Wisconsin Department of Transportation Version 06-2014 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 December 6, 2016 NOTICE TO ALL CONTRACTORS: Proposal #25: 4190-16-71, WISC 2016 485 Ashland Ave., De Pere & Ashwaubenon 8 th Street – Lombardi Avenue STH 32 Brown County 4190-16-72, WISC 2016 486 Ashland Ave., De Pere & Ashwaubenon 8 th Street – Lombardi Avenue STH 32 Brown County Letting of December 13, 2016 This is Addendum No. 01, which provides for the following: Schedule of Items Revised Bid Item Quantities Bid Item Item Description Unit Old Quantity Revised Quantity Proposal Total 205.0100 Common Excavation CY 2,446 904 3,350 208.0100 Borrow CY 321 547 868 305.0120 Base Aggregate 1 ¼-Inch TON 3,191 320 3,511 455.0605 Tack Coat GAL 8,068 67 8,135 460.4110.S Reheating HMA Pavement Longitudinal Joint LF 134,041 1,200 135,241 460.6223 HMA Pavement Lower Layer 3 MT 58-28S TON 18,995 202 19,197 460.6424 HMA Pavement Upper Layer 4 MT 58-28H TON 12,269 108 12,377 625.0500 Salvaged Topsoil SY 2,805 680 3,485 628.1504 Silt Fence LF 5,300 610 5,910 628.1520 Silt Fence Maintenance LF 5,300 610 5,910 628.2002 Erosion Mat Class I Type A SY 1,165 680 1,845 629.0210 Fertilizer Type B CWT 1.9 0.40 2.3 630.0140 Seeding Mixture No. 40 LB 50 13 63 630.0200 Seeding Temporary LB 76 18 94 637.2230 Signs Type II Reflective Type F SF 459.54 59.68 519.22 638.2602 Removing Signs Type II EACH 232 13 235 638.3000 Removing Small Sign Supports EACH 186 -1 185 690.0150 Sawing Asphalt LF 4,067 616 4,683

Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation

Version 06-2014 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

December 6, 2016 NOTICE TO ALL CONTRACTORS: Proposal #25: 4190-16-71, WISC 2016 485

Ashland Ave., De Pere & Ashwaubenon 8th Street – Lombardi Avenue STH 32 Brown County

4190-16-72, WISC 2016 486 Ashland Ave., De Pere & Ashwaubenon 8th Street – Lombardi Avenue STH 32 Brown County

Letting of December 13, 2016 This is Addendum No. 01, which provides for the following: Schedule of Items

Revised Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

205.0100 Common Excavation CY 2,446 904 3,350 208.0100 Borrow CY 321 547 868 305.0120 Base Aggregate 1 ¼-Inch TON 3,191 320 3,511 455.0605 Tack Coat GAL 8,068 67 8,135

460.4110.S Reheating HMA Pavement Longitudinal Joint LF 134,041 1,200 135,241 460.6223 HMA Pavement Lower Layer 3 MT 58-28S TON 18,995 202 19,197 460.6424 HMA Pavement Upper Layer 4 MT 58-28H TON 12,269 108 12,377 625.0500 Salvaged Topsoil SY 2,805 680 3,485 628.1504 Silt Fence LF 5,300 610 5,910 628.1520 Silt Fence Maintenance LF 5,300 610 5,910 628.2002 Erosion Mat Class I Type A SY 1,165 680 1,845 629.0210 Fertilizer Type B CWT 1.9 0.40 2.3 630.0140 Seeding Mixture No. 40 LB 50 13 63 630.0200 Seeding Temporary LB 76 18 94 637.2230 Signs Type II Reflective Type F SF 459.54 59.68 519.22 638.2602 Removing Signs Type II EACH 232 13 235 638.3000 Removing Small Sign Supports EACH 186 -1 185 690.0150 Sawing Asphalt LF 4,067 616 4,683

Page 2: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Plan Sheets

Revised Plan Sheets Plan

Sheet Plan Sheet Title (brief description of changes to sheet)

21 Erosion Control Plan – added erosion control for right turn lane extension 32 Permanent Signing – revised signing plan 34 Permanent Signing – revised signing plan 36 Permanent Signing – revised signing plan 38 Permanent Signing – revised signing plan 39 Permanent Signing – revised signing plan 88 Miscellaneous Quantities – revised earthwork quantities 89 Miscellaneous Quantities – revised base aggregate quantities 91 Miscellaneous Quantities – revised asphaltic material quantities 92 Miscellaneous Quantities – revised asphaltic material quantities 94 Miscellaneous Quantities – revised erosion control and landscaping quantities 105 Miscellaneous Quantities – revised permanent signing quantities 107 Miscellaneous Quantities – revised permanent signing quantities 108 Miscellaneous Quantities – revised permanent signing quantities 109 Miscellaneous Quantities – revised permanent signing quantities 110 Miscellaneous Quantities – revised permanent signing quantities 140 Miscellaneous Quantities – revised sawing quantities 331 Earthwork Data – revised earthwork data 332 Earthwork Data – revised earthwork data 333 Earthwork Data – revised earthwork data

Added Plan Sheets

Plan Sheet

Plan Sheet Title (brief description of why sheet was added)

7A Typical Sections – added typical section for lengthened right turn lane 11A STH 32 and Parkview Road Right Turn Lane – added sheet for right turn lane 251A Permanent Signing – added no train horn sign detail 334A

- 334H

Cross Sections: Added STH 32 and Parkview Road Right Turn Lane

Schedule of Items Attached, dated December 7, 2016, are the revised Schedule of Items Pages 1 – 3, 6, 7, and 13. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 21, 32, 34, 36, 38, 39, 88, 89, 91, 92, 94, 105, 107 - 110, 140, and 331 - 333 Added: 7A, 11A, 251A, and 334A – 334H

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.

Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

END OF ADDENDUM

Page 3: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

E

22

dotmpc
Typewritten Text
7A
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 7A December 7, 2016
Page 4: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

38N

B40

NB

42N

B44

NB

38SB

40SB

42SB

44SB

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FOFO

FOFO

FOFO

FOFO

FOFO

FOFO

GG

GG

GG

GG

GG

GG

G

+01.5724.00' RT

+01.4124.00' RT

+51.6136.66' RT

+72.6132.00' RT

150'

TA

PE

R45

0'

WIS

DOT/

CADD

S SH

EET

42EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\S

HEE

TSPL

AN\A

DDEN

DUM

- RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:32

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

2

PRO

JECT

NO

:PL

OT

NAM

E :

2

SHEE

T PL

OT

SCAL

E :

####

####

##

4190

-16-

71ST

H 3

2BR

OW

NST

H 3

2 AN

D PA

RKVI

EW R

OAD

RIG

HT

TURN

LAN

E

LAYO

UT

NAM

E - A

dden

dum

-1

2'

1'

12'

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

xxxx

ASH

LAN

D AV

ENU

E

ST

H 3

2

ASH

LAN

D AV

ENU

E

ST

H 3

2

3 4" B

ASE

AGG

REG

ATE

SHO

ULD

ER

ASPH

ALT

TURN

LAN

ESE

E TY

PICA

L SE

CTIO

N

dotmpc
Typewritten Text
11A
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 11A December 7, 2016
Page 5: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

E

22

dotmpc
Typewritten Text
21
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 21 December 7, 2016
Page 6: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
32
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 32 December 7, 2016
Page 7: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
34
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 34 December 7, 2016
Page 8: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
36
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 36 December 7, 2016
Page 9: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
38
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 38 December 7, 2016
Page 10: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
39
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 39 December 7, 2016
Page 11: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

Div

isio

nFr

om/T

o S

tati

onLo

cati

on

Com

mon

Ex

cava

tion

(1

)(it

em #

20

5.01

00)

Sal

vage

d/U

nusa

ble

Pav

emen

t M

ater

ial (

4)

Ava

ilabl

eM

ater

ial

(5)

Une

xpan

ded

Fill

Expa

nded

Fill

(1

3)

Mas

s O

rdin

ate

+/-

(1

4)

Was

teB

orro

wC

omm

ent:

Cut

(2

)

EBS

Ex

cava

tion

(3

)Fa

ctor

Div

isio

n 1

1.2

5(ite

m #

208.

