8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 1/64
IWRM ProgressIWRM Progress
in the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines
November 7, 2011November 7, 2011
DoloraDolora N.N. NepomucenoNepomucenoAssistant General Manager Assistant General Manager
Laguna Lake Development Authority
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 2/64
Laguna de BayLaguna de BayRegionRegion-- A National Concern A National Concern
Largest lake in the Philippines
Multiplicity/inter-relationship/conflicts of uses Strategic location (CALABARZON, seat of
government and headquarters of all linedepartments, the military and police
authorities) Contributes around 35% of the country s GDP
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 3/64
Overview of Presentation
Laguna de Bay Basin: Basic Features
Environmental situationer
Legal and institutional framework
Current and pipeline IWRM interventions
IWRM Progress: Using the Spiral Model
Getting the institutional, legal and financial
arrangements right Knowledge sharing and partnership building
with Asia and rest of the world
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 4/64
900 km2
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 5/64
BasicFeatures
Laguna de Bay as ecological & economic resource
Laguna de Bay Region is apolitical concept that considers
politico-administrativeboundaries.
63 LGUs in the Laguna BayRegion with 14.404 million people
29 LGUs along the lakeshore with188 barangays with 3.92 million
Key industrial location
Calamba City as the majormanufacturing center of CALABARZON
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 6/64
Basin
is an ecological unit, a scientificcategory based on the topographicdivide or bowl-like formation
Laguna de Bay Basin being acombination of 24 river basins is a bigbasin and a mega Watershed
More than 100 rivers, 24 majortributaries, hence 24 sub-basins or sub-watersheds
382,000 hectares of lake basin
14,000 hectares lakeshore with 391,084informal settler households from NCR,
Laguna, and Rizal 90,000 hectares lake surface area with
13,000 fishpen structures covering15,000 hectares, above the 9,000hectares allowed by law.
35,500 fisherfolk population
Region vs. Basin
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 7/64
2003
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 8/64
Laguna de
BayRate of change is slow
Napindan Channel - only
one major outlet to
Manila Bay via PasigRiver water more static
than dynamic
Integrating nature of a
lake it absorbs both
good and bad
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 9/64
ØAverage depth of the lake is 2.5meters
ØShoreline length = some 285kilometers
Ø3 distinct bays, the west bay,
central bay, and east bay thatconverge towards the south.
Laguna de Bay
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 10/64
Lake water levels fluctuations:Lake water levels fluctuations:
Summer months: 10.50 m elevation
Rainy seasons: 12.50 m elevationAnnual mean: 11.32 m elevation
Highest Level recorded: 14.60 m (year 1919)Lowest Level recorded: 10.27 m (year 1969)
Recent typhoon: 13.80 m (2009 Typhoon Ketsana )
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 11/64
Sources of surface recharge
22 Major Tributaries35% Pagsanjan-Lumban River
15% Sta. Cruz River
50% 19 remaining Tributaries
OutletNapindan Channel connectsthe lake to Manila Bay
Bay
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 12/64
Water Uses
Fisheries
IrrigationIrrigation
IIndustrial cooling
Navigation
Power GenerationPower Generation
Recreation
Habitat for various species
Drinking water supply
and many others
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 13/64
Conflicting Uses of Lake Water
Settlements andindustries vs.potable water supply
Industries vs.agriculture andfisheries
Fisheries vs. use of water for farmirrigation
Flood Control vs.
Fisheries
Flood Control vs.water abstraction
Fish pens vs.navigation /recreation
Settlements vs.
Tourism Golf courses vs.
water-based factoryproduction
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 14/64
Solid and Liquid Wastes fromLakeshore Communities
Up to 75% of MSW generated is organic,
and 45% can be recycled to producemethane gas. Even in urban areas with
efficient garbage systems, about 20% of
total Municipal Solid Waste remains
uncollected and dumped by residents
into water bodies.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 15/64
Distribution of Pollution from Different
Sources 1996 and 2006
Domestic
77%
Industry
11%
Agriculture
11%Forest
1% Domestic
30%
Industry
40%
Agriculture
30%
Source: LISCOP 2008 and Elmer MercadoSource: LISCOP 2008 and Elmer Mercado
2006 1996
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 16/64
Drinking WaterSupply?
