    New Rule for SteelErectionWAC 296-155-701 through -724

    The Standard

    On the web

    GO

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    2/70

    2

    Do you want a short

    lesson on how to navigatethrough this program?

    If you want to see

    which buttons to

    click on to get

    through thepresentation, click

    here

    If youre confident

    that you can

    navigate through a

    web-based

    presentation onyour own, click on

    the next button.

    http://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    3/70

    3

    Navigational Symbols Used in

    this Presentation

    Next slide

    Return to the program, usually from additional information

    Definitions, more information, FAQs, etc

    Read the actual Standard on line

    Back to the Outline

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    4/70

    4

    Why the new rules??

    OSHA studies of 673 fatalities among

    ironworkers highlighted common

    hazards

    Deaths were largely preventable by

    engineering & regulatory changes

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    5/70

    5

    = Outline

    -703 -

    Site layout, site specific erection plan &

    construction sequence

    -704 - Hoisting & rigging

    -706 - Structural steel assembly details

    -707 - Column anchorage-708 - Beams & columns

    -709 - Open web steel joists

    -711 - Systems engineered metal buildings

    -714 - Falling object protection

    -716 - Fall protection

    -717 - Training

    http://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    6/70

    6

    Site layout, site-specific erection

    plan & construction sequence

    Controlling contractor

    must provide written

    notification that

    concrete has attained

    75% of design strength, or

    Sufficient strength to

    support the loads

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    7/70

    7

    Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    Site layout, site-specific erection

    plan & construction sequence

    Controlling

    contractor mustensure that

    adequate access

    roads are providedand maintained

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    8/70

    8

    Site layout, site-specific erection

    plan & construction sequence

    Controlling

    contractor must

    ensure that a suitable

    space is provided for

    storage of materials and

    safe operation of

    hoisting operations

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    9/70

    9

    Site layout, site-specific erection

    plan & construction sequence

    All hoisting

    operations must be

    preplanned to ensure

    all working under

    loads requirements

    are met

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    10/70

    10

    Site layout, site-specific erection

    plan & construction sequence

    A site-specific

    erection plan may be

    developed to providealternate means to

    protect employees

    Appendix A contains

    guidelines

    Example

    App

    A

    http://www.lni.wa.gov/wisha/regs/WACS/155/296-155p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    11/70

    12

    Site layout, site-specific erection

    plan & construction sequence

    Steel erection must be

    done under thesupervision of a

    competent person who

    is present at theworksite.

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    12/70

    14

    Hoisting & Rigging

    The new section(WAC 296-155-704)and

    WAC 296-155-525

    & -526Both apply to

    hoisting and riggingPhoto courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155L_1.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    13/70

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    14/70

    17

    Hoisting & Rigging

    A qualified rigger must inspect the

    rigging prior to each shift

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading

    Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    15/70

    19

    Hoisting & Rigging

    Working under loadsRoutes for

    suspended loads

    must bepreplanned to

    avoid

    endangering

    workers

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    16/70

    20

    Hoisting & Rigging

    When working under loadsmaterials must be rigged to prevent

    unintentional displacement

    hooks must have self-closing safety

    latches or equivalent

    all loads must be rigged by a qualified

    rigger

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    17/70

    21

    Hoisting & Rigging

    Multiple lift rigging procedureonly when: a multiple lift rigging

    assembly is used

    specifically withinmanufacturersspecifications & limitations

    maximum of 5 membershoisted per lift

    only beams & similarstructural members arelifted

    only trained employeesinvolved

    Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    18/70

    22

    Hoisting & Rigging

    Multiple lift rigging procedureBundles of decking

    are NOTappropriate formultiple lift.

    Even though metaldecking meets thedefinition of structural

    members

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    19/70

    23

    Hoisting & Rigging

    Multiple lift rigging procedureComponents of the multiple liftrigging assembly must be specifically

    designed and assembled with amaximum capacity for total assemblyand for each individual attachment

    point.Based on manufacturersspecifications with a 5 to 1 safety

    factor on all components

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    20/70

    24

    Hoisting & Rigging

    Multiple lift rigging procedureTotal load must not exceed

    rated capacity as specified in the

    hoisting equipment load charts and

    rigging capacity specified in the

    rigging-rating charts

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    21/70

    25

    Hoisting & Rigging

    Multiple lift rigging procedure

    Controlled load

    lowering must be

    used whenever the

    load is over the

    connectors

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    22/70

    26

    Structural Steel AssemblyStructural stability maintained at all times

    during the erection process

    Multistory structures

    have permanent floorsinstalled as the

    erection of structural

    members progresses

    Within 8 floors of the

    concrete, or

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading Fund.

