WIND TURBINE PARK JEPIRACHI EPM LA GUAJIRA
COLOMBIA
PROJECT INTRODUCTION
• Installation of Jepirachi Wind Park
• Location: La Guajira, Colombia
LOCATION
3
PRELIMINARY PROJECT ENGINEERING
• Lifting Engineering Drawings
• Calculation for crane selection
• Logistics of Equipment Transportation
PROJECT LIFTING PLANS
CALCULATION FOR CRANE SELECTION
CRANE SPECIFICATIONS
EQUIPMENT TRANSPORATION
• Receive items at Port Bolivar
• Receive Generator on 6- axle modular.
• Approximate Weight of 62 tons
EQUIPMENT TRANSPORATION
• Transport items on extendable flatbed trucks and modular equipment.
• 45 blades, 30 meters long, 5 tons
ASSEMBLY OF 15 WIND TOWERS
• Towers were assembled in 3 sections of tube of 18 and 22 tons.
• Total average height of tower is 60 meters.
• Liebherr LG1350 Crane was used- 400 ton capacity - 70 meter boom
LIFTING OF THE 62-TON AERO GENERATOR
LIFTING OF THE BLADES30 meters long / 5 ton weight
ASSEMBLED WIND TOWER
ASSEMBLED WIND TOWER
• Approximate distance between towers is 180 meters.