WELCOME!
DOWNTOWN WINDSORDOWNTOWN WINDSORTRANSPORTATION MASTER PLANTRANSPORTATION MASTER PLAN
Public Information Centre #1
Downtown Windsor Transportation Master Plan
STUDY AREASTUDY AREA
Downtown Windsor Transportation Master Plan
STUDY AREASTUDY AREA
Note: Aerial taken in 2005 (Image Source: TerraServer®.Com)
Downtown Windsor Transportation Master Plan
STUDY PURPOSESTUDY PURPOSE
To develop a comprehensive Downtown Windsor Transportation Master Plan that will:
• Identify longer-term traffic circulation, on / off-street parking infrastructure and operational requirements to accommodate new developments
• Develop a short, intermediate and long-term plan for future traffic operations associated with the potential closure of McDougall Street between Chatham Street and Pitt Street and network changes currently being reviewed as part of the Windsor-Detroit Tunnel Canadian Plaza Master Planning Study
• Follow the Municipal Class Environmental Assessment (EA) process for Schedule B Projects as part of the Implementation Process
Downtown Windsor Transportation Master Plan
STUDY PROCESSSTUDY PROCESS
Downtown Windsor Transportation Master Plan
EXISTING CONDITIONSEXISTING CONDITIONS
Road Network Truck Network
Source: WALTS (1999) and the Riverside Vista Improvement Plan EA document (2006)Source: City of Windsor Official Plan Schedule F: Roads & Bikeways
Downtown Windsor Transportation Master Plan
EXISTING CONDITIONSEXISTING CONDITIONS
Transit Service Network Bicycle and Pedestrian Network
Downtown Windsor Transportation Master Plan
EXISTING CONDITIONSEXISTING CONDITIONS
Directional NetworkMunicipal On/Off Street
Parking
Downtown Windsor Transportation Master Plan
DOWNTOWN WINDSOR AREADOWNTOWN WINDSOR AREATRAFFIC FLOWS AND LEVELS OF SERVICETRAFFIC FLOWS AND LEVELS OF SERVICE
Daily 2-Way Traffic VolumesCommuter Peak Hour
Levels of Service
Periodic back-ups due to Tunnel operations resulting in congested intersection operations
Downtown Windsor Transportation Master Plan
IDENTIFIED DEVELOPMENT ANDIDENTIFIED DEVELOPMENT ANDNETWORK OPPORTUNITIESNETWORK OPPORTUNITIES
• Downtown Windsor Developments• St. Clair College – Cleary International Centre• Glengarry-Marentette Community Improvement Plan (CIP)• City Centre West Community Improvement Plan (CIP)• Windsor Transit Terminal
• Casino Windsor Developments• Casino Hotel• Entertainment Centre
• Network Modifications• Enhancement of access to Casino Hotel and Entertainment Centre• Road network modifications currently being reviewed as part of the
Windsor-Detroit Tunnel Canadian Plaza Master Planning Study• Transit access to new terminal• Local network accessibility (e.g., 1-way to 2-way street conversion)
Downtown Windsor Transportation Master Plan
PROBLEM STATEMENTPROBLEM STATEMENT
Downtown Windsor Area:
Traffic Operations Area:
In order to address existing and future transportation issues, there is a need to develop a comprehensive Transportation Master Plan that will facilitate the efficient movement of all modes of travel (e.g., vehicles, pedestrians, bicyclists, commercial vehicles)
The development of the Entertainment Centre adjacent to the already activity-oriented Casino requires that an effective road network system be provided to facilitate the movement of persons and vehicles between the Casino, Hotel, Entertainment Centre and Parking facilities with the potential closure of McDougall Street between Chatham Street and Pitt Street and network changes currently being reviewed as part of the Windsor-Detroit Tunnel Canadian Plaza Master Planning Study.
