Marketing - ContractPhone: +47 51 30 90 00E-mail: [email protected]
Design MSC CJ62 S120 Year/yard built Fels/1993 Modified 1996/1999/2001/2002 Registration Panama Classification DnV, + 1A1 self-elevating mobile offshore unit Length 78.2 m Breadth 90.3 m Water depth 120 m Drilling depth 9,100 m Variable load 3,350 mT Prime movers 8,880 (BHP) Cranes 2 x Liebherr, 50 mT at 8,5m and 5 mT at 46m 1 x Liebherr, 34mT at 7m and 5mT at 30m Derrick LTV 160 ft, 40 ft x 40 ft, 2,000,000 lbs Travelling block CE RA 60 1.5 mill. lbs Drawworks CE C3 3000 Hp Autodriller Varco Ehthan Brake (auxiliary brake) Top drive Varco TDS - 6S - 2200 Hp 60klbf - 220 rpm Rotary table CET-4950-65 hydraulic drive BOP Cameron 21 1/4" - 5k, Shaeffer 13 5/8 15k Mud pumps 3 x CE FC-2,200. 15" stroke Shale shakers 4 x Rigtech VSM 300 Drillpipe 5,500 m x 5 1/2" - S-135 FH-VAM EIS 3,000 m x 4" - S-135 XT-38 Mud/cement bulk 540 m3 Liquid mud 850 m3 Brine/oil based mud 280 + 280 m3 Helideck Sikorsky S-61N Accomodation 115 persons
Third party equipment
TRACK RECORD WEST EPSILON
West Epsilon Page 1 of 1
Country Operator Field / Well name
Water depth (m)
Well depth MD (m)
Well type (appraisal, exploration, development HTHP etc.)
Well start date
Norway Statoil Gudrun 109 Development HPHT Aug. 2011 - present
Norway Statoil Sleipner 15/9-B
108 7882 (longest well)
Development/Exploration Jul. 2009
Norway StatoilHydro Ragnarock 3
110 2074 Exploration Feb. 2009
Norway StatoilHydro Verona 64,5 4850 Exploration / HPHT Sep. 2008
Norway StatoilHydro Huldra 125 4647 Exploration / HPHT May. 2008
Norway StatoilHydro Ragnarock 2
113 1900 Exploration Sep. 2007
Norway StatoilHydro Ragnarock 114 1930 Exploration Jul. 2007
Norway StatoilHydro Ermintrude 113 3849 Exploration Mar. 2007
Norway Statoil Biotitt 91 2401 Exploration Des. 2006
Norway BP Norway Valhall Flanke Souht/North
126 / 129,5
5400 / 5717 (longest wells)
Development Wells Nov. 2002
Netherland NAM, Netherland
L09-FF 25,4 7400 Development HPHT Jan. 2002
Norway TotalFinaElf Norway
Frøy 110 N/A Plug & Abandon operations
2001
Norway Statoil Sleipner Vest
108 7000 (longes well)
Development Wells Sep. 1995
Norway Elf Norway 1 / 3 -7 Appraisal Feb. 1995
UK Elf UK Elgin Appraisal HPHT 1994
Datablad for West Epsilon 3_Part stasjon Port
Electrical
Power Volt Freq Phase Curr
Neut. Loaded
System earth
Short circuit level
Distribution protection
Connection platform
Connection temp.
quip.
Area
* (V) (Hz) (A) Yes/NO (S/I/R)
**
Min
(kA)
Max
(kA)
Fuse
(A)
Earth
Fault (mA)
Description/Type Descripti
on/Type
Modul
No/Room No
Main 220
2stk
60 S 16 30 GHG 543
0008 R0676
Main 440 60 I 32 30-
300
GHG 532
4407 V0000
Main 440 60 I 63 30-
300
GHG 534
0003 R0707
HP
Wash
Down
Main
Deck
Main 440 60 I 125 30-
300
GHG 537
0001 R0004
Tabell utvides med antall linjer etter behov
* **
Main – Main Power S = Solidly (direkte jordet)
Emg – Emergency Power I = Isolated (isolert)
Ess – Essential Power R = Resistor (resistansjordet)
UPS – UPS Power
Instrument
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
Loss of pressure
Fire / Gas Potensialfree
contact
Junc Box Vacumn Unit Leg 3
Gas
Other
ESD battery -
Systems
CCTV COAX Junc Box
Telecom
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
PA 4 stk
2A System
2B System
25W - 100V STAHL 85711/12
– 404 – yellow
3P+PE(4h)
Telephone
2 stk
Telefon signal STAHL 8575/11
– 410 – green
3P+3P, (4h)
Utilities
Function Pressure Amount/flow Connection Area
(bar) Max. capac. Type Diameter Material Modul No/Room
No
Plant air
Instr. air None
Sprinkler
Seawater
Freshwater
Drain
Other
Lifting capacity offshore cranes
Crane 1m
significant wavehight max.load/max. radius
2m
significant wavehight max.load/max. radius
3m
significant wavehight max.load/max. radius
Tabell utvides med antall linjer etter behov
Rev: A___________
Date: 01.08.2015___
Datablad for West Epsilon 3_Part stasjon Cantilever
Electrical
Power Volt Freq Phase Curr
Neut. Loaded
System earth
Short circuit level
Distribution protection
Connection platform
Connection temp.
quip.
