WORK SESSION AGENDA

COMMITTEE-OF-THE-WHOLE MARCH 19, 2018

CONFERENCE ROOM A IMMEDIATELY FOLLOWING THE COUNCIL MEETING

1. Sump Pump Ordinance Review – Steven Lang

2. Hwy 105/12th Street SW Project – Steven Lang 3. Administrative Report 4. Open Discussion

Page 2: Work Session Agenda

City of Austin 500 Fourth Avenue N.E.

Austin, Minnesota 55912-3773

Steven J. Lang, P.E. City Engr./Public Works Dir.

507-437-9949 Fax 507-437-7101

[email protected]

Memorandum To: Mayor & Council

From: Steven J. Lang, P.E.

Date: March 15, 2018

Subject: Sump Pump Ordinance Review

As part of the sump pump inspection program we have worked with WHKS and the City Attorney’s office regarding ordinance revisions. The ordinance revisions are necessary in order to gain access to private property to complete the inspection and provide the necessary enforcement actions to require property owners to make repairs. Key points to a successful Ordinance:

þ Clear water connections into the sanitary sewer are prohibited. Clear water connections include sources such as sump pumps, beaver drains, footing drains, defective laterals, etc.

o Sump pumps must have rigid discharge pipe to exterior, no valves or flex hose o City may choose to allow winter/summer valves in circumstances where nuisance icing is

occurring. o No sump pits without pumps o City, City’s representative, or private plumber inspects. o Ordinance establishes timelines to inspect and correct deficiencies. o City can issue surcharge for violations or no inspection o Stipends – are a discussion item, counts as taxable income, varies by City. o Point of Sale – a discussion item, helps maintain results.

_________ Verbiage added by WHKS to facilitate sump pump inspection program

_________ Verbiage added by City Attorney to address Owner/Tenant compliance

Page 3: Work Session Agenda

Discussion and comment on each point:

þ Clear water connections into the sanitary sewer are prohibited. Clear water connections include sources such as sump pumps, beaver drains, footing drains, defective laterals, etc. (covered with existing language)

§ 3.30 RULES AND REGULATIONS RELATING TO SEWER USE AND SERVICE CHARGE. Subd. 4. Building sewers and connections.

G. No person(s) shall make connection of roof downspouts, foundation drains, areaway drains, sump pumps or other sources of surface runoff or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer unless the connection is approved by the approving authority. Subd. 5. Use of the public sewers. A. It is unlawful for any person to discharge or cause to be discharged any unpolluted waters such as stormwater, ground water, roof runoff, subsurface drainage or cooling water to any sewer. Stormwater runoff from limited areas, which may be polluted at times, may be discharged to the sanitary sewer by permission of the approving authority.

o Sump pumps must have rigid discharge pipe to exterior, no bypass valves or flexible hose. o City may choose to allow winter/summer valves in circumstances where nuisance icing is

occurring. o No sump pits without pumps

§ 3.30 RULES AND REGULATIONS RELATING TO SEWER USE AND SERVICE CHARGE. Subd. 4. Use of public sewers required.

G. No person(s) shall make connection of roof downspouts, foundation drains, areaway drains, sump pumps or other sources of surface runoff or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer unless the connection is approved by the approving authority. Where a sump pit exists in any such building, it shall have a pump installed; no empty pits shall be permitted. The sump shall have a permanently-installed discharge line which provides for a year-round discharge connection to the city subdrain/storm sewer system or exterior surface discharge point, or as otherwise approved by the City. Such discharge line shall consist of a rigid pipe (PVC, copper, or galvanized) discharge line inside the structure, without valving or quick connections for altering the path of discharge and, if connected to the city subdrain/storm sewer system, shall include a check valve. No discharge shall be directed so as to impact neighboring properties or any city street, sidewalk or right-of-way. The City may allow installation of a locked

Page 4: Work Session Agenda

“winter/summer” valve in individual circumstances to abate nuisance icing where no subdrain/storm sewer and other reasonable alternative exists, only with review and express permission of the City.

o City, City’s representative, or private plumber inspects. § 3.04 RULES AND REGULATIONS RELATING TO MUNICIPAL UTILITIES.

