NORTHPINE LAND, INC.
UNREALIZED GROSS PROFIT LEGEND: NEW LIST OF PENDING HOUSES FOR AWARD (WITH J.O)
As of June 1, 2012
Greenwoods Phase 2
B14AL2 9/23/2009 30-Sep-10 FUJIKI, ROSALYN C.
Greenwood Heights
B16L10 12-Nov-09 31-Jul-10 SARRAGA JR. LOPITO S.
B9L49 25-May-10 30-Dec-10 BUTIAL, DINO S.
B9L97 19-Jul-10 30-Dec-10 LONG, MYRA B.
B9L8 12-Aug-10 31-Jan-11 TOMISHIGE, ROWENA C.
B12L7 19-Feb-10 30-Apr-11 ANINAO, RUFINA G.
B12L20 21-Sep-10 30-Sep-11 PATRICIO, CRISPIN JR. B.
B16L12 5-Sep-11 30-Sep-11 JOUMAA, SARAH G./JOUMAA, HOUSAM S.
B16L8 29-Jul-11 30-Sep-11 HIJARA, JULIET L.
B9L27 PARILLA,ROGELIO
B11L36/37 CAMACHO,JANETH
B29L3/4 MASANQUE,EDGARDO
Greenwoods Phase 4
B16L41 8/13/2010 31-Jul-11 PINTANG, FELIX P.
B19L9 MANOY,MARIA NITO
Greenwoods Phase 6
B6L4 8/26/2010 31-Aug-10 NUEZ, YOLANDO B.
Norfolk Ridge
B1L6 10/28/2006 30-Nov-07 GOMEZ, AMELIA V.
Norfolk Expansion 1 (Norfolk Ridge)
B3L20-21 8/10/2009 31-Dec-10 VICTORIA, BARBARA JANE C.
B1L19 1/16/2009 30-Dec-10 GERONA, VENERANDA R. / GERONA, RUSTICO
B3L25 3/15/2011 31-Mar-11 LAUANG, EDWIN A. JR. /ALVIAR CHERINA J.
B1L11 RODRIGUEZ,ARNEL
Greenwoods Expansion 1B (Rosewood)
B3L6 4/19/2011 30-Apr-11 PADERAN, JOSEPHINE
B/L RA Date Booking Date Buyers Name
7/29/2019 Weekly Housing Report 060112-GW
2/17
Forest Ridge
B23L2 8/25/2009 31-Oct-10 CRUZ, DESIREEN B. / CRUZ, ORLANDO M.
B18L3 5/14/2010 30-Dec-10 PUNTILAR, RONWALD B.
B23L6 1/31/2011 28-Feb-11 UGABAN, MINERVA M.B3L9 6/15/2010 30-Apr-11 SANTOS, JESSIERAQUELYN P.
B4L4 4/30/2010 29-Apr-11 HALLAR, SHARON F.
B12L2 7/16/2010 31-Jul-11 TAWAT, MA. LORENA M./ TAWAT NELSON E.
B18L8 8/25/11 30-Sep-11 MASARATE, ROBERTO L./MASARATE, MARGARITA BINKY C.
B3L4 9/3/10 30-Sep-11 GAPAS, ROQUEZA F.
B17L7 8/22/11 30-Sep-11 CASQUEJO, GERALDINE S./ CASQUEJO, JOHN EVAN DOMINIC I.
B18L1 8/31/11 30-Sep-11 TENEFRANCIA, JOSE M. JR.
B24L8 DUMIA,MATT
B11L2 MANZANO,JOHN MICHELA
South Hampton
B6L9 1/18/2010 30-Jun-11 MASA, MARILOU C.
B18L10 7/14/2011 15-Aug-11 CO, CARLOS V.
B15L5 6/17/2011 15-Aug-11 DIZON, GAUDENCIO A. /DIZON, NELIA S.
B17L6 8/8/2011 15-Aug-11 CENTENO, MARY GRACE L.
B21L12 6/15/2011 30-Sep-11 CABATUAN, JOSEPH D./ CABATUAN, DAISY D.