About 20 About 20--30% of households are not30% of households are notserviced by Water districts, or Ruralserviced by Water districts, or Rural
Waterworks AssociationsWaterworks Associations
PhysicoPhysico--chemicalchemicalparameters of parameters of Water QualityWater Quality
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 17/64
Siltation in Laguna de BaySiltation in Laguna de BayBathymetry Studies 1963, 1973, 1983, 1997
Year of
acquisition
of
bathymetry
data
Shallowing
Rate
(mm/year)
1963 vs. 1983 3.23
1983 vs. 1997 9.68
1963 vs. 1997 8.36
Net Changes:
64% of the lakeunderwentshallowing
specially west andcentral bays
exceeding 0.6m 32% of the lake
with minimalchange
Shallowing inexcess of 1moccurred in several
places 4% of the lake
deepened,common alongeastern shores of central & northernshores of west bayThe lake became shallower by
0.30 meters or about one foot
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 18/64
e orestat one orestat on/ Denudation/ Denudation
of Upstreamof Upstream Areas Areas The most denuded
upland areas are
Marikina Watershed,
Tanay Watershed, and
Sta Rosa Watershed
Studies record at least
3.8 m of silt on the
Laguna de Bay lakeside.
Shallowing of the lakebottom to an average of
2.5 meters limiting its
waterholding capacity
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 19/64
In orma Sett ements nLupangArenda, Taytay, Cainta & Pasig
with 62,000 households
Lupang Arenda is a natural
wetland, with
unconsolidated sub-surface
materials
LupangArienda
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 20/64
MANGGAHAN FLOODWAYPasig City & Cainta, Rizal
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 21/64
Pollution from
communities
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 22/64
Areas affected by Ondoy Areas affected by Ondoy
(Ketsana)(Ketsana)104 deaths
20ft. flood water in
some areas
900 barangays in
NCR and 24 sites inLaguna Lakeshore
affected
Php6B damage to
properties including
P4.1 billion damage to
infrastructure, P1.9
billion to schools and
P882.525 million in
damage to agriculture
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 23/64
Images of Ondoy/KetsanaImages of Ondoy/Ketsana
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 24/64
Water Level of Laguna de BayWater Level of Laguna de Bay
Los Baños Station (Sept-Oct 2009)
TYPHOON ONDOY
TYPHOON PEPENG
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 25/64
DYNAMICS OF MARIKINA, PASIG &
NAPINDAN RIVERS
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 26/64
FLOOD LEVELSFLOOD LEVELS
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 27/64
FLOOD LEVELSFLOOD LEVELS
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 28/64
Water-related and weather-induced climatechange impacts
FloodingTyphoon Ondoy
Sept. 2009
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 29/64
LAGUNA LAKE
MANGGAHAN
FLOODWAY
CAINTA
Water-related and weather-induced Typhoon Ketsana
climate change impacts (Ondoy)-Sept.2009
E. Manda
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 30/64
Summary of Major ProblemsSummary of Major Problems
Poverty and lack of information/educationLack of lake-sensitive economic opportunities to expand
livelihood opportunities
Pollution and waste primarily from domestic, commercial,
industrial, agricultural sources
Increased vulnerability of lakeshore settlements to floodhazards, geohazards, climate change impacts and health
hazards
Government indecision over informal sector resettlement
Unrationalized and unsound siting of infrastructure, utilities,
and urban development projects around the lake area
Unregulated activities in upland areas, watershed, and in the
shoreland
Lack of incentives for lake conservation, watershed protection
and restoration
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 31/64
Environmental, socioEnvironmental, socio--economic andeconomic andpolitical implications, present andpolitical implications, present and
longlong--termterm Scarcity of resources occurfrom degradation, abuse of useand inequitable distribution of
resources Environmental issues interplay
with political, social, economicand cultural factors to cause
instability and conflict Scarcity limits economic options
and force those impoverishedto seek livelihood in ecologically
endangered areas
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 32/64
IS THERE ASOLUTION TO SAVELAGUNA DE BAY?
