises or after

delivery to the site.

1.1.8 The Engineer may reject any materials after delivery to the site should he consider them un-

satisfactory, notwithstanding any preliminary test approval of the materials at the manufacturers

premises.

1.1.9 The cost of all tests necessary to ensure compliance with the Project Documentation, shall be

borne by the Contractor.

1.1.10 The number of samples to be tested at the local testing laboratory, must be not less

than One Number of each diameter of the ordered materials, the cost of all tests

necessary to ensure compliance with the Project Documentation, shall be borne by

the Contractor.

1.1.11 The Local test certificates shall be issued by:-

I. Manufacturer premises

II. Central Materials Laboratory.III. An approved third party testing laboratory or other organization.

Page 10: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 10/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 10 of 128

1.2 TRANSPORT & STORAGE OF MATERIALS

1.2.1 All materials handling, transporting and storing should comply with KAHRAMAA

and manufacturer recommendation to avoid damages due to double handling.

1.2.2 During transport, extra care needed to avoid damaging the coating of the materials.

Cleaning any foreign matter deposited on Materials during transport.

1.2.3 All materials to be stored are strictly in accordance with the KAHRAMAA

requirements/Manufacturer storage recommendation at all times, all corrosion

protection materials shall be stored under the shade and not to be exposed under

direct sunlight.

1.2.4 Upon materials delivery to the Contractor’s stores at site, the contractor should

unpack, open all crates etc., and unload to areas as directed by the Store controller

or KAHRAMAA Site Engineer. The contractor shall provide all timbers and

packing, necessary for the correct stacking of pipes, fittings and other delivered

materials.

1.2.5 After inspection the contractor shall shift and stack the approved materials to areas

as directed by store controller/KAHRAMAA Site Engineer.

1.2.6 All Coated materials such as (Epoxy, Polyurethane, and Risen) shall be handled

with special care during loading, transportation and unloading to avoid accidental

damage.

1.2.7 The Pipes may be stored in the open areas; however it shall be stacked off the

ground on 150 x 100 mm timber skids to be provided by the Contractor. The

stacking shall be done according to the manufacturer's recommendations.

1.2.8 Fittings, rubber gaskets, nuts, bolts etc. shall be withdrawn from storage and

delivered to the site to suit the daily construction requirements.

1.2.9 All materials which are subject to deterioration by Ultraviolet Light such as Rubber

gaskets, fixing materials, instruments, polyethylene sheeting etc. must be stored so

that they are not exposed to direct sunlight.

1.2.10 Materials which are liable to deteriorate shall be used in the order of delivery.

1.2.11 The provision and correct usage of broad band slings is particularly important for

the lowering of pipes into the trench. The Contractor shall take the utmost care to

prevent any damage to the coating or sleeving during lowering-in, alignment,

jointing and final removal of the lifting sling. In all cases an approved non metallic

sling must be used for the handling of pipes and fittings.

Page 11: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 11/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 11 of 128

1.3 MANUFACTURER ‘S CERTIFICATION

1.3.1 The Applicant must have a valid ISO 9001 Certificate issued by the granting

certifier body holding BS EN ISO/IEC 17021:2011 certificates.

1.3.2 The applicant must have successful records of experiences for supplying of

minimum 15 year in International market and 5 year minimum in regional / GCC

market for prequalifying.

1.3.3 Provide the QA/QC plan.

1.3.4 Provide organization chart including personals Crucial Vita.

1.4 STANDARDS

1.4.1 The Tenderer shall follow the latest KAHRAMAA General Specifications of Main

laying Materials for Waterworks.

1.4.2 In case of materials were not mentioned in this document, the Tenderer shall follow

the latest edition of one of the following appropriate relevant standards such as BS,

ISO, EN or DIN with all subsequent amendments up to the year of the materials

order. Submit complete documents to Water Network Planning department for

further evaluation.

1.5 MATERIAL COATING & INTERNAL COMPONENTS

1.5.1 All materials in direct contact with potable water must have a health certificate

issued by Worldwide Known Quality Body Certifier (See Appendix IV) as per

requirement of BS6920 "Suitability of Non-Metallic Products for use in contact

with Water Intended for Human Consumption with regards to their effect on the

quality of Water”

1.5.2 Coating shall be smooth and mirror finish without any air bubbles or pebbles, and

the thicknesses shall as per the relevant specifications given below;

I. The minimum thickness is 300 micron Fusion bonded epoxy (Polymeric

anticorrosion) coating as per WIS No. 4-52-01.

II. The minimum thickness is 300 micron Electrostatic ally applied epoxy

coating.III. The minimum thickness is 300 micron Fluidized bed epoxy coating.

1.5.3 The coating quality shall conform to the following tests as per the relevant

specifications given below;

Adhesion Test: Coating adhesion to metal shall not be less than 12N/mm² (BSI BS

EN ISO 4624).

Holiday Test: Coating porosity shall be “zero” on 3 kV DC tester.

Hardness: Intrinsic Rockwell hardness shall be between50 - 60.

Page 12: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 12/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 12 of 128

1.5.4 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not be develop, when tested by 3 kV DC tester.

1.6 FASTENERS

1.6.1 All Bolts, Nuts & Washers connected to Valves, Fire Hydrants, Couplings,

Adaptors and Dismantling Joints shall be Mild steel with hot dipped zinc

galvanized, with minimum thickness 70 micron.

1.6.2 All Bolts, Nuts & Washers connected to Valves, Fire Hydrants, Couplings,

Adaptors and Dismantling Joints shall be protect with putty and wrapping tape.

1.6.3 Saddle Strap fasteners should be Stainless Steel “A4”.

1.7 INSPECTION

1.7.1 Pre-Inspection Arrangement shall comply with the requirements as per the attached

procedure. (See Appendix V).

1.7.2 KAHRAMAA reserves the right to inspect the materials in the factory.

1.7.3 The manufacturer shall allow access at all times during manufacturing and testing to

the premises in which the material being manufactured.

1.7.4 Upon receipt of materials at the contractor's site store, materials to be inspected by

Supervising Consultant of the subject project.

1.7.5 Upon KAHRAMAA Engineer receipt of the Materials Request for Inspection, he

will visit the contractor store. If any damage on the Pipe’s / Fitting’s is observed

and it can be repaired, it's the contractor's responsibility to perform the repair in

accordance with the manufacturer's recommendations and the approval of

KAHRAMAA - repair works should be carried under direct supervision of the

manufacturer.

1.7.6 KAHRAMAA reserves the right to reject the supplied material during final

inspection or at later date, if found not as per the General Specification and will

have the right to put the Manufacturer under “ ON HOLD “ or “ BLACK LISTED “

until further action.

1.7.7 The non-repairable rejected materials, which were not complying with KM

Specifications during inspection and marked by the Engineer (rejected), must be

removed by the Contractor and to be shipped outside State of Qatar and proof of

shipping documents to be submitted to KAHRAMAA.

1.7.8 KAHRAMAA reserves the right to witness all types of testing locally, and the tests

shall be carried out in accordance with applicable standards and codes.

Page 13: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 13/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 13 of 128

1.8 PACKING

1.8.1 The material/item shall be packed in compliances with KM and Manufacturer

recommendation and procedure.

1.8.2 At Site, (from the pre-Inspection arrangement) all items shall be packed individually

and put into the wooden box, which shall be close and open type. Every layer in

wooden box shall be clamped properly to avoid abrasion during transit and damage

to coating.

1.8.3 The cutting of pipes shall be kept to a minimum and after cutting the remaining

length of calibrated pipes shall be suitably marked and re-stacked together with the

remaining calibrated pipes.

1.9 TECHNICAL CLARIFICATION

1.9.1 In case there are disputes, KAHRAMAA shall have the right to ask the

manufacturer all the technical documents that will help out in clarifying this dispute.

1.10 SAMPLES

1.10.1 Samples shall be provided when required by the engineer or instructed by the

project documentation. Materials subsequently supplied shall conform to the quality

of the samples which have been approved by the engineer.

1.10.2 Each sample shall bear a securely fixed label bearing the following information:I. Project Identification.

II. Contractor Identification.

III. Sample Identification including all information as to Manufacturer, Model Number, and

Catalogue Number.

1.10.3 Materials subsequently supplied shall conform to the quality of the samples which

have been approved by the engineer.

1.11 ALTERNATIVE MATERIALS

1.11.1 The Contractor may propose the use of alternatives to materials specified in the

Project Documentation, Due to some problems or delay with the Manufacturer /

Supplier, Such proposals shall be complete with all supporting information showing

that the alternative Materials are complying with KAHRAMAA latest specification.

1.11.2 The use of alternative materials shall only be permitted if it is approved in writing

by the Engineer.

Page 14: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 14/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 14 of 128

Section - 2

Ductile Iron Pipes and Fittings

2.1 GENERAL

These Clauses Shall Be Read In Continuation Of Section 1 Of This Specification.

2.1.1 All pipes and fittings shall be manufactured from approved grade of ductile iron.

2.1.2 All manufacture and testing shall be in accordance with the latest edition of BSEN-

545/ISO 2531, 4179, 8179 including any subsequent amendments and as specified

below.

2.2 JOINTS

2.2.1 Spigot & socket pipes & fittings joints shall be provided with approved integrally

cast ‘push-in’ type joints, each joint being supplied with an approved jointing - ring

designed by the manufacturer solely for the purpose of sealing the joint.2.2.2 All flanged pipes & fittings shall be provided with integrally cast/ or rotatable

flanges drilled to BS EN 1092-2, PN16.

2.2.3 All flanged pipes, fittings and valves shall be supplied with approved EPDM

multilayer cotton reinforced rubber gasket; which in comply with the requirement of

BS6920 and shall be kept in a sealed sun proof bag with written information of the

same.

2.2.4 The manufacture specification of all-joint details, gaskets and jointing rings shall be

supplied to the Engineer by the Tenderer / Contractor for approval.

2.2.5 All jointing materials shall comply with Clause 1.1.1 of this specification.

2.3 LENGTH OF PIPES

2.3.1 All pipes shall be supplied in the lengths of 5.50/6.00 meters or as per project

requirement.

2.4 MARKING

2.4.1 All pipes & fittings shall be marked in accordance with the latest edition of BSEN-

545/ISO-2531.

2.4.2 Additional marking on the pipes and fittings must be included such as;

Tender Number

Contractor's Name

Manufacturer's Name

Year of manufacture

Standard

Page 15: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 15/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 15 of 128

2.5 CERTIFICATE OF TEST

2.5.1 The Tenderer / Contractor shall provide signed certificates stating the results of all

tests as specified in BSEN 545 / ISO 2531, 4179, 8179 and BS 3416.

2.5.2 KAHRAMAA reserves the right to witness tensile tests on bar test pieces selected on

the basis of not more than one test piece for every batch of 100 pipes.

2.5.3 Where specified tests are to be witnessed, the tests shall be carried in accordance

with the manufacturer’s quality control procedure of the relevant international

standard.

2.6 EXTERNAL & INTERNAL COATING OF DUCTILE IRON PIPES & FITTINGS DURING

MANUFACTORY

2.6.1 All materials shall conform and meet all the requirements of the latest edition of

BSEN545/ISO2531, ISO4179, ISO8179, BS3416 and BS6920.

2.6.2 All ductile iron pipes and fittings shall be internally lined by centrifugal method with

Sulphate Resistance Cement (SRC) mortar lining as per requirement of the latest

edition of BSEN 545 or ISO 4179 or epoxy coating.

2.6.3 D.I. Pipes and Fittings shall be cured in curing chambers.

2.6.4 For D.I. Fittings coated with epoxy externally/internally, it shall be conformed one

of the following method;

Fusion bonded epoxy coating shall be minimum thickness 300 micron (Polymeric

anticorrosion) coating as per WIS No. 4-52-01.

Electrostatic ally applied epoxy coating shall be minimum thickness 300 micron.

Fluidized bed epoxy coating shall be minimum thickness 300 micron.

The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017 or

Black.

2.6.5 The external coating shall be of metallic Zinc coating of 130 gm/m2 on pipes and

Zinc rich paint coating of 150 gm/m2 on D.I. Fittings as per the latest edition of

BSEN 545 or ISO 8179.

2.6.6 The external finishing layer to all pipes & fittings after the application of the Zinc

coating shall be of bitumen coating as per the latest edition of BS3416, Type 2.

2.6.7 The internal cement lining shall be uniformed and smooth as possible and shall be

within the tolerance limit acceptable by the International standards.

2.6.8 The thickness of internal cement lining in D.I. Pipes & Fittings shall be as follows in

accordance with the latest edition of BSEN 545 as follows (See table 01):-

Table (01) Thickness of Internal Cement Lining

Page 16: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 16/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 16 of 128

Nominal Size Thickness

80-300mmØ 4.0mm

350-600mmØ 5.0mm

700-1200mmØ 6.0mm

1400-2000mmØ 9.0mm

2.6.9 The contractor is to supply confirmation from manufacturer that cement lining to be

used is suitable for use with the range of chemical characteristics of water detailed in

Appendix “I.”

2.6.10 The internal section of sockets of pipes and fittings shall be painted with a minimum

100-micron thick epoxy coating. The coating shall be suitable for use in contact with

potable water at +50 C.

2.7 FACTORY APPLIED POLYETHYLENE EXTERNAL COATING

2.7.1 The factory applied polyethylene external coating shall be applied by extrusion or

any other approved method as per BSEN 14628-2005 (Ductile iron pipes, fittings

and accessories External polyethylene coating for pipes Requirements and test

methods).

2.7.2 The factory applied polyethylene external coating shall be type PE-D pipe zinc-

coated with minimum thicknesses accordance with latest edition of BSEN 14628-

2005 as follows (See table 02):-

Table (02) MINIMUM COATING THICKNESSES Nominal Size Thickness

80-250mmØ 2.50mm

300-450mmØ 3.0mm

500-1200mmØ 3.50mm

1400-2000mmØ 4.0mm

2.7.3 The color code of polyethylene external coating shall be Blue color RAL-

5000/5001/5005/5010/5017.

2.8 PROTECTION OF ABOVE GROUND & INSIDE CHAMBERS D.I. PIPES & FITTINGS

2.8.1 External coating of ductile iron pipes & fittings to be laid above ground or inside

chambers shall be coated with zinc primer as per ISO 8179, and then followed by an

application of bituminous finish coating. Bituminous finish coating shall contain

aluminum of not less than 20% in the dry film and shall be in silver.

Page 17: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 17/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 17 of 128

2.8.2 The internal section of sockets of pipes and fittings shall be painted with a minimum

100-micron thick epoxy coating. The coating shall be suitable for use in contact with

potable water at +50 C.

2.9 SPECIAL PROTECTION OF D.I. PIPES & FITTINGS

2.9.1 External coating of ductile iron pipes & fittings to be laid on location of high water

table shall be coated with Polyurethane/Epoxy coating with minimum thickness of

300 microns.

2.9.2 External coating of ductile iron pipes & fittings to be laid on location of high water

table shall be coated with Polyurethane/Epoxy coating with minimum thickness of

300 microns.

2.9.3 Ductile iron pipes and fittings which are completely immersed in water (i.e. piping

inside reservoir) shall be coated with a minimum 300microns thickness fusion

bonded epoxy.

2.10 PIPE CUTTING

2.10.1 Unless specified otherwise the Contractor shall supply a minimum of 2% of pipes of

each diameter gauged (calibrated) along two third of the pipe entire length starting

from the spigot end. These pipes shall be clearly marked by the factory and stored

separately in the Contractor's store yard.

2.10.2 Where it is necessary to cut pipes, the cutting shall be neatly and accurately

performed by machine so as to leave the pipe end a true circle and normal to the pipe

axis and the cut ends shall be chamfered and painted as per manufacturer's

recommendations for damaged coatings and generally to the original coating (Zinc

& Primer / Epoxy) of the D.I. pipes and fittings.

2.11 PACKING

2.11.1 Pipes of small diameters shall be packed in bundles. Every pipe shall be separated

from each other with the help of properly designed wooden spacers. The bundleshall be secured firmly with proper straps and well faced wooden base supports for

proper transport, handling and storage. Every bundle shall have only one length of

pipe.

2.11.2 For big diameters, it should be supplied separately.

2.11.3 All pipes and fittings shall be supplied with plastic end caps & shall be maintain in

good condition until the pipe is ready to be installed in the trench.

2.11.4 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 18: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 18/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 18 of 128

Section - 3

Slip-On Coupling and Flange Adaptors and Dismantling Joints and

Step Couplings

3.1 GENERAL

These clauses shall be read in continuation of Section 1 of this Specification.

3.2 SLIP-ON COUPLINGS

3.2.1 Slip-on couplings shall be manufactured from either cast iron or rolled steel and

shall be suitable for use with ductile iron pipes to BSEN 545 / ISO 2531.

3.2.2 Couplings shall be similar in design to that detailed in BS-8010, Section 2.1, and

‘Slip-on Couplings’.

3.2.3 For New Potable Water Network Construction, Couplings are recommended up to

300mm Ø only, 400mm Ø and above, a mechanical Collar is to be used.

3.3 MECHANICAL COLLAR ’S

3.3.1 Mechanical Collars shall be manufactured from Ductile Iron and shall be suitable for

use with ductile iron pipes to BSEN 545 / ISO 2531.

3.3.2 Mechanical Collars shall be suitable for normal pressure test up to PN-16.

3.4 FLANGE ADAPTERS

3.4.1 Flange adapters shall be manufactured from either cast iron or rolled steel and shall

be suitable for use with ductile iron pipes to BSEN 545 / ISO 2531.

3.4.2 Flange adapters shall be suitable for jointing the flanges to PN-16, as detailed in

BSEN 545 / ISO 2531.

3.4.3 Flange adapters shall be similar in design to that detailed in BS-8010, Section 2.1,

‘Flange adapters’.

3.5 DISMANTLING JOINTS

3.5.1 Dismantling Joints shall be suitable for jointing the flanges to PN-16, as detailed in

BSEN 545 / ISO 2531.

3.5.2 Dismantling Joints shall be similar in design to that detailed in BS-8010, Section 2.1,

‘Flange adapters’.

3.6 STEP COUPLINGS

3.6.1 Step couplings shall be manufactured from either cast iron or rolled steel and shall

be suitable to joint between two pipes of different materials.

Page 19: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 19/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 19 of 128

3.7 EXTERNAL AND INTERNAL COATING OF SLIP-ON COUPLINGS, STEP COUPLINGS,

FLANGE ADAPTERS AND DISMANTLING JOINTS DURING MANUFACTURE

3.7.1 All Slip-on couplings, step couplings, flange adapters and dismantling joints shall be

coated both, internally and externally as per one of the following methods;

Fusion bonded epoxy coating shall be minimum thickness 300 micron (Polymeric

anticorrosion) coating as per WIS No. 4-52-01.

Electrostatic ally applied epoxy coating shall be minimum thickness 300 micron.

Fluidized bed epoxy coating shall be minimum thickness 300 micron.

The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017 or

Black.

3.8 FASTENERS

3.8.1 All nuts and bolts must be made of Stainless Steel Grade “A4” or Grade 316L.

3.9 IDENTIFICATION METAL STRIP

3.9.1 All couplings and flange adapters shall be marked by engraving or embossing on a

metal strip, the name of manufacturer, individual serial number, tender number and

Year of manufacturing.

3.10 PACKING

3.10.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 20: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 20/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 20 of 128

Section - 4

Corrosion Protection of Ductile Iron Pipes, Fittings & Accessories

4.1 PIPE WRAPPING TAPE

4.1.1 The tape shall be supplied with width of 150 mm and 225 mm and with length 25 m,

30 m and 75 m per rolls.

4.1.2 Pipe diameters up to 200mmØ, 150mm width tape shall be used.

4.1.3 Pipe diameters 300mmØ and above, 225mm width tape shall be used.

4.1.4 For all types of fitting with diameters 100mmØ and above, 150mm width tape shall

be used.

4.1.5 For normal application, high water table (Sabkha), high resistivity and contaminated

areas, the self adhesive wrapping tape shall be applied with a 55% overlap shall be

applied and sufficient tension in accordance with manufacturer instructions to ensure

complete conformability and smoothed out as application proceeds to avoid air

pockets.