B6L2 FEDERIGAN JEFFREY
B17L5 SARTORIO,CHARLES
B17L1 TILLERMO,JONATHAN
Transferred Bookings
JV201100025 31-Jan-11 31-Jan-11BIGAY, EVELYN P. / BIGAY, JEANIE P. - GWPHA Acct#4399 TO SH
Acct#9949
Balance as of September 30, 2011
Per Trial Balance
Difference
Prepared by: Reviewed by:
Floro Millano Michelle I. Magnaye
Accountanting Assistant Senior Accounting Supervisor
7/29/2019 Weekly Housing Report 060112-GW
3/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Greenwoods & Providence Hills PH. 1, 2A, 2B, & 6)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP Start
2010-077 TARGET
28-Jun-10 ACTUALGWNTP-050-10/Aug.
10, 20108-Sep-10
2010-091 TARGET
9-Aug-10 ACTUALGWNTP-054-10
Se t. 27201030-Sep-1
SERIES 2011 :
2011-024 TARGET
11-May-11 ACTUAL 15-Jul-11
2011-031 TARGET
31-May-11 ACTUAL 21-Jun-1
2011-038 TARGET JOGW11-CO210
27-Jun-11 ACTUAL 15-Jul-11
2011-048 TARGETJOGW11-CN237 /
Oct. 4, 2011
28-Jul-11 ACTUALGWNTP-022-11 /
Sept.28,201117-Oct-1
2011-079 TARGETJOGW11-CN275 /
Dec. 20, 2011
6-Dec-11 ACTUALGWNTP-035-11 /
Dec. 20, 201123-Jan-12
SERIES 2012 :
Prepared By :
2A 7A 8 Linnea
BLOCK
SERIES 2010 :
PROCUREMENT - 1monNAME OF
OWNERNo. PH.
CMLOT MODEL
Tech Assistant - CMD
Freddie Fajardo
8 Linnea
Contractor
RFO
399
J
22
Tithonia RTJ RFO
JLM391
J
393
J1
5
6 4396
V6
30 5&6
AQL William Anquilo C.
Linnea ACDCCabrera, Roberto C. /
Cabrera, Mayrene S.
Nuoez, Yland B. /
Simbit, Sharon G.
398
V1
Poisenttia
397
V2B 12A
400
J6
2B 14A 2
Duran, Edgar V./
Duran, JenetteJLMPoisenttia75
Juan Design
Linnea Juan Design Fjuki, Rosalyn C.
7/29/2019 Weekly Housing Report 060112-GW
4/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Ph3)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP
2010-067 TARGET
11-Jun-10 ACTUAL GWNTP-047-10
2010-063 TARGET
11-Jun-10 ACTUAL GWNTP-043-10
2010-079 TARGET
15-Jun-10 ACTUAL GWNTP-049-10
SERIES 2011 :2011-001 TARGET
7-Jan-11 ACTUAL GWNTP007-11
2011-002 TARGET
7-Jan-11 ACTUAL GWNTP008-11
2011-003 TARGET
7-Jan-11 ACTUAL GWNTP-009-11
2011-004 TARGET
7-Jan-11 ACTUAL GWNTP-010-11
2011-023 TARGET
10-May-11 ACTUAL
2011-030 TARGET
30-May-11 ACTUAL
2011-040 TARGET
14-Jul-11 ACTUAL
2011-053 TARGET
25-Aug-11 ACTUAL
2011-055 TARGET
5-Sep-11 ACTUAL
2011-061 TARGET
13-Sep-11 ACTUAL
2011-069 TARGET
Flora
Hib-Bare RTJ Valdez, Flordeliza
RFOAmcor
452 8 4 Iris-Bare AQL
MODEL Contractor NAME OF
OWNER
PROCUREMENT - 1mon
456
C
RFO
13
No. BLOCK LOT
SERIES 2010 :
457 815
468
V13 5 Holly-Up JSM Model House
29
JSM Model House469
V13 6 Holly-Bare
Model House
470
V13 7 Fennel ACDC Model House
ACDC
471
CV13 8 Fennel ACDC
472
V12 32 Hib-Bare
473
V9 8 Iria-Bare CT Builders
Tomishige, Rowena
C.