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 33/64
Legal Arrangementsq Republic Act 4850 (1966) created LLDA to promote and
accelerate the development and balanced growth
q Presidential Decree 813 (1975) expanded LLDA s mandate& functions to include environmental protection with powerto issue permits for the use of surface waters
q Executive Order 927 granted LLDA water rights over allsurface waters; power to abate & control pollution & collectfees for the water uses
q Philippine Clean Water Act of 2004 declared Laguna de BayWater Quality Management Area (WQMA) reinforcing
LLDA s mandate and functions
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 34/64
Institutional Arrangements [Top 2]
q LLDA administratively attached to DENR (national lineagency) and interacts with 2 Regional ENR offices with
decentralized ENR regulatory responsibilities
q Over 30 other water-related agencies operating in thebasin & 66 LGUs with environment-related functions(1991 Local Government Code), but LLDA GoverningBoard has limited stakeholders/agency representations
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 35/64
Financial Arrangements [Top 2]
q Fiscal independence LLDA authorized to generate,
appropriate, channel & leverage its own funds to fulfillIWRM roles/activities
q Innovative financing mechanisms & market-basedincentives adopted for IWRM including waterresources and environmental management
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 36/64
Domestic
77%
Industry11%
Agriculture
11%Forest
1%Domestic
30%
Industry
40%
Agriculture
30%
Households contribute 77% of pollution load from 30% in 1997, 11%
industrial sources from 40% 10 years ago due to industrial EUFS
Households contribute 77% of pollution load from 30% in 1997, 11%
industrial sources from 40% 10 years ago due to industrial EUFS
Domestic discharges as main source of pollution1995 2006
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 37/64
Improving regulatory efficiency and effectivenessTotal BOD Loading vs. Number of Firms and Ave BOD Loading Per Firm(1997-2006)
17.38
4.17 3.682.29
0.87 0.77 1.13 1.06 1.29
24.34
0
1000
2000
3000
4000
5000
6000
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
0.00
5.00
10.00
15.00
20.00
25.00
30.00
Loading
No. of Firms
Ave.
Significant reduction in industrial BOD loading from 40% in
1997 when EUFS was introduced, to 11% in 2006.
Significant reduction in industrial BOD loading from 40% in
1997 when EUFS was introduced, to 11% in 2006.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 38/64
Proposed Additional Financing
For LISCOP Project
NG-LGU Cost-Sharing Gains
From LISCOP Project
LLDAs Incentive Package
Laguna Lake Development AuthorityLaguna Lake Development Authority
Laguna de Bay Institutional Strengthening and
Community Participation (LISCOP) Project
Laguna de Bay Institutional Strengthening and
Community Participation (LISCOP) Project
Financing Mechanisms for LGUs Environmental Subprojects under Co-
Management Framework
Financing Mechanisms for LGUs Environmental Subprojects under Co-
Management Framework
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 39/64
Lessons Learned from LISCOP
Multi-stakeholder involvement in IWRM
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 40/64
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 41/64
CO-MANAGED INVESTMENTS FOR
WATERSHED DEVELOPMENT
LISCOP Incentive Package
1. NG-LGU Cost sharing
2. Capacity Building Program for LGU
3. PDF as a Source of Equity
4. Programmatic ECC/ EMP 5. FS preparation / DED
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 42/64
Sharing scheme for fishpen and fishcage fee share for Laguna de Bay
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 43/64
Impacts and OutcomesImpacts and Outcomes
24 LGUs implementing
36 sub-projects, majorityon solid waste
management
Upgraded 20 out of 41
(49%) LGU-operateddumpsites in the LdBR
LISCOP-funded
MRF/Composting
facilities have reducedfrom 50-67% of baseline
solid waste levelIncreased envt l. awareness of
LGUs and other stakeholders
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 44/64
US$10 M Additional Financing
To scale up subproject and LGUcoverage in the Laguna de Bay
Region To help LGUs undertake rehabilitation
needs of damaged subprojects
To make the existing environment
and flood control infrastructure moreresilient to the impacts of climatechange
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 45/64
Importance of scientific data and availability of management and technical tools in IWRM
Establishment of DSSSet up of HydrologicalDatabase System andHydrological Monitoring
NetworkDevelopment andInstallation of Geo-Information DatabaseSystem
Laguna de Bay ResourceManagement Info SystemEnvironmental ActionPlanning and Use of Multi-Criteria Analysis Tools
TyphoonOndoy
TyphoonPepeng
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 46/64
Top 3
q Addressing environmental infrastructure needs
qInstitutionalizing IWRM at the sub-watershedlevels
q Addressing climate change impacts at the riverbasin level
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 47/64
Addressing Infrastructure Needs
Background Environmental challenges call for the optimum
combination of soft approaches and hard infrastructures
Need for segregating LLDA s activities as a regulator anddeveloper
Encouraging Private Sector Participation (PSP) insustainable development of the Lake and its watershed
Set Direction
Creating an entity separate but related to LLDA forinfrastructure development and public-private partnerships