Area
* (V) (Hz) (A) Yes/NO (S/I/R)
**
Min
(kA)
Max
(kA)
Fuse
(A)
Earth
Fault (mA)
Description/Type Descripti
on/Type
Modul
No/Room No
Main
2 stk
220 60 S 16 30 GHG 543
0008 R0676
Main 440 60 I 32 30-
300
GHG 532
4407 V0000
Main 440 60 I 63 30-
300
GHG 534
0003 R0707
Main 440 60 I 125 30-
300
GHG 537
0001 R0004
Main 440 60 I 250 Casing
Tongs
Boredk
Tabell utvides med antall linjer etter behov
* **
Main – Main Power S = Solidly (direkte jordet)
Emg – Emergency Power I = Isolated (isolert)
Ess – Essential Power R = Resistor (resistansjordet)
UPS – UPS Power
Instrument
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
Loss of pressure
Fire / Gas Potensialfree
contact
ABB GHG 591
1201 R0001,
21P(5h)
Halliburton
Logging Unit
Gas
Other
ESD battery -
Systems
Telecom
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
PA 4 stk
2 x A System
2 x B System
25W - 100V STAHL 85711/12
– 404 – yellow
3P+PE(4h)
Telephone
2 stk
Telefon signal STAHL 8575/11
– 410 – green
3P+3P, (4h)
Utilities
Function Pressure Amount/flow Connection Area
(bar) Max. capac. Type Diameter Material Modul No/Room
No
Plant air
Instr. air None
Sprinkler
Seawater
Freshwater
Drain
Other
Lifting capacity offshore cranes
Crane 1m
significant wavehight max.load/max. radius
2m
significant wavehight max.load/max. radius
3m
significant wavehight max.load/max. radius
Tabell utvides med antall linjer etter behov
Rev: A________________
Date: 01.08.2015________
Datablad for West Epsilon 3_Part stasjon Styrbord
Electrical
Power Volt Freq Phase Curr
Neut. Loaded
System earth
Short circuit level
Distribution protection
Connection platform
Connection
temp.
quip.
Area
* (V)
(Hz)
(A) Yes/NO (S/I/R) **
Min (kA)
Max (kA)
Fuse (A)
Earth Fault
(mA)
Description/Type Description/T
ype
Modul No/Room
No
Main 220
4 stk
60 S 16 30 GHG 543
0008 R0676
Main 440
4 stk
60 I 32 GHG 532
4407 V0000
Main 440 60 I 63 GHG 534
0003 R0707
Main 440 60 I 125 GHG 537
0001 R0004
Tabell utvides med antall linjer etter behov
* **
Main – Main Power S = Solidly (direkte jordet)
Emg – Emergency Power I = Isolated (isolert)
Ess – Essential Power R = Resistor (resistansjordet)
UPS – UPS Power
Instrument
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
Loss of pressure
Fire / Gas Potensialfree
contact
ABB GHG 591
1201 R0001,
21P(5h)
W/L Unit LO. Dekk
Gas
Other
ESD battery -
Systems
Only one Instrument Outlet Available
EXPO Well Test LAN Junc Box
Telecom
Function Signal type Connection
platform
Connection temp.
equip.
Area
Description/Type Description/Type Modul No/Room No
PA 4 stk
2 x A System
2 x B System
25W - 100V STAHL 85711/12
– 404 – yellow
3P+PE(4h)
Telephone
2 stk
Telefon signal STAHL 8575/11
– 410 – green
3P+3P, (4h)
Utilities
Function Pressure Amount/flow Connection Area
(bar) Max. capac. Type Diameter Material Modul No/Room
No
Plant air 8 bar
Instr. air None
Sprinkler
Seawater
Freshwater
Drain
Other
Lifting capacity offshore cranes
Crane 1m
significant wavehight max.load/max. radius
2m
significant wavehight max.load/max. radius
3m
significant wavehight max.load/max. radius
Tabell utvides med antall linjer etter behov
Rev: A______________
Date: 01.08.2015______