475
J B11 Hyacinth Bare
Macuja, Alfredo P
474
V9 27
Holly Bare
SingleCT Builders
Parilla, Rogelio T. /
Parilla, Felicisima R.
36&37 Juan Design Camacho, Janeth M.
476
V C29 3,4 Fern AQL
Masanque, Edgardo
S.
477
V C16 12
Holly
UpgradedAQL
Jolimaa, Sarah G. /
Jolimaa, Housam S.
7/29/2019 Weekly Housing Report 060112-GW
5/17
11-Oct-11 ACTUAL
2011-071 TARGET
29-Oct-11 ACTUAL
2011-080 TARGET
13-Dec-11 ACTUAL
SERIES 2012 :
BLK LOT MODEL CONTRACTOR OWNER NTC
TARGET JOGH12-CN023
14-Mar-12 ACTUALGHNTP-002-12
TARGET JOGH12-CN025
30-Mar-12 ACTUAL
GHNTP-004-12
TARGET JOGH12-CN024
28-Feb-12 ACTUALGHNTP-003-12
TARGET
22-Mar-12 ACTUAL
TARGET
22-Mar-12 ACTUAL
TARGET
22-Mar-12 ACTUAL86&87 HEATHER MODEL
MODEL84 MODEL 50
485
B11 85 IVY MODEL
Tech Assistant - CMD
Freddie Fajardo
485
B11
485
B11
478
V C9 56
Holly
UpgradedACDC Jeruz, Fe
ACDC Lopito Saraga Jr
479
J C12 20 Hib-Bare Juan Design Patricio, Crispin Jr. B.
Juan Design
480
J C16 10 Hib-Bare
11
484
J B
ACDC Roberto Arcilla
Hajas, Adrian
Jonalyn Sumori/
Kiyoshi Sumori
482
J C9 66 & 67 Holly- Bare
Holly- Up8111
483
V B
Juan Design
11 Holly- Up
7/29/2019 Weekly Housing Report 060112-GW
6/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Norfolk Ridge)
As of June 1, 2012
Notice to
ConstructSchedule JO / NT
SERIES 2010 :
2010-042 TARGET
20-Apr-10 ACTUAL GWNTP-01
2010-043 TARGET
20-Apr-10 ACTUAL GWNTP-01
2010-055 TARGET
11-Jun-10 ACTUAL GWNTP-03
2010-053 TARGET11-Jun-10 ACTUAL GWNTP-03
2010-054 TARGET
11-Jun-10 ACTUAL GWNTP-03
2010-052 TARGET
11-Jun-10 ACTUAL GWNTP-02
2010-056 TARGET
11-Jun-10 ACTUAL GWNTP-03
2010-088 TARGET
29-Jul-10 ACTUAL GWNTP-05
2010-099 TARGET
1-Sep-10 ACTUAL GWNTP-05
SERIES 2011 :
2011-007 TARGET
7-Jan-11 ACTUAL GWNTP-01
2011-018 TARGET
22-Mar-11 ACTUAL GWNTP-01
2011-022 TARGET JOGW11-C
10-May-11 ACTUAL
2011-039 TARGET
31-Jul-11 ACTUAL
2011-041 TARGET
19-Jul-11 ACTUAL
2011-056 TARGET
5-Sep-11 ACTUAL
2011-058 TARGET JOGW11-CN9-Sep-11 ACTUAL GWNTP-02
39J
7 1 6 Meadow Pine AQL Gomez, Amelia V.
38
J7B 1 11 Meadow Pine ACDC
Rodriguez, Arnel B. /
Rodriguez, Annefe L.
37
J7B 1 19 Redbay Pine CT
Geron, Veneranda R.
/ Gerona, Rustico
Lauang, Edwin A. JR.
/ Alviar, Cherina J.
Take Over by CTDela Cruz, Ma.
Sheryl L.