    All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    23/70

    27

    Structural Steel AssemblyStructural stability maintained at all times

    during the erection process

    Multistory structures have permanent

    floors installed as the erection of structural

    members progresses

    Within 8 floors of the concrete, or

    no more than 4 floors (or 48) ofunfinished bolting or welding above

    secured floor

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    24/70

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    25/70

    29

    Structural Steel AssemblyPlumbing up

    When deemed

    necessary by a

    competent person:

    Plumbing upequipment must be

    installed in

    conjunction with thesteel erection process

    to ensure stability of

    the structure.Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading

    Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    26/70

    30

    Structural Steel AssemblyPlumbing up

    When necessary, plumbing up

    equipment must be in place andproperly installed before the

    structure is loaded with

    construction material

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    27/70

    31

    Structural Steel AssemblyPlumbing up

    Plumbing up equipment must

    be removed only with theapproval of a competent

    person

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    28/70

    32

    Structural Steel AssemblyMetal decking

    Hoisting, landing &

    placing of metal

    decking bundlesprovisions to prevent

    displacement of

    decking duringhandling/storage

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading Fund.

    All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    29/70

    33

    Structural Steel AssemblyMetal decking

    Roof & floor holes and openings Must

    be installed as described: Para 706(4)(b)

    Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    30/70

    35

    Structural Steel AssemblyMetal decking

    Covering roof and floor openings

    Photo courtesy of National Ironworkers & Employers Apprenticeship Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    31/70

    36

    Structural Steel AssemblyMetal decking

    Decking gaps around

    columnswhere there are gaps

    between columns, the

    falling objects hazards

    must be eliminated

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading

    Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    32/70

    37

    Structural Steel AssemblyMetal decking

    During installation,

    metal decking mustbe laid tightly &

    immediately secured

    to prevent movement

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    33/70

    38

    Structural Steel AssemblyMetal decking

    During installation,

    metal deckingpanels must be

    placed to ensure

    full support bystructural members

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    34/70

    39

    Structural Steel AssemblyMetal decking

    Derrick floors

    must be fullydecked or planked

    & connections

    completed

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    35/70

    40

    Structural Steel AssemblyMetal decking

    Temporary loads

    placed on derrickfloors must be

    distributed over the

    underlying supportto prevent local

    overloading

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    36/70

    41

    Column anchorage

    Insufficient columnanchorage is a

    primary cause of

    column failure anda large contributor

    to fatalities among

    ironworkers!Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    37/70

    42

    Column anchorageErection Stability

    All columns mustbe anchored by a

    minimum of four

    anchor bolts

    Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    38/70

    43

    All columns* must be

    anchored by a minimum of

    four anchor bolts

    all anchor rod

    assemblies must meet

    strength criterialisted in the rule

    Column anchorageErection Stability

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    39/70

    45

    Column anchorageErection Stability

    Columns must be

    set on level, finished

    floors

    pregrouted leveling

    platesleveling nuts, or

    shim packsPhoto courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    40/70

    46

    All columns must be

    evaluated by a competent

    person to determine ifguying or bracing is

    needed.

    If guying or bracing is

    needed, it must be installed

    Column anchorageErection Stability

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading Fund.

    All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    41/70

    47

    Anchor rods/bolts must not be

    repaired, replaced or field modifiedwithout approval of the project

    structural engineer of record

    Column anchorageAnchor rods (bolts)

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    42/70

    48

    Controlling contractor must provide

    written notification to the steelerector if there has been any repair,

    replacement or modification of the

    anchor rods/bolts

    Column anchorageAnchor rods (bolts)

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    43/70

    49

    Beams & ColumnsFinal placing of solid web structural

    members

    The load must not be released until

    members are secured with at least 2bolts per connection

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    44/70

    50

    The load must not be released until members are

    secured with at least 2 bolts per connection

    Bolts must be

    Same size and strength shown in the

    erection drawings

    Drawn up wrench tight, or equivalent

    specified

    Beams & ColumnsFinal placing of solid web structural

    members

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    45/70

    51

    A competent person must determine if

    more than 2 bolts are needed

    Beams & ColumnsFinal placing of solid web structural

    members

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    46/70

    52

    Beams & ColumnsDiagonal bracing

    Solid webstructuralmembers used as

    diagonal bracingmust be securedby at least one

    bolt perconnection

    Wrench tight orequivalent

    B & C l

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    47/70

    53

    Beams & ColumnsDouble connections at columns and/or

    beam webs over a column

    When making connections

    sharing common connection

    holes, at least one bolt withits wrench-tight nut must

    remain connected to the

    first member Diagram

    Exception

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading Fund.

    All rights reserved.

    http://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155-p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    48/70

    57

    Beams & ColumnsColumn splices

    Each column splice

    must be designed toresist a minimum

    eccentric gravity

    load of 300#Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading

    Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    49/70

    58

    Beams & ColumnsPerimeter columns

    Must extend a minimum

    of 48 above the

    finished floor to permitinstallation of perimeter

    safety cablesprior to

    erection of the next tier

    Photo courtesy of National Ironworkers & Employers

    Apprenticeship Training and Journeyman Upgrading

    Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    50/70

    59

    Beams & ColumnsPerimeter columns

    Must have holes

    or other devices

    for attachingperimeter cables

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    51/70

    60

    Open Web Steel Joists

    Open web

    steel joists must

    be securedbefore releasing

    the load.Photo courtesy of National Ironworkers & Employers Apprenticeship

    Training and Journeyman Upgrading Fund. All rights reserved.