0100

)NB

Brid

ge53

+21

- 6

1+62

STH 3

213

00

013

030

037

3-2

430

243

SB

Brid

ge55

+63

- 6

3+15

STH 3

220

60

020

630

838

5-1

790

179

Out

fall

Cha

nnel

W.

Ditch

61+03

- 6

1+55

STH 3

260

060

010

012

5-1

250

125

Rem

ove

ston

e an

d m

isc

mat

eria

lsDiv

isio

n 1

Sub

tota

l39

60

6033

670

888

3-5

470

547

Div

isio

n 2

Railr

oad

NB

and

SB

77+25

- 7

9+50

STH 3

21,

342

043

390

90

090

990

90

Div

isio

n 2

Sub

tota

l1,

342

043

390

90

090

990

90

Div

isio

n 3

Left

Tur

n La

ne10

2+71

- 1

08+60

STH 3

21,

044

018

386

194

61,

182

-321

032

1Div

isio

n 3

Sub

tota

l1,

044

018

386

194

61,

182

-321

032

1

Div

isio

n 4

Righ

t Tur

n La

ne P

arkv

iew

38+01

- 4

4+01

STH 3

256

80

6250

684

105

401

401

0Div

isio

n 4

Sub

tota

l56

80

6250

684

105

401

401

0

Gra

nd T

otal

3,35

00

738

2,61

21,

738

2,17

044

21,

310

868

Tot

al C

omm

on E

xcav

atio

n3,

350

1) C

omm

on E

xcav

atio

n is

the

sum

of t

he C

ut a

nd E

BS E

xcav

atio

n co

lum

ns. I

tem

num

ber

205.

0100

2) S

alva

ged/

Uns

uabl

e Pa

vem

ent

Mat

eria

l is

incl

uded

in C

ut.

4) S

alva

ged/

Unu

sabl

e Pa

vem

ent

Mat

eria

l5)

Ava

ilabl

e M

ater

ial =

Cut

- S

alva

ged/

Unu

suab

le P

avem

ent

Mat

eria

l13

) Ex

pand

ed F

ill. F

acto

r =

1.2

5D

epen

ding

on

sele

ctio

ns:

Expa

nded

Fill

= (

Une

xpan

ded

Fill

- R

ock*

Roc

k Fa

ctor

- R

educ

ed M

arsh

- R

educ

ed E

BS

) *

Fill

Fac

tor

Expa

nded

Fill

= (

Une

xpan

ded

Fill

- Ro

ck*

Rock

Fac

tor

- Re

duce

d EB

S) *

Fill

Fact

orEx

pand

ed F

ill =

(U

nexp

ande

d Fi

ll -

Rock

* Ro

ck F

acto

r -

Redu

ced

Mar

sh)

* Fi

ll Fa

ctor

Expa

nded

Fill

= (

Une

xpan

ded

Fill

- Ro

ck*

Rock

Fac

tor)

* F

ill Fa

ctor

14)

The

Mas

s O

rdin

ate

+ o

r -

Qty

cal

cula

ted

for

the

Div

isio

n. P

lus

quan

tity

indi

cate

s an

exc

ess

of m

ater

ial w

ithin

the

Div

isio

n. M

inus

indi

cate

s a

shor

tage

of m

ater

ial w

ithin

the

Div

isio

n.

dotmpc
Typewritten Text
88
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 88 December 7, 2016
Page 12: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

305.0110

305.0120

305.0500

312.0110

BASE AGGREGATE

BASE AGGREGATE

SHAPING

SELECT CRUSHED

DENSE 3/4-INCH

DENSE 1 1/4-INCH

SHOULDERS

MATERIAL

STATION

TO

STATION

LOCATION

TON

TON

STA

TON

REMARKS

NORTHBOUND

28+97NB

-46+00NB

STH 32

54

--

34

--

BEGINNING OF PROJECT TO PARKVIEW ROAD

38+01NB

-44+01NB

STH 32

--

320

--

--

RIGHT TURN LANE EXTENSION TO PARKVIEW ROAD

46+00NB

-59+25NB

STH 32

42

--

27

--

PARKVIEW ROAD TO SOUTH EDGE OF NEW BRIDGE DECK

58+49NB

-59+55NB

STH 32

1174

--

--

SHOULDER WIDENING NB SE QUADRANT

59+25NB

-59+55NB

STH 32

126

--

--

SHOULDER WIDENING NB SW QUADRANT

60+85NB

-61+63NB

STH 32

1114

--

--

SHOULDER WIDENING NB NW QUADRANT

60+85NB

-61+42NB

STH 32

188

--

--

SHOULDER WIDENING NB NE QUADRANT

61+42NB

-78+00NB

STH 32

52

--

33

--

NORTH EDGE OF NEW BRIDGE DECK TO SOUTH RAILROAD CROSSING APPROACH

78+00NB

-79+50NB

STH 32

5200

3580

RAILROAD CROSSING

79+50

NB

-86+00NB

STH 32

20

--

13

--

NORTH RAILROAD CROSSING APPROACH TO HANSEN ROAD

90+00NB

-100+25NB

STH 32

32

--

21

--

HANSEN ROAD TO VANDERPERREN WAY

104+25NB

-118+50NB

STH 32

45

--

29

--

VANDERPERREN WAY TO PILGRIM WAY

122+50NB

-141+00NB

STH 32

58

--

37

--

PILGRIM WAY TO CORMIER ROAD

144+50NB

-174+50NB

STH 32

94

--

60

--

CORMIER ROAD TO MIKE MCCARTHY WAY

178+50

NB

-190+75NB

STH 32

39

--

25

--

MIKE MCCARTHY WAY TO LOMBARDI AVENUE

SUBTOTAL NORTHBOUND LANES

446

922

280

580

SOUTHBOUND

28+97SB

-46+00SB

STH 32

54

--

34

--

BEGINNING OF PROJECT TO PARKVIEW ROAD

46+00SB

-58+75SB

STH 32

40

--

26

--

PARKVIEW ROAD TO SOUTH EDGE OF NEW BRIDGE DECK

58+63SB

-59+55SB

STH 32

1161

--

--

SHOULDER WIDENING SB SW QUADRANT

58+75SB

-59+55SB

STH 32

278

--

--

SHOULDER WIDENING SB SE QUADRANT

60+85SB

-61+83SB

STH 32

1168

--

--

SHOULDER WIDENING SB NW QUADRANT

60+85SB

-60+95SB

STH 32

113

--

--

SHOULDER WIDENING SB NE QUADRANT

60+95SB

-77+25SB

STH 32

51

--

33

--

NORTH EDGE OF NEW BRIDGE DECK TO SOUTH RAILROAD CROSSING APPROACH

77+25SB

-78+77SB

STH 32

5200

3620

RAILROAD CROSSING

78+77SB

-86+00SB

STH 32

23

--

14

--

NORTH RAILROAD CROSSING APPROACH TO HANSEN ROAD

90+00SB

-100+25SB

STH 32

32

--

21

--

HANSEN ROAD TO VANDERPERREN WAY

104+25SB

-118+50SB

STH 32

45

--

29

--

VANDERPERREN WAY TO PILGRIM WAY

122+50SB

-141+00SB

STH 32

58

--

37

--

PILGRIM WAY TO CORMIER ROAD

144+50SB

-174+50SB

STH 32

94

--

60

--

CORMIER ROAD TO MIKE MCCARTHY WAY

178+50SB

-190+75SB

STH 32

39

--

25

--

MIKE MCCARTHY WAY TO LOMBARDI AVENUE

SUBTOTAL SOUTHBOUND LANES

446

620

280

620

LEFT TURN LANE

102+68

NB

-108+93NB

STH 32

--

1,969

--

--

LEFT TURN LANE NORTH OF VANDERPERREN WAY

892

3,511

560

1,200

TOTAL

BASE AGGREGATE DENSE

CATEGORY 0010

dotmpc
Typewritten Text
89
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 89 December 7, 2016
Page 13: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

