Making a project work
QM Heat Plants Energy Supply Contracting Project Examples
3
family owned and run lcompany (Ltd.), founded in 1947 overall turnover € 20.000.000,-- 105 employees (30 engineers in the fields of mechanical engineering, heating- & air-
conditioning technology, tool making- and fixture construction, automation engineering, process engineering, welding technology,50 well trained assembly operators and approved welders)
Member of Austrian Biomass AssociationOEC Ecoenergy-ClusterNEE Network Energy EfficiencyNUT Network Environmental TechnologiesDECA Association Energy Contracting AustriaVfW Association for Heat delivery e.V. (located in Germany)Quality community water engineering
Quality management system according to ISO 9001:2000 Projects also in Germany, Slovakia, Hungary, Czech Republic,
Slovenia, Romania, Ukraine, North-Africa Projects range from installation works to research & development projects
4
performance list
Energie Comfort
Wozabal, Lenzing
EVN, Ebergassing
Gregor Mendel Instotut
IKEA, Wels
Plant construction – building engineering
biomass plants (wood chips, pellets, straw, miscanthus)
solar energy plants (thermal, fotovoltaic)
biogas plants CHP combined heat and power heat pumps (air, sole, water)
heating plants (for local heating, district heating, single objects)
steam boiler chiller (compression, absorption)
. . . . . Flughafen Wien
Porr, Wien
Eurotherme Resort
heat, cold, climate, ventilation, sanitary, steam, compressed air
Planning and construction from one-family-houses up to industrial plants
5
performance list
Sewage treatment plants Entire technical equipment Sludge dewatering External sludge transfer stations Fermentation gas plantsAeration plants Bio filterWaste water disinfection plants. . .
Water engineering Process-, bath-, drinking water purificationMunicipal swimming pools Tower tank equipment Stainless steel piping Batch plants for chemicals Pumping station equipment. . .
6
Energy supply contracting
heat, cold, steam, electricity
Planning, finance, construction and operation of energy systems and facilities.
Biomass heat plantsfor local heating, district heating, single objects concept development, feasibility study design, planning authorization procedure, founding construction, commissioning, operation
performance list
“QM Holzheizwerke“ Quality management biomass heat plants
Energy conceptsfor municipalities and industry
7Quality Management in local biomass district heating plants and grids
The Austrian “klima:aktiv”-Program
qm heizwerke - Quality Managementin local biomass district heating plants and grids
SofortSofort, GemeindeobjekteSpäterWohnblocksNeinnicht erhoben
Heizwerk
Abnehmercodierung
8
klima:aktiv • Active climate protection initiative• Launched in 2004 by the Federal Ministry of Agriculture, Forestry, Environment and Water Management
• Emissions must be reduced from 78.9 million tonnes CO2 equivalent (base year: 1990) to 68.7 million tonnes by the period of 2008-2012
klima:aktiv goals• Lower carbon dioxide emissions through higher energy efficiency• Increased use of renewable energy sources in all climate relevant areas of life• Meeting the Kyoto targets• Stimulating the climate protection markets• Creating a strong home market• New jobs are created and secured in the climate relevant industries• Strengthening Austria’s position as a business location in the long term
9
23 klima:aktiv programsbuilding an energy efficiency, municipalities, mobility, renewable energies
qm heizwerke
10
Map of austria - > 1.000 plants (size > 150 kW)
No. and total power installed for federal state:
11
Map of plants in styria in 2008
12
Main technical deficiencies• The heat demand of the consumers is over estimated• Over estimated reserve capacity stored in the heating plant• The pipeline grid system is over dimensioned• Size of the fuel silo is bigger than required• Low utilisation ratio of the wood boiler• Fuel quality does not meet the quality requirements for the installed firing• Faults in the hydraulic and in the control system lead to high operation costs
could have been avoided with professional planning !
Also professional management in organisation, finance, marketing are essential.