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    52/70

    61

    Open Web Steel JoistsLanding and placing loads

    No bundle of decking may

    be placed on steel joists

    until all bridging has beeninstalled and anchored and

    all joist bearing ends

    attached,UNLESS

    Photo courtesy of National Ironworkers & Employers ApprenticeshipTraining and Journeyman Upgrading Fund. All rights reserved.

    S t E i d M t l

    http://www.lni.wa.gov/wisha/regs/WACS/155/296-155L_1.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155L_1.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/regs/WACS/155/296-155L_1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    53/70

    63

    Systems-Engineered Metal

    Buildings

    Package Building

    Before releasing hoisting equipment:

    Columnsminimum 4 bolts at base

    Rigid frames

    50% of the bolts

    or as specified by manufacturer TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    54/70

    64

    Falling Object Protection

    All materials,

    equipment, & tools

    which are not in usewhile aloft must be

    secured against

    accidental

    displacement

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    55/70

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    56/70

    66

    Fall Protection

    Must be in accordancewith WAC 296-155,

    Part C-1 &

    Part K

    TOC

    Next Section

    http://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155k.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155k.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/html/296-155c1.htmhttp://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    57/70

    67

    Training

    Fall hazard training

    Special training in multiple lift

    rigging procedure

    TOC

    End

    http://www.lni.wa.gov/wisha/rules/construction/HTML/296-155p.htm
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    58/70

    68

    Photos courtesy of Pacific Northwest Ironworkers and

    Employers Apprenticeship and Training Committee -86

    Very special thanks to Douglas Smith and KevinMcGee

    And thanks also to Jerry Rowland, Corona Steel and

    Ironworkers Local #86

    http://www.lni.wa.gov/wisha/
  • 7/28/2019 Wish a Steel Erection Rule Presentation

    59/70

    70

    Navigational Symbols Used in

    this Presentation

    Next slide

    Return to the program, usually from additional information

    Definitions, more information, FAQs, etc

    Read the actual Standard on line

    Back to the Outline

    links back to

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    60/70

    71

    -703 -Site layout, site specific erection plan &construction sequence

    -704 - Hoisting & rigging

    -706 - Structural steel assembly details

    -707 - Column anchorage-708 - Beams & columns

    -709 - Open web steel joists

    -711 - Systems engineered metal buildings-714 - Falling object protection

    -716 - Fall protection

    -717 - Training

    links back to

    this page

    Each line

    Hyperlinks to the

    module listed

    Behind the scenes

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    61/70

    72

    Behind the scenes -

    how things are

    arranged:

    You get back

    and forth from

    the Outline

    Outline

    Section

    -703

    Section

    -704

    Section

    -705

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    62/70

    73

    Links to other information

    Steel erection must be

    done under the

    supervision of acompetent person who

    is present at the

    worksite.

    Clicking here or

    else on the i

    will link you to

    the definition

    NEXT: Going from the presentation to web pages

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    63/70

    74

    g p p g

    to read or print out the actual Standard

    This is how the program

    looks behind the scenes

    Going to the Web to

    read the actual

    Standard is easy:

    to go forward, use the

    hyperlinkprovided to go back, use the

    back arrow

    Whats a Hyperlink?Whats a Back Arrow?

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    64/70

    75

    Navigation Part IIThe diagram of how things can be linked

    Course

    List

    Section

    -703

    Section

    -704

    Section

    -705

    Section703

    on the WebOther Web

    Page if you want

    And another

    Web PageSection704

    on the Web

    Section705

    on the Web

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    65/70

    76

    Clicking here wouldhyperlink to the web

    page

    Clicking here

    would return to

    the Presentation

    Navigation Part II

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    66/70

    77

    Navigation Part II

    Outline

    Another way of moving

    back to the presentation

    Just close the web

    page

    Section

    -704Section704

    on the Web

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    67/70

    78

    Clicking here would

    hyperlink to the web page

    Clicking here

    would close

    the Web

    page; returnto the

    Presentation

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    68/70

    79

    Ready to start??

    YES! Run it!Not really.

    Id like to go through

    this navigation thing

    one more time.

    Hyperlink

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    69/70

    80

    Hyperlink

    An item (word, icon, button, etc) thatwill take you to another location (page inthe document, web page, other program,etc)

    Hyperlinks are identified by thefact that when your cursor

    passes over them, it changesfrom an arrow to a hand. Sometimes theyre even underlined

  • 7/28/2019 Wish a Steel Erection Rule Presentation

    70/70

    This is a Back

    Arrow