Sandwich South Master Servicing Plan
Welcome to the Issues and Opportunities Pop-Up
City of Windsor
Forest Glade Arena
3205 Forest Glade Drive, Windsor, ON
Sandwich South Master Servicing Plan
What is this Master Plan All About?
The Sandwich South Master Servicing Plan will
outline a long-term coordinated approach for
municipal infrastructure in the Sandwich South area
to support urbanization.
The study will develop and review solutions for:
o Collector roads
o Water, sanitary and storm sewers
o Stormwater management facilities
The location and phasing of the new infrastructure
will be outlined in the study.
Study Process:
• Following the Municipal Class Environmental
Assessment (2000, as amended)
• Public and agency input is an important part of the
study. There will be several opportunities for input
throughout the study
Learn more and provide your ideas, insights and
feedback
• Visit sandwichsouth.ca to complete the “Issues that
Matter” Survey
• Send an email to [email protected] to be added
to the contact list and receive updates on future events
We are listening Patrick Winters, P. Eng
Project Lead
City of Windsor
350 City Hall Square W
3rd Floor
Windsor, ON N9A 6S1
Nicole Caza, P. Eng
Project Manager
Dillon Consulting Ltd.
3200 Deziel Drive
Suite 608
Windsor, ON N8W 5K8
Sandwich South Master Servicing Plan Pop-Up Engagement Event
• Establish Study Area and gather background mapping
• Identify constraints and opportunities
• Consult community on issues that matter
• Consider road, sewer and storm options
• Establish decision-making criteria
• Identify potential impacts
• Review and incorporate feedback
• Compare options considering feedback
• Select preferred option
• Review design options and finalize preferred designs
• Prepare an overall Strategy for Sandwich South Servicing
• Complete EA Reporting and Master Plan Document
Process
Stage 1: Project Launch
Stage 2: Develop and Evaluate Alternative Solutions
Stage 3: Identify and Develop
Recommended Solutions
Stage 4: Our Strategy
City of Windsor
Council for
Approval
Pop-Up Event
Public Information Centre (PIC) #1
Public Information Centre (PIC) #2
City of Windsor Council will make the final decision to adopt the strategy at
the end of the process.
Once adopted, there will be a 30-day review period of the Master Plan
for public comment.
Sandwich South Master Servicing Plan Pop-Up Engagement Event