Subd. 3. Right of entry. Employees of the city and Austin Utilities, and their designees, have the right to enter in and upon private property, including buildings and dwelling houses, in or upon which is installed a municipal utility or connection therewith, at all times reasonable under the circumstances, for the purpose of reading utility meters, for the purpose of inspection and repair of meters or a utility system or any part thereof, for the purpose of connecting and disconnecting service, and to confirm there is no sump pump or other prohibited discharge from said property into the city sanitary sewer system. The right of entry is a condition to furnishing utility service. If entry is refused, an employee may obtain an administrative search warrant to gain entry. The owner of any such property may meet the requirements of this section by contracting with a licensed plumber who is authorized to do business in the city to perform such inspection. Such plumber shall inspect the owner’s property and shall complete, sign, and return an inspection form to the City, documenting the results of the inspection. The inspection form shall be furnished to the property owner or licensed plumber upon request. All costs associated with an inspection by a licensed plumber retained by the property owner under this section shall be the responsibility of the property owner. If the property is leased by Owner, the tenant in possession has a duty to authorize and cooperate with the inspection. Owners must notify their tenants of Owner’s obligation under this ordinance to grant access to the City, Utilities or their designees, for purposes of performing the inspection and any deadlines by which the inspections must be completed. Subd. 7. Powers and authority of inspectors. A. Duly authorized employees of the city, and its designees, bearing proper credentials and identification…..

o Ordinance establishes timelines to inspect and correct deficiencies. § 3.30 RULES AND REGULATIONS RELATING TO SEWER USE AND SERVICE CHARGE. Subd. 7. Powers and authority of inspectors. A. Duly authorized employees of the city, and its designees, bearing proper credentials and identification shall be permitted to enter all properties for the purposes of inspection, observation, measurement, sampling and testing pertinent to discharge to any public sewer or natural outlet in accordance with the provisions of this section. Sampling pertaining to industry will reflect the number of days an industry is not operating as well as the days in operation and discharging waste to a public sewer. The owner of any dwelling, building, or other structure shall have a period of thirty (30 days from the date

Page 5: Work Session Agenda

the city sends a written notice to the owner requesting admittance to the owner’s property for an inspection, to either allow a city inspection of the property, or to contract with a licensed plumber to perform the inspection, and notify the city of the results thereof. Such inspection, whether performed by the city inspector, or by the licensed plumber hired by the property owner, shall be completed within said thirty (30) day period. Upon completion of a city inspection of a property, or upon the city’s receipt of an inspection form from the licensed plumber hired by the owner of the property, if the city shall determine whether any such property is improperly discharging storm water into the city sanitary sewer system, then the owner shall have a period of ninety (90) days from the date the city sends such written notice to the owner, to obtain a plumbing permit, and to disconnect the owner’s sump pump or other prohibited discharge into the city sanitary sewer system, and to request re-inspection, certifying that all work necessary to disconnect the owner’s sump pump or other prohibited discharge from said property into the city sanitary sewer system has been completed. All work that is necessary to comply with the provisions of this division which requires the issuance of any plumbing, building, or other permit under this code shall be inspected by the city inspection services division for compliance with all applicable city code requirements. If Owner leases the subject property, Owner has a duty to provide these notices to every tenant of the property. No lease or other contract purporting to shift maintenance or repair obligations to a tenant shall relieve Owner’s obligations to the City to comply with these regulations. Tenants in any property within the City have an obligation to cooperate with the Owner and the City, Utilities and their designees with respect to the completion of any required inspections or necessary modifications.

o City can issue surcharge for violations or no inspection.