13
Quality assurance wood combustion• Originated in Switzerland• Advanced by experts from Germany, Switzerland and Austria• Model and basis for qm heizwerke in Austria• implemented in 2006
general management(framework)
Quality managers(execution of QA wood combustion) QA wood
combustion tools
15
The objective of the tool „QA Wood Combustion“ is to ensure, that plants are built with• High technical and operational performance• High utilisation ratio• Low emission• Low investment costs• Low operation costs
qm heizwerke - goals• Optimized design engineering process• More efficient biomass district heating plants• Know-How exchange• CO2 – Reduction• Feedback for subsidising authorities.• International co-operations for more dissemination of biomass district heating plants
16
Assurance of the Technical Quality
Q-Guideline (Q-Leitfaden)
• 45 single requirements are defined
The requirements define the best available technologyin the areas:
• Analysis of initial situation• Heat production• Heat supply• Documentation• Acceptance procedure• Optimisation of the plant operation• Final verification
17
some criteria• network heat utilisation ratio [kWh/m] at least 900, target > 1.200• network heat losses < 20 % • temperature differential feed / return [C] at least > 30°, target > 40°• boiler full load operating hours [hr]• specific electricity consumption [kWhel / MWhth]• specific invest costs heating network [€/MWh a]• specific invest costs heat plant [€/kW]• . . .
• boiler house equipment• minimum requirement of measurement instrumentation
18
• The “Q-Plan” is a tool to stipulate the quality for each specific plant.• After commissioning the functionality and the recorded operation data must be verified by analysis.
Assurance of the Technical Quality
“Q-Plan” - Quality Control Plan
19
• Summarizes operation data after the end of the qm process
• The same versionfor all federal states of Austria
• Upload via XML-Format• Benchmarking is made possible.
Assurance of the Technical Quality
yearly operation reports
20
qm project database - user groups
Database user authorization
State grant giving organization View all projects in Austria
Federal state subsidising organization View all projects of own federal stateOwner/operator (companies) Work on all own projects
Quality delegates Work on projects responsible
Design engineers Work on projects in the design and realization phase
Interested people Try on demonstration project
All activities of users are visible with timelines and user rights.
21
qm project database• easy access • comparing the operating data from plants• plans, charts and photos • Absence of documents is immediately apparent• Detailed project documentation• Part of the funding process• Technical and economical data• Standard forms are composed
automatically• . . .• 900 projects within the first 3 years• More than 34.000 PDF- documents• 1.800 photos
22
Averaged efficiency of the district heating network / installed heat quantity per metre district heating network up to 2003 (source: Rakos,
Nemestothy, [4])
40%
50%
60%
70%
80%
90%
100%
0 500 1000 1500 2000 2500
Installed heat quantitiy per metre district heating network
Aver
aged
effi
cien
cy o
f the
dis
trict
hea
ting
netw
ork
[%]
targ
et s
et b
y Ö
KL-M
erkb
latt N
r. 67
grid efficiency / installed heat quantity
23
Installed heat quantity per meter district heating network July 2006 - November 2009 (n=213; qm project database)
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500installed yearly heat quantity per meter network [kWh/m]
Ave
rage
d ef
ficie
ncy
of d
istr
ict
heat
ing
netw
orks
[%]
grid efficiency / installed heat quantity
Targ
et s
et b
y „Ö
KL M
erkb
latt
Nr.
67“
24
Definition, Characteristics
energy service, aims to improve the efficiency in energy production (and energy consumption)
Contracting ist eine intelligente Lösung für die Energieversorgung Ihrer Gebäude.
Contractorplanning, financing, construction and operation
of the plant to supply energy to buildings & processes (z.B. wood chip plant, pellets plant, …)
Energy-supply-contracting
energy supply can include: heat, cold, steam, electricity, compressed air
25
Heat supply contracting
Contractor = Investor
planning
financing
construction
operation
maintenance
repairs
fuel supply
Customer
planning
financing
construction
operation
maintenance
repairs
fuel supply
Heat price
Heat supply
Heat supply contractboiler room,
siteHire contract
Definition, Characteristics
26
planning, financing, construction and operationis done by the contractor
the contractor hires the room or lot of landhe needs to build the plant from the customer
the customer does not buy the plant (technical equipment),but he draws the energy he needs from the contractor.