33
V7B
Sugar Pine AQL
3 10 Bristle Cone Pine
7B 3 4&5 Redbay Pine
34 7B
25
4 CT
21
NAME OF
OWNER
24 7B 3
RFO
PROCUREMENT - 1mon
6
7 4 8 Spruce Pine
Contractor
AQL
No. PH. BLOCK LOT MODEL
35
V7B 3
CT MODEL HOUSE
36
V
20 7 4 6 Meadow Pine JSM RFO
22 7B 3 15 Meadow Pine AQL Model House
Sugar Pine CT Builders RFO
25 7B 3 7 RFOLong leaf CT Builders
27 7B 4 2 Red Bay Pine Juan Design RFO
28 7B 1 15 Spruce Pine AMCOR RFO
31 7B 1 24 Meadow Pine Monroe RFO
32
J7B 3 1 Long leaf AQL
3 Red Bay Pine
RFO
Gollayan,
Nathaniel/Gollayan,
7/29/2019 Weekly Housing Report 060112-GW
7/17
SERIES 2012 :
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-002 TARGET
3-Jan-12 ACTUAL
2012-019 TARGET JONR12-CO
20-Mar-12 ACTUAL NRNTP-01
2012-032 TARGET
24-May-12 ACTUAL
Prepared By :
49
J7B 1 37 Meadow Pine Juan Design Sacal, Clint Patrick F.
Red Bay Pine (
red Pine )GENSERV Model House
48
J7 2 12
GENSERV Model House47
J7 2 11
Bristle Cone
Pine( Torrey
GENSERV Model Unit
46
V7 2 10 Long leaf CT Model Unit
Red Bay (Red
Pine)
45
V7 2 8
44J
7 2 RFOGENSERVBristle Cone(Torrey Pine)
7
Long leaf (Scots
Pine)CT
Meadow Pine
42
V7 2 5
41
V7 8 6 CT RFO
40
V7 8 4 Meadow Pine CT RMI
43
J7 2 6 RFOCT
Long leaf (Scots
Pine)
RMI
Mr. Freddie Fajardo
Lim, Maria Zahra /
Go, Ricky
50
V7B 3 16 & 17 LongLeaf
7/29/2019 Weekly Housing Report 060112-GW
8/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Parkview Ph 4A & 4B)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP
SERIES 2011 :TARGET
19-May-11 ACTUAL
TARGET
9-Jun-11 ACTUAL
TARGET
13-Sep-11 ACTUAL
SERIES 2012 :
TARGET
4-Jan-12 ACTUAL
TARGET
10-May-12 ACTUAL
Prepared By :
MODEL
406
V4B 17 11 Malva
dela Cruz, Rinzen G /
Dela Cruz Juanito
RFO
Manoy, Marianito
M. / Mary Ann
Lenneth
399
VMonroe4B 16
NAME OF
OWNER
PROCUREMENT - 1mons
No. PH. BLOCK LOT
Tech Assistant - CMD
Freddie Fajardo
15 Linnea397
V4A
Nalin
4B 19 Malva
13
Contractor
Juan Design
4A 3
41 Pintang, Felix P.
403
J
Linnea11 ACDCHarada, Jennifer T. /
Harada, Takahiro
CT9
405
J
7/29/2019 Weekly Housing Report 060112-GW
9/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Rosewood 1B & Ph5)
As of June 1, 2012
Notice to
ConstructSchedule JO / N
TARGET
11-Jun-10 ACTUAL GWNTP-0
TARGET
11-Jun-10 ACTUAL GWNTP-0
TARGET
1-Dec-10 ACTUAL GWNTP-0
SERIES 2011 :
TARGET
24-Jan-11 ACTUAL GWNTP-0
TARGET
7-Jan-11 ACTUAL GWNTP-0
TARGET
7-Jan-11 ACTUAL GWNTP-0
2011-049 TARGET
9-Aug-11 ACTUAL
SERIES 2012 :
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
2012-003 TARGET
3-Jan-12 ACTUAL
Prepared By :
Model Unit
Model Unit
Model Unit
54
A 1B 2 1
Improved
Tithonia AQL
53
A1B 1 6
Improved
LinneaAQL
52
A1B 1 5
Improved
MalvaACDC
Improved Nalin51
A1B 1 4 Model Unit
ACDC
ACDC
Model Unit50
A1B 1 Improved Pyxie3
49
A1B 1 2
AQLImproved Tulip
ACDC
Model Unit
Model UnitImproved
Poinsettia
48
A1B 1 1
47
J1B 3 6
Tulip JSM
CT
Model House
Paderan, Josephine
P.Malva
46
J5 12 14
45
J5 12 13 JSM
Lopez, Sylveer Jaey
Z./Lopez, Corazon Z.