Prototyping the entity prior to full implementation
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 48/64
INTEGRATED WATER RESOURCES MANAGEMENT AND DEVELOPMENT MODEL(as approved per Board Resolution No. 157; January 25,2001)
LLDABoard
LLDAManagement
Team
TechnicalCouncil
OtherAgencies
WatershedManagement
Council
LGUs,Academe,
NGOs,Businesses
River Basin
Councils
SectoralCommittees
Laguna de BayDevelopmentCorporation
Board Trust FundSupervisory
Board
TrusteeOperations
Units
Laguna de BayInfrastructure
DevelopmentFund
LBDCOperations Unit
ExternalFundingAgencies
SpecialPurposeVehicles
Financing UnitBusinessDevelopment andMarketing Unit
Engineering Unit
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 49/64
Planner,Regulator,and
Developer
Current Structure Prototype Phase Final Phase
LLDA as:
Year 0 Years 1-X After Year X
LLDA as: LLDA as:
Plannerand
Regulator
Plannerand
Regulator
Composite andFunctions
UndifferentiatedFunctions Differentiated Corporatized
Developer(PDF) LBDC
Framework of the Strategy for the
Trunk Infrastructure Development
3
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 50/64
Integrated InfrastructureDevelopment Plan
To assess the environmental conditions
To determine competing demands and
stakeholders needs
To develop a roadmap to meet futureneeds
To complete related economic, social, andfinancial analyses for the plan
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 51/64
RecommendedEnvironmental Trust Fund (ETF)
Assure that the money collected from effluent chargeswill be used solely for the rehabilitation of the lake
Improve the billing and collection so that all polluters aremade to pay
Strengthen community initiatives on recycling, properwaste disposal, and improvement of sewerage with thehelp of LGUs
Strict enforcement of penalties for pollution violations.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 52/64
Recommended ETFs Lake Rehabilitation Trust Fund
For projects that directly clean the lake water system
Counterpart money for establishment of sewerage systems inthe municipalities
Additional funding for information, education andcommunication campaigns for recycling, river rehabilitation,
proper disposal, and other environmental programs Recycling Initiatives Trust Fund
For projects that focus on recycling and solid wastemanagement
Municipal Waste Water Treatment Counterpart Trust Fund
Counterpart financing for construction, repair, rehabilitation, orreplacement of new and existing waste water treatmentfacilities
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 53/64
Recommended Distribution of CollectedCharges Among the Trust Funds
Trust Funds Management Costs 5 percent
Lake Rehabilitation Fund 30 percent
Recycling Initiatives Trust Fund 20 percent
Municipal Waste WaterTreatment Counterpart Fund
45 percent
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 54/64
Surface Water Pricing Scheme
Effect proper resource pricing of lakewater resources
Comply with the LLDA mandate toregulate the use of surface waters of
the Laguna Lake.
Raise funds to support the propermanagement, protection and
sustainable development of the Lake.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 55/64
Raw Water Resource Fee
· Based on full recovery of all expendituresnecessary to implement a raw water pricingstructure and required for effective waterresource management;
Takes into account factors for different wateruse categories based on the LLDA s priorities,affordability and consumptive or non-consumptive uses;
To be paid on a per cubic meter of water used orabstracted;
To be calculated annually.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 56/64
Integrated Watershed Management Councilsat the Sub-Watershed Level
Mechanism to effectively mainstream across the entirelake basin such collaborative approach to ensuresustainable management of sub-watersheds
Watershed as an ecosystem and basic planning and
management unit shall be developed in a holistic,scientific, rights-based, technology-based, community-based and collaborative manner
Ultimately to cover all 24 sub-watersheds of Laguna deBay
Prescribes key concepts and principles for watershedmanagement, and processes involved in collaborativearrangement
N k f Ri B i C ilN k f Ri B i C il
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 57/64
ANGONO
CARDONA
ALAMINOS
SINILOAN
NAGCARLAN
LILIW
STA.CRUZ
TERESA
MORONG
TANAY
LUCBAN
MAJAYJAY
KALAYAAN
CAVINTI
AGM
LOS BAÑOS
SAN PEDRO
MUNTINLUPA
SILANG
Napindan-Taguig watershed
Taguig Environment Society
Muntinlupa watershed
Muntinlupa City River Rehab
and Protection Fdn. Inc
San Pedro watershed
San Pedro River Rehab and
Protection Fdn., Inc.
San Pedro-Biñan watershed
Bisig-CataSave Silang-Sta. Rosa River
San Cristobal watershed
San Cristobal River
Enhancement and Defender
San Juan watershed
Malvar, Tanauan, Silang,
Calamba RPFI
Calamba Green StreamBrigade
Sta. Rosa-Cabuyao watershed
Cabuyao River Rehab & Protection
Fdn Inc
Sta. Rosa River Rehab. Mgmt Fdn.,
Inc
Los Baños-Makiling watershed
Los Baños Science Community Fdn,
Inc
Bay-Calauan watershed
Sagip Ilog ng Bae at Calauan
Fdn., Inc
Pila-Victoria-Nagcarlanwatershed
Pila-Victoria-Nagcarlan RFI
Sta. Cruz watershed
Liliw-Magdalena-Sta. Cruz
Majayjay-Rizal-Nagcarlan RFI
Pagsanjan-Lumban watershed
Pagsanjan-Lumban River
Basin Mgmt Devt Plan
Jala-jala watershed
Jala-jala River Council
Pililla watershed
Pillila River Envt Devt Fdn Inc
Tanay watershed
Tanay Environment Fdn, Inc
Morong Teresa watershedMorong-Teresa River Rehab
Prot. Fdn, Inc
Angono-Binangonan-Cardona
watershed
Green Movement of Angono
Inc.