4.1.6 Prior to backfilling the wrapped Pipes / joints shall be holiday tested, and the

porosity shall be “zero” on 3 kV DC tester.

4.1.7 Wrapped pipes shall not be permitted to lie down on the ground except when finally

positioned in the trench.

4.1.8 Wrapping tape dimension selection is Subject to Tenderer / Contractor Specification.

4.1.9 The adhesive compound shall be of the pressure sensitive type (that is, not requiring

a primer in order to achieve bond to the substrata) and shall have thickness between

0.75 to 0.90mm.

4.1.10 The tape shall be supplied with a wider high quality silicon release paper covering

complete tape and both sides of the tape shall have a minimum of 5mm wider silicon

release paper to prevent edge contamination.

4.1.11 In case during storage at maximum storage temperature of 50 C for six months, the

adhesive material shall not flow out of the release paper and there shall not be any

end blocking.

4.1.12 Wrapping tape shall be marking in middle with the following information;

Manufacturers name & logo.

Date of manufacture

Width of the tape

Batch Number

Page 21: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 21/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 21 of 128

4.2 WRAPPING PROCEDURE

4.2.1 To increase the wrapping protection efficiency, pipe diameters up to 300mm must be

wrapped using semi-Automatic Tape Wrapping Machine and for pipe diameters

above 300mm, Fully Automatic Wrapping Machine should be used.

4.3 STORAGE 4.3.1 Wrapping tape shall be stored in dry, cool, well ventilated condition, the temperature

of the store shall not exceed 30° C and out of direct sunlight.

4.4 PACKING

4.4.1 Roll shall be placed in a cardboard carton in layers in vertical position. A proper

separator for safe storage shall separate each layer. The boxes shall be marked

minimum at two places given name and logo of manufacturer, Tender No/ Title,

Type, Size and quantity of material in black/blue color letters with a minimum

height of 50mm.

4.5 WRAPPING TAPE PROPERTY

4.5.1 The wrapping tape shall be conforming to the following specifications given in

Table 03.

Table (03) WRAPPING TAPE PROPERTY DATA SHEET

SR.

No.

Property Test Method Unit Data

A. Physical

1 Color

1.1 Backing --- --- Blue RAL

5000/5001/5005/

5010/5017

1.2 Adhesive Compound --- --- Black

1.3 Release Paper --- --- White/Cream

2 Backing Type --- --- PVC

3 Backing Thickness Min. --- mm 0.75

4 Adhesive Thickness Min. --- mm 0.75

5 Total Thickness Min. --- mm 1.56 Elongation BS 2782 % 270

7 Tensile Strength Tape BS 2782 N/mm2 14.8

8 Modulus BS 2782 N/mm2 50

9 Tear Strength ASTM D1004 N 50

10 Impact Resistance (Two

layers)

DIN 30627 Nm 15

11 Flow coefficient of Bitumen

11.1 Viscosity at 200º C Cone & Plate Poise 5.5

11.2 Viscosity at 175º C Cone & Plate Poise 7.5

12 Adhesion to Steel ASTM D 1000 N/mm 2.7513 Adhesion to Tape ASTM D 1000 N/mm 2.75

Page 22: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 22/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 22 of 128

B. Electrical

13 Dielectric Strength BS 2782 kV 30

14 Insulation resistance ASTM D 257 Ohm/cm2 1012

15 Cathodic disbandment ASTM G 8 mm2 NIL

C. General

16 Water vapor permeability BS 2782 g/m2/24h 0.4

17 Water absorption ASTM D 570 % 0.118 Bacterial growth

disbandment

--- --- NIL

D. Temperature Range

19 For wrapping --- º C 0 to + 50

20 In service --- º C 0 to + 50

21 For storage --- º C up to + 30

4.6 PRIMER

4.6.1 The primer shall be of fast drying type. It’s only purpose shall be to maintain the

surface cleanliness condition of the cleaned prepared D.I. pipe surface prior to tape

application.

4.6.2 The primer shall be supplied in 20 to 25 Liters drums with following specifications

given in Table 04.

Table (04) PRIMER DATA SHEET

Property Data

Flash Point, C º 24 - 34

Weight Solid, % 58Viscosity, CP 200 - 500

Coverage m2/l 6 - 12

Type Bitumen solution

4.7 PACKING

4.7.1 Drums shall be put into a wooden box, which shall be close and open type. The

boxes shall be marked minimum at two places given name and logo of manufacturer,

Tender No. or Title, Type, Size and quantity of material in black or blue color letters

with a minimum height of 50mm.

Page 23: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 23/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 23 of 128

4.8 WRAPPING TAPE VISCO ELASTIC POLY ISO BUTENE

4.8.1 The specification of visco elastic wrapping tape shall be according to ISO 21809-3

Amendment 1 for Non crystalline Poly Iso Butene tapes.

4.8.2 The tape shall be supplied with width of 100 mm and 200 mm and with length 10 m,

20 m or approved by Engineer depending upon the requirements.4.8.3 Pipe diameters up to 200mmØ, 100mm width tape shall be used.

4.8.4 Pipe diameters 200mmØ and above, 200mm width tape shall be used.

4.8.5 For all types of fitting with diameters 100mmØ and above, 100mm width tape shall

be used.

4.8.6 The wrapping tape shall consist of a polyolefin based corrosion preventing

compound and a PE backing.

4.8.7 The corrosion preventing compound shall be a non-crosslinked, non-crystalline, low-

viscosity polyolefin (that is, not requiring a primer in order to achieve bond to the

substrate) and shall have thickness between 0.90 to 1.00 mm.

4.8.8 The tape shall be supplied with a high quality silicon release foil covering complete

tape.

4.8.9 During storage at maximum storage temperature of +50° C, the adhesive material

shall not flow out of the release foil and there shall not be any end blocking.

4.8.10 Wrapping tape shall be marking in middle with the following information;

Manufacturers name & logo.

Date of manufacture.

Width of the tape.

Batch Number.

4.9 WRAPPING PROCEDURE

4.9.1 Tools & Equipment required Temperature probe, Dew point tester, High voltage

holiday tester.

4.9.2 The substrate should be free from condensing water which can be reached bykeeping the temperature at least 3°C above dew point. The substrate should be dry,

clean and protected against negative weather influences.

4.9.3 The area to be coated has to be clean, dry, and free from oil, grease and dust. All

contamination including mill-scale has to be removed. De-gloss and degrease the

surfaces by using an abrasive pad and isopropyl alcohol and e.g. a lint-free cloth.

Page 24: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 24/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 24 of 128

4.9.4 Minimum requirement for surface preparation is St 2 according to ISO 8501-1.

Roughness profile should not be essential for adhesion.

4.9.5 Start wrapping with removal of a small part of the release liner and apply on the

substrate without exerting any tension. Avoid air inclusions. Mould the tape tight

onto the substrate surfaces.4.9.6 Release foil should be removed only just prior to application onto the surface.

Overlap of wraps Side-by-side overlap: > 10 mm

Consecutive rolls: = 50 mm

Overlap on Existing coating= 50 mm.

4.9.7 The appearance of the tape must look smooth and tight and should be shaped around

all details and into corners.

4.9.8 Holiday testing should be carried out immediately after application of wrapping

tapes with a voltage of 15 kV. A brush probe is recommended. No further testing is

required.

4.9.9 The wrapped pipe should not be exposed to loads e.g. from supports- or lifting

equipment.

4.9.10 To increase the wrapping protection efficiency, pipe diameters up to 300mm must be

wrapped using semi-Automatic Tape Wrapping Machine and for pipe diameters

above 300mm, Fully Automatic Wrapping Machine should be used, manual

wrapping is also acceptable.

4.9.11 Pipelines: Machine wrapped or manually wrapped protective coating on buried

ductile iron pipelines. Field joints, Flanges, Couplings bell and spigot joint manually

wrapped.

4.9.12 If the wrapping on the pipe is damaged during transportation localized repair should

be performed as per above procedure.

4.9.13 If required extra mechanical impact resistance for Field Joints,Flanges & couplings

can be achieved by applying an extra self-adhesive PE or PVC film on top of the

tape wrap material. This will not be considered as extra corrosion prevention.

4.9.14 The self-adhesive PE or PVC film shall be applied with 50% overlap.

4.10 STORAGE

4.10.1 Store indoor, clean and dry, away from direct sunlight in a cool place below +50°C.

Material should have Unlimited shelf life.

Page 25: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 25/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 25 of 128

4.11 PACKING

4.11.1 Roll shall be placed in a cardboard carton in layers in vertical position. A proper

separator for safe storage shall separate each layer. The boxes shall be marked

minimum at two places given name and logo of manufacturer, Tender No., Type,

Size and quantity of material in black/blue color letters with a minimum height of50mm.

4.12 WRAPPING TAPE PROPERTY

4.12.1 The wrapping tape shall also conform to the minimum requirement given which is

based on ISO 21809-3 Amendment 1(2011) and EN 12068 and shall be conforming

to the following specifications given in Table 05.

Table (05) WRAPPING TAPE PROPERTY DATA SHEET

Property Test

Temp.

Unit Requirements Test

Method Minimum thickness 23 °C mm 1.5 mm Annex A

Glass transition temperature - °C

< Minimum

application temp

minus 20

Annex E

Holiday detection at 5

kV/mm + 5 kV- - No holiday Annex B

Drip resistance

Tmax +

- 15

°C

No drip at 80 °C Annex J

Specific electricalinsulation

resistance

- R S100 23 °C Ω.m²

≥ 108 Annex K

-

R S100/R S70

a

≥ 0,8

Peel strength test and

adhesion test with respect tosteel and to plant coating

before and after thermalageing resistance and before

and after hot water

immersion test, both for 100

days at T + 20 °C (if

reinforcement in the

compound tape)

23 °C

N/mm

≥ 0.2 Cohesive

failure

Coverage ≥

95 % The

coating

shall leavea film of

corrosion protective

coating

material on

the

substrate.

There shall

be no

evidence of

adhesive

failure

Annex

D

18.5.9.2

(and N.3

and

Annex I)

Tmax

≥ 0.2

Impact resistance (Singlelayer)

20 °C J ≥ 4 EN12068

Page 26: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 26/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 26 of 128

Indentation

resistance,

Pressure

23 °C

and

Tmax

N/mm²1

EN

12068

ANNEX

G

Holiday

detection

at 5

kV/mm +

5 kV

-

Cathode disbandment

resistance at 28 days

23 °C

and

Tmax

mm 0 mm, no holiday

Self-Healing*

Annex F

(and

Annex B)

Lap Shear Test 23 °C N/mm2 ≥ 0.02 cohesive failure Annex L

Peel strength (layer-to-layer)

before and after thermal

ageing resistance and before

and after hot water

immersion test both for 100

days at Tmax + 20 °C.

23 °C N/mm ≥ 0.20 Annex M

UV Resistance 23 °C gJ/m2 17,5 EN12068Lap Shear Test 23 °C N/mm2 ≥ 0.02 cohesive failure Annex L

Peel strength (layer-to-layer)

before and after thermal

ageing resistance and before

and after hot water

immersion test both for 100

days at Tmax + 20 °C.

23 °C N/mm ≥ 0.20 Annex M

UV Resistance 23 °C gJ/m2 17,5 EN12068

MIC Resistance 23 °C - pass EN12068

Water absorption 23 °C % < 0.02 ASTMD5

70

Water vapour permeability 23 °C g/m2/day <0.2 ASTM

E96

Temperature for wrapping - °C - 20°C to +70°C -

Temperature In service - °C -45°C to +70°C -

Temperature for storage - °C up to +50°C -

*Extra mechanical Outer wrap applied.

4.13 POLYETHYLENE SLEEVING

4.13.1 The polyethylene sleeving shall be manufactured to ISO 8180 and shall have the

following additional characteristics: -

4.13.2 The film shall be manufactured in tubular form in blue color (RAL-

5000/5001/5005/5010/5017) with a nominal thickness of the film shall be 225

microns with tolerance of 25 microns.

Page 27: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 27/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 27 of 128

4.13.3 The film shall be manufactured from polyethylene or a blend of polyethylene and/or

copolymer of ethylene and higher olefins.

4.13.4 The film shall have UV absorber and UV stabilizer-

4.13.5 No recycled materials shall be used in the manufacture of the sleeving.

4.13.6 The test method of Polyethylene sleeving shall be as pre specifications given inTable 06.

Table (06) TEST METHOD FOR POLYETHYLENE SLEEVING

Property Data

Density Between 910-930 Kg/m3 tested as per ISO/R1183.

Flow Index Less than 2.5g/600s tested as per ISO/1133

Tensile Strength Both directions not less than 8.3 MPa

Elongation at Fracture: Not less than 300%.

4.14 MARKING 4.14.1 Polyethylene sleeving shall be supplied with a center guideline printed on the middle

of the tape and the markings shall be consist the following;

KAHRAMAA logo

Manufacturers name & logo

Date of manufacturing )MM/YY(

Width & thickness of the sleeving

Size of the Relevant DI pipe in mm.

4.14.2 Lay flat width of PE sleeving for D.I. pipe shall be as given in Table 07.

Table (07) DETAILS OF FLAT WIDTH OF PE SLEEVING

Sr. No. Nominal Ø of D.I. Pipe in mm Lay flat width in mm

1 80 280

2 100 320

3 150 435

4 200 540

5 300 755

6 400 980

7 450* 1090

8 500* 1215

9 600 1440

10 700* 1610

11 800* 1825

12 900 2025

13 1,000* 2255

14 1,200 2500

15 1,400 2800

16 1,600 3100

Note: * The subject Diameter’s are not be used in a new potable water network

construction.

Page 28: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 28/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 28 of 128

4.15 PACKING

4.15.1 Each roll shall be individually packed and protected with shrinkable plastic sheet

and marked with name and logo of manufacturer, Tender No/Title., Type, Size and

quantity of material in black/blue color letters with a minimum height of 50mm.

4.15.2 The packing shall be as per Section 1, Clause 1.8 of this specification.

4.16 PVC BLACK SELF ADHESIVE TAPE

4.16.1 PVC black self adhesive tape shall be 50 mm/2” wide of length 30 meter/100 ft. in

Rolls black in color. The tape shall be good quality and from an approved

manufacturer.

4.16.2 The adhesive material shall be suitable when used in water and underground.

4.16.3 Each roll shall be individually packed and placed in a cardboard carton for safe

storage.

4.17 JOINT MOLDING PUTTY

4.17.1 The joint molding putty used on all types of pipe joints shall be inert/non-toxic putty.

4.17.2 The putty shall be suitable for use with the approved PVC/Bituminous tape

wrapping materials. The putty shall be that recommended by the tape manufacturer.

4.17.3 The putty shall be supplied in 20-25 Kg drums or smaller packages as approved by

the Engineer.

4.17.4 Putty shall consist of the following properties as given in Table 08.

Table (08) PUTTY CONSIST DATA SHEET

Property Data

Color Black / Beige

Shrinkage: Nil

Temperature range Application: -10 to + 50 Cº

Temperature range In service: -40 to + 75 Cº

4.18 PACKING

4.18.1 Drums shall be put into the wooden box, which shall be close and open type. The

boxes shall be marked minimum at Two places given name and logo of

manufacturer, Tender No./Title, Type, Size and quantity of material in black/blue

color letters with a minimum height of 50mm.

4.18.2 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 29: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 29/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 29 of 128

4.19 STORAGE

4.19.1 Putty should be stored in original containers until required for use. Store in dry,

4.19.2 Cool, well ventilated condition, out of direct sunlight and other major sources of

heat.

4.20 TRENCH MARKER TAPE 4.20.1 The tape shall be manufactured from non-biodegradable low-density virgin

polyethylene in blue color (RAL-5000/5001/5005/5010/5017).

4.20.2 The tape shall be 150mm wide and 200 micron thickness with a tolerance of 5%.

The rolls shall be of 500-meter long tape.

4.20.3 For PE Pipe and Road Crossing Duct, metallic blue Color a detectable warning tape

of 150mm wide, 250microns thickness to detect the pipe through metal detector.

4.21 MARKING

4.21.1 The tape shall be inscribed with both Arabic and English in black color with a

minimum height of letters 75 mm as follows:

FOR WATER MAINS – with the words

CAUTION: POTABLE WATER MAIN BELOW

---------------ذر! خط ماه ر ي صاح شب اسفل ---------------

FOR SERVICE CONNECTIONS – with the words

CAUTION: POTABLE WATER SERVICE CONNECTION BELOW

---------------ذر! وصة خدمات ماه صاة شب اسفل ---------------

4.21.2 The trench marker tape shall be supplied with the following printed markings:

KAHRAMAA logo

Manufacturers name & logo

Date of manufacturing )MM/YY(

Width & thickness of the tape Batch Number

4.22 PACKING

4.22.1 Each roll shall be individually packed and protected with shrinkable plastic sheet

and marked with name and logo of manufacturer, Tender No/Title., Type, Size and

quantity of material in black/blue color letters with a minimum height of 50mm.

4.22.2 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 30: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 30/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 30 of 128

4.23 LUBRICANT

4.23.1 The lubricant shall be as per manufacturer’s recommendations and conforming to

Section 1, Clause 1.1.1. of this specification.

4.24 PACKING

4.24.1 The lubricant shall be packed in 200 – 500 gram steel containers. These steelcontainers shall be placed in a cardboard carton for safe storage.

4.25 SLIP-ON COUPLINGS, FLANGE ADAPTERS AND DISMANTLING JOINT DURING

INSTALLATION

4.25.1 All wrapping tapes used for the corrosion protection of couplings and flange

adapters shall be identical to that detailed in Section 4, Clause 4.1.

4.25.2 Moulding putty used for building up the contours on couplings and flange adapters,

prior to the application of wrapping tape shall be identical to that detailed in Section

4, Clause 4.5.

4.25.3 All polyethylene sleeving used to cover couplings and flange adapters shall be

identical to that detailed in Section 4, Clause 4.3.

4.25.4 All PVC Black adhesive tape shall be identical to that detailed in Section 4, Clause

4.26 HEAT SHRINK SLEEVE

4.26.1 Heat shrink sleeve method for corrosion protection on pipes and fittings joints,coupling & flange adaptors during installation shall be applied, depends on Tender

Requirements.

4.27 PACKING

4.27.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 31: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 31/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 31 of 128

Section - 5

Bedding and Surround Material’s

5.1 GENERAL

These clauses shall be read in continuation of Section 1 of this Specification.

5.1.1 The pipes shall be laid in such a manner that the whole length of the pipe barrel is

supported on the bedding material. At collars, sockets, flanges etc. the bedding

material shall be removed to avoid point loads occurring at these locations. Bedding

material shall be as per KAHRAMAA Specifications and shall be free from clay,

large stones, rubbish, perishable matter or any other material which could damage

the pipeline coating or assist in setting up corrosion, and the used material must be

non-plastic material.

5.1.2 A samples will be taken from the accumulated piles at the approved source site andit will be tested on laboratory, if the result of the samples are compiling with

KAHRAMAA specifications, The contractor is allowed to start having stock piles

at the site and the contractor is allowed to start using the approved material (from

the approved piles), and a randomly samples will be taken from the trench

(preferably every 200.0 linear meters by the supervisors to assure the compliance of

the delivered materials to the site.

5.2 IMPORTED GRANULAR MATERIAL AND SELECTED EXCAVATED MATERIAL

5.2.1 Imported Granular Material shall comprise either of natural Dune Sand or Crushed

Clean Hard Limestone or be a mixture of these.

5.2.2 Gabbros shall be used in water logged ground, (Sabkha), high resistivity, and

contaminated areas.

5.2.3 The sand, crushed limestone or Gabbros shall be obtained from an approved source

by the Engineer.

5.2.4 Granular material shall contain no excessive quantities of Dust, Soft or Flaky

Particles, Shells congealed lumps, Nodules of soft clay, Shell, Alkali or other

contaminated likely to affect adversely the compaction of the material or to cause

damage to pipes.

