West Lake UpdateApril 13, 2016
Final Comprehensive Phase 1
EPA has released the Final Comprehensive Phase 1 Report, which includes data and find-ings from a detailed investigation of Operable Unit-1 (OU-1), Area 1. The investigation of Area 1 was conducted in four primary phases known as: Phase 1A, 1B, 1C, and the recently concluded Phase 1D. The Phase 1 report identifies areas containing radiologically impacted material in Operable Unit 1, Area 1, of the West Lake Landfill. One primary purpose of the Phase 1 investigation was to help identify an appropriate location for an isolation barrier, however over time the purpose of the investigation was expanded to define the extent of RIM in the south and southwest portions of Area 1.
Phase 1A The Phase 1A portion of this effort consisted
of the Gamma Cone Penetration Test (GCPT) investigation and began in 2013. The goal of the Phase 1A investigation was to help identify a potential suitable location for the proposed isola-tion barrier. Based on the results of the Phase 1A investigation, EPA determined additional inves-tigation was needed in southwestern portion of Area 1 to fully define the extent of RIM.
Phase 1B The Phase 1B field work consisted of addi-
tional GCPT investigation in the western portion of Area 1 and began in 2014. As with the Phase 1A investigation, the Phase 1B GCPT data was used as a screening tool to tentatively identify pos-sible RIM occurrences.
Phase 1B occurred concurrently with Phase 1C. Review of the results of the Phase 1B GCPT work also indicated that RIM may be present
beneath the southwestern portion of Area 1 in the area of possible preferred alignments for an IB.
Phase 1C The Phase 1C field work consisted of using sonic
drilling technologies to place soil borings and collect sam-ples for laboratory analysis. This step of the investigation also began in 2014. The 1C borehole locations selected for sonic drilling were based on GCPT data results from the Phase 1A and 1B investigations.
During Phase 1C, sixteen sonic borehole locations were drilled in order to identify the bottom of waste; col-lect waste samples from intervals where elevated gamma responses were observed to verify that such responses were due to the presence of radium, thorium and/or uranium as opposed to other possible sources of gamma radiation such as potassium-40; and verify the absence of RIM in areas where the GCPT did not detect elevated gamma levels.
After the Phase 1B and Phase 1C work was com-plete, the results of these investigations demonstrated the need to further define the extent and RIM in the south-western and western portions of Area 1, leading to Phase 1D.
Phase 1D The Phase 1D work consisted of additional GCPT
investigation, sonic drilling and core sampling, and began in May and continued through July, 2015. Phase 1D focused on the western and southwestern portions of Operable Unit 1, Area 1. A total of 18 GCPT sounding locations and bore holes were completed as a part of this investigation. Results of the gamma logging of the Phase 1D GCPT soundings indicated that elevated gamma readings were potentially present in 5 of the 18 Phase 1D GCPT soundings. The sonic coring and sampling con-firmed the presence of RIM in 6 of the 20 borings.
Conclusions The GCPT work, soil borings, and samples from the
Phase 1 investigation provided data which supported the site model. Based upon the Phase 1 data a revised Extent of RIM map was created, which is included in this West Lake Update. The Extent of RIM map depicts areas of RIM located in Area 1 that are based on sampling points
Find Us Onwww.facebook.com/WestLakeLandfillSuperfundSite
www.twitter.com/WestLakeSitewww.scribd.com/eparegion7
www3.epa.gov/region07/cleanup/west_lake_landfill
Community InquiriesBen Washburn913-551-7364
included in the Phase 1 Investigation combined with data collected from previous site investiga-tions.
To accomplish the Phase 1 objectives, con-tractors working for the responsible parties un-der EPA oversight collected more than 120 soil samples from 110 borings and conducted gamma scans from across Area 1, to determine areas with RIM present. The collected samples were analyzed in a certified laboratory to ensure the scientific ac-curacy and integrity of the data.
While the footprint of RIM within the West Lake Landfill has been revised based upon the re-sults of the Phase 1 investigation, the health risks associated with the site remain consistent with previous studies. For the community surround-ing the site, there are no current significant health risks posed by the radiological wastes contained at the West Lake Landfill. Health risks for on-site workers also remain consistent with previous studies. On-site workers that conduct activities on Area 1 and Area 2 are subject to strict health and safety protocols while on-site, including scanning for radiological contamination before exiting the controlled exclusion zones. Additionally, risks associated with the potential for surface fires oc-curring in areas where RIM is near the surface are being mitigated by the current Removal Action to install the non-combustible cover in portions of Areas 1 and 2 of OU-1.