455.0605

460.5223

460.5224

460.6223

460.6424

460.4110.S

465.0105

465.0110

HMA PAVEMENT

HMA PAVEMENT

HMA PAVEMENT

HMA PAVEMENT

REHEATING HMA

ASPHALTIC

TACK

LOWER LAYER

UPPER LAYER

LOWER LAYER

UPPER LAYER

PAVEMENT

ASPHALTIC

SURFACE

COAT

3 LT 58-28S

4 LT 58-28S

3 MT 58-28S

4 MT 58-28H

LONGITUDINAL JOINT

SURFACE

PATCHING

STATION

TO

STATION

GAL

TON

TON

TON

TON

LF

TON

TON

REMARKS

NORTHBOUND

29+00NB

-46+00NB

411

164

118

896

706

6,800

--

--

BEGINNING OF PROJECT TO PARKVIEW ROAD

38+01NB

-44+01NB

68

--

--

202

109

1,200

--

--

RIGHT TURN LANE EXTENSION TO PARKVIEW ROAD

46+00NB

-59+72NB

281

185

133

539

430

5,487

--

--

PARKVIEW ROAD TO SOUTH EDGE OF NEW BRIDGE DECK

60+69NB

-78+00NB

360

232

167

698

556

6,923

--

--

N EDGE OF BRIDGE DECK TO S RAILROAD CROSSING APPROAC H

78+00NB

-79+50NB

44

36

14

108

42

600

175

--

RAILROAD CROSSING; ASPHALTIC SURFACE UNDER RAILROAD

79+50

NB

-86+00NB

144

52

38

320

252

2,600

--

--

NORTH RAILROAD CROSSING APPROACH TO HANSEN ROAD

86+00NB

-90+00NB

164

14

10

527

201

1,600

--

--

HANSEN ROAD INTERSECTION; PLACE 6" ASPHALT

90+00NB

-100+25NB

211

133

96

411

327

4,100

--

--

HANSEN ROAD TO VANDERPERREN WAY

100+25NB

-104+25NB

137

50

36

403

140

1,600

--

--

VANDERPERREN WAY INTERSECTION; PLACE 6" ASPHALT

104+25NB

-118+50NB

306

147

106

643

508

5,700

--

--

VANDERPERREN WAY TO PILGRIM WAY

118+50

NB

-122+50NB

168

11

8543

207

1,600

5--

PILGRIM WAY INTERSECTION; PLACE 6" ASPHALT

122+50NB

-141+00NB

388

234

169

767

610

7,400

--

--

PILGRIM WAY TO CORMIER ROAD

141+00NB

-144+50NB

147

64

481

185

1,400

--

--

CORMIER ROAD INTERSECTION; PLACE 6" ASPHALT

144+50NB

-174+50NB

615

390

281

1,198

955

12,000

--

--

CORMIER ROAD TO MIKE MCCARTHY WAY

174+50NB

-178+50NB

160

32

525

203

1,600

--

--

MIKE MCCARTHY WAY INTERSECTION; PLACE 6" ASPHALT

178+50

NB

-190+75NB

263

122

88

558

441

4,900

--

--

MIKE MCCARTHY WAY TO LOMBARDI AVENUE

190+75NB

-195+00NB

164

--

--

541

210

1,700

--

--

LOMBARDI AVENUE INTERSECTION/EOP; PLACE 6" ASPHALT

SUBTOTAL NORTHBOUND LANES

4,029

1,780

1,269

9,360

6,084

67,210

180

--

SOUTHBOUND

31+00SB

-46+00SB

325

156

112

684

541

6,000

--

--

BEGINNING OF PROJECT TO PARKVIEW ROAD

46+00SB

-59+72SB

282

158

114

570

453

5,487

--

--

PARKVIEW ROAD TO SOUTH EDGE OF NEW BRIDGE DECK

60+69SB

-77+25SB

374

164

118

800

632

6,623

--

--

N EDGE OF BRIDGE DECK TO S RAILROAD CROSSING APPROAC H

77+25SB

-78+77SB

45

37

15

110

43

608

175

--

RAILROAD CROSSING; ASPHALTIC SURFACE UNDER RAILROAD

78+77SB

-86+00SB

143

95

68

274

218

2,892

--

--

NORTH RAILROAD CROSSING APPROACH TO HANSEN ROAD

86+00SB

-90+00SB

164

97

532

204

1,600

--

--

HANSEN ROAD INTERSECTION; PLACE 6" ASPHALT

90+00SB

-100+25SB

219

113

82

452

358

4,100

--

--

HANSEN ROAD TO VANDERPERREN WAY

100+25SB

-104+25SB

137

96

444

170

1,600

--

--

VANDERPERREN WAY INTERSECTION; PLACE 6" ASPHALT

104+25SB

-118+50SB

312

130

93

675

533

5,700

--

--

VANDERPERREN WAY TO PILGRIM WAY

118+50SB

-122+50SB

168

75

547

211

1,600

--

--

PILGRIM WAY INTERSECTION; PLACE 6" ASPHALT

122+50SB

-141+00SB

413

148

107

918

722

7,400

--

--

PILGRIM WAY TO CORMIER ROAD

141+00SB

-144+50SB

147

54

481

185

1,400

--

--

CORMIER ROAD INTERSECTION; PLACE 6" ASPHALT

144+50SB

-174+50SB

624

314

226

1,297

1,027

12,000

--

--

CORMIER ROAD TO MIKE MCCARTHY WAY

174+50SB

-178+50SB

160

86

519

199

1,600

--

--

MIKE MCCARTHY WAY INTERSECTION; PLACE 6" ASPHALT

178+50SB

-190+75SB

248

133

96

506

402

4,900

--

--

MIKE MCCARTHY WAY TO LOMBARDI AVENUE

190+75SB

-195+80SB

202

10

7656

252

2,020

--

--

LOMBARDI AVENUE INTERSECTION/EOP; PLACE 6" ASPHALT

SUBTOTAL SOUTHBOUND LANES

3,960

1,497

1,065

9,466

6,149

65,530

175

--

ASPHALTIC MATERIALS

CATEGORY 0010

dotmpc
Typewritten Text
91
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 91 December 7, 2016
Page 14: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

455.0605

460.5223

460.5224

460.6223

460.6424

460.4110.S

465.0105

465.0110

HMA PAVEMENT

HMA PAVEMENT

HMA PAVEMENT

HMA PAVEMENT

REHEATING HMA

ASPHALTIC

TACK

LOWER LAYER

UPPER LAYER

LOWER LAYER

UPPER LAYER

PAVEMENT

ASPHALTIC

SURFACE

COAT

3 LT 58-28S

4 LT 58-28S

3 MT 58-28S

4 MT 58-28H

LONGITUDINAL JOINT

SURFACE

PATCHING

STATION

TO

STATION

GAL

TON

TON

TON

TON

LF

TON

TON

REMARKS

LEFT TURN LANE

102+68

NB

-108+93NB

146

--

--

371

144

2,501

155

--

LEFT TURN LANE NORTH OF VANDERPERREN WAY

--

--

--

--

--

--

--

200

AS NEEDED; LOCATIONS TO BE DETERMINED IN FIELD

8,135

3,277

2,334

19,197

12,377

135,241

510

200

UNDISTRIBUTED

TOTAL

ASPHALTIC MATERIALS (CONTINUED)

