49
1 October 28, 2011 Sheraton Vancouver Airport Wood Residue Conference

Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

1

October 28, 2011Sheraton Vancouver Airport

WoodResidueConference

Page 2: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

2

Making a project work

QM Heat Plants Energy Supply Contracting Project Examples

Page 3: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

3

family owned and run lcompany (Ltd.), founded in 1947 overall turnover € 20.000.000,-- 105 employees (30 engineers in the fields of mechanical engineering, heating- & air-

conditioning technology, tool making- and fixture construction, automation engineering, process engineering, welding technology,50 well trained assembly operators and approved welders)

Member of Austrian Biomass AssociationOEC Ecoenergy-ClusterNEE Network Energy EfficiencyNUT Network Environmental TechnologiesDECA Association Energy Contracting AustriaVfW Association for Heat delivery e.V. (located in Germany)Quality community water engineering

Quality management system according to ISO 9001:2000 Projects also in Germany, Slovakia, Hungary, Czech Republic,

Slovenia, Romania, Ukraine, North-Africa Projects range from installation works to research & development projects

Page 4: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

4

performance list

Energie Comfort

Wozabal, Lenzing

EVN, Ebergassing

Gregor Mendel Instotut

IKEA, Wels

Plant construction – building engineering

biomass plants (wood chips, pellets, straw, miscanthus)

solar energy plants (thermal, fotovoltaic)

biogas plants CHP combined heat and power heat pumps (air, sole, water)

heating plants (for local heating, district heating, single objects)

steam boiler chiller (compression, absorption)

. . . . . Flughafen Wien

Porr, Wien

Eurotherme Resort

heat, cold, climate, ventilation, sanitary, steam, compressed air

Planning and construction from one-family-houses up to industrial plants

Page 5: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

5

performance list

Sewage treatment plants Entire technical equipment Sludge dewatering External sludge transfer stations Fermentation gas plantsAeration plants Bio filterWaste water disinfection plants. . .

Water engineering Process-, bath-, drinking water purificationMunicipal swimming pools Tower tank equipment Stainless steel piping Batch plants for chemicals Pumping station equipment. . .

Page 6: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

6

Energy supply contracting

heat, cold, steam, electricity

Planning, finance, construction and operation of energy systems and facilities.

Biomass heat plantsfor local heating, district heating, single objects concept development, feasibility study design, planning authorization procedure, founding construction, commissioning, operation

performance list

“QM Holzheizwerke“ Quality management biomass heat plants

Energy conceptsfor municipalities and industry

Page 7: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

7Quality Management in local biomass district heating plants and grids

The Austrian “klima:aktiv”-Program

qm heizwerke - Quality Managementin local biomass district heating plants and grids

SofortSofort, GemeindeobjekteSpäterWohnblocksNeinnicht erhoben

Heizwerk

Abnehmercodierung

Page 8: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

8

klima:aktiv • Active climate protection initiative• Launched in 2004 by the Federal Ministry of Agriculture, Forestry, Environment and Water Management

• Emissions must be reduced from 78.9 million tonnes CO2 equivalent (base year: 1990) to 68.7 million tonnes by the period of 2008-2012

klima:aktiv goals• Lower carbon dioxide emissions through higher energy efficiency• Increased use of renewable energy sources in all climate relevant areas of life• Meeting the Kyoto targets• Stimulating the climate protection markets• Creating a strong home market• New jobs are created and secured in the climate relevant industries• Strengthening Austria’s position as a business location in the long term

Page 9: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

9

23 klima:aktiv programsbuilding an energy efficiency, municipalities, mobility, renewable energies

qm heizwerke

Page 10: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

10

Map of austria - > 1.000 plants (size > 150 kW)

No. and total power installed for federal state:

Page 11: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

11

Map of plants in styria in 2008

Page 12: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

12

Main technical deficiencies• The heat demand of the consumers is over estimated• Over estimated reserve capacity stored in the heating plant• The pipeline grid system is over dimensioned• Size of the fuel silo is bigger than required• Low utilisation ratio of the wood boiler• Fuel quality does not meet the quality requirements for the installed firing• Faults in the hydraulic and in the control system lead to high operation costs

could have been avoided with professional planning !

Also professional management in organisation, finance, marketing are essential.