5.2.5 The sulphate content (SO3) of the material shall not exceed 0.4% by weight and the

Chlorides as (CI) shall not exceed 0.10 %by weight.

Page 32: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 32/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 32 of 128

5.2.6 The grading of fine aggregate when determined by the method described in BS 812

shall lie within the respective limits specified within the given Table 09.

5.2.7 The total quantity of fine dust through No. 22 mesh sieve in fine aggregate derived

by crushing rock, shall be determined by the method described in BS 812 paragraph

14 and shall not exceed 8% by weight.

5.2.8 The total quantity of clay and silt in nature and shall not exceed 4% by weight when

determined by the field setting test described in BS 812 paragraph 15.

Table (09) Normal Sand / Crushed Rock Percentage Passing by Weight

B.S. Sieve Size (mm) Normal Sand Crushed Rock

4.76 95 – 100 90 – 100

2.40 70 – 95 60 – 90

1.20 45 – 85 40 – 80

0.60 25 – 60 20 – 50

0.30 05 – 30 05 – 30

0.15 0.0 - 10 0.0 - 15

Page 33: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 33/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 33 of 128

Section - 6

Gate valves

6.1 GENERAL

These clauses shall be read in continuation of Section 1 of this Specification.

6.1.1 All gate valves shall be manufactured and tested in accordance with BS-5163 Type

‘B’/ BSEN 1171, BSEN 1074 and their amendments.

6.1.2 All gate valves shall be: -

A. Double flanged drilled according to BSEN 1092-2 PN16.

B. Face – to-face dimensions according to BSEN 558-1; Series 3 and 14.

C. Designed for use with nominal pressure of 16 Bar.

D. With inside screw, solid wedge and shall be of non-rising stem type.

E. Operated by the use of a removable key through a valve cap.

F. Suitable for use in a closed end test.

6.1.3 Gearbox shall be of:

Standard ratio 1.1-10.1 (as specified)

Torque ranges 400-40,000 Nm.

Thrust range 4,000-250,000 DaN

6.1.4 All gate valve and gear box shall be suitable for use with water temperature up to

50º C and in climate and soil conditions encountered in the State of Qatar.

6.1.5 All gate valves shall be of the resilient seat type.

6.1.6 All component parts of the valve body i.e. bonnet and stem seal housing shall be

bolted together, where setscrews are used, the socket shall be provided with a PVC

cap.

6.1.7 All gate valves shall be designed for clockwise closing and be marked accordingly.

6.2 MOTORISED ACTUATOR

6.2.1 Electric type actuators shall include the motor, operators unit gearing, limit

switches, torque switches, de clutch lever, auxiliary hand wheel, forward reversing

and off position switches for local valve operation, local position indicator, local

and remote selector switch, terminal for remote control, valve status and position

indications(as specified below).

6.2.2 The actuator motor and all electrical enclosure shall be waterproof (IP67) as

minimum. Motor shall be totally enclosed non ventilated construction with class F

insulation with temperature rise limited to class B.

6.2.3 Actuator shall be suitable for operations in ambient temperature up to 50 degrees

centigrade and capable of prolonged operations in a sand laden atmosphere.Available torque shall be at least two times the valve manufacturer's maximum

Page 34: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 34/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 34 of 128

torque requirements. The motor shall be designed specially for use on valve

operation, having high torque capacity coupled with low inertia. Motor shall be of

sufficient size to open or close a valve against the maximum specified differential

pressure when the voltage drop at the motor is 10% of the nominal voltage.

6.2.4 Electrical power to the motor shall be 3 phase, 50 Hz, 415 V and motor rating shall

be continuous duty. Heater and thermostats shall be provided for high humidity

condition.

6.2.5 The power gearing shall be consisting of helical gears of heat treated steel and worn

gearing of hardened alloy steel. All power gearing shall be lubricated with high

speed parts on anti friction bearing. It shall be possible to remove the

motor/actuator from the valve without taking the valve out of service.

6.2.6 Provision shall be made for the incorporation of 4-20 mA position transmitters, powered internally to transmit the valve position remotely. The actuator shall be

provided at least or minimum with following normally open/close dry contacts for

monitoring following status remotely:

Open, Close, Healthy/Available, Failed, In Remote and Local.

Also following provision to control actuator from remotely through NO/NC

potential free contact.

Open & Close (In Desired Position), Stop

6.3 TESTING

6.3.1 The gate valve shall be tested as per BS 5163 as follows:

Hydraulic test for body - 24 Bar

Hydraulic test for seat - 17.6 Bar

6.3.2 A factory test certificate shall be issued for each Gate valve giving its serial

numbers, and the certificate shall be submitted to KAHRAMAA at the time of

supply.

6.3.3 KAHRAMAA reserves the right to witness the testing of the valves locally. Testing

shall be carried out in accordance with applicable codes and standards for the

particular valves. Each valve shall be subjected to hydrostatic body and seat

pressure test as mentioned in clause 6.3.1.

Page 35: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 35/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 35 of 128

6.4 HAND-WHEEL

6.4.1 Gate valves shall be supplied with cast iron hand wheels marked “Open” and

“Closed” with arrow in appropriate directions. The design shall be such that it can

be removed if necessary.

6.5 MARKING

6.5.1 All gate valves shall have clearly marked in the casting of the body the following

information;

A. Size of valve in mm.

B. Pressure rating in Bars.

C. Manufacturer’s name and/or logo.

D. Material type (GGG40/GGG50/SG)

E. Manufacturing Standards Number.

F. Year of manufacture.

6.5.2 All gate valves shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number and Year of manufacturing.

6.5.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

6.6 MATERIALS OF GATE VALVES

6.6.1 The valve body, bonnet, gland, yoke and wedge body shall be manufactured of

ductile iron as per one of the following standard:

DIN 1693 GGG-50/40

BS EN 1563: 1997 grade EN-GJS-500-7

ISO 500-7, ISO 400-15

6.6.2 The stem shall be manufactured of acid resistance stainless steel 316L/BS 970 Gr

431 S29 with the threaded portion being formed by rolling process.

6.6.3 Stem nuts shall be gunmetal to BS 1400 LG2 or BS 2874 CZ132.

6.6.4 Dimensions and materials shall conform to those detailed in BS 5163, as applicable

for Type “B”, and BS EN 1171.

6.6.5 The wedge body/core shall be manufactured from ductile iron.

6.6.6 The wedge shall be completely vulcanized by EPDM and coupled to the valve stem

by gunmetal or dezincification resistance brass nut slide into the specifically

Page 36: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 36/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 36 of 128

designed slot hole in wedge or rigidly fastened into the wedge body by forging

before rubber vulcanization.

6.6.7 Rubber material shall be of “EPDM EDK - 70” and the minimum thickness shall be

1.5 mm, and all sealing surfaces not less than 4.0 mm.

6.7 GEAR BOX

6.7.1 The properties of the gearbox shall be as given in Table 10.

Table (10) Properties of the Gearbox Data Sheet

Property DataBody & body cover Ductile Iron GGG 50/40, SG

Bevel gear-shaft Steel / Carbon steel

Gear SG Iron, BS EN 1563 Grade 700-2, GGG 50 or AISI

1045

Bearing SteelPlate & base plate Carbon steel

Stem nut Aluminum Bronze / Steel / DZR Brass

6.8 FLANGES

6.8.1 All gate valve flanges shall be drilled to suite ductile iron flanges as detailed in BS

EN 1092-2, PN-16 rating.

6.8.2 Fasteners for joint shall be as per Section 1, Clause 1.6 of this specification.

6.9 GATE VALVE STEM SEALS 6.9.1 Gate valves up to and including 300 mm Ø shall have ‘O’ ring seals which are to

comprise of seal, wiper rings and lip seal. There shall be a minimum of two wiper

rings or one wiper ring and one lip seal in addition to the seal rings and shall be

made of synthetic rubber material.

6.9.2 Gate valves above 300mm may have either ‘O’ ring seals, or stuffing boxes fitted

with an approved ‘Teflon’ or graphite based packing material.

6.9.3 The stem sealing shall be maintenance free.

6.9.4 There shall not be any direct contact with spindle and bonnet to avoid cold welding.

6.10 MATERIAL COATING & INTERNAL COMPONENTS

6.10.1 The entire body of gate valves shall be coated both internally and externally with

either of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating.

300 micron Fluidized bed epoxy coating.

Page 37: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 37/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 37 of 128

6.10.2 The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

6.10.3 All materials coating shall be WRC, DVGW, SGS, and DWI. , KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water at

+50 degrees centigrade.

6.10.4 The concern Department / Section has the right to request any Worldwide Known

Quality Body Certifier if require.

6.10.5 All casting shall be properly finished, sand blasted and cleaned before coating.

6.10.6 Coating shall be smooth and mirror finish without any hairline cracks.

6.10.7 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2 (BSI

BS EN ISO 4624).

6.10.8 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

6.10.9 Hardness: Intrinsic Rockwell hardness shall be between 50 - 60.6.10.10 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

6.11 ACCESSORIES

6.11.1 Each valve shall be supplied with all accessories such as:-

Bolts, nuts, washers and 3 mm cotton reinforced rubber gasket for each flange.

Caps.

The number of torque wrench with bit / flank socket shall be Supplied:

a) From 1 to 20 valves, 1 torque wrench and bit / flank socket should be

supplied.

b) For 20 valves and above 20% of the supplied quantity of torque wrench and

bit / flank socket should be supplied.

For the reservoir (RPS) the number of hand wheel shall be Supplied:

a) From 1 to 20 valves, 1 hand wheel should be supplied.

b) For 20 valves and above 20% of the supplied quantity of hand wheel should

be supplied.

Extension Operating Spindle as per KAHRAMAA Standard Drawings, rod with

all accessories such as coupling, cap, Wall Bracket, etc.

6.11.2 Valve keys shall be of the heavy duty mild steel, lever type, shall be and to becapable of opening valves against their designed working pressure heads and shall

be capable of producing enough torque to close the valve to a drop tight extent.

6.11.3 For gate valve the number of valve operating “T” keys shall be supplied:

o From 1 to 20 valves, 1 of operating “T” key should be supplied.

o For 20 valves and above 20% of the supplied quantity of operating “T” key

should be supplied.

6.12 PACKING

6.12.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 38: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 38/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 38 of 128

Section - 7

Butterfly Valve

7.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

7.1.1 All butterfly valves shall be manufactured and tested in accordance with BS EN 593

or equivalent.

7.1.2 Butterfly valves shall be of the following types;

A. Double/Triple Offset or Rubber-lined concentric type.

B. Double flanged design. Face-to-face dimensions shall be as per BSEN 558-1:

Series 20 for Replaceable lining valves.

Series 13 & 14 for Vulcanized and Double/Triple Offset valves.

C. The thickness of the EPDM rubber shall be minimum 3mm.

D. Designed for use with nominal pressure of 16 Bar.

E. Operated by the use of a removable key.

F. Suitable for use in a closed end test.

7.1.3 All butterfly valves and gear boxes shall be suitable for use with water temperature

up to 50ºC in climate and soil conditions encountered in the State of Qatar.

7.1.4 All component parts of valve body i.e. bonnet and stem seal housing shall be bolted

together where setscrews are used. The socket shall be provided with a PVC cap.

7.1.5 All butterfly valves shall be designed for clockwise closing and to be marked

accordingly.

7.2 MOTORISED ACTUATOR

7.2.1 Electric type actuators shall include the motor, operators unit gearing, limit

switches, torque switches, de clutch lever, auxiliary hand wheel, forward reversing

and off position switches for local valve operation, local position indicator, local

and remote selector switch, terminal for remote control, valve status and position

indications(as specified below).

7.2.2 The actuator motor and all electrical enclosure shall be waterproof (IP67) asminimum. Motor shall be totally enclosed non ventilated construction with class F

insulation with temperature rise limited to class B.

7.2.3 Actuator shall be suitable for operations in ambient temperature up to 50 degrees

centigrade and capable of prolonged operations in a sand laden atmosphere.

Available torque shall be at least two times the valve manufacturer's maximum

torque requirements. The motor shall be designed specially for use on valve

operation, having high torque capacity coupled with low inertia. Motor shall be of

Page 39: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 39/128

Page 40: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 40/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 40 of 128

7.5 MARKINGS

7.5.1 All valves shall have clearly marked in the casting of the body with the following

information:

A. Size of valve in mm.

B. Pressure rating in Bars.

C. Manufacturer’s name and/or logo. D. Material type (GGG40/GGG50/SG)

E. Manufacturing Standards Number.

F. Year of manufacture.

7.5.2 All valves shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number and Year of manufacturing.

7.5.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

7.6 MATERIALS

Butterfly Valves

7.6.1 The butterfly valve shall be of following properties as given in Table 11.

Table (11) Properties of the Butterfly valve Data Sheet

Gear box

Property Data

BodyDI GGG- 40/50, DIN1693 GGG-50/40, BSEN 1563:1997,

Grade EN-GJS-500-7, ISO500-7, ISO400-15

Body Seat Shall be Stainless Steel 316L

Disc

DI GGG-40/50 or SS 316L shall be of solid one piece casting

(non-hollow) coated with 300 micron Rilsan /Epoxy and the

retaining ring shall be SS 316L.

Disc Seat Shall be Stainless Steel 316L

Gasket Rubber (cotton reinforced)

Bearing PTFE filled line steel bearing(self lubricated)

Fasteners Shall be Stainless Steel 316L

ShaftDuplex Stainless Steel 1.4462 and shall be 100% dry shaft

design

Lining Must be of the highest grade of EPDM rubber

Page 41: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 41/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 41 of 128

7.6.2 Gear box shall be of following properties as given in Table 12.

Table (12) Properties of the Gearbox Data Sheet

Property Data

Body & body cover Ductile Iron GGG 50/40, SG

Bevel gear-shaft Steel / Carbon steel

Gear SG Iron, BS EN 1563 Grade 700-2, GGG 50 or AISI

1045

Bearing Steel

Plate & base plate Carbon steel

Stem nut Aluminum Bronze / Steel / DZR Brass

7.6.3 Fasteners shall be as per Section 1, Clause 1.6 of this specification.

7.7 FLANGES

7.7.1 All butterfly valve flanges shall be drilled to BSEN 1092-2, PN 16.

7.8 COATINGS

7.8.1 The entire body of valves shall be coated both internally and externally with either

of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating.

300 micron Fluidized bed epoxy coating.

7.8.2 In special cases, Rilsan coating with 300 microns can be approved.

7.8.3 The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

7.8.4 All materials coating shall be WRC, DVGW, SGS, and DWI. , KIWA, NSF 61 orother Worldwide Known Quality Body Certifiers in contact with potable water at

50 degrees centigrade.

7.8.5 All casting shall be properly finished, sand blasted and cleaned before coating.

7.8.6 Coating shall be smooth and mirror finish without any hairline cracks.

7.8.7 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2 (BSI

BS EN ISO 4624).

7.8.8 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

7.8.9 Hardness: Intrinsic Rockwell hardness shall be between 50 - 60.

7.8.10 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

Page 42: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 42/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 42 of 128

7.9 VALVE K EYS

7.9.1 Valve keys shall be of heavy duty, lever type, and aluminum alloy and to be capable

of opening valves against their designed working pressure heads and shall be

capable of producing enough torque to close the valve to a drop tight extent.

7.9.2 Valve operating “T” keys of standard length shall be supplied in the ratio of 1 - 20 butterfly valves.

7.10 ACCESSORIES

7.10.1 Each valve shall be supplied with all accessories such as:-

Bolts, nuts, washers and 3 mm cotton reinforced rubber gasket for each

flange.

Caps

The number of torque wrench with bit / flank socket shall be Supplied:

a) From 1 to 20 valves, 1 torque wrench and bit / flank socket should be

supplied.

b) For 20 valves and above 20% of the supplied quantity of torque wrench and

bit / flank socket should be supplied.

For the reservoir (RPS) the number of hand wheel shall be Supplied:

I. From 1 to 20 valves, 1 hand wheel should be supplied.

II. For 20 valves and above 20% of the supplied quantity of hand wheel should

be supplied.

Extension Operating Spindle as per KAHRAMAA Standard Drawings, rod with

all accessories such as coupling, cap, Wall Bracket, etc.

7.10.2 Valve keys shall be of the heavy duty mild steel, lever type, shall be and to be

capable of opening valves against their designed working pressure heads and shall

be capable of producing enough torque to close the valve to a drop tight extent.

7.10.3 For butterfly valve the number of valve operating “T” keys shall be supplied:

I. From 1 to 20 valves, 1 of operating “T” key should be supplied.

II. For 20 valves and above 20% of the supplied quantity of operating “T” key

should be supplied.

7.11 PACKING

7.11.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 43: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 43/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 43 of 128

Section - 8

Air Valves

8.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

8.1.1 All Air valves shall be manufactured and tested in accordance with BS EN 1074 – 4

or equivalent.

8.1.2 All valves shall be suitable for a maximum working pressure of 16 Bar.

8.1.3 All materials shall be suitable for use with potable water at a temperature of 50C.

8.1.4 The Tenderer shall supply with his Tender, a detailed specification for the valves he

intends to supply under the contract.

8.1.5 Air valve heads should be positioned vertically.

8.1.6 The flange shall be either welded type, or rotatable type.

8.1.7 Air Valve shall be Anti Surge Vacuum Break Type.

8.2 AIR VALVES CONSTRUCTION MATERIALS

8.2.1 The body shall be of ductile Iron, GGG-40/50. DIN1693 GGG-50/40, BSEN

1563:1997 Grade EN-GJS-500-7, ISO500-7, ISO400-15, The Tenderer shall supply

with his tender, details of all air valve and check valve component parts and the

materials from which they are to be manufactured.

8.2.2 Fastener shall be as per Section 1, Clause 1.6 of this specification.8.3 SINGLE AIR VALVE LARGE ORIFICE TYPE

8.3.1 Large orifice air valves are for the bulk removal of air (inlet of air from/ to the

mains).

8.3.2 These air valves shall be of BSPT type or flange type to suit the requirement.

8.4 SINGLE AIR VALVE SMALL ORIFICE TYPE

8.4.1 Small orifice air valves are for the removal of air under pressure from the main.

8.4.2 These air valves are installed in the pipeline via a 1” (inch) BSPT tapping.

8.4.3 These air valves shall be supplied with an approved isolating cock on the inlet,

threaded to suit the air valve.

8.5 DOUBLE AIR VALVE

8.5.1 Double air valves are a combination of both large and small orifices and are used

for bulk removal, inlet of air as well as removal of air under pressure.

8.5.2 These air valves are installed into mains via a standard flange drilled to suit ductile

iron flanges to BS EN 1092, PN-16 rating. Inlet sizes are to be as shown in the Bill

of Quantities.

Page 44: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 44/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 44 of 128

8.5.3 Double air valves are to be supplied with an isolating valve and the stem should be

positioned vertically with DAV.

8.6 COATINGS

8.6.1 All valves and gear boxes shall have their entire body coated both internally and

externally with either of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating.

300 micron Fluidized bed epoxy coating.

The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

All materials coating shall be WRC, DVGW, SGS, DWI, KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water

at 50 degrees centigrade .

All casting shall be properly finished, sand blasted and cleaned before coating.

Coating shall be smooth and mirror finish without any hairline cracks.8.6.2 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2

(BSI BS EN ISO 4624).

8.6.3 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

8.6.4 Hardness: Intrinsic Rockwell hardness shall be between 50 - 60.

8.6.5 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

8.7 MARKINGS

8.7.1 All air valves shall have clearly marked in the casting of the body with the

following information:

A. Size of valve in mm.

B. Pressure rating in Bars.

C. Manufacturer’s name and/or logo.

D. Material type (GGG40/GGG50/SG, etc.)

E. Manufacturing Standards Number.

F. Year of manufacture.

Page 45: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 45/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 45 of 128

8.7.2 All valves shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number, and Year of manufacturing.

8.7.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

8.8 PACKING

8.8.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 46: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 46/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 46 of 128

Section - 9

Fire Hydrants

9.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.Underground Fire Hydrant

9.1.1 All fire hydrants shall be manufactured and tested in accordance with latest BS 750,

“Type 2”, and its amendments.