§ 3.30 RULES AND REGULATIONS RELATING TO SEWER USE AND SERVICE CHARGE. Subd. 9. Sewer service charges.

A. Persons discharging wastewater to the city sanitary sewer system in accordance with the provisions of this section shall be charged monthly on the basis of the volume and strength of wastewater discharged. The monthly service charge will include a user charge component (to meet all costs associated with operation, maintenance and replacement of the wastewater collection and treatment facilities) and a debt retirement component (to meet facility construction costs). The actual service charge shall be based upon four cost causative elements: flow, BOD, suspended solids and administration. Administration costs shall include all costs (such as billing costs, insurance costs and infiltration/inflow related costs) that are judged to be equitably recovered on a uniform monthly minimum or connection type charge. That is, administration costs are not a variable among various users since these costs are not a function of the amount of wastewater discharged by a particular user.

B. As an equitable share of the expenses incurred by the city in the construction, administration, operation, maintenance and replacement of the sewerage works, each user will pay to the city a monthly amount based upon the following formula:

A = M + (f)(F) + (b)(B) + (ss)(S) + R + I/I Surcharge

Page 6: Work Session Agenda

1. A = Service charge to user, with units of $/month. 2. M = Average city per connection cost for administration and for treating clean water (infiltration and/or inflow), with units of $/month. 3. f = Average city unit cost of wastewater collection and treatment, with units of $/100 cubic feet. 4. F = Volume of wastewater from user with units of 100 cubic feet per month (often assumed equal to metered water usage). 5. b = Average city unit cost of wastewater treatment chargeable to BOD, with units of $/lb of BOD. 6. B = Weight of BOD contributed by user, with units of lb BOD per month. 7. SS = Average city unit cost of wastewater treatment chargeable to suspended solids, with units of $/lb suspended solids. 8. S = Weight of suspended solids contributed by user, with units of pound of SS per month. 9. R = Monthly amount of required federal grant repayments, in accordance with regulations applying to grant funds received by the city. R = zero for non-industrial users and may also equal zero for industrial users, depending upon applicable federal regulations. 10. I/I Surcharge = Any owner who fails to comply with the requirements of this code relating to prohibited clear water discharge to sanitary sewer shall pay a monthly surcharge on the property owner’s city sewer bill in the amount of $100.00 per month. Said surcharge shall commence on the first day of the month following the expiration of the thirty (30) day period set forth for inspections, or the ninety (90) day period set forth for correction of deficiencies, as applicable, when either the property owner has failed to timely allow a city inspection or has failed to timely correct any illegal connections to the city sanitary sewer system. Such surcharge shall continue to be imposed on the owner’s city sanitary sewer bill for as long as the property owner continues to own the property without complying with the requirements of this code. This monthly surcharge is intended to offset the added cost to the city associated with having the city wastewater collection, conveyance, and treatment system process clear or clean water (Inflow/Infiltration) unnecessarily, when the status of the property owner’s connection or non-connection to the city sanitary sewer system cannot be ascertained, or when the owner has failed to timely disconnect any discharge of storm water to the city sanitary sewer system.

o Stipends – are a discussion item, counts as taxable income, varies by City. Typically, Cities do not provide stipends. For those that do, amounts may vary from $400 to $2000. Stipends count as taxable income and may have the counter effect of raising contractor prices. Simple sump pump corrections such as swapping flex hose for rigid piping are inexpensive (under $100 materials) and can be done by the homeowner. More expensive corrections, such as installing a new sump pit and pump, are $1,500 to $2,000 but are infrequent. An alternative to stipends is to allow a time extension for making corrections if they are a financial burden. Note, per discussion 2/1/18, stipends not to be included in this draft.

Page 7: Work Session Agenda

o Point of sale – discussion item, helps maintain results.

§ 3.04 RULES AND REGULATIONS RELATING TO MUNICIPAL UTILITIES.