The Phase 1 data indicate that RIM has been identified further south and beneath a portion of the Bridgeton landfill known as the “Muffin Top”. However, on-site monitoring from temperature monitoring probes, gas extraction wells, and land-fill subsidence, indicate that the SSE remains in the South Quarry and that there is no rapid move-ment of the SSE towards the North Quarry or the RIM in OU-1. The SSE is monitored and managed under the regulatory authority of the Missouri
Department of Natural Resources. All information related to oversight and monitoring of the Bridgeton Landfill is posted on their website (http:// dnr.mo.gov/bridgeton/).
In December, EPA announced its decision to require the Potentially Responsible Parties at the site to construct an isolation barrier, as well as install additional engi-neering controls, to prevent the SSE from contacting or impacting the RIM in OU-1. EPA will release additional information regarding the isolation barrier when the tech-nical and legal details of this work are complete.
The report is available online: https://www3.epa.gov/region07/cleanup/west_lake_landfill/pdf/west-lake-com-prehensive-phase1-report-4-5-16.pdf
Community Dialogue Meeting - April 18 EPA has scheduled the next meeting for April 18
at 6:30 p.m. at the Bridgeton Recreation Center, 4201 Fee Fee Road, Bridgeton Mo. EPA will also hold a Public Availability Session at the same location from 5:30 to 6:30 p.m. EPA and partner agencies will meet with stakehold-ers to discuss the site and answer questions. The main topic for dialogue at this meeting is the 2008 Record of Decision.
GC
PT
1-1A
GC
PT
1-1G
CP
T 2-
1
GC
PT
2-2
GC
PT
2-2A
GC
PT
2-2B
GC
PT
2-3
GC
PT
3-1
GC
PT
3-1A
GC
PT
3-2
GC
PT
4-1
GC
PT
4-2
GC
PT
5-1
GC
PT
5-2 G
CP
T 5-
3
GC
PT
5-4A
GC
PT
5-4
GC
PT
6-2
GC
PT
6-3
GC
PT
6-4
GC
PT
6-5
GC
PT
7-1
GC
PT
7-2
GC
PT
7-3
GC
PT
8-1
GC
PT
9-1 G
CP
T 9-
2
GC
PT
9-3A
GC
PT
9-3
GC
PT
10-1
GC
PT
10-2
GC
PT
10-3
AG
CP
T 10
-3G
CP
T 10
-4A
GC
PT
10-4
GC
PT
11-1
GC
PT
11-2
GC
PT
11-3 GC
PT
11-4
GC
PT
12-1
GC
PT
12-2
GC
PT
12-3
GC
PT
12-4
GC
PT
12-5
GC
PT
12-6G
CP
T 13
-1
GC
PT
13-2
AG
CP
T 13
-2
GC
PT
13-3
GC
PT
13-4
GC
PT
13-5
GC
PT
13-6
GC
PT
13-7
GC
PT
14-1
GC
PT
14-2
GC
PT
14-3
GC
PT
14-4 G
CP
T 14
-5
GC
PT
14-6
GC
PT
14-7
GC
PT
15-1
GC
PT
15-2