9.1.2 Fire hydrants shall be screw down type with captive stopper.

9.1.3 Fire hydrants shall be medium, fixed type stopper. Simple drain plug with needle

hole.

9.1.4 Drain plug must be Stainless Steel.9.2 MARKING

9.2.1 All fire hydrants shall have clearly marked in the casting of the body the following

information.

A. Number of BS Code i.e. BS 750

B. Manufacturer’s name and/or logo.

C. Material designation of body and bonnet i.e. SG.

9.2.2 All fire hydrants shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number, and Year of manufacturing.

9.2.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

9.3 MATERIALS

9.3.1 All fire hydrant body and bonnet shall be manufactured using ductile iron, GGG

50/40 to BS EN1563, Grade 420-12/500-7.

9.3.2 Fasteners shall be as per Section 1, Clause 1.6 of this specification.

9.3.3 All fire hydrants shall have “O” ring seals which are to comprise of seal and wiper

rings and shall be made of synthetic rubber material. Removable gland fire hydrants

shall not be accepted.

Page 47: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 47/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 47 of 128

9.3.4 The stem shall be manufactured of acid resistance SS 316L/BS-970 Gr. 431 S29

with the threaded portion being formed by rolling process.

9.3.5 The wedge body/core shall be manufactured from ductile iron, GGG 50/40 to BS

EN1563, Grade 420-12/500-7.

9.3.6 The stopper shall be completely vulcanized by EPDM or a suitable designed EPDM

seal fasten with properly design arrangement, suitable for life of the fire hydrant and

coupled to the stem by gunmetal or DZR brass nut slides into specifically designed

slot hole in stopper or rigidly fastened into the stopper body by forging before

rubber vulcanization.

9.3.7 If stopper is completely vulcanized, the rubber material shall be of “EPDM” EDK -

70 or equivalent and the minimum thickness shall be 1.5mm and on all sealing

surfaces shall not be less than 4.0mm.

9.3.8 The stopper nut shall be made of gunmetal to BS 1400 LG-2 or BS 2874 CZ 132.

9.4 CONNECTIONS

9.4.1 Inlet flanges shall be drilled to suite ductile iron flanges as detailed in BS EN 1092,

PN-16 rating.

9.4.2 Fire hydrants shall have a pressure rating of 16 Bar and shall be subject to a

working test pressure of 24 Bar.

9.4.3 All materials shall be suitable for use with potable water at a temperature of 50C.

9.4.4 Outlets shall be 2.5” (inches) male London Round Thread.

9.4.5 Fire hydrants are to be designed for clockwise closing.

9.5 COATINGS

9.5.1 All fire hydrants shall have their entire body coated, both internally and externally

with either of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating.

300 micron Fluidized bed epoxy coating. The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

9.5.2 All materials coating shall be WRC, DVGW, SGS, and DWI. , KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water at

50 degrees centigrade.

Page 48: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 48/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 48 of 128

9.5.3 All casting shall be properly finished, sand blasted and cleaned before coating.

9.5.4 Coating shall be smooth and mirror finish without any hairline cracks.

9.5.5 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2

(BSI BS EN ISO 4624).

9.5.6 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

9.5.7 Hardness: Intrinsic Rockwell hardness shall be between 50- 60.

9.5.8 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

9.6 TESTING

9.6.1 All fire hydrants shall be tested as per BS 750 as follows: -

Hydraulic test for body - 24 Bar

Hydraulic test for seat - 17.6 Bar

9.6.2 A factory test certificate shall be issued for each fire hydrant giving its serial

number. This certificate shall be submitted to KAHRAMAA at the time of supply.

9.6.3 KAHRAMAA reserves the right to witness the testing of the valves locally. Testing

shall be carried out in accordance with applicable codes and standards for the

particular FH. Each FH shall be subjected to hydrostatic body and seat pressure test

as mentioned in clause.

9.7 STAND PIPES

9.7.1 Stand pipes shall be of revolving head type, the heads to be fitted with chained

blanking plugs with a minimum height of 950mm and manufactured from

aluminum alloy or equivalent.

9.7.2 Inlet shall be 2.5” (inch) female London Round Thread to fit fire hydrants to BS

750 and outlet shall be 2.5” instantaneous male to BS 336.

9.8 ACCESSORIES

9.8.1 Each fire hydrant shall be supplied with following:

Bolts, nuts, washers and 3 mm cotton reinforced rubber gasket for each flange.

Antifreeze bolts for fire hydrants, 1 per 20 fire hydrants.

Stand pipe, 1 per 20 fire hydrants.

9.8.2 For underground fire hydrant the number of fire hydrant operating “T” keys shall be

supplied:

I. From 1 to 20 fire hydrants, 1 of operating “T” key should be supplied.

II. For 20 fire hydrants and above 20% of the supplied quantity of operating “T”

key should be supplied.

Page 49: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 49/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 49 of 128

9.9 PACKING

9.9.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Aboveground (Pillar Type) Fire Hydrant

9.10 ABOVE GROUND FIRE HYDRANT (PILLAR TYPE)

9.10.1 The aboveground pillar type fire hydrants shall be of the breakable pillar type in

accordance with the latest edition of BSI BS EN 14384.

9.10.2 All fire hydrants shall be equipped as given below:

The fire hydrants shall be approved by Civil Defense of State of Qatar.

The hydrant shall be fitted with 2 No couplings of 2"1/2 including caps made of

aluminum alloy or Gunmetal (EN 182, grade CuSnPb5).

Bronze valve seat ring, or Gunmetal (EN 1982 grade CuSn6Zn45Pb2)

Stainless steel 316 spindle.

A frangible section which breaks on impact, at the same time as the clamping

washers.

DN 100 mm, PN 16 rating to EN 1092-2 standard.

A screw and nut device fitted on the stem holder so that the valve remains closed

in case of impact.

Automatic drain valve.

The pillar type fire hydrant shall be supplied with an aluminum alloy hood

(protection box), to be closed and opened through a key, and every pillar hydrant

shall be supplied with one key.

Each two pillar hydrants supplied shall be provided with one extra repair kit for

the breakable section.

The pillar type fire hydrant shall be supplied with ductile iron ductfoot bend with

inlet flange size DN 100 mm, PN 16 rating to EN 1092-2 standard.

9.11 MARKING

9.11.1 All pillar type fire hydrants shall have clearly marked in the casting of the body the

following information.

B. Number of Standard Code.

C. Manufacturer’s name and/or logo.

D. Material designation of body and bonnet i.e. SG.

Page 50: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 50/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 50 of 128

9.11.2 All pillar type fire hydrants shall have individual identification strip which shall be

marked by engraving or embossing on a metal strip, the name of manufacturer,

individual serial number, tender number, and Year of manufacturing.

9.11.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

9.11.4 The marking plate shall be fixed on the hood at the factory.

9.12 COATING

9.12.1 All pillar type fire hydrants shall have their entire body coated, both internally and

externally with either of the following:

Coating shall be smooth and mirror finish without any hairline cracks.

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating.

300 micron Fluidized bed epoxy coating.

The hood shall also be epoxy coated, to achieve an average D.F.T of not less

than 60 microns but no value shall be less than 50.

The color of coating shall be “Red”, Code RAL-3000/3001/3002/3016/3024.

9.12.2 All casting shall be properly finished, sand blasted and cleaned before coating.

9.12.3 All materials coating shall be WRC, DVGW, SGS, and DWI. , KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water at

50 degrees centigrade.

9.13 TESTING

9.13.1 All pillar type fire hydrants shall be tested in factory as the follows: -

Hydraulic test for body - 24 bar in open position. Hydraulic test for seat - 17.6 bar in closed position.

9.13.2 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2(BSI BS EN ISO 4624).

9.13.3 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

9.13.4 Hardness: Intrinsic Rockwell hardness shall be between 50- 60.

Page 51: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 51/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 51 of 128

9.13.5 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

9.13.6 A factory test certificate shall be issued for each pillar type fire hydrants giving its

serial number and this certificate shall be submitted to KAHRAMAA at the time of

supply.

9.13.7 KAHRAMAA reserves the right to witness all types of testing locally, and the tests

shall be carried out in accordance with applicable codes and standards for the

particular pillar type fire hydrants.

9.14 ACCESSORIES

9.14.1 Each fire hydrant shall be supplied with following:

Master universal keys 10% of the supplied amount of the fire hydrants

Operating keys 10% of the supplied amount of the fire hydrants.

Additional repair kit 10% of the supplied amount of the fire hydrants, consist

of the following:-

I. One set of bracket.

II. Four numbers of fasteners.

III. One set of rubber gasket.

Protection hood Cover, 10% of the supplied amount of the fire hydrants

Master universal key for the protection hood Cover, 10% of the supplied

amount of the fire hydrants.

9.15 PACKING

9.15.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 52: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 52/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 52 of 128

Section - 10

Check Valve

10.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

10.1.1 All valves shall be suitable for a maximum working pressure of 16 Bar.

10.1.2 All material shall be suitable for use with potable water at a temperature of 50 C

10.1.3 Check or non-return valves below the size DN 300 mm (inclusive) shall comply

with BS 5153 standards. It shall be of the swing, non-slam, noiseless type having

flanged connections. The rating of the flanges shall be as per the design conditions

of the operating system and as indicated in the Data Sheet. Non return valves shall

be metal.

10.1.4 The internal and external surfaces of the valve and the disc shall be blast cleaned to

SA 2.5, ISO 8501 standards and coated with fusion bonded epoxy coating system to

a dry film thickness of 300mm.

10.1.5 The design of the valve body shall be such that there is adequate clearance around

the back of the door to minimize jamming by rags and debris. Stops shall be

provided to limit the back lift of the disc and shall be positioned to prevent fouling.

10.1.6 The hinge pin/shaft shall be stainless steel 316L. Both disc and lever shall be

positively and securely fixed to the hinge pin/shaft. Grub screws pins (parallel to

taper) or clamps will not be acceptable. All internal fixing devices shall be of

stainless steel or bronze. Valves shall carry identification marks in accordance with

BS 5153. All nuts and studs subject to vibration shall be fitted with spring washers

or locking tabs.

10.1.7 The Check Valve (DN ≤ 300mm) shall be conforming to the following

specifications given in Table 13.

Table (13) Property DataBody, bonnet, weight and hinge Ductile Iron GGG 50/40, SG

Flap / Disc Ductile Iron GGG 50/40, SG

Sealing for metal seated Dezincification resistant brass CZ 132

Lever Carbon Steel

Shaft / Pin Stainless Steel 316L

10.1.8 Non return valves of sizes DN 350 mm and above shall be high dynamic, spring

loaded, non slam, noiseless long pattern, metal seated type manufactured API 6 D

standards. The rating of the flanges shall be in accordance with the standardsindicated in the data sheets. The design of the valve internal parts shall allow the

Page 53: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 53/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 53 of 128

disc to respond very quickly to any flow changes and shall achieve movement from

fully open to fully close in less than 0.15 seconds. The single helical spring shall be

fully shielded from the process stream by the central flow diffuser. The metal to

metal sealing shall achieve tight shut off with 100% reliability.

10.1.9 The Check Valve (DN ≥ 350mm) shall be conforming to the followingspecifications given in Table 14.

Table (14)

Property DataBody, bonnet, weight and hinge Ductile Iron GGG 50/40, SG

Flap / Disc ASTM A 351 CF 8m

Spring AISI Stainless Steel 316

Seat AISI Stainless Steel 316

10.2 CHECK VALVES CONSTRUCTION MATERIALS

10.2.1 The body shall be of ductile iron, GGG 40/GGG 50/SG, BS EN 1563Grade EN-

GJS-500-7, ISO 500-7 and ISO 400-15.

10.2.2 Fasteners shall be as per Section 1, Clause 1.6 of this specification.

10.3 COATINGS

10.3.1 All valves shall have their entire body coated both internally and externally with

either of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating. 300 micron Fluidized bed epoxy coating.

The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

All materials coating shall be WRC, DVGW, SGS, DWI, KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water at

50 degrees centigrade.

All casting shall be properly finished, sand blasted and cleaned before coating.

Coating shall be smooth and mirror finish without any hairline cracks.

10.3.2 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2

(BSI BS EN ISO 4624).

10.3.3 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

10.3.4 Hardness: Intrinsic Rockwell hardness shall be between 50 - 60.

10.3.5 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

10.4 MARKINGS

10.4.1 All check valves shall have clearly marked in the casting of the body with the

following information:

A. Size of valve in mm.

Page 54: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 54/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 1 19/08/2015 Unclassified Page 54 of 128

B. Pressure rating in Bars.

C. Manufacturer’s name and/or logo.

D. Material type (GGG 40/GGG 50/SG)

E. Manufacturing Standards Number.

F. Year of manufacture.

10.4.2 All check valves shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number and Year of manufacturing.

10.4.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

10.5 PACKING

10.5.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 55: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 55/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 55 of 128

Section - 11

Other Types of Valves

11.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

11.1.1 The all valves (Flow Control Valve, Plug Valve, Float Valve, Pressure Regulating

Valves/Pressure Reducing Valves and Altitude Valves) shall be complying with the

following specifications:

11.1.2 All valves shall be suitable for a maximum working pressure of 16 Bar.

11.1.3 All material shall be suitable for use with potable water at a temperature of 50C.

11.1.4 The body shall be of ductile iron, GGG 40/GGG 50/SG, BS EN 1563Grade EN-

GJS-500-7, ISO 500-7 and ISO 400-15.

11.1.5 All flanged valves shall be drilled to BSEN 1092-2, PN 16.

11.2 COATINGS

11.2.1 All valves shall have their entire body coated both internally and externally with

either of the following:

300 micron Fusion bonded epoxy (Polymeric anticorrosion) coating as per WIS

No. 4-52-01.

300 micron Electrostatic ally applied epoxy coating. 300 micron Fluidized bed epoxy coating.

The color of coating shall be “Blue”, Code RAL-5000/5001/5005/5010/5017.

All materials contact with potable water shall be WRC, DVGW, SGS, DWI,

KIWA, NSF 61 or other Worldwide Known Quality Body Certifiers in contact

with potable water at 50 degrees centigrade.

All casting shall be properly finished, sand blasted and cleaned before coating.

Coating shall be smooth and mirror finish without any hairline cracks.

11.2.2 Adhesion Test: Adhesion of coating to metal shall not be less than 12N/mm2

(BSI BS EN ISO 4624).

11.2.3 Holiday Test: Porosity of coating shall be “zero” on 3 kV DC tester.

11.2.4 Hardness: Intrinsic Rockwell hardness shall be between 50 - 60.

11.2.5 Impact resistance: For applying of impact energy of 5 NM on coating the cracks

should not develop, when tested by 3 kV DC tester.

Page 56: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 56/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 56 of 128

11.3 MARKINGS

11.3.1 All valves shall have clearly marked in the casting of the body with the following

information:

A. Size of valve in mm.

B. Pressure rating in Bars.

C. Manufacturer’s name and/or logo.

D. Material type (GGG 40/GGG 50/SG)

E. Manufacturing Standards Number.

F. Year of manufacture.

11.3.2 All valves shall have individual identification strip which shall be marked by

engraving or embossing on a metal strip, the name of manufacturer, individual

serial number, tender number and Year of manufacturing.11.3.3 The metal strip shall be of minimum size of 100mm x 30mm and shall be fixed

securely and permanently at appropriate location by industrial type cold welded

glue and shall not be screwed or riveted. The glue shall be of industrial grade with a

melting point higher than 80°C.

11.3.4 Fasteners shall be as per Section 1, Clause 1.6 of this specification.

11.4 FLOW CONTROL VALVES

11.4.1 Unless otherwise specified, all control valves shall be axial flow non-diaphragm

type relation of valve capacity close valve position with percentage (%) opened

shall be linear with approximately 50% close valve position, 50% opened valve

position and produce no cavitations throughout the operating range as specified in

the data sheet.

11.4.2 The valve shall be capable of bubble tight sealing against 16 bar operating pressure

unless specified otherwise. The valve shall be manually operated with clockwise

hand wheel closing. Pressure drop across the valve should not exceed 0.10 bar when

fully opened at maximum specified flow rate.

11.4.3 The valve shall have positioned indicating 0, 25, 50, 75 and 100% opened.

Maximum allowable noise level shall be 70 DBA at 1-meter distance. The control

valves shall have flanged ends.

11.4.4 All Flow Control Valve flanges shall be drilled to BSEN 1092-2, PN 16.

11.4.5 If the control valves are electrically activated, then the actuator shall be modulating

type and can be complete with a positioned.

Page 57: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 57/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 57 of 128

11.5 MATERIAL SPECIFICATION

11.5.1 Body Solid stainless steel to ASTM A351 Gr. CF 8M for valves up to 250mm dia.

and ductile iron GGG 40 for valves above 250mm dia.

Coating internally and externally 300 micron hot cured fusion bonded non-toxic

epoxy coating. Piston : stainless steel AISI 316

Piston ring : stainless steel AISI 316

Cage : stainless steel AISI 316

Cage ring : stainless steel AISI 316

Stem : stainless steel AISI 316 or AISI 4340

Guide bushing : stainless steel AISI 316

Piston rod : stainless steel AISI 316 or AISI E3316

Seat retaining bush : stainless steel AISI 316

11.6 PRESSURE R EGULATING VALVES/ PRESSURE R EDUCING VALVES

11.6.1 The Pressure regulating and Pressure reducing valves shall be of the globe type,

piston or diaphragm operated to comply with the general requirements of

specifications.

11.6.2 The valve must be capable of bubble tight sealing against 16 bar operating pressure

unless mentioned otherwise.

11.6.3 The end flange shall be rated and drilled in accordance with the standard BSEN

1092-2, PN 16.

11.6.4 The pressure sustaining valve shall be of the pressure compensated globe type

complete with external hydraulic relay system and designed to automatically sustain

a predetermined pressure immediately upstream its position.

11.6.5 The pressure reducing valve shall be of the pressure compensated globe type

complete with external hydraulic relay system and designed to reduce a constant or

variable inlet pressure to a predetermined constant outlet pressure at varying flows.

11.6.6 The controlling pressure point can be either at the valve or at a point on the pipeline

some distance from the valve.11.6.7 The relay control system shall consist of a hydraulic relay valve unit, orifice and

strainer block, control valves and interconnecting small bore piping.

11.6.8 The relay valve shall be manufactured completely in stainless steel 316, which shall

consist of diaphragm, diaphragm guide, support piston, spindle, etc.

11.6.9 The orifice / strainer unit shall have a body and internals of stainless steel.

Page 58: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 58/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 58 of 128

11.6.10 The pressure setting control valves and control piping shall be constructed in

316 stainless steel, the valves shall be designed such that the hydraulic relay system

can be inspected, maintained or replaced without isolating the supply.

11.6.11 All necessary repairs to the valve shall be possible without removing the

valve from the line.

11.6.12 The pressure setting shall be capable of being adjusted on site by the use of an

adjustment screw to alter the compression of the spring.

11.6.13 The opening and closing speeds shall also be field adjustable by adjusting the

flow regulation screw.

11.6.14 The valves shall be capable of being fully opened or fully closed by

respective opening and closing of upstream and downstream ground cocks.

11.6.15 The valves shall be designed to provide the necessary loss of head and shalloperate without hunting. The valve mechanism shall be piston operated, controlled

from a servo diaphragm actuated by an adjustable spring balance relay comparing

pressure generated across an integral orifice plate.

11.7 MATERIAL SPECIFICATION

11.7.1 The material specification of valve shall be as given bellow:

Body : Ductile Iron GGG 40/50

Trims Ported Guide & Seating : Gunmetal to BS 1400 LG 2C

Seating on plunger : Rubber Plunger : Ductile iron GGG 40/50

Pilot Valves (control valves) : Stainless Steel 316

Pilot parts (fittings) : Stainless Steel 316

Indicating rod : Stainless Steel 316

11.8 ALTITUDE VALVES

11.8.1 The altitude valves shall be of the globe type and shall comply with the general

requirements of the specifications.