Network of River Basin CouncilsNetwork of River Basin Councils
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 58/64
Addressing Climate Change
Impacts
Context of river basins Provides a natural
framework for climatechange including water-related disaster risk management
Brings natural and socialsystems together to develop
and provide the context forwater-induced/flood risk management decisionmaking.
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 59/64
Addressing Climate Change
Impacts Multi-disciplinary approaches considering the scientificcontext of climate change
Integrated where the program relates to a broad rangeof local problems or made worse by natural hazards and
disasters. DRRM needs community engagement to directly involve
vulnerable communities in the decisions on risk management so that their interests and affordability areconsidered
Multi-sectoral where people from different existingorganizations at the community level are engaged asvolunteers
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 60/64
Using the IWRM Spiral Model
Need to enhancesmall-scale LGU
env. projects(2010) & address
domesticpollution
2. Conceptualizing
Legend Past Activities
Future Activities
[1960-1966]Leading/CoordinatingBody LLDA as RBO
[1966-1975]Water Quality Control/
Environment Mgmt
Climate Change Adaptation River Basin
Context
Need to improveinstitutional
arrangements toresolve conflicts
(2010)
1. Recognizing & identifying
Re-submissionof LLDA
StrengtheningBill to Congress
(2010)
2010
Re-packagingLISCOP to scaleup LGUs to sub-watershed level
(2010)
3. Coordinating & planning
Forming/organizing the IWM
Councils at sub-watershed level
thru multi-sectoral
consultations
(2010)
Documentationfor LdB
DevelopmentCorp.
(2010)
4. Implementing,monitoring & evaluating
Creation of LdBDevt. Corp.(2011-12)
LISCOP Projectwith additionalfinancing for
LGUs(WB, 2011-13)
[1975-1983] Authority to issue water
permits & collecting fee forwater use and discharge
[2000-2010] Adoption of IWRM Model for Re-eng g LLDA, Decision Support
System/Geo-desk,LISCOP Project
[2010 Onward]IWM at Sub-watershed
Level
[1983-2000]Master Plan and EUFS
PackagingIntegrated WQMProgram (2011-
12)
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 61/64
Legal Arrangements [Top 2]q Legislated charter vs. ad-hoc & project-based
arrangementsq Unique legal, institutional & financing
arrangements
Institutional Arrangements [Top 2]q Multi-stakeholder engagementq IWRM as an approach
Financial Arrangements [Top 2]q Fiscal autonomy of RBOq Mobilization & leveraging of funds to catalyze
investments in IWRM including infrastructure
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 62/64
[top 2 improvement issues]
Envisaged Key Areas for Knowledge Networking
[Top 3]q Roadmaps for IWRM Investments and financing
mechanisms to address domestic wastewaterpollution
q Disaster risk reduction management in the context of river basin, e.g., designing of DRRM, climate changeadaptation strategies, etc.
q Benchmarking for RBO performance (international,
regional, country, RBO levels) Modalities for country assessments Toolkits for performance assessments
q IWRM Processes Sharing of country/RBO experiences on IWRM processes
Protocols for IWRM planning & implementation
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 63/64
[top 2 improvement issues]
Topics / Challenges for Partnerships with AsiaCountries/Institutions
[Top 3]q Disaster risk reduction management in the context
of river basin, e.g., risk assessmentmethods/technologies; IT, GIS/Remote sensingtechnologies/applications; real time telemetering(water quantity & quality) and flood forecasting
q IWRM investment planning and decision making
given multiplicity of actors in a given watershedq Innovative financing mechanisms & market-based
incentives to address lack of investments in waterresources/environmental management including
8/3/2019 WLW Day 1: IWRM Progressin the Laguna de Bayin the Laguna de BayBasin/PhilippinesBasin/Philippines by Dolora Nepomuceno
http://slidepdf.com/reader/full/wlw-day-1-iwrm-progressin-the-laguna-de-bayin-the-laguna-de-baybasinphilippinesbasinphilippines 64/64
Amending the LLDA LawThank You
& Good Day!