GC
PT
15-3
GC
PT
15-4
GC
PT
15-5
GC
PT
15-6
GC
PT
15-7
GC
PT
15-8
GC
PT
16-1
GC
PT
16-2
GC
PT
16-4
GC
PT
16-5
GC
PT
16-6
GC
PT
16-7
GC
PT
16-8
GC
PT-
108
GC
PT-
111A
GC
PT-
28A
GC
PT-
25
GC
PT-
36
GC
PT
2-4
GC
TP 9
-4
GC
PT
1C-1
AG
CP
T 1C
-1 GC
PT
1C-2
GC
PT
1C-3
GC
PT
1C-4
GC
PT
1C-5
GC
PT
1C-5
A
GC
PT
1C-7
GC
PT
1C-8
GC
PT
1C-9
GC
PT
1C-1
0
GC
PT
1C-1
1
GC
PT
1C-1
3
GC
PT
28
GC
PT
111
GC
PT
5-5
GC
PT
5-6 G
CP
T 6-
6
GC
PT
13-4
S
GC
PT
13-5
S
GC
PT
13-6
S GC
PT
13-7
S
GC
PT
14-3
S
GC
PT
14-5
S
GC
PT
14-6
S
GP
CT
1C-4
R
GC
PT
1C-6
GC
PT
1C-6
T1
GC
PT
1C-6
T
PV
C-2
5R
GP
1-2
GP
1C
-12
GP
1C
-12B
GP
1C
-12C
GP
1C
-2R
A
GP
1C
-4R
B
GP
1C
-6T1
GP
2-2
GP
2-3
GP
8-1
GP
8-1
BG
P W
L-11
9G
P W
L-11
9B
GP
WL-
119C
S2-
2
S5-
3
S8-
1
S12
-5S13
-3
S13
-6
S14
-2
S14
-4
S14
-5
S14
-7
S15
-2A
S15
-2
S16
-6
S1C
-6
SW
L-11
9
1D-1
1D-2
1D-3
1D-4
1D-5
1D-6 1D
-7
1D-8
A1D
-8
1D-9
A1D
-9
1D-1
0
1D-1
1A
1D-1
1
1D-1
2
1D-1
3B1D
-13A
1D-1
3 1D-1
3C
1D-1
4
1D-1
51D
-16
1D-1
6A
1D-1
7A1D
-17
1D-1
8
1D-1
8A
1D-1
S
1D-2
S1D
-3S
1D-4
S
1D-5
S
1D-6
S
1D-7
S
1D-8
S
1D-9
S
1D-1
0S
1D-1
1S
1D-1
2S
1D-1
3S
1D-1
4S
1D-1
5S1D
-16S
1D-1
7S
1D-1
8S
1D-1
9S
1D-2
0S
PV
C-2
4
PV
C-2
6
PV
C-2
7
PV
C-2
8
PV
C-2
9
PV
C-3
6
PV
C-3
7
PV
C-3
8
PV
C-4
1
WL-
101
WL-
102
WL-
103
WL-
104
WL-
105A
WL-
105B
WL-
105C
WL-
106
WL-
106A
WL-
107
WL-
108
WL-
109A
WL-
109B
WL-
109C
WL-
109D
WL-
110
WL-
111
WL-
112
WL-
113
WL-
114
WL-
115
WL-
116
WL-
117
WL-
118
WL-
119
WL-
120
WL-
121
WL-
122
WL-
123
WL-
124
S16
-3G
CP
T 16
-3
GP
1C
-4R
GC
PT
1C-1
2
GC
PT-
119
S8-
1A
GC
PT
2-2C
GC
PT
2-3A
GC
PT
1C-2
R
PV
C-2
5
GC
PT
1-2
S1-
2
Eng
inee
ring
Man
agem
ent S
uppo
rt, In
c.EM
SI
Wes
t Lak
e La
ndfil
l Sup
erfu
nd S
ite
Figu
re 1
5
M:\clients\EMSI\westlake\2015\Comp Report\WL-Fig-15-Extent ofRIM.dwg
NO
TES
:
AE
RIA
L TO
PO
GR
AP
HY
PR
OV
IDE
D B
YC
OO
PE
R A
ER
IAL
SU
RV
EY
S C
O. A
ND
ISD
ATE
D F
EB
RU
AR
Y 1
0, 2
015
A
LL E
LEV
ATI
ON
S A
RE
AB
OV
E M
EA
N S
EA
LE
VE
L (A
MS
L)
EX
TEN
T O
F R
IM
OU
-1 W
AS
TE D
ISP
OS
AL
AR
EA
1
OU
-1 A
PP
RO
XIM
ATE
ED
GE
OF
RE
FUS
E
LEG
EN
D
BO
RIN
GS
WIT
H E
LEV
ATE
D G
AM
MA
AN
D/O
RR
AD
IUM
OR
TH
OR
IUM
AB
OV
E U
NR
ES
TRIC
TED
US
E L
EV
ELS
AP
PR
OX
IMA
TE E
DG
E O
F R
EFU
SE
ED
GE
OF
QU
AR
RY
HIG
HW
ALL
Ext
ent o
f Rad
iolo
gica
lly-Im
pact
edM
ater
ial i
n A
rea
1
4-5-16