the contractor is owner of the plant (technical equipment)
jointly the details of the agreement are defined in the energy supply contract
the total price for the energy supply consists of a basic rate [€/month], an energy rate [€/kWh], and an meter charge [€/yr]
Wärmepreis
Wärmelieferung
Energieliefervertrag
Heizraum,Grundstück
Mietvertrag
Definition, Characteristics
Energy costs
years0 5 10Basic rate
27
public buildings hospitals hotels office buildings shopping center dormitory, nursing homes medical centers sports facilities, stadium, baths apartment buildings production plants . . . . .
Possible applications
28
district heating
heat-distribution
new
existing
heat-production
new / reconstruction /
substitution
power requirement
winter- / summer-operation
fuel
wood chips,pellets, bark
straw, …
customersingle objects,local heating
Heat supply contracting
29
no own investments necessary for the customer financial resources can be used for other purposes one contact person for the whole project use of modern and efficient technology use of renewable and clean energy special know-how of the contractor saving in fuel consumption due to efficient operation of the plant assignment of duties to the contractor (organization, operation of the plant) assignment of risks to the contractor (financial, technical) guaranteed operating reliability; maintenance, repairs,
operation, optimization, is done by the contractor modern image of the real estate quick realization possible security of supply and comfort
Benefits of energy-supply-contracting
30
St. Florian Stift Kremsm.
Weber-Hydraulik Fronius PPI ProPet
object school monastery office, production
office, production
office, production production
motivation renovation substitutionof old boilers
extension,substitution
of old oil-boilersnew building Substitution
of old oil-boilers
extension,substitution
of old oil-boilers
heat needed for room heating,hot water
room heating,hot water
room heating,hot water,
process heat
room heating,hot water,
process heat
room heating,hot water
room heating,hot water,
process heat
Heat planthired from third
partyhired from customer
hired from customer
hired from customer
hired from customersite -
boiler room C C hired from customer C C C
boiler system 700 kW 1.000 kW BM1.500 kW Oil 85 + 500 kW BM 350 + 1.200 kW BM
1.300 kW Gas1.000 kW BM
550 kW Oil1.500 kW BM1.000 kW Oil
peak load,back up
-mobile heating
stationnew oil-boiler
-mobile heating
stationnew gas-boiler existing oil-boiler existing oil-
boiler
Heat supply contracting
31
St. Florian Stift Kremsm.
Weber-Hydraulik Fronius PPI ProPet
object school monastery office, production
office, production
office, production production
net length 100 m using an existing net 0 200 m 50 m 0
operation time winter winter (total yearly heat demand) winter, summer winter, summer winter winter, summer
fuelBiomass 100 % Biomass 100 % Biomass ~ 98 % Biomass ~ 95 % Biomass > 95 % Biomass
Wood chips Wood chips, bark, saw side products Wood chips Wood chips, bark,
saw side productsWood chips, bark, saw side products
Wood chips, bark, saw side products
fuel supplier local farmers contracting customer local farmers local farmers local farmers
fuel traderlocal farmers
fuel trader
Heat supply contracting
32
Project HBLA St. FlorianClient federal governmentRealization 2000Construction time 2,5 monthsFuel logistic local farmerFuel demand wood chipsFinancing ContractingFunding noneCustomer SchoolNominal output 700 kWHeat demand 900 MWh/aFuel storage 190 m3Back up mobile heating stationMain length 100 m
heat supply contracting
Public school
33
34
Project / client Fronius International
heat supply contracting