625.0500

628.1104

628.1504

628.1520

628.2002

628.2023

628.7015

628.7504

628.7555

628.7570

SILT

EROSION MAT

EROSION MAT

INLET

TEMPORARY

CULVERT

SALVAGED

EROSION

SILT

FENCE

CLASS I

CLASS II

PROTECTION

DITCH

PIPE

ROCK

TOPSOIL

BALES

FENCE

MAINTENANCE

TYPE A

TYPE B

TYPE C

CHECKS

CHECKS

BAGS

STATION

TO

STATION

LOCATION

SY

EACH

LF

LF

SY

SY

EACH

EACH

EACH

EACH

38+01NB

-44+01NB

E DITCH

680

--

610

610

680

--

--

--

--

--

53+20NB

-59+55NB

E DITCH

620

--

640

640

--

620

--

1--

--

55+65SB

-59+60SB

W DITCH

530

--

400

400

--

530

--

1--

--

55+47NB

-59+53NB

MEDIAN

150

--

410

410

150

--

--

1--

--

58+73SB

-59+59SB

MEDIAN

50

--

100

100

50

--

--

--

--

--

59+60NB

-59+60NB

S RIVER BANK

--

--

120

120

--

--

--

--

--

--

60+85NB

-60+85NB

N RIVER BANK

--

--

120

120

--

--

--

--

--

--

60+85NB

-61+63NB

MEDIAN

100

--

90

90

100

--

--

--

--

--

60+85NB

-61+40NB

E DITCH

140

--

70

70

--

140

--

--

--

--

60+85SB

-63+15SB

W DITCH

350

--

240

240

--

350

--

1--

--

60+85SB

-63+00SB

MEDIAN

115

--

230

230

115

--

--

1--

--

77+25NB

-79+50NB

NB & SB

750

--

620

620

750

--

--

45

--

101+50NB

-108+90NB

MEDIAN

--

--

--

--

--

--

11

15

--

107+95NB

-113+15NB

E DITCH

--

--

530

530

--

--

--

--

--

--

110+40SB

-113+15SB

W DITCH

--

--

280

280

--

--

--

--

--

--

123+00NB

-130+70NB

E DITCH

--

--

800

800

--

--

--

--

--

--

125+85SB

-132+30SB

W DITCH

--

--

650

650

--

--

--

--

--

--

PROJECT

--

30

--

--

--

--

--

10

--

50

3,485

30

5,910

5,910

1,845

1,640

11

20

10

50

UNDISRIBUTED

EROSION CONTROL

TOTAL

dotmpc
Typewritten Text
92
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 92 December 7, 2016
Page 15: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

629.0210

630.0140

630.0200

FERTILIZER

SEEDING

SEEDING

TYPE B

MIXTURE NO. 40

TEMPORARY

STATION

TO

STATION

LOCATION

CWT

LB

LB

REMARKS

38+01NB

-44+01NB

STH 32

0.4

12

18

PARKVIEW ROAD RIGHT TURN LANE EXTENSION

53+20NB

-59+55NB

STH 32

0.4

11

17

ASHWAUBENON CREEK NB LANES EAST DITCH

55+65SB

-59+60SB

STH 32

0.3

10

14

ASHWAUBENON CREEK SB LANES WEST DITCH

55+47NB

-59+53NB

STH 32

0.1

34

ASHWAUBENON CREEK NB LANES MEDIAN DITCH

58+73SB

-59+59SB

STH 32

0.1

12

ASHWAUBENON CREEK SB LANES MEDIAN DITCH

60+85NB

-61+63NB

STH 32

0.1

23

ASHWAUBENON CREEK NB LANES MEDIAN DITCH

60+85NB

-61+40NB

STH 32

0.1

33

ASHWAUBENON CREEK NB LANES EAST DITCH

60+85SB

-63+15SB

STH 32

0.2

69

ASHWAUBENON CREEK SB LANES WEST DITCH

60+85SB

-63+00SB

STH 32

0.1

23

ASHWAUBENON CREEK SB LANES MEDIAN DITCH

77+25NB

-79+50NB

STH 32

0.5

14

20

RAILROAD CROSSING RECONSTRUCTION NB & SB

TOTAL

2.3

63

94

LANDSCAPING

dotmpc
Typewritten Text
94
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 94 December 7, 2016
Page 16: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

EH

WY

: ST

H 3

2C

OU

NT

Y:B

RO

WN

SH

EE

T

3

MIS

CE

LLA

NE

OU

S Q

UA

NT

ITIE

SP

RO

JEC

T N

UM

BE

R:

4190

-16-

71

3

PLA

N S

HE

ET

PR

OD

UC

ED

BY

Wis

DO

T -

NE

RE

GIO

N

dotmpc
Typewritten Text
105
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 105 December 7, 2016
Page 17: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

EH

WY

: ST

H 3

2C

OU

NT

Y:B

RO

WN

SH

EE

T

3

MIS

CE

LLA

NE

OU

S Q

UA

NT

ITIE

SP

RO

JEC

T N

UM

BE

R:

4190

-16-

71

3

dotmpc
Typewritten Text
107
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 107 December 7, 2016
Page 18: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

EH

WY

: ST

H 3

2C

OU

NT

Y:B

RO

WN

SH

EE

T

3

MIS

CE

LLA

NE

OU

S Q

UA

NT

ITIE

SP

RO

JEC

T N

UM

BE

R:

4190

-16-

71

3

dotmpc
Typewritten Text
108
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 108 December 7, 2016
Page 19: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

EH

WY

: ST

H 3

2C

OU

NT

Y:B

RO

WN

SH

EE

T

3

MIS

CE

LLA

NE

OU

S Q

UA

NT

ITIE

SP

RO

JEC

T N

UM

BE

R:

4190

-16-

71

3

dotmpc
Typewritten Text
109
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 109 December 7, 2016
Page 20: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

EH

WY

: ST

H 3

2C

OU

NT

Y:B

RO

WN

SH

EE

T

3

MIS

CE

LLA

NE

OU

S Q

UA

NT

ITIE

SP

RO

JEC

T N

UM

BE

R:

4190

-16-

71

3

dotmpc
Typewritten Text
110
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 110 December 7, 2016
Page 21: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NM