11.8.2 The valve must be capable of bubble tight sealing against 16 bar operating pressureunless mentioned otherwise.

11.8.3 The end flange shall be rated and drilled in accordance with the standard BSEN

1092-2, PN 16.

11.8.4 The altitude valves shall be of the straight through type and the operation of the

float operated pilot valve shall be through a chamber, which is separated with a

plunger from the body.

Page 59: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 59/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 59 of 128

11.8.5 The Altitude valves shall be fitted with external hydraulic relay system designed to

automatically close the valve at reservoir high level and reopen the valve at pre-set

minimum level, and the valve shall be suitable for drop tight shut off by having full-

face sealing.

11.8.6 The relay control system shall consist of a three way float operated pilot valve,

orifice and strainer block, pilot control valves and interconnecting small bore

piping, the float operated pilot valve shall be manufactured completely in 316

stainless steel.

11.8.7 The orifice/strainer unit shall have a body and internals of stainless steel, the pilot

control valves and control piping shall be constructed in 316 stainless steel.

11.8.8 The altitude valve shall be designed such that the hydraulic relay system can be

inspected, maintained or replaced without isolating the supply the pressure settingshall be capable of being adjusted on site by turning the pilot valve screw, the

opening and closing speeds shall also be field adjustable by adjusting the flow

regulation screw.

11.8.9 The minimum upstream pressure from the valve must exceed 0.4 bars. The distance

between the main valve and the pilot valve should not exceed 50 m for proper

functioning of the valve.

11.8.10 The globe valve shall be designed to provide the necessary loss of head and

shall operate smoothly without hunting.

11.9 MATERIAL SPECIFICATION

11.9.1 The material specification of valve shall be as given bellow:

Body : Ductile Iron GGG 40/50

Trims Ported guide & seat ring : Gunmetal to BS 1400 LG 2C

Seating on plunger : Rubber

Plunger : Ductile Iron GGG 40/50

Pilot valve : Stainless Steel 316

Pilot parts : Stainless Steel 316

Indicating rod : Stainless Steel 316

11.10 PACKING

11.10.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 60: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 60/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 60 of 128

Section - 12

Pumps

12.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

12.2 SCOPE

12.2.1 This specification covers the minimum requirements for design, manufacture,

testing at manufacturer's works, supply, site testing and commissioning of the

transmission and distribution pumps. This specification shall be read in conjunction

with the relevant data sheets, drawings and other relevant sections of the tender

documents. Compliance with this specification shall not relieve the Tenderer from

any of his contractual obligations and responsibilities towards fulfilling the

performance requirements. This specification and the associated drawings shall be

considered to be the absolute minimum requirements for performance and quality

and shall be considered in extension of "not in limitation".

12.3 CONFLICTS & DEVIATIONS

12.3.1 Any conflicts between this specification and any other applicable KAHRAMAA

specification, other industrial standard, or international code etc. shall be resolved in

writing by the KAHRAMAA head of water projects, No deviation from this

specification shall be allowed, if the tenderer's offer differs from tender

specifications, all such differences shall be specifically listed under the title

"Variations” and submitted for review and approval, the tenderer's offer, with the

exception of specific variations, shall be considered to be according to

specifications, any item of pump submittal not included by the tenderer in the offer

must be specifically indicated under the heading "Exclusions" and the reasons given

for such exclusions, any item not specifically excluded shall be deemed to be

included in the offer.

12.4 APPLICABLE STANDARDS AND CODES

12.4.1 The pumps shall be designed, manufactured and tested in accordance with the latest

edition of the standards & codes listed below (See Table 15):

Table (15) Applicable Standards and Codes

Standards

& CodesDescriptions

EN 1982 Copper and copper alloy- ingots and casting.

EN 1561 Founding, Gray Cast Iron.

PD 970 Specification for wrought steels for mechanical and alliedengineering purposes.

Page 61: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 61/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 61 of 128

EN 1092-1 Circular flanges for pipes, valves and fittings.

ISO 2531Ductile iron pipes, fittings, accessories and their joints for

water applications.

ISO 9906 Hydraulic performance acceptance test grade 1 & 2.

EN 837-1 Bourdon tubes Pressure and vacuum gauges.

12.5 TECHNICAL SUBMITTAL:

12.5.1 The Pumps shall be submit complete and comprehensive technical submittal

comprises but not limited to minimum of followings:

1. Compliance statement of pump specifications and technical data and drawings

consist from followings:

Data sheet.

Performance curves showing duty point, power, efficiency and NPSH valuesfor variable speed pumps, curves must be show the performance at minimum

of four different speeds. Detail drawings showing dimensions, outlines, sectionals & 3D exploded

views, mechanical seals details, P& ID etc.

Multi pumps operation curves with recorded minimum & maximum flows for

1, 2, 3 etc. pumps running.

Catalogues.

List of spare parts

Coating details and procedures including health certificates shall be as per

Section 1, Clause 1.5 of this specification

Shop testing procedures with details.

Previous approvals, certificates etc.

Warranty information.

12.6 DESIGN CONSIDERATIONS

12.6.1 The pumps and associated equipments shall be designed and be suitable for

operation in the climatic conditions of state of Qatar.

12.6.2 The Conditions under which the pumps are required to operate is considered to be

tropical weather, with excess heat dust and humidity at time.

12.6.3 The pumps shall be conforming to the following specifications for the climatic

conditions to be considered at site as given in table 16:

Table (16) Specifications for the climatic conditions

Descriptions Temperature

Maximum ambient relative humidity: 100%

Maximum ambient temperature: 50 °C

Minimum ambient temperature: 5 °C

Design ambient temperature: 50 °C

Maximum metal temperature under the sun: 85 °C

Minimum ambient humidity: 20%

Page 62: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 62/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 62 of 128

Design ambient humidity 100%

Design wind velocity 150 km/hr

Yearly rainfall 80-150

Maximum ambient relative humidity: 100%

Under certain climatic conditions, considerable condensation may take

place.

A considerable amount of salt is contained in atmosphere, which together

with the relative high ambient humidity, can produce sever corrosion

problems.

12.7 GENERAL R EQUIREMENTS:

12.7.1 The pump covered by this specification shall be suitable for the specified operation

conditions and shall be designed and manufactured for a minimum service of 20

years plus minimum of three years of uninterrupted continuous operation or 25,000

hours operation, whichever is later.

12.7.2 Pumps shall be Single stage, double suction, horizontal shaft, centrifugal split case

design, suction and discharge connections shall be located on opposite sides of the

lower casing, allowing removal of the rotating assembly without disturbing the

system piping connections.

12.7.3 The pump shall be suitable for variable speed operation, pressure control and

generally satisfactory operation.

12.7.4 The pump maximum speed shall be 1500 RPM and the minimum operating speed

shall not be more than 50% of the maximum speed .accordingly, the pump motor

shall be suitable for this range.

12.7.5 The pump operation range shall be located between minimum allowable flow

specified by pump supplier and the maximum allowable flow of 110 % of best

efficiency point at all pump operating speeds.

12.7.6 Water velocity in pump suction and discharge nozzles shall not exceed 4 and 5 m/s

respectively at maximum operating condition within pump operation specifiedrange.

12.7.7 Low maintenance cost, reliability and trouble free operation shall be a prime

consideration when selecting pumps.

Page 63: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 63/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 63 of 128

12.7.8 The pumps and associated equipment shall include all necessary provisions to

prevent contamination of the drinking water being pumped.

12.7.9 The pumps shall be designed for continuous duty at rated parameters and shall be

capable of pumping the flow ranges specified above.

12.7.10The rated capacity and head of each pump shall be as specified on relevant

particular specifications.

12.7.11The optimum efficiency of the pump shall not be less than 85% at rated duty point

unless specifically mentioned otherwise, and shall be designed for parallel

operation of duty pumps. The minimum efficiency shall not be less than 70% at any

other operating point located within specified pump operation range.

12.7.12The head-capacity curve of the pumps shall be stable at all flow rates. The curve

shall be of a continuously rising type, right up to shut-off.12.7.13The minimum flow for each pump shall not exceed 40% of the best efficacy flow

unless specifically mentioned otherwise.

12.7.14The maximum flow for each pump shall not be less than 110% of the rated flow at

best efficacy point at rated speed.

12.7.15The pump capacity at run-out conditions shall not be less than 130% of the duty

point unless specifically mentioned otherwise.

12.7.16The required net positive suction head (NPSHR) at rated flow shall be at least 1.5

meters less than the available net positive suction head (NPSHA) and 0.5metere

less than the available net positive suction head (NPSHA) for all pumps parallel

operation range.

12.7.17The contractor shall verify the NPSHA value prior to ordering of pumps.

12.7.18The combined noise level of pump-drive system and motor shall not exceed

“85dbA” at 1 meter distance from equipment unless mentioned otherwise.

12.7.19The selected duty impeller should not exceed 95% of the r maximum impeller

diameter.

12.8 PUMP CONSTRUCTION R EQUIREMENTS:

Casing;

12.8.1 The casing of pumps shall exhibit good strength, corrosion resistance, abrasive-

wear resistance; material of pump casing shall be close grained cast iron to EN BS

1561 or BS 1452 Grade 260, ASTM A48 CL30 or equivalent and be free of any

blow holes and sand pockets resulting from imperfect and defective castings unless

specifically mentioned otherwise. Inner surfaces of casing which are in contact with

the fluid shall be ideally shaped to match the streamlines and be finished so that

Page 64: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 64/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 64 of 128

minimum head loss and favorable efficiency could be attained. The casing shall be

provided with vent and drain connections, screwed type, and fitted with removable

cocks. The material of construction for the removable cocks shall be stainless steel

316 all screw or bolt and nut seating in the casing shall be machined and the joint

face of the pump casing shall be sealed by means of flat gasket and bolted together.

Pump feet shall be casted as an integral part of the lower casing. Casing shall be

hydrostatically tested at 150% the pressure developed by the pump at shut-off.

Flanges shall be drilled to EN BS 1092-1 PN 16 rating. All pump casings shall have

a minimum corrosion allowance of 3 mm unless otherwise specified on the data

sheets. Sufficient clearance shall be provided between the drain opening and base

plate, to allow for assembly of pipes and fittings, as required without dismantling

the pump. All auxiliary piping connected to the casing shall be made of stainlesssteel 316L.

IMPELLER12.8.2 The impeller of pump shall be double entry suction manufactured from duplex

stainless steel EN 1.4517 (G-X3CrNi Mo Cu N 26633) or equivalent and should

exhibit excellent corrosion resistance, abrasive-wear resistance and casting and

machining properties. They shall be machined where practicable and made as

smooth as possible elsewhere. The vanes of each impeller shall be identical as

regards form and dimensions to ensure hydraulic balance in operation. The

impellers together with shaft shall be statically and dynamically balanced to ensure

a smooth and free of vibration running throughout its operating range. The impeller

shall be keyed to the shaft using one piece key; details of the fixing arrangement

shall be indicated by the Tenderer in his proposal. Impellers shall be fixed to the

shaft such that they do not loosen or become detached when the pump is rotating in

the wrong direction by reverse flow or reversed motor connections.

Shaft

Page 65: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 65/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 65 of 128

12.8.3 The shaft of pumps should exhibit high tensile strength, endurance limit and corrosion

resistance. Material of pump shaft shall be of high tensile steel to BS 970 or PD 970,

forged stainless steel or other approved material and shall properly be turned all over,

ground at the bearings and finished. Sealing of shaft is made by means of mechanical

seals. Shafts shall be provided with suitable hard faced sleeves. All pumps shall have

renewable shaft sleeves and shall not be in contact with water anywhere. Shaft sleeves

material shall be stainless steel EN 1.4571 (316Ti) or other proper equivalent material.

The uni-shaft or combined assembly (shaft and impeller) are not acceptable.

Wearing Rings12.8.4 The pump shall have wearing rings at casing and impeller. Material of renewable rings

shall be stainless steel EN 1.4571 (316Ti). Clearance within the rings shall be

acceptable and according to manufacturer standard or other approved standards.

Wearing rings shall be of renewable type and should be easily replaceable. Impeller

wear rings shall be the softer material of the two.

End Bearings & Bearing Housing12.8.5 Both radial and thrust bearings shall be of antifriction maintenance free type. Bearings

shall be self alignment type. Bearings shall be sized to offer a minimum L10 life of

100000 hours when operating at any flow rate. Bearings shall be of grease lubricated

and protected from water ingress by appropriate means. Bearing housing shall be of

cast iron or similar and consist of bearing end cover, thrower, vent, etc. Bearing

supports shall not be bolted type and shall be part of pump casing lower half only.

Base Plate

12.8.6 Base plate shall be secured to the foundation with foundation bolts and should

withstand the weight and vibrations of the pump. Material shall be made of

fabricated steel. The design of base plate shall be ratified by the Original Equipment

Manufacturer of the pumps.

Mechanical Seal

Page 66: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 66/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 66 of 128

12.8.7 The shaft seals shall be of the mechanical type by an approved specialist

manufacturer. The seals shall be designed and suited for both intermittent and

continuous running under all operating conditions. Lubricating and cooling water

for the seals shall be drawn from connections on the pump casings. The sealing

construction and design should enable the inspection and removal of the seals

without disturbing the pumps. The seal chamber size should be proper for all the

well-known mechanical seals. An inline filter must be used in the flush line to

prevent any foreign material from entering the seal chamber.

Bearings

12.8.8 Pumps bearing shall be Ball or roller bearing of anti friction maintenance free

standard type provided in accordance with the pump manufacturers

recommendations.(insert standards) The bearings shall be easy to replace and

available from manufacturer's normal stocks. In the design of bearing assemblies,

due consideration must be given to the ambient temperatures. The bearings shall be

protected against ingress of dust and moisture by effective seals. If the bearing

housing brackets and/or gland bowls(amend the sentence) are not integral with the

pump casing, they must be positively located by stainless steel dowel pins to ensure

correct repositioning of the brackets in the event of the joints being distributed.

Bearing supports shall not be bolted type and shall be part of pump casing lower

half only. Where pump bearings are pressure lubricated, they shall be supplied

complete with the associated lubricating oil system. Bearing shall have an ISO L10

life of 100,000 hours as minimum.

GAUGES & FITTINGS 12.8.9 Each pump shall be fitted with liquid filled type pressure gauges on the suction and

delivery sides complete with isolating cocks and snubbers & 2 way manifold.

Pressure gauges shall be 6 inch (150mm) nominal diameter "Industrial" bourdon

type in accordance with BS 1780 or equivalent. The suction gauges shall be ofcompound type with vacuum figures calibrated in red (please add the range of

value). The gauges shall be of robust construction, tropicalised with dust and damp

proof sealed brass cases or other approved non-corroding solid (not plated)

materials. The movements shall be of robust design, capable of withstanding the

degree of vibration shocks and pressure fluctuations normally encountered with

pump operation when protected by snubbers & 2 way manifold. Where pressurised

oil lubricated sleeve bearing are proposed, a dial type temperature gauge shall be

provided on shaft bearing. This shall be waterproof and provided with two

Page 67: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 67/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 67 of 128

adjustable contacts for two stage alarm and shut down. All gauges on a pump shall

be visible from one position and shall be mounted separately as a single panel with

SS 316L impulse line, fixed close to both suction and discharge sides of the pump.

VENTS & DRAINS 12.8.10An air-release priming cock shall be fitted at the top of the top of the volute casing

on each pump and the discharge piped to one of the shaft gland bowls. The gland

and body drains shall be collected in a drip-tray and the final discharge shall be

piped individually from each pump to the drainage channel in the pump house. The

drain pipes shall be in 25mm nominal size heavy wall copper or stainless steel tube

fitted with couplings so as to facilitate removal of any possible blockages.

NOZZLE & FLANGES

12.8.11Suction and Discharge connections shall be suitable to be connected to PN 16/25,

EN 1092-1 flanges as provided in relevant tender document unless mentioned

otherwise. The suction nozzles shall be designed for the same pressures as the

discharge nozzles. The suction nozzle size shall be selected to keep the suction

velocity low, so as to avoid cavitations. Flanges shall be raised face, drilled to PN

16/25, EN 1092-1 unless mentioned otherwise. Necessary tapping shall be provided

on the suction & delivery flanges to allow for installation of the pressure gauges.

12.9 ACCESSORIES

Driver (Electric Motor)12.9.1 The pumps shall be driven by suitably rated electric motor, conforming to

applicable specifications and to relevant tender document. The motor shall be

designed with over-rating factors to take the below mentioned conditions into

consideration:

An over-rating of 15% higher than the maximum power required at point of 110

% of the duty point. Of Q-H curve.

Temperature de-rating for the motor from 40°C to 50°C in addition to above.

The CONTRACTOR shall submit the motor rating calculations toKAHRAMAA for review and approval, prior to initiating motor design.

Variable speed drive:12.9.2 Variation of speed shall be achieved by frequency converters. The variable speed

pumping system shall be designed to operate over the entire range of operation.

The combination of pump and drive shall be designed to operate under changing

loads without getting overloaded and/or tripped. The offered Variable Speed Drive

System (V.S.D.S.) shall comply to relevant particular specifications and data sheets.

Couplings

Page 68: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 68/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 68 of 128

12.9.3 The pump shall be coupled to the motor via flexible coupling. The flexible

couplings shall be of rigid maintenance free type and shall be of an approved

design. The type of coupling offered shall be submitted for KAHRAMAA approval.

12.10 PROTECTION OF MOVING PARTS

12.10.1Moving parts of pump including all shafts, couplings, and collars, projecting key

heads, gear wheels, chain drives and all other moving machinery shall be guarded

where necessary to give complete protection to operating personnel.

12.10.2All set screws on revolving shafts shall be countersunk or suitably protected. The

guards shall be of an approved design and shall be fitted where necessary with

inspection doors. All guards shall be arranged so that they can be removed without

disturbing the parts of the gears and equipment they protect. Guards for shaft

couplings shall comply with requirements not less than BS 1649.

12.11 PUMPS COATING

12.11.1 All pumps shall be suitably coated and painted on both outer and inner

surfaces. All surfaces are to be thoroughly cleaned free of rust, scale, grease, dirt and

moisture before being painted. Grease and oily matter is to be removed by means of

a suitable solvent. After surface preparation, the coating system shall be applied. The

finish coat(s) shall be applied over the dry intermediate or first coat as recommended

by the manufacturer. The internal coating shall consist of primer, intermediate and

final coat(s).If more than one coat shall be applied, the second coat shall be applied

within time limits recommended by the manufacturer to prevent delaminating

between coats. The total dry film thickness for the proposed coating system shall be

not less than 300 microns The external coating of the pump shall comprise 2 pack

epoxy resin to a minimum dry film thickness of 300 microns. The colour of the

coating shall be blue. Coating of the pumps shall be plastic enamel paint (epoxyresin) inside and outside applied by electrostatic spray process. The coating shall

exhibit excellent protection for surfaces of pump and should be resistant against

impact and sag resistant quality. The adhesion or bond of the primer to the steel and

the inter coat adhesion of the finish coats and primer should be perfect The coating

shall be suitable for drinking water and shall be certified as non-toxic by an

internationally recognised testing organisation prior to internal coating applying.

The proposed coating system should be submitted for KAHRAMAA approval

Page 69: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 69/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 69 of 128

complete with a guarantee of at least 7 years under all operating conditions. The

internal coating system shall be tested in accordance with ISO 2178.

12.12 INSPECTION & TESTING

Factory TESTS & INSPECTIONS During the course of manufacture, each one of the pumps shall be subject to

minimum of followings standard inspection and testing procedures:

12.12.1 Mechanical property tests and chemical analyses for structural materials and

alloys of all pump components. The material certificates for same tests shall be

reviewed and approved by KAHRAMAA prior to any manufacturing process in

accordance with ISO 10474 3.1B certificate.

12.12.2 Hydrostatic pressure tests for the casing, body, and seating of pumps and

valves at 1.5 times of the design pressure plus the suction pressure if the operating

pressure is above 5 bars or as per the relevant code. If the design pressure is below 5 bars, the test pressure shall be the shut off pressure plus the suction pressure.

