 PRO FORMA ANNUAL BUDGET FOR 44 UNITS Accounting & Administrative Annual Total Management Fee $8,976  Annual Accounting Audit $300 Legal and Bank Charges $100 Building/Liability Insurance (Common Areas) $8,800 $18,176 Common Utilities Street Light(s) $2,688 Water (Fire Hydrants) $820 Water (Irrigation) $1,000 $4,508 Grounds Maintenance (Common Elements) Mowing and Landscape Maintenance $28,600 Plantings Maintenance $1,925 Snow Plowing/Removal/Sanding $19,800 $50,325 Repairs Miscellaneous Painting $450 Miscellaneous Repairs/Building Maintenance $1,100 Miscellaneous Supplies $250 Irrigation Startup, Winterization & Repairs $750 $2,550 Capital Improvement Escrow Reserves $12,100 Riverbend Woods Association Dues  Annual Maintenance & Reserves $7,391 $95,050 nnua u g et ivie y ni ts equa s ,  Monthly C os t E s timate $180 TOTAL ANNUAL BUDGET ESTIMATE Windward Pointe Condominium Exhibit E Public Offering Statement Notes: 1. Management Fee assumes independent management company. 2. This budget has not been adopted by the Association and is only an estimate of a possible Association budget . 3. Building/Liabili ty insurance as noted in the Declaration and Bylaws, is required on all common areas and has been estimated at Year 2011 rates. 4. Common Open Space land is assessed as part of individual unit taxes by the Town of Wells. 5. See attached sheets for assumptions for Replacement Reserves. Condo Budget.xls November 10, 2011 Pro Forma Budget

Windward Pointe - Condo Budget

Embed Size (px)

DESCRIPTION

Exhibit E Public Offering Statement Windward Pointe CondominiumPRO FORMA ANNUAL BUDGET FOR 44 UNITSAccounting & Administrative Management Fee Annual Accounting Audit Legal and Bank Charges Building/Liability Insurance (Common Areas) Common Utilities Street Light(s) Water (Fire Hydrants) Water (Irrigation) Grounds Maintenance (Common Elements) Mowing and Landscape Maintenance Plantings Maintenance Snow Plowing/Removal/Sanding Repairs Miscellaneous Painting Miscellaneous Repairs/Building Mainten

Citation preview

5/12/2018 Windward Pointe - Condo Budget - slidepdf.com

http://slidepdf.com/reader/full/windward-pointe-condo-budget 1/4

PRO FORMA ANNUAL BUDGET FOR 44 UNITS

Accounting & Administrative Annual TotaManagement Fee $8,976Annual Accounting Audit $300Legal and Bank Charges $100Building/Liability Insurance (Common Areas) $8,800

$18,176

Common Utilities

Street Light(s) $2,688

Water (Fire Hydrants) $820

Water (Irrigation) $1,000

$4,508

Grounds Maintenance (Common Elements)

Mowing and Landscape Maintenance $28,600Plantings Maintenance $1,925Snow Plowing/Removal/Sanding $19,800

$50,325

Repairs

Miscellaneous Painting $450Miscellaneous Repairs/Building Maintenance $1,100Miscellaneous Supplies $250Irrigation Startup, Winterization & Repairs $750

$2,550Capital Improvement Escrow

Reserves $12,100

Riverbend Woods Association Dues

Annual Maintenance & Reserves $7,391

$95,050

Annual Budget divided by 44 Units equals 2,160  

Monthly Cost Estimate $180  

TOTAL ANNUAL BUDGET ESTIMATE

Windward Pointe CondominiumExhibit E Public Offering Statement

Notes:

1. Management Fee assumes independent management company.

2. This budget has not been adopted by the Association and is only an estimate of a possible Association budget.

3. Building/Liability insurance as noted in the Declaration and Bylaws, is required on all common areas and has been estimated at Year

2011 rates.

4. Common Open Space land is assessed as part of individual unit taxes by the Town of Wells.

5. See attached sheets for assumptions for Replacement Reserves.

Condo Budget.xls November 10, 2011 Pro Forma Budget

5/12/2018 Windward Pointe - Condo Budget - slidepdf.com

http://slidepdf.com/reader/full/windward-pointe-condo-budget 2/4

RESERVE ACCOUNT SUMMARY

Repavement Roads, Parking Areas, Drives, Sidewalk Total Cost Annual Cost

73,115 s.f. paved area resurface @ $.55/s.f.Total to resurface every 15 years 40,213$ $2,681

Roofs

Material estimate $13,250 per 4 Unit building 145,750$Labor estimate $12,250 per 4 Unit building (8 days, 5 men) 134,750$

Total labor & materials to replace every 30 years 280,500$ 9,350$

Exterior Siding, Windows, Shutters

Material estimate $33,070 per 4 unit building 363,770$Labor estimate $7,600 per 4 unit building (10 days, 5 men) 83,600$

Total labor & materials replaced every 40 years 447,370$ 11,184$

Signage/Lights

Cost to replace every 20 years $2,500 125$

Pond Maintenance

Cost to remove sediments every 20 years $500 25$

TOTAL ESTIMATE OF RESERVES NEEDED 770,583$ 23,340$

Windward Pointe Condominium

Note:

Based on interest on accumulated funds, the actual estimated yearly contribution to the Reserve Account is

estimated to be $12,100.