ISC

ELL

AN

EO

US

QU

AN

TIT

IES

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

33

690.0150

690.0250

SAWING

SAWING

ASPHALT

CONCRETE

STATION

TO

STATION

LOCATION

LF

LF

REMARKS

CATEGORY 0010

NORTHBOUND LANES

29+00NB

-

29+00NB

STH 32

35

--

NB SOUTH PAVING LIMITS

38+01NB

-44+01NB

STH 32

616

--

RIGHT TURN LANE EXTENSION TO PARKVIEW ROAD

44+49NB

-44+53NB

STH 32

20

5CURB AND GUTTER REMOVAL AT PARKVIEW MEDIAN

58+49NB

-59+60NB

STH 32

120

--

SAW CUT FOR SHOULDER WIDENING EAST SIDE

59+25NB

-59+60NB

STH 32

40

--

SAW CUT FOR SHOULDER WIDENING WEST SIDE

60+80NB

-61+41NB

STH 32

70

--

SAW CUT FOR SHOULDER WIDENING EAST SIDE

60+80NB

-61+63NB

STH 32

90

--

SAW CUT FOR SHOULDER WIDENING WEST SIDE

63+90NB

-64+00NB

STH 32

25

5CURB AND GUTTER REMOVAL AT BAETEN ROAD MEDIAN

76+25NB

-76+25NB

STH 32

35

--

NB SOUTH RAILROAD CROSSING APPROACH

80+21NB

-80+21NB

STH 32

35

--

NB NORTH RAILROAD CROSSING APPROACH

86+00NB

-86+00NB

STH 32

50

--

6" PAVING LIMITS S OF HANSEN ROAD

90+00NB

-90+00NB

STH 32

35

--

6" PAVING LIMITS N OF HANSEN ROAD

100+25NB

-100+25NB

STH 32

50

--

6" PAVING LIMITS S OF VANDERPERREN WAY

102+13NB

-102+20NB

STH 32

--

5CURB AND GUTTER REMOVAL AT VANDERPERREN

102+75NB

-108+95NB

STH 32

620

--

NB LANE FOR LEFT TURN LANE

102+75NB

-102+75NB

STH 32

50

--

LEFT TURN LANE SOUTH LIMITS

104+25NB

-104+25NB

STH 32

35

--

6" PAVING LIMITS N OF VANDERPERREN WAY

116+00NB

-116+00NB

STH 32

35

--

STAGE 5 LIMITS N OF TENNIS COURT

118+50NB

-118+50NB

STH 32

55

--

6" PAVING LIMITS S OF PILGRIM WAY

119+02NB

-120+05NB

STH 32

230

--

PILGRIM WAY CURB REPLACEMENT NB LEFT TURN LANE

121+17NB

-121+24NB

STH 32

45

10

MEDIAN CURB & GUTTER AND ISLAND FOR PED XING

122+50NB

-122+50NB

STH 32

35

--

6" PAVING LIMITS N OF PILGRIM WAY

141+00NB

-141+00NB

STH 32

55

--

6" PAVING LIMITS S OF CORMIER ROAD

144+50NB

-144+50NB

STH 32

35

--

6" PAVING LIMITS N OF CORMIER ROAD

174+50NB

-174+50NB

STH 32

55

--

6" PAVING LIMITS S OF MIKE MCCARTHY WAY

175+46NB

-175+61NB

STH 32

--

50

EAST LEG OF MIKE MCCARTHY WAY INTERSECTION

175+95NB

-176+15NB

STH 32

--

70

EAST LEG OF MIKE MCCARTHY WAY INTERSECTION

178+50NB

-178+50NB

STH 32

35

--

6" PAVING LIMITS N OF MIKE MCCARTHY WAY

190+75NB

-190+75NB

STH 32

57

--

6" PAVING LIMITS S OF LOMBARDI AVENUE

195+00NB

-195+00NB

STH 32

35

--

NB NORTH PAVING LIMITS

2,598

145

SAWING

SUBTOTAL NORTHBOUND LANES

690.0150

690.0250

SAWING

SAWING

ASPHALT

CONCRETE

STATION

TO

STATION

LOCATION

LF

LF

REMARKS

CATEGORY 0010

SOUTHBOUND LANES

31+00SB

-31+00SB

STH 32

35

--

SB SOUTH PAVING LIMITS

58+63SB

-59+60SB

STH 32

105

--

SAW CUT FOR SHOULDER WIDENING WEST SIDE

58+75SB

-59+60SB

STH 32

90

--

SAW CUT FOR SHOULDER WIDENING EAST SIDE

60+80SB

-60+96SB

STH 32

20

--

SAW CUT FOR SHOULDER WIDENING EAST SIDE

60+80SB

-61+83SB

STH 32

110

--

SAW CUT FOR SHOULDER WIDENING WEST SIDE

75+80SB

-75+80SB

STH 32

35

--

SB SOUTH RAILROAD CROSSING APPROACH

79+63SB

-79+63SB

STH 32

35

--

SB NORTH RAILROAD CROSSING APPROACH

86+00SB

-86+00SB

STH 32

35

--

6" PAVING LIMITS S OF HANSEN ROAD

90+00SB

-90+00SB

STH 32

55

6" PAVING LIMITS N OF HANSEN ROAD

100+25SB

-100+25SB

STH 32

35

--

6" PAVING LIMITS S OF VANDERPERREN WAY

104+25SB

-104+25SB

STH 32

55

6" PAVING LIMITS N OF VANDERPERREN WAY

102+75SB

-108+95SB

STH 32

620

--

SB LANE FOR LEFT TURN LANE

106+60SB

-108+10SB

STH 32

150

--

ACCESS DRIVE TO FRONTAGE ROAD

116+00SB

-116+00SB

STH 32

35

--

STAGE 5 LIMITS N OF TENNIS COURT

118+50SB

-118+50SB

STH 32

35

6" PAVING LIMITS S OF PILGRIM WAY

122+50SB

-122+50SB

STH 32

50

--

6" PAVING LIMITS N OF PILGRIM WAY

141+00SB

-141+00SB

STH 32

35

6" PAVING LIMITS S OF CORMIER ROAD

144+50SB

-144+50SB

STH 32

50

--

6" PAVING LIMITS N OF CORMIER ROAD

174+50SB

-174+50SB

STH 32

35

6" PAVING LIMITS S OF MIKE MCCARTHY WAY

178+50SB

-178+50SB

STH 32

50

--

6" PAVING LIMITS N OF MIKE MCCARTHY WAY

190+75SB

-190+75SB

STH 32

35

6" PAVING LIMITS S OF LOMBARDI AVENUE

195+80SB

-195+80SB

STH 32

50

--

SB NORTH PAVING LIMITS

1,755

0

SIDE ROADS

10+35 PAR

-10+35 PAR

PARKVIEW ROAD

35

--

WEST LEG OF INTERSECTION PAVING LIMITS

12+75PAR

-12+75PAR

PARKVIEW ROAD

30

--

EAST LEG OF PAVING LIMITS TO W. TIMBER

21+05 BAE

-21+05 BAE

BAETEN ROAD

50

--

WEST LEG OF INTERSECTION PAVING LIMITS

51+27 TEN

-51+27 TEN

TENNIS COURT

130

--

WEST LEG OF INTERSECTION PAVING LIMITS

70+89 WIL

-70+89 WIL

WILLARD DRIVE

40

--

WEST LEG OF INTERSECTION PAVING LIMITS

87+73 MOR

-87+73 MOR

MORRIS AVENUE

45

--

WEST LEG OF INTERSECTION PAVING LIMITS

40+52 VAN

-41+25 VAN

VANDERPERREN ROAD

--

410

WEST LEG OF INTERSECTION

80+40 COR

-81+25 COR

CORMIER ROAD

--

360

WEST LEG OF INTERSECTION

330

770

4,683

915

SAWING (CONTINUED)

SUBTOTAL SOUTHBOUND LANES

SUBTOTAL SIDE ROADS

TOTAL

dotmpc
Typewritten Text
140
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 140 December 7, 2016
Page 22: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right
dotmpc
Typewritten Text
251A
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 251A December 7, 2016
Page 23: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NE

AR

TH

WO

RK

DA

TA

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

99

Cu

tS

alv

ag

ed

/U

nu

sab

leF

illC

ut

Sa

lva

ge

d/

Un

usa

ble

Fill

Cu

tS

alv

ag

ed

/U

nu

sab

leE

xp

an

de

d F

illM

ass

Ord

ina

teS

TATI

ON

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

1.25

53+21

.13

0.00

00.

000

00

00

00.

0053

+25

0.00

00.

010

00

00

00.

0053

+50

0.00

00.

000

00

00

00.

0053

+75

0.00

00.

050

00

00

0-0

.03

54+00

0.00

01.

560

01

00

1-0

.96

54+25

0.00

00.

090

01

00

2-1

.92

54+39

.68

0.00

03.

380

01

00

3-3

.10

54+50

0.00

02.

600

01

00

5-4

.53

54+65

0.00

00.

110

01

00

5-5

.47

54+75

0.00

00.

080

00

00

6-5

.52

54+90

0.00

00.

030

00

00

6-5

.55

55+00

0.00

00.

090

00

00

6-5

.58

55+25

0.00

00.

440

00

00

6-5

.88

55+47

.62

0.00

00.

000

00

00

6-5

.88

55+50

0.00

00.

000

00

00

6-6

.14

55+75

0.00

00.

000

00

00

6-6

.14

56+00

0.00

00.

010

00

00

6-6

.14

56+25

0.00

00.

000

00

00

6-6

.14

56+50

0.00

00.

000

00

00

6-6

.14

56+66

.06

0.00

00.

420

00

00

6-6

.14

56+75

0.00

00.

000

00

00

6-6

.14

57+00

0.00

00.

170

00

00

6-6

.24

57+25

0.00

02.

510

01

00

8-7

.79

57+50

0.00

05.

390

04

00

12-1

2.29

57+75

0.00

06.

090

05

00

19-1

8.56

58+00

0.00

08.

740

06

00

27-2

6.54

58+25

0.00

010

.39

00

90

038

-37.

7958

+50

24.8

70

10.1

513

010

130

50-3

6.95

58+75

22.9

80

19.4

822

014

350

68-3

2.29

59+00

19.4

30

39.8

620

027

550

102

-46.

4059

+25

34.1

40

68.2

916

050

710

164

-92.

7459

+50

31.4

10

106.