12.12.3 Performance tests for each pump coupled to its own motor in accordance with

ISO 9906 part 1&2.These tests shall be witnessed by KAHRAMAA and shall be at

the manufacturer's factory to show that pumps are capable of achieving the duty

point values as provided in the Contract. The pump curves shall be plotted at

minimum of seven heads/flow rates together with efficiencies, NPSH, power etc.

Certified data, curves, etc. both for witnessed test conditions and corrected for actual

site conditions shall be plotted & furnished for each test and submitted for approval

by KAHRAMAA. Tolerance of curves shall be in accordance with ISO 9906 grade

1. Tolerance for Q & H shall be in accordance with EN ISO 9906- Grade 1 tolerance

grade. However for efficiency, no negative tolerance is acceptable.

12.12.4 Noise and vibration tests for motor-pump sets.

12.12.5 Painting test: inspection shall cover colours, thickness and general

appearance, blisters, bubbles, voids or other discontinuities

12.12.6 Temperature rise test for bearings of motor-pumps.

12.12.7 Static and dynamic balancing of rotors and impellers of each motor-pump set.

12.12.8 Visual inspection shall include detection of defects, appearance, dimensions

etc.

12.12.9 Works tests of any other items of the plant not specifically mentioned above

as may be required by the Engineer.

12.12.10 KAHRAMAA reserve the right for shop inspection/stage inspection by their

authorised representatives.

Page 70: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 70/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 70 of 128

12.12.11 The CONTRACTOR/Manufacturer shall submit detailed and complete shop

testing procedure for the pump as per above mentioned type of tests at early stage,

and inform KAHRAMAA sufficiently in advance to enable their representatives to

witness the tests. The procedure shall be brief, comprehensive mentioning all

governing standards and limitations of acceptable range of values to be obtained in

the tests.

12.12.12 If any defects / faults / deformations detected during test or after delivery

before end of warranty period, it shall be repaired or replaced by Contractor /

Manufacturer after obtaining approval of KAHRAMAA. If the fault cannot be

rectified, the manufacturer must then replace the detective pump.

12.12.13 If witnessing of any tests is not satisfactory and a retest is required, the cost

of the witnessed retests shall then be borne by the Contractor.12.12.14 All instruments used during shop tests at manufacturer's premises shall be

duly calibrated by recognised laboratories and the calibration certificates shall be

inspected and certified by inspectors prior to starting the shop tests. The calibration

certificates should not be more than six month old. The data and results done during

test shall be recorded and submitted after end of the tests.

12.13 SITE ACCEPTANCE TEST:-

12.13.1 Following the completion of the installation and satisfactory start-up of the

equipments, site acceptance tests for all pumps, shall be conducted over the entire

speed range and pumps shall be free of cavitations or excessive vibration or noise.

Performance of each pump shall be within acceptable tolerance of EN ISO 9906,

Grade-2. In case of non-compliance to this required performance, the

manufacturer/contractor shall take corrective actions as necessary to improve the

performance of pumps. Considering this stringent performance criteria,

manufacturer must review the water quality, the piping & installation layout of pump

station with locations of key equipments such as pressure & flow transmitters and all

other components that may affect the pump performance test at site.

12.14 R ETENTION OF PUMP EFFICIENCY FOR SUSTAINABLE PERFORMANCE:

12.14.1 Pumps shall offer sustainable performance over a longer period. Manufacturer

shall specify efficiency after defect liability period (2 years), with tolerance limit at

the time of the bidding & give warrantee for the retention of efficiency after defect

liability period (2 years). After completion of defect liability period but before

issuing final taking over certificate, Site tests shall be performed as explained above,

Page 71: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 71/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 71 of 128

to ascertain the performance with agreed tolerance. In case of non-compliance to this

required performance, the manufacturer/contractor shall take corrective actions as

necessary to improve the performance of pumps at his cost. Otherwise

KAHRAMAA may carry out such rectifications from other contractor.

12.15 SPARE PARTS,

TOOLS AND ACCESSORIES

12.15.1 The Contractor should include all necessary and required spare parts for pump

and relating special of standard tools and accessories. Spare parts shall suitably be

packed and labeled as to the related apparatus for long storage under the climate

conditions prevailing in Qatar. The spare parts should be sufficient for two years

operation of pumps and as recommended by the manufacturer. Contractor should

provide the complete list of spare parts and relating unit prices. The minimum spare parts required shall be comprised as given in Table 17:

12.16 MAINTENANCE

12.16.1 The pumps shall be designed to permit fast and economical maintenance. The

major parts of pump such as casing, impeller etc. shall be designed and

manufactured to insure accurate alignment during installation in the pump hall. The

pumps and motor assembly shall be installed in a way allowing for sufficient space

for dismantling any component of the assembly without the need of removing from

the base plate. The package shall include any special tool required for dismantling

Table (17)Specifications for the climatic conditions N

o.Spare part Name

Number of pumps including stand by

pumps

1 2 3 4 5 6

1 Impeller (each) 1 1 1 2 3 3

2 Impeller wear ring(set) 1 2 4 6 8 8

3 Casing wear rings

(set)

1 2 4 6 8 8

4 Shaft with key and nut

(set)

1 1 2 3 4 4

5 Shaft protection

sleeves (set)

1 2 4 6 8 8

6 Pumps bearings &

washers (set)

1 2 4 6 8 8

7 Mechanical seals

(each)

1 2 3 6 8 8

8 O-rings, V-rings , and

gaskets (set)

4 4 8 12 16 16

9 Pump/motor coupling 1 1 1 2 2 210 Bearing housing 1 1 1 2 2 2

Page 72: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 72/128

Page 73: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 73/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 73 of 128

• Separate alarm contact for High & High- High winding temperature for all three

winding to alert & trip the motor.

12.19 VIBRATION MONITORING:

12.19.1 Pump

• Real time (4-20 mA) X & Y direction Vibration reading for DE, NDE bearings.

• Separate alarm contact for High & High- High bearing X & Y Vibration for both bearings (DE, NDE) to alert & trip the pumps.

12.19.2 Motor

• Real time ( 4-20 mA) X & Y direction Vibration reading for DE, NDE bearings

• Separate alarm contact for High & High- High bearing X & Y Vibration for both

bearings (DE, NDE) to alert & trip the motor.

• The above signals shall have indication in, Wall mounted LED screens display

system, local PLC & NWCC SCADA as attached.

12.20 GUARANTEE & WARRANTY

12.20.1 The warranty period for all of the pumps shall be two years as defined in the

General Conditions of Contract. The Contractor shall be responsible for the

correction of any defects to the pumps during the Warranty Period and shall make all

necessary repairs and replacements free of charge including labour charges.

12.21 NAMEPLATES, MARKING & LABELING

12.21.1 All pumps shall be identified by marking and labeling. A stainless steel

nameplate shall be provided for each pump including complete information i.e.

pump identification, manufacturers name, type & size, serial No., speed, rated flow ,

rated head, maximum casing pressure, weights of pump & motor & base plate, in

kilograms. The direction of rotation shall be clearly indicated, preferably on the

pump, otherwise on the name plate. The plate shall be securely riveted or screwed in

a readily accessible position on the pump .If screwed, heads are to be deformed to

prevent removal, and on no account shall the method of fixing involve drilling into

the wall of a pressure part. The name plate dimensions shall be according to DIN

825 standard.12.22 PACKING

12.22.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 74: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 74/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 74 of 128

Section - 13

Surface Boxes &Manhole Covers, Marker Posts & Indicator Plates

13.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

13.1.1 All surface boxes and manhole covers shall be manufactured from ductile iron in

accordance with BS-5834, Part 2 Grade A or EN 124, Class D-400 heavy duty or

equivalent as specified.

13.1.2 All surface boxes and manhole covers shall be coated with a cold applied black

bitumen solution in accordance with BS-3416.

13.1.3 All surface boxes and manhole covers shall be kite marked or a BIS Certificate of

compliance with the relative standard must be supplied with all deliveries.

13.1.4 All surface boxes and manhole covers shall have open keyways and prising slot in

frame.

13.1.5 Lifting keys, of malleable cast iron with loop handles or “T” handle as appropriate

suitable for all surfaces box and manhole covers and shall be supplied One (1) set

per Twenty (20) surface boxes.

13.1.6 All surface boxes and manhole covers shall have a height and depth of raised for

recessed pattern, Letters, Symbols and KAHRAMAA logo with minimum of 5mm

raised (See Appendix III).

13.1.7 All surface boxes and manhole covers shall have bounding ribs on the base frame.

13.2 GATE VALVE SURFACE BOXES (UP TO 300MM Ø VALVES)

13.2.1 The SV surface boxes shall be of the square type with a minimum 150 x 150mm

clear opening or double triangular loose coupled type, with a nominal 150 x 150mm

clear opening to BS 5834, Part 2 Grade A or EN 124, Class D-400 heavy duty or

equivalent as specified.

13.2.2 The covers of the SV surface boxes shall have open keyways and prising slot in

frame.

13.2.3 The covers of SV surface boxes are to have in the casting the letters ‘SV’ and

Water/W with a minimum height of 25mm and the raised as per clause 13.1.6.

13.2.4 The covers of the SV surface boxes shall be fitted with security chains.

13.2.5 The SV surface box shall have KAHRAMAA Logo for identification and the raised

as per clause 13.1.6.

Page 75: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 75/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 75 of 128

13.3 GATE VALVE MANHOLE COVERS (400MM Ø VALVES AND ABOVE)

13.3.1 The GV manhole covers shall be of the square type with a minimum 750 x 750mm

double triangular type clear opening, and shall conform to BS-5834, Part 2 or EN-

124, Class D-400 heavy duty or equivalent as specified.

13.3.2 The covers of the GV manhole covers shall have closed keyways and prising slots

in frame.

13.3.3 The covers of GV manhole covers are to have in the casting, the letters ‘GV’ and

Water/W with a minimum height of 50mm and the raised as per clause 13.1.6.

13.3.4 The GV manhole covers shall have KAHRAMAA Logo for identification and the

raised as per clause 13.1.6.

13.4 AIR VALVE MANHOLE COVERS

13.4.1 The AV manhole covers shall be of the square type with a minimum 750 x 750mm

double triangular type clear opening, and shall conform to BS-5834, Part 2 or EN-

124, Class D-400 heavy duty or equivalent as specified.

13.4.2 The covers of the AV manhole covers shall have closed keyways and prising slots

in frame.

13.4.3 The covers of AV manhole covers are to have in the casting, the letters ‘AV’ and

Water/W with a minimum height of 50mm and the raised as per clause 13.1.6.

13.4.4 The AV manhole covers shall have KAHRAMAA Logo for identification and the

raised as per clause 13.1.6.

13.5 BUTTERFLY VALVE MANHOLE COVERS

13.5.1 The BV manhole covers shall be of the square type with a minimum 750 x 750mm

double triangular type clear opening, and shall conform to BS-5834, Part 2 or EN-

124, Class D-400 heavy duty or equivalent as specified.

13.5.2 The covers of the BV manhole covers shall have closed keyways and prising slots

in frame.

13.5.3 The covers of BV manhole covers are to have in the casting, the letters ‘BV’ and

Water/W with a minimum height of 50mm and the raised as per clause 13.1.6.

13.5.4 The BV manhole covers shall have KAHRAMAA Logo for identification and the

raised as per clause 13.1.6.

13.6 STOPCOCK AND FERRULES (SC) SURFACE BOX

13.6.1 The Surface Connection (SC) surface boxes shall be of the square type with a

minimum 150 x 150mm clear opening or double triangular loose coupled type, with

Page 76: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 76/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 76 of 128

a nominal 150 x 150mm clear opening to BS 5834, Part 2 Grade A or EN 124,

Class D-400 heavy duty or equivalent as specified.

13.6.2 The covers of the SC surface boxes shall have open keyways and prising slot in

frame.

13.6.3 The covers of SC surface boxes are to have in the casting the letters ‘SC’ and

Water/W with a minimum height of 25mm and the raised as per clause 13.1.6.

13.6.4 The covers of the SC surface boxes shall be fitted with security chains.

13.6.5 The SC surface box shall have KAHRAMAA Logo for identification and the raised

as per clause 13.1.6.

13.7 UNDER GROUND FIRE HYDRANT MANHOLE COVERS

13.7.1 Fire hydrant (FH) manhole covers shall be of the Rectangle type with a minimum

380 x 230mm clear opening and shall conform to BS-5834, Part 2 or EN-124, Class

D-400 heavy duty or equivalent as specified.

13.7.2 The covers of the FH manhole covers shall have closed keyways and prising slots in

frame.

13.7.3 The covers of FH manhole covers shall have in the casting either the words ‘Fire

Hydrant’, in letters 25mm minimum in height or the letters ‘FH’ and Water/W with

a minimum height of 50mm and the raised as per clause 13.1.6.

13.7.4 The covers of the FH manhole covers shall be fitted with security chains.

13.7.5 The FH manhole covers shall have KAHRAMAA Logo for identification and the

raised as per clause 13.1.6.

13.8 WASHOUT MANHOLE COVERS

13.8.1 The WO manhole covers shall be of the square type with a minimum 750 x 750mm

double triangular type clear opening, and shall conform to BS-5834, Part 2 or EN-

124, Class D-400 heavy duty or equivalent as specified.

13.8.2 The covers of the WO manhole covers shall have closed keyways and prising slots

in frame.

13.8.3 The covers of WO manhole covers are to have in the casting, the letters ‘WO’ and

Water/W with a minimum height of 50mm and the raised as per clause 13.1.6.

13.8.4 The BV manhole covers shall have KAHRAMAA Logo for identification and the

raised as per clause 13.1.6.

13.9 MARKER POST

13.9.1 Marker post shall be manufactured from steel channel as detailed in the standard drawing

No. 1/49/C (See Appendix III).

Page 77: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 77/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 77 of 128

13.9.2 Each post will be supplied with a steel backing plate use for GV, AV and FH, and Each

post will be supplied with:-

A) Six (6) Nos. of M-8 x 30mm long counter sunk bolts with hexagon drive.

B) Four (4) Nos. of M-6 x 30mm long slotted round head bolts with nuts and spring

washers.

13.9.3 All posts and backing plates are to be grit blasted prior to the application of a suitable

three stages epoxy paint system. The color shall be light aircraft gray color Code RAL

7035.

13.9.4 All post & backing plates shall have identification metal strip (i.e. name or logo of the

manufacturers).

13.10 INDICATOR PLATE

13.10.1 Indicator plates and tiles will be from the ‘F’ range. The Engineer will notify Numbers

and letters in Arabic and English to be shown on the tiles.

13.10.2 Fire hydrant plates will have the letter ‘H’ cross and commas be empty of tiles and have

a plastic backing plate.

13.10.3 Gate valve and air valve plates will have the Arabic ‘Water’ ‘T’ cross and commas, be

empty of tiles and have a plastic backing plate.

13.11 ALUMINUM

INDICATOR PLATE

13.11.1 All aluminum indicator plate shall be designed as per the standard drawing No. NDS-

SD-902 (See Appendix III).

13.11.2 Aluminum Plate Thickness: 3mm

13.11.3 Type of Coating: Electro static powder coating

13.11.4 International coating cooler code: RAL 5019 (Blue)/ RAL 3002 (Red)

13.11.5 Coating thickness: 100 micron13.11.6 Depth of engraved letters: 0.8mm

13.11.7 Coating UV resistance: ASTM G 154 (UVB- 131) cycle at 50C UV and 4 hours at 40C

condensation, no chalking, excellent gloss retention & color stability after 1000 hours

testing. Series: 1307, Gloss: 77 ±7, Finish: smooth.

13.12 PACKING

13.12.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 78: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 78/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 78 of 128

Section - 14

Copper Tubes

14.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

14.1.1 The copper tubes shall be manufactured to BS-2871, Part 1, Table ‘Y’/ EN 1057 R 220-

250 and marking shall be engraved as per relevant standard.

14.1.2 The tubes shall be suitable for underground use for the transmission of potable water.

14.1.3 The tubes shall be supplied in the following forms:

14.1.4 15mm to 28mm Ø - soft coils of 20 meters length.

14.1.5 42mm & 54mm Ø - half-hard 5.8 meters straight length.

14.1.6 Tube samples and test results including ‘Drift Test’ results shall be provided at the

client’s request.

14.1.7 The coiled tubing is to be secured against uncoiling during transit, the straight lengths to

be supplied in wooden boxes and is to be fitted with end caps to prevent damage during

transit.

14.1.8 All tubes are to be new and factory fresh, tubes which have developed thick ‘patina’

through standing in stockyards etc. will not be accepted.

14.2 SHEATHING

14.2.1 The copper tubes shall be externally coated over their entire length with continuous

seamless polyethylene sheathing. The color of this sheathing shall be Green/Blue.

14.3 TUBE SIZES

14.3.1 The copper tubes shall be complying with the following specification with size as given

in Table 18:

Table (18) The Specification for copper tubes.

Tube

Nominal

size

Outside Ø (mm)

Nominal wall

Thickness

(mm) Max. Min.Thickness(m

m)

sheathing

(mm)

15 15.04

5

14.965 1.0 1.0

22 22.05

5

21.975 1.2 1.0

28 28.05

5

27.975 1.2 1.0

42 42.07 41.99 1.5 1.6

54 54.07 53.99 2.0 1.6

Page 79: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 79/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 79 of 128

14.4 PACKING

14.4.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 80: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 80/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 80 of 128

Section - 15

Copper Fittings, Ferrules, Stopcocks

15.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

15.1.1 The compression fittings shall be manufactured to BS-864, Part 2, Type ‘B’, and shall be

the ‘manipulative’ type with 2 locking rings and marked as BS 864.2. All mater ial and

associated components intended to be used for this project must be approved by the

Materials Standards Section of KAHRAMAA, prior to place firm order for purchasing.

15.1.2 The capillary fittings shall be manufactured to BS-864, Part 2, and shall be of the

‘integral’ solder ring type and marked as BS 864.

15.1.3 All the above fittings as referred in Clause 15.1.1 & 15.1.2, shall be suitable for use with

copper tube to BS-2871, Part 1, Table ‘Y’/ EN 1057 R -220-250, shall also be suitable

for underground use with potable water and shall be wrapped by lubricated tape.

15.1.4 All poly fittings shall be compression type and shall be manufactured to BS 864, Part 3,

Type A marked as BS 864.3 and shall also be suitable for use with potable water.

15.1.5 All nuts on these fittings shall be hexagonal or octagonal.

15.1.6 All fittings must be new, clean and recent manufactured.

15.2 MARKING 15.2.1 All fittings shall have engraved and/or casted the following:-

The manufacturer’s name and identification mark.

British Standard Number:

Compression Fittings - BS-864.2 or BS-864.3

Capillary Fittings - BS-864

Poly Adapters - BS-864.5

The size of the fitting in mm.

15.2.2 In the case of universal swivel ferrule, these will not have the BS number on them.

However, ferrules may have their size indicated in “imperial” measurement. In addition

to the above, an arrow indicating the “direction of flow” engraved and/or cast into them.

15.3 MATERIALS

15.3.1 All fittings including nuts & bolts, unions, etc., are to be manufactured from ‘gunmetal’

to BS-1400 LG2 or DZR Brass except material specified elsewhere in the specifications.

Samples with complete material specifications shall be supplied at the time of tendering.

15.3.2 UNIVERSAL SWIVEL FERRULES, SADDLES AND POLY ADAPTERS MUST BE

MANUFACTURED FROM ‘gunmetal’, no other material will be accepted.

Page 81: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 81/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 81 of 128

15.3.3 Stopcock, material option will depends on the application type:

For Above ground application: Stopcock is to be manufactured from gunmetal to

BS-1400 LG2 or DZR brass.

For underground application: If the Stopcock will be in direct contact with soil then

it must be manufactured from gunmetal to BS-1400 LG2. If not (inside chamber with

wrapping protection) either DZR brass/ gunmetal.

Note. Specifications of both applications will depend in the tender requirements.

15.3.4 Gaskets to be supplied with fittings in this section must be suitable for use with potable

water and the type of gasket to be set out in the offer.