Condo Budget.xls July 15, 2011 Reserve Acct Summary

5/12/2018 Windward Pointe - Condo Budget - slidepdf.com

http://slidepdf.com/reader/full/windward-pointe-condo-budget 3/4

WINDWARD POINTE CONDOMINIUM

CAPITAL IMPROVEMENT ACCOUNT PROJECTIONS

YEAR CONTRIBUTION CUM. CONTRIB. CUM. ACCOUNT

(Assumes No Inc.) BALANCE PAVING ROOFS

SIDING/

WINDOWS

SIGNS &

POND BALANCE

**Bal. 15,400$ 15,400$

1 12,100$ 27,500$ 27,962$2 12,100$ 39,600$ 40,901$3 12,100$ 51,700$ 54,228$4 12,100$ 63,800$ 67,955$5 12,100$ 75,900$ 82,093$6 12,100$ 88,000$ 96,656$7 12,100$ 100,100$ 111,656$

8 12,100$ 112,200$ 127,106$9 12,100$ 124,300$ 143,019$

10 12,100$ 136,400$ 159,409$11 12,100$ 148,500$ 176,292$12 12,100$ 160,600$ 193,680$13 12,100$ 172,700$ 211,591$

14 12,100$ 184,800$ 230,038$15 12,100$ 196,900$ 40,213$ 208,826$16 12,100$ 209,000$ 227,191$17 12,100$ 221,100$ 246,107$18 12,100$ 233,200$ 265,590$19 12,100$ 245,300$ 285,658$

20 12,100$ 257,400$ 3,000$ 306,327$21 12,100$ 269,500$ 327,617$22 12,100$ 281,600$ 349,546$23 12,100$ 293,700$ 372,132$24 12,100$ 305,800$ 395,396$25 12,100$ 317,900$ 419,358$

26 12,100$ 330,000$ 444,039$27 12,100$ 342,100$ 469,460$28 12,100$ 354,200$ 495,644$29 12,100$ 366,300$ 522,613$

30 12,100$ 378,400$ 40,213$ 140,250$ 369,928$31 12,100$ 390,500$ 140,250$ 252,876$32 12,100$ 402,600$ 272,562$33 12,100$ 414,700$ 292,839$34 12,100$ 426,800$ 313,724$35 12,100$ 438,900$ 335,236$36 12,100$ 451,000$ 357,393$37 12,100$ 463,100$ 380,215$

38 12,100$ 475,200$ 403,721$39 12,100$ 487,300$ 427,933$40 12,100$ 499,400$ 447,370$ 5,501$

CAPITAL EXPENSES

Notes:

* Cumulative account balance assumes 3% growth on account balance after capital expenditures are deducted.

** Beginning balance based on estimated amount in account at time of transfer to Association.

Condo Budget.xls July 15, 2011 Capital Improvement Acct.

5/12/2018 Windward Pointe - Condo Budget - slidepdf.com

http://slidepdf.com/reader/full/windward-pointe-condo-budget 4/4

ACCOUNT SUMMARY

RIVERBEND WOODS ASSOCIATION

Street/Sidewalk Maintenance Total Cost Annual Cost

75,950 s.f. paved area resurface @ $.55/s.f.Total to resurface every 15 years 41,773$ $2,785

Grounds Maintenance (Common Elements)

Mowing and Landscape Maintenance $8,400Plantings Maintenance $425Irrigation $1,000Snow Plowing/Removal/Sanding $6,000

Stormwater Maintenance $400 $16,225

Common Utilities

Street, Sign, Flag Light(s) & Irrigation Pump $3,500 $3,500

TOTAL ANNUAL BUDGET ESTIMATE $22,510

Annual Budget divided by 134 Units equals $168 Monthly Cost Estimate $14.00 

Notes:

1. Budget assumes Gateway Drive will remain a private road unless accepted by the Town.

2. This budget has not been adopted by the Association and is only an estimate of a

possible Association budget.

Condo Budget.xls November 10, 2011 Riverbend Woods Association