Model HousePyxie
42 5 712
Tithonia Juan Design
Monroe
44 5 6 7 Poinsettia RTJ
Poinsettia Juan Design RFO
Thistle
RFO
No.
34
Sagum, Angelito M.
5
36 5 5 15
ContractorBLOCK LOT
Tech Assistant - CMD
SERIES 2010 :
Freddie Fajardo
5 13
PH. MODELNAME OF
OWNER
PROCUREMENT - 1mon
7/29/2019 Weekly Housing Report 060112-GW
10/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Primrose)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP
SERIES 2010 : BATCH 2 ( 5 units )
TARGET
13-Apr-11 ACTUAL GWNTP-018-1
SERIES 2011 : BATCH 2 ( 1 units )
2011-020 TARGET
7-Apr-11 ACTUAL GWNTP-018-11
SERIES 2012 : BATCH 1 ( 4 units )
2012-004 TARGET
JOPP12-CN016
2/14/2012
3-Jan-12 ACTUALPPNTP-005-12
2/8/2012
2012-004 TARGET
3-Jan-12 ACTUAL
2012-004 TARGETJOPP12-CN017
2/14/2012
3-Jan-12 ACTUALPPNTP-006-12
2/8/2012
2012-004 TARGET
13-Jan-12 ACTUAL
2012-011 TARGETJOPP12-CN022
3/1/2012
14-Feb-12 ACTUALPPNTP-007-12
2/29/2012
Prepared By :
Juan Design Ferdinand Castor
AQL RFO
RFO
51
A
52
V8 7 16 Poinsettia
8 11 10Improved
Tithonia
RFOImproved
Poinsettia
AQL RFO
AQL50 A 8 11 9
48 A 8 12 11
Freddie Fajardo
Tech Assistant - CMD
Santos, Gilda T.12 8 Tulip JLM
AQL
Improved Tulip
8
49 A 8 12 12
Improved Pyxie
47
V
Contractor NAME OF OWNER
PROCUREMENT - 1mons
AQL RFO19
MODEL
31 8 Thistle
No. PH. BLOCK LOT
7
7/29/2019 Weekly Housing Report 060112-GW
11/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Norfolk Ridge)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP Start
2012-002 TARGET 1-Feb-
3-Jan-12 ACTUAL 14-May
2012-002 TARGET 1-Feb-
3-Jan-12 ACTUAL 14-May
2012-002 TARGET 1-Feb-
3-Jan-12 ACTUAL 14-May
2012-002 TARGET 1-Feb-
3-Jan-12 ACTUAL 14-May
Model Houses (Rosewood)2012-003 TARGET
3-Jan-12 ACTUAL 1-Feb-
2012-003 TARGET
3-Jan-12 ACTUAL 15-Feb-2012-003 TARGET
3-Jan-12 ACTUAL 15-Feb-
45
V
PH. BLOCK
7 2
SERIES 2012 : Model Houses (Norfolk Ridge)
No. LOT MODEL Contractor
PROCUREMENT - 1mon
NAME OF
OWNER
8 Red Bay (Red Pine)
2 10 Long leaf CT
GENSERV Model Unit
C
47
J7 2 11
Bristle Cone Pine(
Torrey Pine)
46
V7
Model House
Model Unit
48
J7 2 12
49
A
Red Bay Pine ( red
Pine )GENSERV
GENSERV Model House
Improved Poinsettia
50
A1B 1 3 Improved Pyxie
Improved Tulip AQL
ACDC
Model Unit
Model Unit
48
A1B 1 1
1B 1 2
ACDC Model Unit
7/29/2019 Weekly Housing Report 060112-GW
12/17
WEEKLY STATUS REPORT ON HOUSING CONSTRUCTION
LOCATION : GREENWOODS VILLAGE (Norfolk Ridge)
As of June 1, 2012
Notice to
ConstructSchedule JO / NTP Sta
PH. BLOCK
No. LOT MODEL Contractor
PROCUREMENT - 1mon
NAME OF
OWNER
C
2012-003 TARGET
3-Jan-12 ACTUAL 15-Feb
2012-003 TARGET