Downtown Windsor Transportation Master Plan
DOWNTOWN DEVELOPMENT DOWNTOWN DEVELOPMENT PROPOSALSPROPOSALS
City Centre West CIP:• Study area: 14.2 ha• Develop 3.7 ha of vacant land for
residential, mixed use (e.g., retail) and recreational uses
• PM peak hour vehicle trips:• 130 inbound• 230 outbound
Transit Windsor:• New terminal located
west of Dougall Avenue between Pitt Street and Chatham Street
• Transit Windsor to issue new transit service routes
St. Clair College:• Classes to be held for 600
students at the Cleary International Centre
• PM peak hour vehicle trips:• 40 inbound• 90 outbound
Glengarry-Marentette CIP:• Study area: 6.4 ha• Redevelopment of entire
area to low, medium and high profile residential area with local convenience commercial uses
• PM peak hour vehicle trips:• 360 inbound• 230 outbound
Development impacts:• Overall commuter
peak hour flows will increase by approximately 6% based on documented development proposals
(Image Source: TerraServer®.Com)
Downtown Windsor Transportation Master Plan
CASINO WINDSORCASINO WINDSORDEVELOPMENTDEVELOPMENT
Casino Hotel:• West side of McDougall Street, south of Pitt
Street• 800 rooms including 50,000 sq. ft. of
convention space (both hotel buildings)• PM peak hour vehicle trips (assuming full
occupancy):• 330 inbound• 345 outbound
Entertainment Centre:• West side of McDougall Street, south of Pitt
Street• 5,000 seats or 50,000 sq. ft. of convention space• PM peak hour vehicle trips (assuming event
night):• 1750 inbound
• 265 valet parking• 1490 parking garage(s)
Downtown Windsor Transportation Master Plan
PROPOSED NETWORK PROPOSED NETWORK MODIFICATIONS UNDER STUDY MODIFICATIONS UNDER STUDY
New Transit Windsor Terminal:• Dougall Avenue – closure from
Pitt Street to Chatham Street
Casino Windsor:• McDougall Street – potential
closure from Pitt Street to Chatham Street to through traffic. Private road for Hotel guests and Casino VIP guests going to Valet Parking as well as emergency vehicle access.
• Pitt Street – potential conversion to two-way between McDougall Street and Goyeau Street
Windsor-Detroit Tunnel Plaza:• Road network changes currently
being reviewed as part of the Windsor-Detroit Tunnel Canadian Plaza Master Planning study
Local Network Accessibility:• Victoria Avenue – potential
conversion to two-way
Old Transit Windsor Terminal:• Closure of existing terminal
(Image Source: TerraServer®.Com)
Downtown Windsor Transportation Master Plan
COMMUTER PEAK HOUR COMMUTER PEAK HOUR (4 p.m. (4 p.m. –– 5 p.m.) OPERATING LOS5 p.m.) OPERATING LOS
EXISTING AND PROPOSED DEVELOPMENT TRAFFICEXISTING AND PROPOSED DEVELOPMENT TRAFFIC
Downtown Windsor Transportation Master Plan
TRAFFIC OPERATIONS AREATRAFFIC OPERATIONS AREAEVENT NIGHT (7 p.m. EVENT NIGHT (7 p.m. –– 8 p.m.) INTERSECTION LOS8 p.m.) INTERSECTION LOS
Legend:
Delays:
Downtown Windsor Transportation Master Plan
NETWORK IMPACT SUMMARYNETWORK IMPACT SUMMARY
• Development related commuter peak hour operations:
Generally good level of service throughout the Downtown Area
Un-signalized intersections at periphery becoming busy
• Casino event night evening peak hour operations:
Busy but reasonable operating LOS
LOS D operations at Riverside Drive / Glengarry Avenue due to increased traffic circulation resulting from the potential closure of McDougall Street between Chatham Street and Pitt Street
Downtown Windsor Transportation Master Plan
OPPORTUNITIESOPPORTUNITIES
• Implement McDougall Street closure from Chatham Street to Pitt Street
• Conversion of one-way to two-way streets within the Downtown Study Area
• Review opportunities to improve operations at Riverside Drive / Glengarry Avenue
Intersection channelization / traffic flow management
Two-way conversion of Glengarry Avenue and Aylmer Avenue
• Review road classification network
• Review truck route network
• Assess impacts of Downtown Streetscape Policies
Downtown Windsor Transportation Master Plan
NEXT STEPSNEXT STEPS
• Review public comments
• Refine problem statement
• Refine and evaluate alternatives
• Develop a recommended Transportation Master Plan
• Review recommendations with the Public and Agencies
• Public Information Centre – April 2007
THANK YOU!