2914

081

850

265

-179

.80

59+55

29.9

90

123.

793

022

880

293

-204

.54

60+85

.92

19.1

60

100.

950

00

880

293

-204

.54

61+00

19.2

50

48.1

810

039

980

341

-243

.16

61+25

20.4

80

3.56

180

2411

60

371

-255

.10

61+50

5.89

00.

0012

02

128

037

3-2

45.1

661

+62

3.83

00.

002

00

130

037

3-2

43.1

6

NB

Ashw

aube

non

Cre

ek B

ridg

eIn

cre

me

nta

l Vo

l (C

Y)

(Un

ad

just

ed

)A

RE

A (

SF

)C

um

ula

tiv

e V

ol (

CY

)

dotmpc
Typewritten Text
331
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 331 December 7, 2016
Page 24: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NE

AR

TH

WO

RK

DA

TA

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

99

Cu

tS

alv

ag

ed

/U

nu

sab

leF

illC

ut

Sa

lva

ge

d/

Un

usa

ble

Fill

Cu

tS

alv

ag

ed

/U

nu

sab

leE

xp

an

de

d F

illM

ass

Ord

ina

teS

TATI

ON

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

1.25

55+63

.73

0.00

00.

000

00

00

00.

0055

+75

0.00

00.

000

00

00

00.

0056

+00

0.00

00.

000

00

00

00.

0056

+25

0.00

00.

010

00

00

0-0

.01

56+50

0.00

00.

010

00

00

0-0

.02

56+75

0.00

00.

020

00

00

0-0

.04

57+00

0.00

00.

140

00

00

0-0

.13

57+25

0.00

00.

570

00

00

1-0

.55

57+50

0.00

01.

440

01

00

2-1

.71

57+75

0.00

04.

280

03

00

5-5

.03

58+00

0.00

07.

020

05

00

12-1

1.57

58+25

0.00

05.

900

06

00

19-1

9.04

58+50

0.00

03.

670

04

00

25-2

4.58

58+75

43.9

80

6.76

300

530

031

-0.6

159

+00

41.6

70

12.3

238

09

680

4226

.34

59+25

36.9

80

35.9

236

022

104

070

34.4

359

+50

29.6

40

98.0

331

062

135

014

7-1

2.08

59+75

0.00

00.

000

045

135

020

4-6

8.81

60+00

0.00

00.

000

00

135

020

4-6

8.81

60+25

0.00

00.

000

00

135

020

4-6

8.81

60+50

0.00

00.

000

00

135

020

4-6

8.81

60+75

0.00

00.

000

00

135

020

4-6

8.81

61+00

17.7

40

75.3

89

035

144

024

7-1

03.4

461

+25

20.1

80

34.8

618

051

162

031

1-1

49.2

461

+50

23.1

10

17.4

920

024

182

034

2-1

59.5

461

+75

27.9

70

6.87

240

1120

60

356

-149

.63

62+00

0.00

03.

030

05

206

036

1-1

55.3

662

+25

0.00

00.

800

02

206

036

4-1

57.5

862

+50

0.00

01.

900

01

206

036

5-1

59.1

462

+75

0.00

08.

060

05

206

037

1-1

64.9

063

+00

0.00

07.

980

07

206

038

0-1

74.1

963

+15

.37

0.00

05.

280

04

206

038

5-1

78.9

0

SB A

shw

aube

non

Cre

ek B

ridg

eA

RE

A (

SF

)In

cre

me

nta

l Vo

l (C

Y)

(Un

ad

just

ed

)C

um

ula

tiv

e V

ol (

CY

)

dotmpc
Typewritten Text
332
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 332 December 7, 2016
Page 25: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

PR

OJE

CT

NO

: 41

90-1

6-71

HW

Y:

ST

H 3

2C

OU

NT

Y:

BR

OW

NE

AR

TH

WO

RK

DA

TA

SH

EE

T:

EF

ILE

NA

ME

: _

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

PL

OT

DA

TE

: _

__

__

__

__

__

__

__

__

__

PL

OT

BY

: D

UM

S,

AL

EX

AN

DE

R T

PL

OT

NA

ME

: _

__

__

__

__

__

__

__

PL

OT

SC

AL

E :

1:1

99

Cu

tS

alv

ag

ed

/U

nu

sab

leF

illC

ut

Sa

lva

ge

d/

Un

usa

ble

Fill

Cu

tS

alv

ag

ed

/U

nu

sab

leE

xp

an

de

d F

illM

ass

Ord

ina

teS

TATI

ON

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

1.25

77+25

110.

0052

.00

0.00

00

00

00

0.00

77+35

110.

0052

.00

0.00

4119

041

190

21.4

877

+50

110.

0052

.00

19.8

561

290

102

480

53.7

077

+75

113.

0052

.00

23.8

110

348

020

596

010

8.80

78+00

222.

0052

.00

10.3

915

548

036

014

40

215.

7478

+04

220.

8052

.00

10.2

236

90

397

153

024

3.53

78+10

221.

8352

.00

8.86

4912

044

616

50

281.

1678

+25

245.

2952

.00

0.00

126

280

572

193

037

9.13

78+50

249.

7852

.00

0.00

229

480

801

241

056

0.18

78+73

226.

2752

.00

25.8

920

445

01,

005

285

071

9.75

78+75

112.

7052

.00

1.57

124

01,

017

289

072

7.76

78+81

112.

0752

.00

2.20

2311

01,

040

299

074

0.06

79+00

115.

4452

.00

23.5

682

380

1,12

233

70

784.

6679

+25

121.

5852

.00

22.2

811

048

01,

231

385

084

6.25

79+50

116.

9952

.00

0.00

110

480

1,34

243

30

908.

54

Rai

lroa

d C

ross

ing

NB

and

SBA

RE

A (

SF

)In

cre

me

nta

l Vo

l (C

Y)

(Un

ad

just

ed

)C

um

ula

tiv

e V

ol (

CY

)

Cu

tS

alv

ag

ed

/U

nu

sab

leF

illC

ut

Sa

lva

ge

d/

Un

usa

ble

Fill

Cu

tS

alv

ag

ed

/U

nu

sab

leE

xp

an

de

d F

illM

ass

Ord

ina

teS

TATI

ON

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

Pa

ve

me

nt

Ma

teri

al

1.25

38+

2525

.01

00.

020

00

00

00.

0038

+50

24.8

80

0.19

230

023

00

22.9

838

+75

24.2

50

0.76

230

046

01

45.1

739

+00

23.7

60

3.97

220

268

03

64.6

639

+25

23.7

60

9.95

220

690

011

78.6

039

+50

24.5

70

14.1

822

011

112

025

87.0

139

+75

24.4

80

12.1

323

012

135

041

94.4

940

+00

27.3

20

6.60

240

915

90

5110

7.64

40+

2525

.79

18.

9825

07

184

061

122.

8340

+50

24.1

41

9.86

231

920

71

7113

4.02

40+

7525

.44

24.

7323

27

230

380

146.

9341

+00

29.4

23

0.73

252

325

55

8316

6.96

41+

2525

.87

33.

5926

32

281

886

187.

2641

+50

26.6

34

2.86

243

330

511

8920

4.51

41+

7527

.94

52.

1125

42

330

1592

223.

0142

+00

27.9

05

2.41

264

235

620

9524

1.84

42+

2528

.22

62.

2126

52

382

2597

260.

2242

+50

28.3

96

1.81

265

240

830

100

278.

8542

+75

28.5

56

1.44

265

243

535

102

298.

0443

+00

28.6

86

0.98

265

146

140

103

317.

8443

+25

28.8

76

0.54

275

148

846

104

338.

3143

+50

28.9

66

0.27

275

051

551

104

359.

3343

+75

28.8

86

0.16

275

054

156

105

380.

5644

+00

29.3

16

0.05

275

056

862

105

402.