15.4 UNIVERSAL SWIVEL FERRULE

15.4.1 The ferrule shall be suitable for connecting copper service pipes, (copper tubes to BS-2871, Part 1, Table ‘Y’/ EN 1057 R 220-250), to cement lined ductile iron distribution

mains to, (BS-4772/ISO 2531/EN545), and shall be ductile iron distribution pattern.

Screws down type ferrules with crutch heads are not acceptable.

15.4.2 The ferrules shall be suitable for insertion under-pressure by the use of a normal under-

pressure-tapping machine, as well as for normal dry installation.

15.4.3 The ferrules shall be manufactured throughout in ‘gunmetal’ to BS -1400 LG2 including

the inner plug, the top plug may be of PVC.

15.4.4 The following inlet/outlet connection will be required as per given in Table 19: -

Table (19) The Inlet / Outlet connection

Size of ferrule Type of outlet connection

½” x 15mm Copper compression , BS 864-2,

Type ‘B’

¾” x 22mm Copper compression , BS 864-2,

Type ‘B

1” x 28mm Copper compression , BS 864-2,

Type ‘B

1½” x 42mm Copper compression , BS 864-2,Type ‘B

2” x 54mm Copper compression , BS 864-2,

Type ‘B

15.5 MARKING

15.5.1 All fittings shall have engraved and/or casted the following:-

The manufacturer’s name and identification mark.

British Standard Number:

Compression Fittings - BS-864.2 or BS-864.3

Capillary Fittings - BS-864

Page 82: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 82/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 82 of 128

Poly Adapters - BS-864.5

The size of the fitting in mm.

15.6 STOPCOCKS

15.6.1 Stopcocks are to be manufactured to BS-1010, with crutch heads and loose jumpers. Thestopcock shall be manufactured from gunmetal to BS-1400 LG2 or DZR according to

the type of the application as mentioned in clause 15.3.3.

15.6.2 Stopcock washers are to be suitable for use with potable water at a normal temperature of

50 C.

15.6.3 Stopcocks will be required with the following types of connection as given in Table 20: -

Table (20)The required types of connection

Size of stopcock Type of connection

15mm Copper compression Type ‘B’ 22mm Copper compression Type ‘B’

28mm Copper compression Type ‘B’

42mm Copper compression Type ‘B’

54mm Copper compression Type ‘B’

15.7 MARKING

15.7.1 All fittings shall have engraved and/or casted the following:-

The manufacturer’s name and identification mark.

British Standard Number: Compression Fittings - BS-864.2 or BS-864.3

Capillary Fittings - BS-864

Poly Adapters - BS-864.5

The size of the fitting in mm.

15.8 SADDLES

15.8.1 Saddle strap shall be manufactured from ‘Gunmetal’ to BS-1400 LG2 with bolts size

suitable for ferrule connections up to 54mm, (2 Inches).

15.8.2 All bolts and nuts shall be stainless steel grade A4.15.8.3 The saddles shall be suitable for use with ductile iron pipes to BSEN 545 / ISO 2531.

15.9 MARKING

15.9.1 All saddles shall have engraved and/or casted the following:-

The manufacturer’s name and identification mark.

British Standard Number:

The size in mm.

15.10 PACKING

15.10.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 83: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 83/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 83 of 128

Page 84: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 84/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 84 of 128

Section - 16

Electronic Flow Meters District

16.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

16.1. 1 Electromagnetic flow meters shall be of a robust construction; generally with the requirements of

BS 5792. Materials of construction shall have a high level of corrosion resistance, be durable and

where normally exposed, be resistant to degradation by sunlight and high temperatures.

16.1. 2 The meter installation shall include a microprocessor transmitter of a similar durable construction

to that of the meter. The transmitter shall incorporate a display indicating a four digit flow rate.

16.1. 3 All connections shall be watertight and be of a heavy duty design with high reliability.

16.1. 4 The flow meters and transmitters shall be protected to the International Protection Code IP68.

16.1. 5 Manufacture/vendor clearance shall be obtained for flow meter installation drawings with respect to its performance for the selected range.

16.1. 6 The installation shall be powered from a UPS power mains supply.

16.1. 7 Electromagnetic Flow Meters components shall comply with the following:

16.2 FLOW SENSOR AND TRANSMITTER

16.2.1 Magnetic flow meters shall have flanged connections PN 16(.Material: Carbon Steel)

16.2.2 Vendor shall recommend and provide all accessories and fittings necessary for earthing /

grounding Electromagnetic flow meters for a noise-free signal (clean Instrument earthing shall

be checked and being less than 1 ohm)

16.2.3 The upstream and downstream straight lengths required for the offered Magnetic flow meters

are to be furnished along with bid. The criterion for location of piping reducers, valves, tees,

bends etc shall be checked by contractor.

16.2.4 The flow sensor should be buriable and to have a protection to IP 68, N EMA 6P.

16.2.5 Ambient Temperature Limits: 70º C

16.2.6 Process Temperature Limits: 70º C

16.2.7 The flow meter shall be bi-directional.

16.2.8 The sensor shall be constructed of stainless steel grade 316L and coated with a certified epoxy

coating (Minimum 300 micron).

16.2.9 Hastelloy electrodes shall be used.

16.2.10 The liner material should withstand minimum 100ppm of CL2 and Clo2 and the contractor

should submit a WRAS certification for their Flow Meters with liner Material for Hot Portable

water application in line with project specification.

16.2.11 The sensor operating temperature range shall be 0 to +70º C at 16 bars.

16.2.12 The flow sensor cable has to be armored, fitted and potted to the sensor prior to shipping from

the manufacturer's location. The electrical connection should be 20 mm armored glands.

16.2.13 The Flow sensor shall be potted at site for the flow meter having remote transmitter

installation ( more than 20 M away from flow sensor )

Page 85: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 85/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 85 of 128

16.2.14 The Flow sensor Terminal Box shall be of stainless steel.

16.2.15 The contractor should install only the manufacture Flow meter sensor cable for better

accuracy.

16.2.16 The sensor shall be to IP68 rated for permanent submergence up to 2 meters.

16.2.17 The Transmitter Operating temperature range shall be 0 to +60º C.

16.2.18 The Transmitter shall have housing with IP68 rating.

16.2.19 The transmitter has to be mounted away from the sensor in an Air condition environment and

if any limitation in distance than it will install such a way that it is protected by a sunshade and

can be enclosed in IP68 enclosure as per Kahramaa engineer approval.

16.2.20 The converter shall have background illumination with a three button menu driven

alphanumeric 5 lines, 40 character display to indicate flow rate, totalized values, settings and

faults.

16.2.21 The transmitter power supply shall be suitable for both 240Vac and 24Vdc.

16.2.22 The transmitter shall have four separate digital programmable outputs; open collector

transistor useable for pulse, frequency or alarm settings, for standard converters and Modbus

configuration.

16.2.23 The totalizer value has to be independently stored both in the sensor and the transmitter.

16.2.24 The transmitter analogue output shall be 4 – 20 mA into 800 ohms max.

16.2.25 The user interface shall be via hand held (HART) and via Asset Management System.

16.2.26 The Signal interface shall traditional I/O, Modbus and HART.

16.2.27 The totalizer shall be configurable pulses.

16.2.28 Minimum three Configurable alarms (Low Flow Alarm and High Flow Alarms , Empty pile

line detection alarm)

16.2.29 Accuracy; 0.2% at 0.5 M/S and 0.5% at 0.2 M/S of actual flow not full range of the flow

meter.

16.2.30 Each flow sensor shall be wet calibrated with the relevant/Paired transmitter and all of the

calibration information and factory settings matching the sensor/Transmitter shall be stored

integrally within the converter’s non-volatile memory. At initial commissioning, the flow

meter shall commence measurement without any initial programming. The certificate of

calibration shall be provided with each flow meter (having both flow sensor and transmitter

details)16.2.31 The contractor shall submit the finger print of the flow meter along with calibration certificate.

16.2.32 The signal converter/ Transmitter shall have the facility to replace a new signal converter/

Transmitter to upload all previous settings and resume measurement without any need for

reprogramming or rewiring.

16.2.33 The offered bid price shall cover the manufacturer review of installation drawings, approval

and their physical presence during site installation to confirm their recommendation for the

minimum upstream and downstream installation requirements and other vital criteria for stable

measurement.

16.2.34 The proposed Flow meter sensor / transmitter shall have wet calibration facility in Qatar orMiddle East.

Page 86: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 86/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 86 of 128

16.2.35 The contractor should submit minimum 5 point calibration certificate for each Flow meter

with 0.2 m/s , 0.3 m/s ,0.4 m/s ,0.5m/s and 1 m/s Velocity points as Mandatory and the

calibration certificate should have upstream and Downstream distance details in the certificate

)

16.2.36 During FAT Kahramaa Representative will check the 5 point calibration for each Flow meter

type (as per Pipe Size).

16.2.37 The Contractor shall submit the Calibration facility details with its accredited certificate

during material submittal stage.

16.2.38 The contractor shall provide the calibration certificate validity as follows

16.2.39 On shelf –

16.2.40 After site installation –

16.2.41 The Flow Transmitter should have a self-diagnostic or Verification facility (internally or

externally) to cross check the function of the Transmitter and Sensor.

16.2.42 The verification should read all the diagnostics for preventive maintenance.

16.2.43 The verification should be supported by necessary verification software and shall be able to be

printed as a certificate to prove that the meter is within the limits of all parameters as the

finger print.

16.2.44 The self-calibration method shall be stated in details to demonstrate the elements under

calibration.

16.2.45 The measurement draft and MTBF shall be stated.

16.2.46 The software and the special tools shall be provided to Kahramaa for future maintenance and

trouble shooting.

16.2.47 The contractor should do yearly instu- verification for the installed flow meter till the end of

contract maintenance period.

16.2.48 The flow meter shall have the facility to link any further monitoring & data acquisition

systems such AMR (Automatic Meter Readings), SCADA ... etc.

16.2.49 Provision of service passwords for security should be an essential feature of the transmitter to

prevent tampering of the transmitter configuration. Write access should be prevented by an

internal switch.

16.2.50 The transmitter shall have a simulation mode wherein simulation for Velocity, Q, Q%, I out,

Pulse, Logic2 / Pulse 2, Logic 3 and HART can be carried out (internally / externally through

source).

16.3 PRESSURE GAUGE

16.3. 1 Bourdon tube pressure gauges should be of the safety-pattern type in accordance

withEN60837-1. Where such gauges are not suitable due to corrosion, plugging, etc., pressure

gauges with a diaphragm seal shall be used.

16.3. 2 Pressure gauges shall have a circular dial and shall be of the direct sensing type, with bourdon

element. Gauges shall have a 4 inch (100 mm) dial and shall be of 316L SS construction as a

minimum and shall have ½” NPT male bottom process connections.

16.3. 3 Pressure gauges shall be of the safety pattern construction and shall be fitted with full blowout

backs and shatterproof lens (laminated safety glass).

Page 87: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 87/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 87 of 128

16.3. 4 Pressure gauge dial shall be white, non rusting plastic with black figures. Pointers shall have

external micrometer adjustment for gauge zero adjustment.

16.3. 5 Pressure gauges shall be weatherproof and shall have features like screwed bezels, externally

adjustable zero, over range protection and blowout discs.

16.3. 6 Pressure gauge ranges shall be selected from the following series so that the normal operating pressure is between 50 to 75% of scale, and the gauge is suitable for the lower design pressure

and the upper design pressure.

16.3. 7 For pressures above atmospheric the following ranges shall be considered, in barg.

1 to 1 0 to 1.6 0 to 2.5 0 to 4 0 to 6 0 to 10

0 to 16 0 to 25 0 to 40 0 to 60

16.3. 8 Pressure gauges shall have an accuracy of 1% of URV as a minimum. Differential pressures

gauges shall have an accuracy of 2% of URV.

16.3. 9 Over range protector and pulsation dampener, whenever used, shall be of SS316L, as a

minimum. Pulsation dampeners shall be used for all pulsating services. These shall be floating

pin type, externally mounted and externally adjustable.

16.3. 10 Process connection shall normally be 1/2" NPT-M bottom, except for diaphragm seal

where11/2" flanged connection shall be used.

16.3. 11 Cases shall be weatherproof to IP-68 as per IEC-60529. Blow-out discs shall be provided for

all gauges.

16.3. 12 Filled gauges shall not be used for any service, except where needed due to vibration.

16.3. 13 Primary isolation valves at main pipe tapping point are provided by Piping for all installations.

16.3. 14 All the pressure gauge shall install through Impulse line without fail as per Kahramaa engineerapproval.

16.3. 15 The contractor shall install the Pressure Gauge with online calibration facility using Manifold

(2 or 3 way manifold SS316) with other accessories (snubber and so on.).

16.3. 16 The calibration certificate shall show the valve in 25% increment and decrement to confirm

the linearity / repeatability of the gauges.

16.3. 17 The contractor shall supply the special tools (Pressure source and standard reference with all

the accessories) to do Future maintenance and Trouble shooting.

16.4 PRESSURE TRANSMITTERS AND DIFFERENTIAL PRESSURE TRANSMITTERS

16.4. 1 The accuracy is 0.1% of calibrated span (including temperature drift, linearity andrepeatability).

16.4. 2 Smart type and the output signal shall be 4-20mA besides HART.

16.4. 3 The pressure range and other specifications are as mention in the pressure gauge specification.

16.4. 4 Transmitters shall have no vent or drain connections in the body. They shall also have over-

range protection up to 150% of the maximum chamber rating on one or either side without

temporary or permanent damage.

16.4. 5 All wetted parts and body for Transmitters and fitting shall be SS316L as a minimum.

16.4. 6 The signal output, transmitter protection, Certification, susceptibility, EMC compliance, cableentry etc shall comply with IEC and be approved by KM

Page 88: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 88/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 88 of 128

16.4. 7 All Transmitters' process connection shall normally be 1/2" NPTF.

16.4. 8 The ambient temperature is up to 70º C.

16.4. 9 The power supply 24VDC.

16.4. 10 Primary isolation valves at main pipe tapping point are provided by Piping for all installations.

16.4. 11 Transmitter shall be installed through Impulse line without fail as per Kahramaa Engineer

approval.

16.4. 12 The contractor shall install the Transmitter with online calibration facility using Manifold (3

or 5 way manifold SS316) with all the required accessories.

16.4. 13 The calibration certificate shall show the valve in 25% increment and decrement to confirm

the linearity / repeatability of the Transmitter reading.

16.4. 14 The Transmitter, its Electrical connection and Accessories shall have ingress protection class

according to IP68.

16.4. 15 The Transmitter should have display with Push Button option for basic settings and thecontractor shall supply the special tools ( HART Communicator / OEM recommendation) to

do Future maintenance and details diagnostic (while trouble shooting).

16.4. 16 The Special tool shall be the latest model ( not less than 2 years old) with all the option

16.5 ASSET MANAGEMENT SYSTEM

16.5. 1 The contractor shall supply a workstation complete with an asset management system

compatible with the provided flow meters to be installed with all needed accessories that

ensures the functionality of the system. The provided asset management system shall support

OPC connectivity with the NWCC SCADA.

Page 89: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 89/128

Issue : 0 12/04/2015 Unclassified Page 89 of 128

Section - 17

S.S. Repair clamps & under pressure Drilling Tees

17.1 GENERAL These clauses shall be read in continuation of Section 1 of this specification.

17.1.1 The repair clamps and under pressure drilling tees shall be suitable for use with Ductile

Iron pipes manufactured to BSEN 545/ISO 2531. All pipe diameters being metric.

17.1.2 All units shall be supplied complete and ready for use.

17.1.3 All units are to be supplied in minimum of Two (02) bands segments for easy handling

during installation.

17.1.4 All units are to have ‘Finger’ lugs to ensure bolt guidance and alignments of units during

installation.

17.1.5 All units are to have a suitable method of jointing between the stainless steel band of the

clamp body and the lugs containing the bolts etc.. The preferred method of jointing is

by ‘pinning’; the Tenderer shall specify the method of jointing at the time of tendering.

17.1.6 In the case of under pressure drilling tees, the method of jointing the branch to the main

clamp body shall also be set out in the offer. In the case of welded joints, the method

and standards of welding and preparation shall be set out.

17.1.7 The packing of all units shall provide protection from damage during transit and be

suitable for storage once delivered.

17.1.8 The inner diameter of S.S. Repair clamps shall be suitable to the outer diameter of the

D.I. Pipes as per ISO 2531 / BSEN 545.

17.2 MARKING

17.2.1 Repair camps and under pressure tees are to be supplied with each unit marked with the

following information: -

Manufacturer’s name.

Size of pipe for which the unit is manufactured for.

Direction of rotation.

Size of branch

Grade of stainless steel.

17.3 MATERIALS

17.3.1 The repair clamps and under pressure drilling tees shall be manufactured from high grade

Stainless Steel to BS-1449, Para 2 - 316L/S12 or similar approved.

17.3.2 ‘Finger’ lugs may be manufactured from cast or malleable iron, ductile iron, steel or

stainless steel. In all cases, other than the lugs manufactured from stainless steel, the

Page 90: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 90/128

Issue : 0 12/04/2015 Unclassified Page 90 of 128

lugs must be protected from corrosion by a suitable coating; this is to be specified at the

item of tendering.

17.3.3 Fasteners shall be manufactured from stainless steel.

17.3.4 The gaskets used in all units shall be of EPDM (EDK-70), suitable for use with potable

water and full details of the same shall be included with the tender offer.

17.4 LENGTHS OF THE CLAMP

17.4.1 Lengths of the repair clamp must fall within the ranges as given in Table below 21.

Table (21) The length of the repair clamp

Type Minimum Length Maximum Length

A 300 mm 450 mm

B 500 mm 600 mm

C 750 mm 1000 mm

17.4.2 The Tenderer shall specify at the time of tendering the exact length of the clamp he is to

offer to comply with each of the above ranges.

17.5 FLANGES

17.5.1 The flanges fitted to the branch outlet of the under pressure drilling tees are to be drilled

to BS 4504, PN-16.

17.5.2 The branch must be of stainless steel.

17.6 PACKING

17.6.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 91: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 91/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 91 of 128

Section - 18

Concrete and Ancillary Items

18.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

18.1.1 All concrete shall be made using the sulphate resisting cement and shall comply fully with

the specification set by the Ministry of Municipal Affairs & Agriculture in the QNBS.

18.2 PRE-CAST CONCRETE CHAMBER SECTIONS

18.2.1 Pre-cast concrete chamber sections shall be of grade SRC-30/20, concrete made with

sulphate resisting cement.

18.2.2 Pre-cast concrete chamber shall have steel bars reinforcement to strengthen the concrete.

18.2.3 Pre-cast concrete chamber sections shall be of the size and shape as per the approved

contract/project drawings.

18.3 IMPREGNATED FIBER BOARD

18.3.1 Pipelines that are surrounded with concrete are to have expansion joints as specified.

These joints are to be formed by the use of bitumen impregnated fiber board.

18.3.2 The fiber board shall be bitumen impregnated 19mm thick and generally conform to

ASTM-1751 standard.

18.3.3 The contractor is to supply details of fiber board to the Engineer for approval.

Page 92: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 92/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 92 of 128

Section - 19

Polyethylene Pipes & Fittings for Service Connections (MDPE)

19.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

19.1.1 Polyethylene Pipes & Fittings used for conveyance of potable water shall be

manufactured in accordance with DIN-8074, BS 6730, BS 6572, ISO 4427 or

equivalent and shall be manufactured by ISO Certified Company.

19.1.2 Polyethylene Pipes shall be MDPE, PE-80, SDR 11, PN-12.5 bar.

19.1.3 Polyethylene Pipes shall be multi-layer construction. (Black MDPE with outer layer blue

MDPE)

19.1.4 Hydrostatic Test Pressure shall be 1.5 times the working pressure.

19.1.5 Polyethylene Pipes & fittings shall be Kite Marked certifying it complies with ISO 4427

or equivalent DIN, BS Standard.

19.1.6 Pipe manufacturers must furnish test certificate in accordance with EN 10204-3.1 for

batches of MDPE supplied.