Page 13: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

13

Quality assurance wood combustion• Originated in Switzerland• Advanced by experts from Germany, Switzerland and Austria• Model and basis for qm heizwerke in Austria• implemented in 2006

general management(framework)

Quality managers(execution of QA wood combustion) QA wood

combustion tools

Page 14: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

15

The objective of the tool „QA Wood Combustion“ is to ensure, that plants are built with• High technical and operational performance• High utilisation ratio• Low emission• Low investment costs• Low operation costs

qm heizwerke - goals• Optimized design engineering process• More efficient biomass district heating plants• Know-How exchange• CO2 – Reduction• Feedback for subsidising authorities.• International co-operations for more dissemination of biomass district heating plants

Page 15: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

16

Assurance of the Technical Quality

Q-Guideline (Q-Leitfaden)

• 45 single requirements are defined

The requirements define the best available technologyin the areas:

• Analysis of initial situation• Heat production• Heat supply• Documentation• Acceptance procedure• Optimisation of the plant operation• Final verification

Page 16: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

17

some criteria• network heat utilisation ratio [kWh/m] at least 900, target > 1.200• network heat losses < 20 % • temperature differential feed / return [C] at least > 30°, target > 40°• boiler full load operating hours [hr]• specific electricity consumption [kWhel / MWhth]• specific invest costs heating network [€/MWh a]• specific invest costs heat plant [€/kW]• . . .

• boiler house equipment• minimum requirement of measurement instrumentation

Page 17: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

18

• The “Q-Plan” is a tool to stipulate the quality for each specific plant.• After commissioning the functionality and the recorded operation data must be verified by analysis.

Assurance of the Technical Quality

“Q-Plan” - Quality Control Plan

Page 18: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

19

• Summarizes operation data after the end of the qm process

• The same versionfor all federal states of Austria

• Upload via XML-Format• Benchmarking is made possible.

Assurance of the Technical Quality

yearly operation reports

Page 19: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

20

qm project database - user groups

Database user authorization

State grant giving organization View all projects in Austria

Federal state subsidising organization View all projects of own federal stateOwner/operator (companies) Work on all own projects

Quality delegates Work on projects responsible

Design engineers Work on projects in the design and realization phase

Interested people Try on demonstration project

All activities of users are visible with timelines and user rights.

Page 20: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

21

qm project database• easy access • comparing the operating data from plants• plans, charts and photos • Absence of documents is immediately apparent• Detailed project documentation• Part of the funding process• Technical and economical data• Standard forms are composed

automatically• . . .• 900 projects within the first 3 years• More than 34.000 PDF- documents• 1.800 photos

Page 21: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

22

Averaged efficiency of the district heating network / installed heat quantity per metre district heating network up to 2003 (source: Rakos,

Nemestothy, [4])

40%

50%

60%

70%

80%

90%

100%

0 500 1000 1500 2000 2500

Installed heat quantitiy per metre district heating network

Aver

aged

effi

cien

cy o

f the

dis

trict

hea

ting

netw

ork

[%]

targ

et s

et b

y Ö

KL-M

erkb

latt N

r. 67

grid efficiency / installed heat quantity

Page 22: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

23

Installed heat quantity per meter district heating network July 2006 - November 2009 (n=213; qm project database)

0

10

20

30

40

50

60

70

80

90

100

0 500 1000 1500 2000 2500installed yearly heat quantity per meter network [kWh/m]

Ave

rage

d ef

ficie

ncy

of d

istr

ict

heat

ing

netw

orks

[%]

grid efficiency / installed heat quantity

Targ

et s

et b

y „Ö

KL M

erkb

latt

Nr.

67“

Page 23: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

24

Definition, Characteristics

energy service, aims to improve the efficiency in energy production (and energy consumption)

Contracting ist eine intelligente Lösung für die Energieversorgung Ihrer Gebäude.