08

Rig

ht T

urn

Lane

Par

kvie

wA

RE

A (

SF

)In

cre

me

nta

l Vo

l (C

Y)

(Un

ad

just

ed

)C

um

ula

tiv

e V

ol (

CY

)

dotmpc
Typewritten Text
333
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Revised Sheet 333 December 7, 2016
Page 26: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

38+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.99

25.98

607.03

24.00

606.69

40.92606.74

41.09606.74

41.09

2.0%

3.5:

1

38+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

606.88

28.09

606.96

24.00

606.6241.08

606.64

41.12606.64

41.12

2.0%

3.5:

1

38+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.74

30.19

606.8724.00

606.52

41.24

604.03

49.98604.03

49.98

2.0%

3.5:

1

SAN

SAN

SAN

GASGASGAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

PLO

T SC

ALE

:

10 F

T

10 F

T

4190

-16-

71ST

H 3

2BR

OW

N

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(1)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

dotmpc
Typewritten Text
334A
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334A December 7, 2016
Page 27: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

39+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

606.59

32.30

606.75

24.00

606.38

42.61

603.38

53.12603.38

53.12

2.0%

3.5:

1

39+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.42

34.41

606.63

24.00

606.22

44.72

602.95

56.17602.95

56.17

2.0%

3.5:

1

39+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

606.2836.52

606.54

24.00

606.08

46.83

602.46

59.49602.46

59.49

2.0%

3.5:

1

SAN

SAN

SAN

GASGASGAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(2)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334B
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334B December 7, 2016
Page 28: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

39+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.20

36.62

606.46

24.00

606.00

46.92

602.60

58.83

602.60

58.83

2.0%

3.5:

1

40+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.96

36.59

606.21

24.00

605.75

46.89

602.87

56.95602.87

56.95

2.0%

3.5:

1

40+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.89

36.55

606.14

24.00

605.69

46.85

602.61

57.61602.61

57.61

2.0%

3.5:

1

SANSANSAN

GASGASGAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(3)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334C
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334C December 7, 2016
Page 29: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

40+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

606.01

36.51

606.26

24.00

605.80

46.81

602.90

56.95602.90

56.95

2.0%

3.5:

1

40+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.01

36.48

606.26

24.00

605.80

46.78

603.6754.25

603.6754.25

2.0%

3.5:

1

41+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

606.03

36.44

606.28

24.00

605.83

46.74

604.62

50.95604.62

50.95

2.0%

3.5:

1

SANSANSAN

GASGASGAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(4)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334D
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334D December 7, 2016
Page 30: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

41+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

606.0338.40

606.32

24.00

606.01

39.40

606.0338.40

605.49

48.16605.49

48.16

2.0%

4.0%

3.5:

1

41+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.98

38.37

606.27

24.00

605.96

39.37

605.98

38.37

606.01

46.12606.01

46.12

2.0%

4.0%

3.5:

1

41+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.90

38.33

606.19

24.00

605.88

39.33

605.90

38.33

606.19

45.17606.19

45.17

2.0%

4.0%

3.5:

1 SANSANSAN

GASGASGAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(5)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334E
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334E December 7, 2016
Page 31: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

42+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.86

38.29

606.15

24.00

605.84

39.29

605.86

38.29

606.11

45.29606.11

45.29

2.0%

4.0%

3.5:

1

42+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.83

38.26

606.11

24.00

605.81

39.26

605.83

38.26

606.16

44.95606.16

44.952.

0%4.

0%3.

5:1

42+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.80

38.22

606.09

24.00

605.78

39.22

605.80

38.22

606.30

44.35

606.30

44.35

2.0%

4.0%

3.5:

1

SANSA

NSAN

GAS

GAS

GAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(6)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334F
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334F December 7, 2016
Page 32: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

42+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.78

38.18

606.06

24.00

605.76

39.18

605.78

38.18

606.43

43.79606.43

43.79

2.0%

4.0%

3.5:

1

43+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.75

38.15

606.04

24.00

605.73

39.15605.75

38.15

606.66

42.84606.66

42.842.

0%4.

0%3.

5:1

43+2

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.72

38.11

606.00

24.00

605.70

39.11

605.72

38.11

606.93

41.75606.93

41.75

2.0%

4.0%

3.5:

1

SANSA

NSAN

GAS

GAS

GAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:18

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(7)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334G
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334G December 7, 2016
Page 33: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

43+5

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.70

38.08

605.9824.00

605.68

39.08

605.70

38.08

607.17

40.77

607.17

40.77

2.0%

4.0%

3.5:

1

43+7

5

600

610

600

610

010

2030

4050

6070

0-1

0

605.68

38.04

605.96

24.00

605.66

39.04

605.68

38.04

607.29

40.28607.29

40.28

2.0%

4.0%3

.5:1

44+0

0

600

610

600

610

010

2030

4050

6070

0-1

0

605.64

38.58

605.93

24.00

605.63

39.00605.64

38.58607.42

39.71607.42

39.71

2.0%

4.0%3.

5:1

GAS

GAS

GAS

WIS

DOT/

CADD

S SH

EET

49EH

WY:

COU

NTY

:N

:\PD

S\C3

D\41

9016

00\D

ESIG

N\C

ORR

IDO

RS\P

ARKV

IEW

RT

LAN

E EX

TEN

SIO

N.D

WG

FILE

NAM

E :

11/2

3/20

16 9

:19

AMPL

OT

DATE

:PL

OT

BY :

DUM

S, A

LEXA

NDE

R T

9

PRO

JECT

NO

:PL

OT

NAM

E :

9

CRO

SS S

ECTI

ON

S:SH

EET

PLO

T SC

ALE

:PL

OT

SCAL

E :

10 F

T

10 F

T

LAYO

UT

NAM

E - S

ectio

n Sh

eet -

(8)

1 IN

:10

FT H

ORZ

. / 1

IN:1

0 FT

VER

T.

STH

32

AND

PARK

VIEW

RO

AD R

IGH

T TU

RN L

ANE

4190

-16-

71ST

H 3

2BR

OW

N

dotmpc
Typewritten Text
334H
dotmpc
Text Box
Addendum No. 01 ID 4190-16-71 Added Sheet 334H December 7, 2016
Page 34: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

0010 203.0100Removing Small Pipe Culverts EACH

3.000_________._____ _________._____

0020 203.0200Removing Old Structure (station) 01.STA 129+53

LUMP SUM _________._____LS

0030 203.0600.SRemoving Old Structure Over WaterwayWith Minimal Debris (station) 01. STA60+25 NB

LUMP SUM _________._____LS

0040 203.0600.SRemoving Old Structure Over WaterwayWith Minimal Debris (station) 01. STA60+25 SB