3-Jan-12 ACTUAL 15-Feb
2012-003 TARGET
3-Jan-12 ACTUAL 1-Feb
2012-003 TARGET
3-Jan-12 ACTUAL 15-Feb
SERIES 2012 : Model Houses (Primrose Place)
2012-0004 TARGET 3-Apr-12 1-Feb
3-Jan-12 ACTUAL 14-Ma
2012-0004 TARGET 3-Apr-12 1-Feb
3-Jan-12 ACTUAL 14-Ma
2012-0004 TARGET 3-Apr-12 1-Feb3-Jan-12 ACTUAL
2012-0004 TARGET 3-Apr-12 1-Feb
3-Jan-12 ACTUAL 14-Ma
Improved Nalin ACDC Model Unit
52
A1B 1 5 Improved Malva
51
A1B 1 4
ACDC Model Unit
53
A1B 1 6 Improved Linnea
Model Unit
Model Unit
54
A1B 2 1 Improved Tithonia AQL
AQL
55
A8 11 9 Improved Poinsettia AQL
56
A8 11 10
Model Unit
Improved Tithonia AQL Model Unit
Model Unit
57A 8 12 11 Improved Pyxie AQL Model Unit
58
A8 12 12 Improved Tulip AQL
7/29/2019 Weekly Housing Report 060112-GW
13/17
EMD - 1mon BUYER
CompletionHandover to
EMD/CSD
Handover to
Client
%
Accomplish
ment
SlippageNo. of Days
Delayed
10-Nov-12 10-Nov-12 9-Jan-13 15%
0%
10-Nov-12 10-Nov-12 9-Jan-13 15%
7%
10-Nov-12 10-Nov-12 9-Jan-13 15%
6%
10-Nov-12 10-Nov-12 9-Jan-13 15%
8%
30-Jul-12 30-Jul-12 30-Aug-12 38%
25%
13-Aug-12 13-Aug-12 30-Aug-12 38%
31%
13-Aug-12 13-Aug-12 30-Aug-12 38%
17%
-15% no lay- out plan
REMARKS CRITICAL MAT
mons
GF Chb laying
-7%GF Chb laying. Note: 1st revision-
relocation of interior column
-8%Gravel bedding preparation. Rebar
works preparation for slab.
-9%
on going plastering works
still without 2F Structural Plan
roof fram
-13% 2F slab pouring schedule on 6/8/12 roof fram
-21%
-7%
2F Structual Plan &
As of June 1, 2012
7/29/2019 Weekly Housing Report 060112-GW
14/17
EMD - 1mon BUYER
CompletionHandover to
EMD/CSD
Handover to
Client
%
Accomplish
ment
SlippageNo. of Days
Delayed
REMARKS CRITICAL MAT
mons As of June 1, 2012
13-Aug-12 13-Aug-12 30-Aug-12 38%
32%
13-Aug-12 13-Aug-12 30-Aug-12 38%
30%
30-Jul-12 30-Jul-12 30-Aug-12 38%
34%
13-Aug-12 13-Aug-12 30-Aug-12 38%
32%
10-Nov-12 10-Nov-12 9-Jan-13 38%
12-Aug-12 32%
10-Nov-12 10-Nov-12 9-Jan-13 38%
12-Aug-12 31%
28-Jun-00 28-Jun-00 27-Aug-00 38%13%
10-Nov-12 10-Nov-12 9-Jan-13 38%
12-Aug-12 21%
roof fram-6%on going 2F plastering works & roof
beam works
roof fram-8% on going 2F CHB laying
-6%
-4%
on going plastering works roof fram
roof fram
on going rebars & formworks for
roof beamroof fram
roof fram
-25% still without 2F Structural Plan
on going 2F CHB laying
-6%
-7%
-17% 2F slab pouring schedule on 6/8/12 roof fram
2F Structual Plan &
7/29/2019 Weekly Housing Report 060112-GW
15/17
GREENWOODS VILLAGE
STATUS REPORT ON HOUSING CONSTRUCTION
As of June 1, 2012
RFO Units with Request for Refurbishing (2 months)
REF.