(This will come later) Subd 6. Point of Sale Inspection Required. The City of Austin shall require all properties to have a sanitary sewer inspection before they are advertised for sale. Property owners must obtain a Certificate of I/I Compliance from the City before selling or transferring title of property. Properties that do not pass inspection will be issued a correction notice. Certificates of I/I Compliance may be obtained through the inspection procedures defined in this section.

Page 8: Work Session Agenda

Page 1 of 1

City of Austin 500 Fourth Avenue N.E.

Austin, Minnesota 55912-3773

Steven J. Lang, P.E. City Engr./Public Works Dir.

507-437-9949 Fax 507-437-7101

[email protected]

Memorandum To: Mayor & Council

From: Steven J. Lang, P.E.

Date: March 15, 2018

Subject: Hwy 105, 12th Street SW Turtle Creek to City Limits

MnDOT is planning for a project on Hwy 105 south, 12th Street SW (Turtle Creek to City Limits.) The project would be similar to the mill & overlay project on Oakland Avenue West and 12th Street SW completed by MnDOT in 2016. Work on this project will include a mill & overlay, pedestrian curb ramps and sidewalk replacement to comply with ADA requirements. Future costs to the City on the project would include:

• Pedestrian flashing beacon at 19th Avenue SW • Sidewalk improvements adjacent to service road from 17th Ave. to 21st Ave. • On-road bike symbols

Construction of the project is planned for 2020. MnDOT is currently in the scoping phase and has provided the attached aerial photos for review and comment. If you have any questions, please let me know.

Page 9: Work Session Agenda

12th Street SW

Turtle Creek to City Limits

Construction 2020

Legend Feature 1

Untitled Path

Untitled Polygon

2000 ft

N

➤➤

N

Page 10: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

45

20

SCALE IN FEET

{ TH 105

zilk1jos
Callout
No work proposed
Page 11: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

45

15th

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
9.4%
etaylor
Arrow
etaylor
Text Box
10.3%
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
9.5%
etaylor
Text Box
Adjust MH
etaylor
Arrow
etaylor
Text Box
2.5%
etaylor
Text Box
1.5%
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
Tiered perpendicular
etaylor
Text Box
Low point in curb
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
5.0%
etaylor
Arrow
etaylor
Text Box
2.0%
etaylor
Text Box
Determine where to have pedestrians cross since not tying into walk on east side of TH 105
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Possible easement needed
zilk1jos
Callout
Since this driveway will be a "psuedo" ped ramp it should have an 8.3% max. apron slope.
Page 12: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

55

MM

M

M

DI

16th

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
Depressed corner or Fan
etaylor
Text Box
Adjust comm MH
etaylor
Text Box
Possible tighten radius, check auto-turn
etaylor
Arrow
etaylor
Text Box
Depressed corner
etaylor
Text Box
Proposed v curb, bituminous patch around landscape retaining wall and in auto sales parking lot
etaylor
Arrow
etaylor
Text Box
2.7%
etaylor
Text Box
3.0%
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
Easement needed
etaylor
Text Box
Easement needed
Page 13: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

BO

TT

OM

OF

CB

DI

17th

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
Tiered Perpendicular
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Possible tie into City proposed walk; determine City involvement
etaylor
Text Box
Proposed curb ramp and 5-6' concrete walk between power pole and drop inlet drainage structure, grade slope at 1:3
etaylor
Text Box
Avoid hydrant, possible relocate stop sign
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
Arrow
etaylor
Text Box
Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Easement needed
Page 14: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

60

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
City walk ends; determine if City wants to extend it to end of block. Possible conflicts: parking lot, trees
etaylor
Text Box
No curb cut, ramp
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
4.5%
etaylor
Text Box
6.5%
etaylor
Arrow
etaylor
Text Box
4.5%
etaylor
Arrow
etaylor
Text Box
10.0%
etaylor
Arrow
etaylor
Text Box
1.6%
etaylor
Text Box
13.5% ramp
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
9.0% existing gutter in slope
etaylor
Text Box
Possible bump out or switchback walk up to church parking lot; determine City's involvement
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
2.6%
etaylor
Text Box
Proposed gutter out to reduce ramp slope
etaylor
Text Box
Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Easement needed
etaylor
Text Box
Possible easement needed
Page 15: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-343

