25
WITSML IMPLEMENTATION WITSML IMPLEMENTATION IN ONGC IN ONGC By By Naresh Kumar Naresh Kumar Oil and Natural Gas Corporation Ltd. Oil and Natural Gas Corporation Ltd. India India

WITSML IMPLEMENTATION IN ONGC By Naresh Kumar Oil and Natural Gas Corporation Ltd. India

Embed Size (px)

Citation preview

WITSML WITSML IMPLEMENTATION IN IMPLEMENTATION IN

ONGCONGC

ByBy

Naresh KumarNaresh Kumar

Oil and Natural Gas Oil and Natural Gas Corporation Ltd. Corporation Ltd. IndiaIndia

ABOUT ONGCABOUT ONGC

ONGCOil and Natural Gas Corporation Ltd

Corporate Office, Dehradun (INDIA)Registered Office, New Delhi (INDIA)

Operates in diverse logisticsIn On land & Offshore areas

Western Offshore

Basin

Western Onshore

Basin

KrishnaGodavari

Basin

CauveryBasin

CBMBPMBasin

FrontierBasin

Assam & A Arakan

Basin

National Oil Company with Asset Based Structure•ER

•CR

•NR

•WR

•MR

•SR

EPINET PROJECT OF EPINET PROJECT OF

ONGCONGC

EPINET OBJECTIVE

Single validatedE & P data base

throughout ONGC

Flow of analytical& interpretation Data to EPINET

Web based reportingAnd current E&P data

flow into EPINET

Compliance of industry standards

& best practices

Integrated E&P Database

Karaikal Asset,Karaikal

Rajahmundry, Asset Rajahmundry

RO Chennai

W A N LAN

Cauvery Basin, Karaikal

Krishna Godavari, Basin Rajahmundry

CBM-MBP BasinKolkata

Cambay Project, Cambay

Rajastan Project, Jodhpur

IRS/Ahmedabad AssetAhemdabadMehsana Asset, Mehsana

Ankleshwar Asset, Ankleshwar

Mumbai High/ Neelam/ Bassien Assets, Mumbai

W.Offshore, BasinMumbai

Sibsagar

E&D DteDehradun

KDMIPEDehradun

IDT/ GEOPIC/ OBG Tel Bhawan

Frontier Basin,Dehradun

EPINET System Phase-I Scope

EPINET System Phase-II Scope

Nazira Asset,NaziraA&AA Basin

Jorhat

Tripura AssetAgartala

Cachar Project,Silchar

Blue Site- Phase-I scope Red Site- Phase-II scope

W.Onland BasinBaroda

IOGPT, Mumbai

EPINET Sites & Networking

EPINET WORK FLOW EPINET WORK FLOW

BASIN

ASSET/BASIN

Forward Base

SERVICES

INSTITUTES/RGL

- Well Data- Reservoir Data- Production Data- Cultural Data- ML Data

- Geology Lab.- Reservoir Lab.- Geochemistry Lab.

- Well - Drilling

- Bid Monitoring Data- Lease Data- Interpreted Data (Basin)- Interpreted Data ( Instt.)- RGL

ASSET/Forward Base

Server

BASINServer

Corporate

Server

- Logging - Geophysical

Navigation &

Com

posite Log

Post Stack 2D&3DOriginal Logs

Replica Server

E&D Dte

FinderFinder

E&P MasterE&P Masteron-line

LogDBLogDB Log

Archival

SeisDBSeisDB Seismic

Archival

AssetDBAssetDB Physical

Assets

OtherOther data-data-basesbases

Forms / ReportsForms / Reports Direct PC AccessDirect PC Access

SmartMapSmartMapGISGIS

Web Web ApplicationApplication

EPINET ScenarioEPINET Scenario

WITSML IMPLEMENTATIONWITSML IMPLEMENTATION

WITSML FOR REAL TIME WITSML FOR REAL TIME

OPERATIONOPERATION

WITSML FOR REAL TIME OPERATIONSWITSML FOR REAL TIME OPERATIONS

Well-site / platform

Visualization Center (VRC)

• ONGC, Paradigm and Halliburton developed a software (2003).

• Interact & Insite (2004 onwards)• LWD/MWD objects.• Used for Geo-steering in Mumbai

High.

PANNA MUKTA TAPTI PANNA MUKTA TAPTI (PMT)(PMT)

PROJECTPROJECT

•Introductory Meeting held in Kolkata in Jan 2006 during SPG.

•Attended by representatives from ONGC, BG & Reliance.

•It was decided to go ahead with the Pilot in PMT JV because of its multi-operators environment.

PMT PROJECTPMT PROJECT

Data Objects for Stage-I (Drilling+G&G centric)

•Log Object (MWD, LWD, Wireline)

•Well / Wellbore object (well header information)

•Trajectory object

•Mud log object

Stage-II planned as Production centric

DATA OBJECTSDATA OBJECTS

Status:

•Developed Fields.

•EOR/IOR Phase

•Now changed idea to implement PRODML which was earlier planned in Stage II.

PMT PROJECTPMT PROJECT

WITSML IN SCADA WITSML IN SCADA

PROJECTPROJECT

WITSML IN SCADA PROJECT

AN ENTERPRISE-WIDE SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) SYSTEM.

WITSML COMPLIANT SERVER.

SCADA THREE-TIER STRUCTURE

OffshoreAsset Data

Center

Typical On-shore Asset

Corporate Data Center

GGS

CPF

CTFURANTrombay

HAZIRAPlant

Process Complex

Process Complex

Western Offshore Assets

Onshore Asset Data

CenterData

EPINET

Data

ICEDrilling SCADA at IDT

Data

EPINET

TIER -1

TIER -2

TIER -3

EPINET WORK FLOW EPINET WORK FLOW

BASIN

ASSET/BASIN

Forward Base

SERVICES

INSTITUTES/RGL

- Well Data- Reservoir Data- Production Data- Cultural Data- ML Data

- Geology Lab.- Reservoir Lab.- Geochemistry Lab.

- Well - Drilling

- Bid Monitoring Data- Lease Data- Interpreted Data (Basin)- Interpreted Data ( Instt.)- RGL

ASSET/Forward Base

Server

BASINServer

Corporate

Server

- Logging - Geophysical

Navigation &

Com

posite Log

Post Stack 2D&3DOriginal Logs

Replica Server

E&D Dte

THE CHALLENGETHE CHALLENGE

SEAMLESS INTEGRATION OF SAP & EPINET WITH SCADA

FROM WITSML COMPLIANT SCADA

TIME STAMPED DATA WILL FLOW INTO ICE-SAP FOR BUSINESS COMPUTATIONS.

THE E & P DATA WILL FLOW TO EPINET.

EP

INE

T T

eam

...

En

d U

sers

SAPCapture Data

Transfer Decimated Data

Validate / QC

Data HistorianHigh Frequency

Database

ValidationDone at

Assets, basins

Well References

Domain Experts

Export validated data in prescribed formats ( templates)

to be loaded by the EPINET team

Drilling, G&G, Prod

SCADA System

Data Loaders

Third Eye, IIWSCollaborative Teams

Web portal

Managers for Business

InformationMIS

Reports

Data Transfer

Data Access by Users

Epinet Master Data

1

2

3

Ice

Manual entry

(Lab, Institute etc.)

Integrated SCADA-EPINET-ICE System