9
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

Embed Size (px)

Citation preview

Page 1: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

Welcome and Introductions

1

Ron Wood

ILE Kick-off Meetingon

June 17, 2010

Technology Investment Agreement (TIA): 2010-627

Integrated Logistics Environment

Page 2: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

2

General Dynamics Electric Boat (EB) Northrop Grumman Shipbuilding (NGSB) * Product Data Services Corporation (PDS)

ILE Team

* with Northrop Grumman Technical Services (NGTS)

Page 3: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

3

Program Technical Representative (PTR) – Doug Martin

ATI: Program Technical Director - Larry Karns

Systems Technologies MI Team – Ron Wood

NSRP ILE Contacts

Page 4: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

Other 2010 Project Awards Weld Shrinkage and Distortion Allowance for Neat ConstructionWeld Shrinkage and Distortion Allowance for Neat Construction

– Project Lead: Bollinger Shipyards Team MembersProject Lead: Bollinger Shipyards Team Members– Team Members: ShipConstructor USA; Gatekey Engineering; Edison Welding Institute; : Team Members: ShipConstructor USA; Gatekey Engineering; Edison Welding Institute; :

Northrop Grumman Shipbuilding-Gulf Coast; Todd Pacific Shipyards; Marinette Marine; Northrop Grumman Shipbuilding-Gulf Coast; Todd Pacific Shipyards; Marinette Marine; Hepinstall Consulting Group; Victoria DlugokeckiHepinstall Consulting Group; Victoria Dlugokecki

Common Parts Catalog EnhancementsCommon Parts Catalog Enhancements– Project Lead: GD Electric Boat Project Lead: GD Electric Boat – Team Members: Northrop Grumman Shipbuilding-Gulf Coast; GD Bath Iron WorksTeam Members: Northrop Grumman Shipbuilding-Gulf Coast; GD Bath Iron Works

Streamlining Shipyard Rigging AnalysisStreamlining Shipyard Rigging Analysis– Project Lead: GD NASSCOProject Lead: GD NASSCO– Team Members: TransSystems, Inc; Atlantec ES; Penn State/ARLTeam Members: TransSystems, Inc; Atlantec ES; Penn State/ARL

ERP Integration with CADERP Integration with CAD– Project Lead: VT Halter Marine Team MembersProject Lead: VT Halter Marine Team Members– Team Members: Austal USA, Todd Pacific Shipyards, Bollinger Shipyards, Marinette Team Members: Austal USA, Todd Pacific Shipyards, Bollinger Shipyards, Marinette

Marine, NG Shipbuilding-Gulf Coast, Praeses LLC, Jerry Pittman & Assoc., Marine, NG Shipbuilding-Gulf Coast, Praeses LLC, Jerry Pittman & Assoc., ShipConstructor USAShipConstructor USA

5

Page 5: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

Other 2010 Project Awards (continued)

Large Scale Computer Simulation Modeling System Large Scale Computer Simulation Modeling System EnhancementsEnhancements– Project Lead: NASSCOProject Lead: NASSCO– Team Members: TransSystems, Inc; Atlantec ES; Penn State/ARLTeam Members: TransSystems, Inc; Atlantec ES; Penn State/ARL

Process Oriented Visual Planning Tool (POV Planner)Process Oriented Visual Planning Tool (POV Planner)– Project Lead: Todd Pacific ShipyardsProject Lead: Todd Pacific Shipyards

– Team Members: Bollinger Shipyards, NG Shipbuilding-Gulf Coast, Team Members: Bollinger Shipyards, NG Shipbuilding-Gulf Coast, Knowledge Based Systems, First Marine International, Autodesk, PraesesKnowledge Based Systems, First Marine International, Autodesk, Praeses

Advanced Systems Development of the Remote Climbing Advanced Systems Development of the Remote Climbing RobotRobot– Project Lead: Robotic Technologies of TennesseeProject Lead: Robotic Technologies of Tennessee– Team Members: NG Shipbuilding-Gulf Coast, Bath Iron Works, Tennessee Team Members: NG Shipbuilding-Gulf Coast, Bath Iron Works, Tennessee

Technological UniversityTechnological University

6

Note: In January NSRP approved phase 2 of Improve Method for Generation of Full-Ship Simulation/Analysis Model 2

Page 6: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

ILE SCIM Model Tasks : Electric Boat

Provide Leadership and Project Management for entire ILE effortProvide Leadership and Project Management for entire ILE effort Lead the SCIM Development Task as well as the SCIM Evaluation for VIRGINIA Lead the SCIM Development Task as well as the SCIM Evaluation for VIRGINIA

Class Data Migration TaskClass Data Migration Task Develop and maintain the XSL transformation mediators for Part 21 to XML Develop and maintain the XSL transformation mediators for Part 21 to XML

transformations for the SCIM entitiestransformations for the SCIM entities Develop and maintain the information models, context schemas, and Develop and maintain the information models, context schemas, and

generated XML schemas for all SCIM chaptersgenerated XML schemas for all SCIM chapters Manage the publication of the ISE schemas and mediators to the ISE website Manage the publication of the ISE schemas and mediators to the ISE website

for the SCIM chaptersfor the SCIM chapters Maintain the information models developed under ISE-2, ISE-3, ISE-4, ISE-5, Maintain the information models developed under ISE-2, ISE-3, ISE-4, ISE-5,

ISE-6, and NPDI for the SCIM-related entitiesISE-6, and NPDI for the SCIM-related entities Provide coordination with ISO-STEP pertinent to the adoption and/or Provide coordination with ISO-STEP pertinent to the adoption and/or

modification of the relevant SCIM standardsmodification of the relevant SCIM standards Contribute to the development of the integration architecture to support the Contribute to the development of the integration architecture to support the

SCIMSCIM

7

Page 7: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

ILE SCIM Model Tasks: Northrop Grumman

Northrop Grumman Shipbuilding (NGSB) Northrop Grumman Shipbuilding (NGSB) supported by Northrop Grumman Technical supported by Northrop Grumman Technical Services (NGTS)Services (NGTS)– Lead the SCIM Evaluation Task for Sharing DDG 1000 Lead the SCIM Evaluation Task for Sharing DDG 1000

Structural Design Data with Manufacturing Systems Across Structural Design Data with Manufacturing Systems Across ShipyardsShipyards

– Participate in writing the remaining seven chapters of the Participate in writing the remaining seven chapters of the SCIM as part of SCIM Development TaskSCIM as part of SCIM Development Task

– Develop software to support demonstrations and prototypesDevelop software to support demonstrations and prototypes– Assist in the development of briefings and reportsAssist in the development of briefings and reports

8

Page 8: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

ILE SCIM Model Tasks : Product Data Services (PDS)

Monitor both the VIRGINIA and DDG1000 SCIM Evaluation Monitor both the VIRGINIA and DDG1000 SCIM Evaluation Subtasks to identify and record any enhancements that Subtasks to identify and record any enhancements that are required to existing SCIM chapters, as well as are required to existing SCIM chapters, as well as changes to improve the structure of the SCIM documentchanges to improve the structure of the SCIM document

Participate in development of the remaining seven Participate in development of the remaining seven sections of the Ship Common Information Modelsections of the Ship Common Information Model

Develop SCIM-STEP Mapping Tables for each SCIM Develop SCIM-STEP Mapping Tables for each SCIM sectionsection

Continue resolution of technical issues against content of Continue resolution of technical issues against content of source XML schemas for all SCIM sections.source XML schemas for all SCIM sections.

9

Page 9: Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): 2010-627 Integrated Logistics Environment

10

Back-up Slides