19.1.7 Polyethylene Pipe shall be protected with GRP duct when laid aboveground along

customer wall premises. Two sizes are allowed; 2” duct for 20mm (1/2"), 2 5mm (3/4")

& 32mm (1") and 3”duct for 50mm (11/2") & 63mm (2"). The GRP duct shall be ofsemi-circular shape and be firmly fixed to the wall with brackets.

19.1.8 Polyethylene Pipe shall have detectable warning tape of 150mm wide, 250 microns

thickness to detect the pipe through metal detector.

19.2 POLYETHYLENE PIPES (MATERIAL)

19.2.1 All materials coating shall be WRC, DVGW, SGS, and DWI. , KIWA, NSF 61 or

other Worldwide Known Quality Body Certifiers in contact with potable water at

+50 degrees centigrade.

19.2.2 The Pipes & Fittings used for conveying potable water or likely to come into contact

with potable water shall not constitute a toxic hazard, shall not support microbial

growth and shall not give rise to unpleasant taste, or odor, cloudiness or discoloration

of water.

19.2.3 Polyethylene shall be manufactured from virgin polyethylene resin of a single or bi-

modal process of manufacture. Master batching and/or re-grind material is not

permitted.

Page 93: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 93/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 93 of 128

19.2.4 Polyethylene pipes installed in the water meter service cabinet between stop cock and

water meter or in direct sunlight shall be black in colour, UV resistant, of solid wall

construction to ISO 4427, all as per discretion of the Engineer.

19.2.5 The polyethylene pipe shall be confirming the specification as given in Table 22.

Table (22) The specification of the polyethylene pipe

Specification Value

Min density measured according

to ISO 1872

949 Kg/m

Melt flow rate measured

according to ISO 1133

@ 2.16 Kg. Load=

0.18g/10min.

@ 5 Kg. Load = 0.18/10min.

Tensile Strength at yield 18 Mpa

Elongation at break 600 %

Elongation 10 %

Thermal conductivity 0.32 W/mº K

Vicat Softening point at 1 kg.

load

122ºC

Flexural Modulus- ASTM D790 900 MPa

Tensile strength ASTM D638 30 MPa

HDT @ 0.46 MPa – ASTM D648 90ºCHDT @ 1.82 MPa – ASTM D648 58ºC

19.3 LENGTH AND SIZE

19.3.1 The polyethylene pipes are normally supplied in coils as per the specification given in

Table 23 (or in bundles of straight lengths of 12 up to 500m as per the discretion of the

Concerned Engineer):

Table (23) The polyethylene pipe sizes (in mm) and coils (in meters).

Nom. Ø Min. Ø Max. ØMin. Wall

Thickness

Max. Wall

Thickness

Max. Coil

Length20 20 20.30 2.30 2.80 500

25 25 25.30 2.30 2.80 400

32 32 32.30 3.00 3.50 300

40 40 40.30 3.70 4.30 300

50 50 50.30 4.60 5.30 300

63 63 63.40 5.80 6.70 200

Page 94: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 94/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 94 of 128

19.3.2 The ovality of the pipe in coils as manufactured shall not exceed the value of 0.06 of the

nominal size of the pipe.

19.3.3 The ovality of the pipe in coils after relaxation and straight pipe shall not exceed the

value of “1 + (0.008 of the nominal size of the pipe).

19.4 FITTINGS

19.4.1 All fitting for polyethylene pipes (MDPE) shall be compression type (Gunmetal) and all

details are given in Section 15.

19.5 STOP VALVE:

19.5.1 For underground installation - Stop Valve shall be made of Gunmetal BS 5433 crutch

head with gunmetal ended compression couplings to fit MDPE pipe both sides for all

size range from 20mm up to 63mm.

19.5.2 For aboveground installation inside/outside service cabinet before water meter – Stop

valve shall be of Brass tamper proof lockable type as per discretion of the concerned

Engineer. Suitable size of gunmetal compression couplings at both sides shall be used

in connecting MDPE Pipe of all size range from 20mm up to 63mm.

19.6 FLANGED FITTINGS:

19.6.1 Flange Adaptor to join MDPE pipe to flanged equipments (63mm OD MDPE pipe to 2"

Ø flange to BS 4504/ISO 7005, BS EN 1092-2 with PN 16 rating), material: black

coated Steel or SG Iron to BS EN 1563:1997 Grade EN-GJS-450-10, Gasket: EPDM

compound Grade 'E'.

19.7 SADDLE STRAPS

19.7.1 Saddle straps for service connections shall be flat boss type suitable for tapping from ½”

up to 2” diameter ferrule. The strap shall be suitable for making service connections

under pressure or dry using approved tapping machine into DI, AC Steel or PVC pipes.

The saddle shall be of two parts fitted with EPDM sealing gasket in a groove on the

underside of the flat boss.

19.7.2 The flat boss shall be cast with a hole or marking through the boss to facilitate the

drilling and tapping process. The straps shall be supplied un-drilled.

19.7.3 The saddle strap shall be of gunmetal to BS 1400-LG2 with stainless steel nuts, bolts and

washer to ISO 3506 and shall be suitable for a working pressure of up to 16 bar.

19.7.4 The name of manufacturer, patent number, pipe diameter to which the strap is suitable,

and pipe material shall be engraved on the saddle strap.

19.7.5 The saddle strap shall be accompanied by manufacturer’s certificate stating date of

manufacture, material specification.

Page 95: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 95/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 95 of 128

19.8 FERRULE

19.8.1 Ferrule shall be of gunmetal BS1400 LG2 body with gunmetal compression coupling

outlet suitable to fit directly with MDPE service pipe of all size from 20mm to 63mm,

for Underground application. Gunmetal with PE compression coupling outlet is

unacceptable.

19.8.2 Ferrules shall be the screw down valve type allowing for the shut off of the flow by

means of Ω” square head spindle extending from the top cap for opening and closing.

The valve shall close clockwise.

19.8.3 The ferrule stern, banjo, spindle, inner plug and top cap shall be of gunmetal to BS 1400-

LG2. The washers shall be of EPDM and shall provide the sealing between the outer

body and the ferrule stem. A polyethylene top plug shall prohibit the ingression of dirt.

19.8.4 The ferrule shall be designed as a main stem with a 360 swivel outlet at 90 with control

of water flow via the threaded inner plug. The inlet shall be male taper thread to BS 21.

19.8.5 The ferrule shall be suitable for drinking water at a temperature of up to 50C and

capable to sustain a working pressure of up to 16 bar without leakage.

19.8.6 The ferrule shall permit the installation of service connection using under pressure

tapping through flat boss saddle straps.

19.9 JOINTS

19.9.1 Fittings shall be of the slide and tighten type using a dynamic sealing method and

positive grip.

19.10 MARKING

19.10.1 Pipes shall be marked as follows:-

1. Manufacturer’s name

2. Standard

3. Nominal size of pipe in mm [ nominal outside diameter x nominal wall thickness]

4. SDR

5. Pressure rating in Bar6. Month & year of manufacture.

7. Body of the fittings should have Manufacturer’s name/ logo.

19.11 PACKAGING

19.11.1 All compression fittings must be individually packed in transparent protective bags

indicating its type and size.

Page 96: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 96/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 96 of 128

19.11.2 All compression fittings must be packed in cartoon boxes.

19.11.3 If only one type of product is packed all cartoon boxes shall have a label showing the

manufacturer identification, the description of the product, the drawing of the product,

the relevant size and the quantity.

19.12 PACKING

19.12.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

19.13 HANDLING & STORAGE

19.13.1 Pipes and Fittings shall be handled and stored carefully as per manufacturer’s

recommendation.

19.13.2 From manufacturer to laying stage, Pipes & Fittings shall be stored and transported in

covered area to avoid direct sunlight.

19.13.3 All damaged Pipe & Fitting due to mishandling shall be rejected.

19.13.4 The height of stack of pipes shall be as per manufacturer’s recommendation.

Page 97: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 97/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 97 of 128

Section - 20

uPVC Duct

20.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

20.1.1 All uPVC Duct should be manufactured, and test according to BS EN 1401-1.

20.1.2 The Color of uPVC Duct pipes shall be orange-brown (approximately RAL 8023) or

dusty grey (approximately RAL 7037) in color.

20.1.3 All Dimensions of uPVC Duct pipes shall be in millimeters as given in Table 24:

Table (24) The Dimension of the uPVC Ducts Pipe.

Nominal Size

(DN/OD)

Nominal

Outside

Diameter (dn)

Mean Outside

Diameter

Wall Thickness

SN2 SDR 41

dem,min dem,max. emin emax.

110 110 110.0 110.3 3.2 3.8160 160 160.0 160.4 4.0 4.6

20.1.4 All Ducts should be supplied in 4 meters or 6 meters in length.

20.1.5 The external and the internal surface of the pipe shall be smooth, clean, and free from

grooving, blistering, impurities and any other surface irregularity.

20.1.6 Pipe ends shall be cleanly cut and the ends of the pipes shall be square to their axis.

20.2 MARKING

20.2.1 uPVC Duct should be supplied with a center guideline printed on the middle of the duct,

where the marking consists of the following:

Number of Standard. (e.g. EN 1401)

Manufacturer name and/or trade mark.

Nominal Size.

Minimum wall thickness.

20.3 PACKING

20.3.1 The packing shall be as per Section 1, Clause 1.8 of this specification.

Page 98: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 98/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 98 of 128

Section - 21

Water Service Cabinet

21.1 GENERAL

These clauses shall be read in continuation of Section 1 of this specification.

21.2 WATER SERVICE CABINET (STANDARD – FLUSHED TYPE)

21.2.1 Bottom punch to be revised to 80 mm dia instead of 42 mm

21.2.2 Canceling the pad lock tongue and pin pieces

21.2.3 Provision of (2) additional 3 mm holes for riveting the new serial number with logo plate

area between the louver punches and vision panel. Cancel the previous emboss on the

top right side.

21.2.4 Position the Kahramaa logo emboss on the top left side of the door (To be eliminated

from the list of requirements, since the Customer Number accommodating KM Logo).

21.2.5 Provision of internal handle to open the cabinet door to avoid damages on the lock.

21.3 WATER SERVICE CABINET (STANDARD – SURFACE MOUNTED TYPE)

21.3.1 Remarks 1, 2, 3 and 4 are maintained as in the Flushed Type

21.3.2 No profile is required (flange) minimum lip bend or alternative proposal is acceptable21.3.3 Provision of (3) punches 42 m dia back/left/ and right aligned on the box top side

21.3.4 Cancel the Top punch and provide propose alternative preparation if future needed

21.3.5 Provision of (3) plastic end caps for the 3 top punches

21.3.6 Provision of internal handle to lift cabinet door easily

Page 99: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 99/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 99 of 128

APPENDIXES

I. Typical Drinking Water Quality .

II. Site Environmental Conditions.

III. Drawings.

1. WATER METER SERVICE CABINET.

2. Precast Concrete Chamber Slab Construction Details.

3. Marker Post, Backing Plates, and Plate.

4. Surface Box & Manhole Cover

IV. Worldwide Known Quality Body Certifier.

V. Pre - Arrangement Inspection.

Page 100: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 100/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 100 of 128

I. TYPICAL DRINKING WATER QUALITY

Page 101: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 101/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 101 of 128

Page 102: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 102/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 102 of 128

Page 103: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 103/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 103 of 128

Page 104: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 104/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 104 of 128

II. SITE ENVIRONMENTAL CONDITIONS

State of Qatar is classified as being among the worlds most arid and desert regions. The rainfall is

concentrated in the Winter & Spring period (December to March) with an average of 50 – 80mm

per annum. No discernible pattern in rainfall occurrence is apparent, but there is a tendency ofrainfall to occur more often during February & March. Rainfall can be heavy with poor natural

drainage resulting in surface flooding.

Month

Temperature Humidity

Degrees Centigrade %

Mean

Max.

Mean

Min.

Mean

Daily

Mean

Max.

Mean

Min.

January 22.3 13.1 17.5 90.7 51.9

February 22.7 12.7 17.5 82.8 38.7

March 27.5 16.8 21.8 85.3 40.9

April 31.3 20.0 25.3 80.9 37.3

May 37.6 24.3 30.7 67.6 20.8

June 41.0 26.0 33.6 64.2 20.1

July 41.5 28.3 34.6 71.0 24.6

August 40.7 28.3 34.1 77.7 30.7

September 38.3 25.9 32.0 86.5 38.9

October 35.2 23.0 29.0 83.7 37.0

November 29.8 19.5 24.5 89.9 37.6

December 24.8 14.5 19.4 86.1 46.5

Minimum-recorded related humidity is 100 %.

Maximum recorded direct sunlight temperature is 75 C.

Maximum recorded ambient shade temperature is 51 C.

Minimum recorded ambient shade temperature is 0 C.

Site elevation is 2 – 20 M AOD (State of Qatar).

Prevailing winds are mainly Northerly occasionally with Southeasterly gusts up to 140

Km/h.

Sandstorms though not severe, do occur and can persist for several days.

The site is not subject to Industrial pollution, but due to being near the coast; the air can be

salt laden with occasional fog. During the winter and spring periods, sever electrical

storms with sheet and forked lightning can occur.

Page 105: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 105/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 105 of 128

III. DRAWINGS

1. WATER METER SERVICE CABINET

Domestic Electronic in Wall Meter Cabinet – Aluminum

Page 106: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 106/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 106 of 128

Domestic Electronic on Wall Meter Cabinet – Aluminum

Page 107: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 107/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 107 of 128

2” Bulk Electronic Meter Cabinet – Aluminum

2” Bulk Electronic Meter Cabinet – Aluminum

Page 108: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 108/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 108 of 128

Page 109: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 109/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 109 of 128

2” to 12” Bulk Electronic Cabinet- GRP

Page 110: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 110/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 110 of 128

2. PRECAST CONCRETE CHAMBER SLAB CONSTRUCTION DETAILS

Page 111: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 111/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 111 of 128

Page 112: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 112/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 112 of 128

Page 113: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 113/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 113 of 128

Page 114: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 114/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 114 of 128

Page 115: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 115/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 115 of 128

3. MARKER POST, BACKING PLATES, AND PLATE

Fire Hydrant and Valves

Page 116: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 116/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 116 of 128

Valves

Page 117: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 117/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 117 of 128

Fire Hydrant

Page 118: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 118/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 118 of 128

4. SURFACE BOX & MANHOLE COVER

Surface Boxes

Page 119: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 119/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 119 of 128

Fire Hydrant Surface Boxes

Page 120: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 120/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 120 of 128

Manhole Covers

Page 121: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 121/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 121 of 128

IV. WORLDWIDE K NOWN QUALITY BODY CERTIFIER

WRc Evaluation &Testing Center,

o WRAS "Water Regulations Advisory Scheme”

o Fern Close, Pen-y-Fan Industrial Estate

Oakdale, Gwent NP11 3EH, U.K.

Tel.: 44 - 01495 248454

Fax: 44 - 01495 249234

o Website: http://www.wras.co.uk

E-mail: [email protected]

WRc-NSF

o Henley Road, Medmenham, Marlow

Bucks SL7 2HD, U.K.

Tel.: 44 – 01495 636500Fax: 44 – 01495 636501

Website: http:// www.wrcnsf.com

E-mail: [email protected]

LaboratoRI SpA

Via Vitorchiano, 165/167

00189 Roma, Italy

Tel.: 0039 06 57992600

Fax: 0039 06 57992629Website: http:// www.laboratorispa.it

E-mail: [email protected]

DVGW “The German Technical and Scientific Association for Gas and Water “.

Josef-Wirmer-Straße 1-3,

D-53123 Bonn, Germany

Tel.: 49-228-9188-5

Fax: 49-228-9188-990

Website: http://www.dvgw.de

E-mail: [email protected]

Page 122: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 122/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 122 of 128

NSF "National Standard Foundation".

P.O. Box 130140

789 N. Dixboro Road

Ann Arbor, MI 48113-0140, USA

Tel.: (+1) 734-769-8010

Toll Free (USA): 800-NSF-MARK

Fax: 734-769-0109

Website: http:// www.nsf.org [For Water System → http://www.nsf.org/dwa/]

E-mail: [email protected]

Aquacheck

Aquacheck Ltd

Europa Business Park, Barcroft Street

BURY, Greater ManchesterBL9 5BT, U.K.

Tel.: +44 (0)161 7638777

Fax: +44 (0)161 7638788

Website: http:// www.aquacheck.co.uk

E-mail: [email protected]

KIWA

Kiwa Water Research

Groningenhaven 7

3433 PE Nieuwegein

PO Box 1072

3430 BB Nieuwegein, Holland

Tel: +31 30 606 95 11

Fax: +31 30 606 11 65

E-mail: [email protected]

SIRIM QAS International Sdn.Bhd 1 , Persiaran Dato Menteri ,Seksyen 2 , Peti Sural 7035

40911 Shah Alam

Seiangor Darul Ehsan, Malaysia

Tel: 60-3-5544 6400

Fax: 60-3-5510 9439

Website: http : // www.sirim-qas.com.my

Page 123: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 123/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 123 of 128

Australian Water Quality Center

Hodgson Road, Bolivar, South Australia

Postal Address: Private Mail Bag 3, Salisbury SA 5108

Tel.: (08) 8259 0211 Fax: (08) 8259 0228

E-Mail: [email protected]

Website: http://www.awqc.com.au

Hygiene Institute

Hygiene-Institute des Ruhrgebietes,

Abt. Wasserhygiene, KTW-Prüfung

Rotthauser Str. 19

D-45879 Gelsenkirchen

Tel: +49 (209) 92 42 210

Fax: +49 (209) 92 42 212

E-Mail: [email protected]

Website: http://www.hyg.de

DWI- Drinking Water Inspectorate

Drinking Water Inspectorate

Area 7e

9 Millbank

c/o Nobel House

17 Smith Square

LondonSW1P 3JR

Telephone: 0300 068 6400

E-mail: [email protected]

Page 124: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 124/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 124 of 128

V. PRE - ARRANGEMENT INSPECTION

Pre-inspection arrangements for DI pipes, fittings, Valves, and Corrosion protection

materials (Wrapping Tape, PE Sleeving, Putty, Primer):

In order to facilitate the onsite inspection for Materials Specifications Engineers, these

following points are to be followed:

1. For any materials inspection (especially DI Fittings & valves), the items shall be

segregated as per their type/sizes on different pallets.

2. Each pallet shall have a post with an A-4 page with the description of the items

clearly written on it.

3. There shall be appropriate spaces between the pallets so that the engineer/inspector

can freely go around them and inspect the materials thoroughly.

4. Staking the materials all over each other & in one corner is strictly not allowed.

5. All valves shall be kept under the shade away from direct sun light. The valves shall

not be kept on the floor; they shall have wooden pallets underneath them.

6. Corrosion protection materials (Wrapping Tape, PE Sleeving, Putty, and Primer)

shall never be kept under direct sunlight or exposed to harsh site environment. They

shall be stored inside the site warehouse.

7. Wrapping tape shall be stored as per the manufacturer recommendations in cool /

ventilated area, and A/C equipped room during summer.

8. The wrapped/PE Sleeved DI pipes & Fittings Shall never be exposed to direct

sunlight and shall be covered with tarpaulin in order to protect them from the UV of

the direct sunlight which deteriorates the sleeve and the wrapping tape.

9. If the items in one pallet are more than 10 do not arrange it on top of the others, and

provide space in between to inspect easily.

Page 125: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 125/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 125 of 128

Page 126: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 126/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 126 of 128

Page 127: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 127/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Issue : 0 12/04/2015 Unclassified Page 127 of 128

Page 128: WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

7/21/2019 WP-P5-S1_19!8!15 General Specification of Main Laying Materials for Waterworks

http://slidepdf.com/reader/full/wp-p5-s119815-general-specification-of-main-laying-materials-for-waterworks 128/128

General Specification of Main Laying Materials For Waterworks WP-P5/ S1

Item Numbers as per attached lest of

materials inspection request Quantity of item

Project Name

Description of the Items Clearly Written