Class IX Dreamweaver project workplan
Citation preview
Starting Date: 4-Feb-2011Submission Date: Mar 8, 2011
ICT Project - Class IXWork Plan Term 2
SUBTASK ROLE START DATE END DATEPRODUCT
(milestones are highlighted)
Introduction of the project. Requirements discussed.
Teacher initiates 31-Jan-11 4-Feb-11 Select the topic for the project.
Work Plan Teacher 31-Jan-11 7-Feb-11Work Plan posted on softboards and ICT website
Students 7-Feb-11 11-Feb-11 Hard Copy Action Plan submitted
Online Research
Library Research
Writing the Report
Organize the information under main headings and sub headings
Make a flow chart
Decide the navigation tabs.
Design a banner
Design a template
Create 25 pages 28-Feb-11 Draft to be checked by teacher
Create Navigations Students 28-Feb-11 4-Mar-11
Complete the website Students 8-Mar-11
Paraphrased Content with citation to be emailed
18-Feb-1111-Feb-11Students
Students 18-Feb-11 21-Feb-11
Final Submission
21-Feb-11
25-Feb-11
Students
Submit the site map hard copy
Write-up about the layout