Contractorplanning, financing, construction and operation

of the plant to supply energy to buildings & processes (z.B. wood chip plant, pellets plant, …)

Energy-supply-contracting

energy supply can include: heat, cold, steam, electricity, compressed air

Page 24: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

25

Heat supply contracting

Contractor = Investor

planning

financing

construction

operation

maintenance

repairs

fuel supply

Customer

planning

financing

construction

operation

maintenance

repairs

fuel supply

Heat price

Heat supply

Heat supply contractboiler room,

siteHire contract

Definition, Characteristics

Page 25: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

26

planning, financing, construction and operationis done by the contractor

the contractor hires the room or lot of landhe needs to build the plant from the customer

the customer does not buy the plant (technical equipment),but he draws the energy he needs from the contractor.

the contractor is owner of the plant (technical equipment)

jointly the details of the agreement are defined in the energy supply contract

the total price for the energy supply consists of a basic rate [€/month], an energy rate [€/kWh], and an meter charge [€/yr]

Wärmepreis

Wärmelieferung

Energieliefervertrag

Heizraum,Grundstück

Mietvertrag

Definition, Characteristics

Energy costs

years0 5 10Basic rate

Page 26: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

27

public buildings hospitals hotels office buildings shopping center dormitory, nursing homes medical centers sports facilities, stadium, baths apartment buildings production plants . . . . .

Possible applications

Page 27: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

28

district heating

heat-distribution

new

existing

heat-production

new / reconstruction /

substitution

power requirement

winter- / summer-operation

fuel

wood chips,pellets, bark

straw, …

customersingle objects,local heating

Heat supply contracting

Page 28: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

29

no own investments necessary for the customer financial resources can be used for other purposes one contact person for the whole project use of modern and efficient technology use of renewable and clean energy special know-how of the contractor saving in fuel consumption due to efficient operation of the plant assignment of duties to the contractor (organization, operation of the plant) assignment of risks to the contractor (financial, technical) guaranteed operating reliability; maintenance, repairs,

operation, optimization, is done by the contractor modern image of the real estate quick realization possible security of supply and comfort

Benefits of energy-supply-contracting

Page 29: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

30

St. Florian Stift Kremsm.

Weber-Hydraulik Fronius PPI ProPet

object school monastery office, production

office, production

office, production production

motivation renovation substitutionof old boilers

extension,substitution

of old oil-boilersnew building Substitution

of old oil-boilers

extension,substitution

of old oil-boilers

heat needed for room heating,hot water

room heating,hot water

room heating,hot water,

process heat

room heating,hot water,

process heat

room heating,hot water

room heating,hot water,

process heat

Heat planthired from third

partyhired from customer

hired from customer

hired from customer

hired from customersite -

boiler room C C hired from customer C C C

boiler system 700 kW 1.000 kW BM1.500 kW Oil 85 + 500 kW BM 350 + 1.200 kW BM

1.300 kW Gas1.000 kW BM

550 kW Oil1.500 kW BM1.000 kW Oil

peak load,back up

-mobile heating

stationnew oil-boiler

-mobile heating

stationnew gas-boiler existing oil-boiler existing oil-

boiler

Heat supply contracting

Page 30: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

31

St. Florian Stift Kremsm.

Weber-Hydraulik Fronius PPI ProPet

object school monastery office, production

office, production

office, production production

net length 100 m using an existing net 0 200 m 50 m 0

operation time winter winter (total yearly heat demand) winter, summer winter, summer winter winter, summer

fuelBiomass 100 % Biomass 100 % Biomass ~ 98 % Biomass ~ 95 % Biomass > 95 % Biomass

Wood chips Wood chips, bark, saw side products Wood chips Wood chips, bark,

saw side productsWood chips, bark, saw side products

Wood chips, bark, saw side products

fuel supplier local farmers contracting customer local farmers local farmers local farmers

fuel traderlocal farmers

fuel trader

Heat supply contracting

Page 31: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

32

Project HBLA St. FlorianClient federal governmentRealization 2000Construction time 2,5 monthsFuel logistic local farmerFuel demand wood chipsFinancing ContractingFunding noneCustomer SchoolNominal output 700 kWHeat demand 900 MWh/aFuel storage 190 m3Back up mobile heating stationMain length 100 m

heat supply contracting

Public school

Page 32: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

33

Page 33: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

34

Project / client Fronius International

heat supply contracting

Industry, new plant

Page 34: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

35

BMBMBMBM

Sp-

Sp-

--

BMBM

-Ö/G

-Ö/G

Page 35: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

36

Commissioning 2006

Nominal output 350 kW wood chip boiler1.200 kW wood chip boiler

Peak load &back up 1.300 kW gas boilerHeat demand 5.000 MWh/a

for room heating,hot water and process heat

CO2 savings ~1.000 to/yrMain length 130 mFuel wood chips, bark,

saw residuesFuel storage 600 m3,

push floorFuel demand ~ 7.800 m3/yrFuel logistic local farmer

Prinzipschema BM-Heizwerk

Page 36: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

37

Wartung

WARTU

NG

Page 37: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

38

Project / client Weber Hydraulik GmbHObjects office building,

assembly hall,storage building(9.000 m2)