10/17/2017

65

M M M

M

19th

Ave S

W 20

SCALE IN FEET

{ TH 105

etaylor
Text Box
Determine City's involvement/ intentions and ROW
etaylor
PolyLine
etaylor
Text Box
Revise City's ped ramp to provide access across the frontage road and TH 105
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Curb ramp
etaylor
Text Box
Fan
etaylor
Text Box
Remove v curb, grade turf to back of walk
etaylor
Text Box
One-way Directional
etaylor
Text Box
Possible tighten radii at this intersection
etaylor
Text Box
Curb ramp
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Shift crossing to south to avoid tree in City blvd, if City participates in upgrades
etaylor
Text Box
8' bituminous existing, 5-6' concrete proposed
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
1.5%
etaylor
Text Box
3.3%
etaylor
Text Box
2.5%
etaylor
Arrow
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
Pedestrian warning flashers upgrade; currently battery/solar powered, fails on a regular basis. Upgrade audio tone for visually impaired
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Fan
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Easement needed
etaylor
Text Box
Easement needed
etaylor
Text Box
Possible easement needed
etaylor
Text Box
Possible easement needed
Page 16: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

75

21st A

ve S

W

20

SCALE IN FEET

{ TH 105

etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Tiered Perpendicular
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
Text Box
Determine City's involvement/ intentions and RoW
etaylor
Text Box
Extend walk to provide access to crossings/ walk
etaylor
Text Box
Curb ramp
etaylor
Text Box
Add access to frontage road
etaylor
Text Box
Perpendicular
etaylor
Text Box
One-way Directional
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Perpendicular
etaylor
Text Box
Easement needed
etaylor
Text Box
Possible easement needed
etaylor
Text Box
One-way Directional
Page 17: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

U

M

M

M M

M

22nd

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
Sunken curb near drainage structure
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
One-way Directional
etaylor
Text Box
Possible tighten radii at this intersection, check auto-turn
etaylor
Text Box
One-way Directional
etaylor
Text Box
4.0%
etaylor
Arrow
etaylor
Text Box
6.1%
etaylor
Arrow
etaylor
Arrow
etaylor
Text Box
10.0%
etaylor
Text Box
3.1%
etaylor
Arrow
etaylor
Text Box
0.5%
etaylor
Arrow
etaylor
Text Box
XS steep through par
etaylor
Arrow
etaylor
PolyLine
etaylor
PolyLine
Page 18: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

85

23rd

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Arrow
etaylor
Text Box
2.0%
etaylor
Text Box
2.6%
etaylor
Arrow
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
5' blvd, 6" curb
etaylor
PolyLine
etaylor
PolyLine
Page 19: Work Session Agenda

SHEET NO. OF SHEETS (TH 105)

PA

TH

&

FIL

EN

AM

E:

pw:\\p

w8i.ad.d

ot.state.m

n.u

s:c

adp\

Docu

me

nts\

Projects\

D6_

RC

H\105\5007\034\

Sco

pin

g\

Preli

min

ary\p5007034_ada1.d

gn

DIS

TRIC

T #:

6

PL

OT

TE

D/

RE

VIS

ED:

PL

OT

NA

ME:

p5007034_ada1.d

gn

STATE PROJ. NO. 5007-34

10/17/2017

24th

Ave S

W

20

SCALE IN FEET

{ TH 105

etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Tiered Perpendicular
etaylor
Text Box
Replace ramp at end of walk, back in kind
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
etaylor
PolyLine
Page 20: Work Session Agenda