WGISS Meeting Schedule. March 2005. Background circa 2001. WGISS & SGs Participants Very Different Different Levels Within Same Organizations WGISS Did Not Comprehend SGs Well Large Gap Between WGISS & SGs WGISS More Policy & Strategy SGs More Technical. Response. Combine WGISS & SGs - PowerPoint PPT Presentation
Citation preview
WGISS Meeting Schedule
March 2005
Background circa 2001
• WGISS & SGs Participants Very Different– Different Levels Within Same Organizations
• WGISS Did Not Comprehend SGs Well– Large Gap Between WGISS & SGs
• WGISS More Policy & Strategy
• SGs More Technical
Response
• Combine WGISS & SGs
• Bring Policy & Technical Expertise Together– Added Benefit of Possibly Reducing Travel
• Achieved
– SG Reports Not Repeated• Achieved
Combined Meetings
• Tokyo 1996• Sioux Falls 2001
• Toulouse 2003• Chiang Mai 2003• Tromso 2004• Beijing 2004• Argentina 2005• Ukraine 2005• Hungary 2006
Future State
• Have we have swung too far towards technology?• Have we lost WGISS strategic planning and interfacing with
agency decision makers?
• Maybe More Balance is Needed
• Suggestions:– Revise Meeting Schedule– Solicit Former “Policy” Representative Views
• The Survey– An Additional Topic
Possible Meeting Schedule
1. SG Meeting2. WGISS Meeting3. Combined WGISS & SG Meeting
• PROS– Maybe Interject More “Policy” Personnel– SGs Retain More Autonomy (opportunity for working
sessions)– Possibility to Join With Other Meetings (ISPRS, WGCV,
WGEdu, ASPRS, etc.)
• CONS– Measures of Success?– Possibly 1 Additional Trip for Some– Additional host / site to be found each year