Heat demand 720 MWh/afor room heating,hot water,process-heat

Nominal output 85 kW + 500 kWPuffer storage 5.000 lBack up mobile heating station

heat supply contracting

Commercial business, existing boiler room

Page 38: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

39

Commissioning 2005/2006Funding ~ 40%

Fuel wood chipsFuel storage 200 m3,

undergroundFuel logistic local farmer

Page 39: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

40

Project / client Stift KremsmünsterFuel logistic Stift KremsmünsterFuel wood chipsFunding about 30 %Customer Monastery KremsmünsterNominal output 1.000 kWBack up &Peak load 1.500 kW Öl Fuel wood chips,

saw residuesHeat demand 3.000 MWh/aFuel storage 400 m3Main length 10 m

heat supply contracting

Existing district heating net,new heat plant

Page 40: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

41

Page 41: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

42

heat supply contracting

New heat plant and district heating grid

Page 42: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

43

Feriendorf Obertraun

Project Holiday village Client Feriendrof Obertraun GmbHObjects 75 flats in 46 buildings and

one central building (hotel, pool, restaurant)Heat demand ca. 1.600 MWh / aNet lenght 1.350 trmBase load Biomass boiler 390 kWPeak load Oil boiler 700 kW Puffer storage 12.000 lBack up mobile heating stationFuel 95 % wood chips, ~ 2.600 srm,

5 % oil, ~ 9.000 lFuel storage 250 m3CO2 savings 500 to / aCommissioning 2011

Page 43: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

44

heat supply contracting

existing district heating grid, retrofitting the heat plantProject DH EngelszellClient Monastery EngelszellExisting heat plant 500 kW biomass boiler - warm water

1.000 kW biomass boiler - steam NEW:Changing the steam system & boiler

to a warm water systemCommissioning 2009

Page 44: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

45

Biomass projects

existing heat plant, new district heating gridProject DH WaizenkirchenClient Municipality Waizenkirchen /

Siemens AGExisting heat plant 300 + 1.000 kW

biomass boilerNEW:Net length 1.200 mPuffer storage 12.000 lPeak load 560 kW gasCommissioning 2009 / 2011

Page 45: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

46

Project BM-heatplant PurkersdorfClient Energiecomfort GmbHObjects private & public buildingsBase load 1.200 kW biomass boilerPeak load existing gas boilersFuel wood chips Commissioning 2004

Biomass projects

New district heating

Page 46: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

47

Project BM-heatplant TrumauClient Energiecomfort GmbHObjects private & public buildingsBase load 2.000 kW biomass boilerPeak load 4.000 kW gas boilersFuel wood chips Commissioning 2007

Biomass projects

New district heating

Page 47: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

48

Biomass projects

Base load for existing district heatingProject BM-heatplant Presov (Sk)Client C.E.U. s.r.o.Base load 9.600 kW biomass boilerPeak load 4 x 6.000 kW gas boilersCommissioning 2008 / 09

Page 48: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

49

Biomass projects

Base load for existing district heating

Project BM-heatplant Nove Zamky (Sk)Client Bytkomfort s.r.o.Base load 6.000 kW biomass boilerCommissioning 2011

Existing plant:2 x 33 MW Gas boiler1 x 12 MW Gas boiler1 x 2.700 kW Gas-CHP1 x 2.000 kW Gas-CHP

Page 49: Wood Residue Conference - Forestnet Aigner.pdfPPI ProPet object school monastery office, production office, production office, production production net length 100 m using an existing

50

EA-NRW

Thank you for your kind attention !

aigner energie contracting gmbhing. aigner wasser-wärme-umwelt gmbhA-4501 Neuhofen, Kremstalstraße 18Tel: +43 (0)7227 6081–0 Fax: -13www.ing-aigner.at [email protected]

DI Siegfried Aigner

Contact:

EnergiesparpartnerschaftDienstleistung

keine Investitionskosten

Energieeffiziente SystemeWirtschaftliche, Zukunftssichere, Innovative Lösungen

ModernisierungErneuerbare Energieträger