LUMP SUM _________._____LS

0050 204.0100Removing Pavement SY

952.000_________._____ _________._____

0060 204.0115Removing Asphaltic Surface Butt Joints SY

361.000_________._____ _________._____

0070 204.0120Removing Asphaltic Surface Milling SY

144,770.000_________._____ _________._____

0080 204.0150Removing Curb & Gutter LF

175.000_________._____ _________._____

0090 204.0195Removing Concrete Bases EACH

19.000_________._____ _________._____

0100 204.0220Removing Inlets EACH

1.000_________._____ _________._____

0110 205.0100Excavation Common CY

3,350.000_________._____ _________._____

0120 206.1000Excavation for Structures Bridges(structure) 01. B-5-408

LUMP SUM _________._____LS

0130 206.1000Excavation for Structures Bridges(structure) 01. B-5-409

LUMP SUM _________._____LS

0140 206.2000Excavation for Structures Culverts(structure) 01. B-5-35

LUMP SUM _________._____LS

0150 206.5000Cofferdams (structure) 01. B-5-35 LUMP SUM _________._____LS

Proposal Schedule of Items Page 1 of 15

Page 35: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

0160 208.0100Borrow CY

868.000_________._____ _________._____

0170 210.1500Backfill Structure Type A TON

1,600.000_________._____ _________._____

0180 210.2500Backfill Structure Type B TON

820.000_________._____ _________._____

0190 213.0100Finishing Roadway (project) 01. 4190-16-71

EACH1.000

_________._____ _________._____

0200 305.0110Base Aggregate Dense 3/4-Inch TON

892.000_________._____ _________._____

0210 305.0120Base Aggregate Dense 1 1/4-Inch TON

3,511.000_________._____ _________._____

0220 305.0500Shaping Shoulders STA

560.000_________._____ _________._____

0230 312.0110Select Crushed Material TON

1,200.000_________._____ _________._____

0240 415.0120Concrete Pavement 12-Inch SY

108.000_________._____ _________._____

0250 415.0410Concrete Pavement Approach Slab SY

160.000_________._____ _________._____

0260 416.0610Drilled Tie Bars EACH

307.000_________._____ _________._____

0270 416.0620Drilled Dowel Bars EACH

97.000_________._____ _________._____

0280 416.1715Concrete Pavement Repair SHES SY

42.000_________._____ _________._____

0290 416.1725Concrete Pavement Replacement SHES SY

910.000_________._____ _________._____

1.000000300 440.4410

Incentive IRI Ride DOL25,280.000

25,280.00

0310 455.0605Tack Coat GAL

8,135.000_________._____ _________._____

1.000000320 460.2000

Incentive Density HMA Pavement DOL32,620.000

32,620.00

Proposal Schedule of Items Page 2 of 15

Page 36: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

1.000000330 460.2010

Incentive Air Voids HMA Pavement DOL28,170.000

28,170.00

0340 460.4110.SReheating HMA Pavement LongitudinalJoints

LF135,241.000

_________._____ _________._____

0350 460.5223HMA Pavement 3 LT 58-28 S TON

3,277.000_________._____ _________._____

0360 460.5224HMA Pavement 4 LT 58-28 S TON

2,334.000_________._____ _________._____

0370 460.6223HMA Pavement 3 MT 58-28 S TON

19,197.000_________._____ _________._____

0380 460.6424HMA Pavement 4 MT 58-28 H TON

12,377.000_________._____ _________._____

0390 465.0105Asphaltic Surface TON

510.000_________._____ _________._____

0400 465.0110Asphaltic Surface Patching TON

200.000_________._____ _________._____

0410 502.0100Concrete Masonry Bridges CY

594.000_________._____ _________._____

0420 502.3200Protective Surface Treatment SY

896.000_________._____ _________._____

0430 502.3210Pigmented Surface Sealer SY

218.000_________._____ _________._____

0440 503.0146Prestressed Girder Type I 45W-Inch LF

960.000_________._____ _________._____

0450 504.0100Concrete Masonry Culverts CY

48.000_________._____ _________._____

0460 505.0400Bar Steel Reinforcement HS Structures LB

12,250.000_________._____ _________._____

0470 505.0600Bar Steel Reinforcement HS CoatedStructures

LB74,780.000

_________._____ _________._____

0480 506.2605Bearing Pads Elastomeric Non-Laminated

EACH20.000

_________._____ _________._____

Proposal Schedule of Items Page 3 of 15

Page 37: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

0800 614.0905Crash Cushions Temporary EACH

1.000_________._____ _________._____

0810 614.0920Salvaged Rail LF

4,153.000_________._____ _________._____

0820 614.2300MGS Guardrail 3 LF

2,813.000_________._____ _________._____

0830 614.2500MGS Thrie Beam Transition LF

200.000_________._____ _________._____

0840 614.2610MGS Guardrail Terminal EAT EACH

8.000_________._____ _________._____

0850 614.2620MGS Guardrail Terminal Type 2 EACH

5.000_________._____ _________._____

0860 619.1000Mobilization EACH

1.000_________._____ _________._____

0870 620.0300Concrete Median Sloped Nose SF

150.000_________._____ _________._____

0880 624.0100Water MGAL

63.000_________._____ _________._____

0890 625.0500Salvaged Topsoil SY

3,485.000_________._____ _________._____

0900 628.1104Erosion Bales EACH

30.000_________._____ _________._____

0910 628.1504Silt Fence LF

5,910.000_________._____ _________._____

0920 628.1520Silt Fence Maintenance LF

5,910.000_________._____ _________._____

0930 628.1905Mobilizations Erosion Control EACH

6.000_________._____ _________._____

0940 628.1910Mobilizations Emergency Erosion Control EACH

3.000_________._____ _________._____

0950 628.2002Erosion Mat Class I Type A SY

1,845.000_________._____ _________._____

0960 628.2023Erosion Mat Class II Type B SY

1,640.000_________._____ _________._____

Proposal Schedule of Items Page 6 of 15

Page 38: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

0970 628.7015Inlet Protection Type C EACH

11.000_________._____ _________._____

0980 628.7504Temporary Ditch Checks LF

20.000_________._____ _________._____

0990 628.7555Culvert Pipe Checks EACH

10.000_________._____ _________._____

1000 628.7570Rock Bags EACH

50.000_________._____ _________._____

1010 629.0210Fertilizer Type B CWT

2.300_________._____ _________._____

1020 630.0140Seeding Mixture No. 40 LB

63.000_________._____ _________._____

1030 630.0200Seeding Temporary LB

94.000_________._____ _________._____

1040 633.5200Markers Culvert End EACH

23.000_________._____ _________._____

1050 634.0612Posts Wood 4x6-Inch X 12-FT EACH

44.000_________._____ _________._____

1060 634.0614Posts Wood 4x6-Inch X 14-FT EACH

70.000_________._____ _________._____

1070 634.0616Posts Wood 4x6-Inch X 16-FT EACH

28.000_________._____ _________._____

1080 634.0618Posts Wood 4x6-Inch X 18-FT EACH

46.000_________._____ _________._____

1090 637.2210Signs Type II Reflective H SF

1,984.210_________._____ _________._____

1100 637.2215Signs Type II Reflective H Folding SF

298.400_________._____ _________._____

1110 637.2230Signs Type II Reflective F SF

519.220_________._____ _________._____

1120 638.2602Removing Signs Type II EACH

235.000_________._____ _________._____

1130 638.3000Removing Small Sign Supports EACH

185.000_________._____ _________._____

Proposal Schedule of Items Page 7 of 15

Page 39: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right

Wisconsin Department of Transportation 12/07/2016 10:40:26

Proposal ID: 20161213025 Project(s): 4190-16-71, 4190-16-72

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescriptionItem ID

ProposalLine

Number

1930 658.0610Led Modules 12-Inch Green Ball EACH

40.000_________._____ _________._____

1940 658.0615Led Modules 12-Inch Red Arrow EACH

29.000_________._____ _________._____

1950 658.0620Led Modules 12-Inch Yellow Arrow EACH

62.000_________._____ _________._____

1960 658.0625Led Modules 12-Inch Green Arrow EACH

33.000_________._____ _________._____

1970 658.0635Led Modules Pedestrian CountdownTimer 16-Inch

EACH1.000

_________._____ _________._____

1980 658.5069Signal Mounting Hardware (location) 01.STH 32 and Lombardi Avenue

LUMP SUM _________._____LS

1990 658.5069Signal Mounting Hardware (location) 02.STH 32 and Potts Avenue

LUMP SUM _________._____LS

2000 658.5069Signal Mounting Hardware (location) 03.STH 32 and Cormier Road

LUMP SUM _________._____LS

2010 658.5069Signal Mounting Hardware (location) 04.STH 32 and Pilgrim Way

LUMP SUM _________._____LS

2020 658.5069Signal Mounting Hardware (location) 05.STH 32 and Vanderperren Way

LUMP SUM _________._____LS

2030 658.5069Signal Mounting Hardware (location) 06.STH 32 and Hansen Road

LUMP SUM _________._____LS

2040 659.1120Luminaires Utility LED B EACH

12.000_________._____ _________._____

2050 690.0150Sawing Asphalt LF

4,683.000_________._____ _________._____

2060 690.0250Sawing Concrete LF

915.000_________._____ _________._____

1.000002070 715.0415

Incentive Strength Concrete Pavement DOL500.000

500.00

Proposal Schedule of Items Page 13 of 15

Page 40: Wisconsin Department of Transportation...2016/12/13  · 251A Permanent Signing – added no train horn sign detail 334A - 334H Cross Sections: Added STH 32 and Parkview Road Right