Industry, new plant
35
BMBMBMBM
Sp-
Sp-
--
BMBM
-Ö/G
-Ö/G
36
Commissioning 2006
Nominal output 350 kW wood chip boiler1.200 kW wood chip boiler
Peak load &back up 1.300 kW gas boilerHeat demand 5.000 MWh/a
for room heating,hot water and process heat
CO2 savings ~1.000 to/yrMain length 130 mFuel wood chips, bark,
saw residuesFuel storage 600 m3,
push floorFuel demand ~ 7.800 m3/yrFuel logistic local farmer
Prinzipschema BM-Heizwerk
37
Wartung
WARTU
NG
38
Project / client Weber Hydraulik GmbHObjects office building,
assembly hall,storage building(9.000 m2)
Heat demand 720 MWh/afor room heating,hot water,process-heat
Nominal output 85 kW + 500 kWPuffer storage 5.000 lBack up mobile heating station
heat supply contracting
Commercial business, existing boiler room
39
Commissioning 2005/2006Funding ~ 40%
Fuel wood chipsFuel storage 200 m3,
undergroundFuel logistic local farmer
40
Project / client Stift KremsmünsterFuel logistic Stift KremsmünsterFuel wood chipsFunding about 30 %Customer Monastery KremsmünsterNominal output 1.000 kWBack up &Peak load 1.500 kW Öl Fuel wood chips,
saw residuesHeat demand 3.000 MWh/aFuel storage 400 m3Main length 10 m
heat supply contracting
Existing district heating net,new heat plant
41
42
heat supply contracting
New heat plant and district heating grid
43
Feriendorf Obertraun
Project Holiday village Client Feriendrof Obertraun GmbHObjects 75 flats in 46 buildings and
one central building (hotel, pool, restaurant)Heat demand ca. 1.600 MWh / aNet lenght 1.350 trmBase load Biomass boiler 390 kWPeak load Oil boiler 700 kW Puffer storage 12.000 lBack up mobile heating stationFuel 95 % wood chips, ~ 2.600 srm,
5 % oil, ~ 9.000 lFuel storage 250 m3CO2 savings 500 to / aCommissioning 2011
44
heat supply contracting
existing district heating grid, retrofitting the heat plantProject DH EngelszellClient Monastery EngelszellExisting heat plant 500 kW biomass boiler - warm water
1.000 kW biomass boiler - steam NEW:Changing the steam system & boiler
to a warm water systemCommissioning 2009
45
Biomass projects
existing heat plant, new district heating gridProject DH WaizenkirchenClient Municipality Waizenkirchen /
Siemens AGExisting heat plant 300 + 1.000 kW
biomass boilerNEW:Net length 1.200 mPuffer storage 12.000 lPeak load 560 kW gasCommissioning 2009 / 2011
46
Project BM-heatplant PurkersdorfClient Energiecomfort GmbHObjects private & public buildingsBase load 1.200 kW biomass boilerPeak load existing gas boilersFuel wood chips Commissioning 2004
Biomass projects
New district heating
47
Project BM-heatplant TrumauClient Energiecomfort GmbHObjects private & public buildingsBase load 2.000 kW biomass boilerPeak load 4.000 kW gas boilersFuel wood chips Commissioning 2007
Biomass projects
New district heating
48
Biomass projects
Base load for existing district heatingProject BM-heatplant Presov (Sk)Client C.E.U. s.r.o.Base load 9.600 kW biomass boilerPeak load 4 x 6.000 kW gas boilersCommissioning 2008 / 09
49
Biomass projects
Base load for existing district heating
Project BM-heatplant Nove Zamky (Sk)Client Bytkomfort s.r.o.Base load 6.000 kW biomass boilerCommissioning 2011
Existing plant:2 x 33 MW Gas boiler1 x 12 MW Gas boiler1 x 2.700 kW Gas-CHP1 x 2.000 kW Gas-CHP
50
EA-NRW
Thank you for your kind attention !
aigner energie contracting gmbhing. aigner wasser-wärme-umwelt gmbhA-4501 Neuhofen, Kremstalstraße 18Tel: +43 (0)7227 6081–0 Fax: -13www.ing-aigner.at [email protected]
DI Siegfried Aigner
Contact:
EnergiesparpartnerschaftDienstleistung
keine Investitionskosten
Energieeffiziente SystemeWirtschaftliche, Zukunftssichere, Innovative Lösungen
ModernisierungErneuerbare Energieträger