No.PH BLK LOT BUYER'S NAME House Model CONTRACTOR
REFURBISHING
REQUEST DATE
DATE RECE
BY CM
134 1 31A 4Menardo Jules N.
PeleoErythrina - 17-Sep-11 19-Sep-
135 1 19 6,7&8Maria Teresa /
Zenaida FallerJasmine De Luxe Orlan Marcelo 21-Sep-11 22-Sep-
136 1 31A 2 Urbina, Dionesio Jr NALIN ACDC 7-Oct-11 4-Nov-1
137 5 12 32 Ronel, Amparo Delonix Vic R. 15-Sep-11 3-Nov-1
139 3C 9 32&33 Estela D. Wurkman Hyacinth-Up In House 14-Nov-11 19-Nov-
140 3 9 50&51Teresa dela Fuente
BurgosHyacinth-Up In House 9-Nov-11 14-Nov-
141 3B 11 56&57 Arlene Sodsod Hyacinth-Bare In House 7-Dec-11 4-Jan-1
142 3C 9 112&113 Peter T. Damalerio Hyacinth-BareVic Rosagaso
28-Dec-11 4-Jan-1
143 6 11 3Leonardo R. Petilla
Jr.Erythrina
Vic Rosagaso3-Dec-11 5-Jan-1
144 1 14 3 Alicia Ohshima Delonix In House 2-Nov-11145 3 12 22 Corazon Kakuno Hibs-Com Orlan Marcelo 29-Nov-11
146 3 8 4 Reavin Revaldo Iris-Bare 7-Dec-11
147 NFx 4 2 Lolita Baronda RedBay 13-Feb-12
148 3 9 40&41 Edelyn Beltran HYA-Bare 9-Feb-12
149 NFX 3 10 Marcela del Prado Bristle Cone In House 23-Mar-12
150 3C 9 79&80 Lar-Len Que HYA-Bare 26-Mar-12
151 1 6 1&2 Castao Erythrina 3-Apr-12
152 3A 4 34 Jeffry Pesino His-Bare 16-Apr-12
153 6 10 6 Model House Erythrina In House RFO Unit
7/29/2019 Weekly Housing Report 060112-GW
16/17
1 2A 7A 8 Linnea JLM RFO 2010-077
2 1 30 5&6 Tithonia RTJ RFO 2010-091
3 6 6 4 Poisenttia Juan DesignNuoez, Yland B. / Simbit,
Sharon G.2011-024
4 2B 14A 2 Linnea Juan Design Fjuki, Rosalyn C.2011-048/JOGW
CN237
5 6 5 7 Poisenttia JLMDuran, Edgar V./ Duran,
Jenette2011-079
6 3 11 36&37 Hyacinth Bare Juan Design Camacho, Janeth M. 2011-053
7 3 29 3,4 Fern AQL Masanque, Edgardo S. 2011-055
8 3 16 12 Holly Upgraded AQLJolimaa, Sarah G. / Jolimaa,
Housam S.2011-061
9 3 9 56 Holly Upgraded ACDC Jeruz, Fe 2011-069
10 3 12 20 Hib-Bare Juan Design Patricio, Crispin Jr. B. 2011-071
11 3 16 10 Hib-Bare ACDC Lopito Saraga Jr 2011-080
12 3 9 66 & 67 Holly- Bare ACDC Roberto Arcilla
13 7B 1 11 Meadow Pine ACDCRodriguez, Arnel B. /
Rodriguez, Annefe L.2011-056
14 7 1 6 Meadow Pine AQL Gomez, Amelia V.2011-058 / JOGW
CN239
15 7 8 4 Meadow Pine CT RMI 2012-0002
16 7 8 6 Meadow Pine CT RFO 2012-0002
17 7 2 5 Long leaf (Scots Pine) CT RFO 2012-0002
18 7 2 6 Long leaf (Scots Pine) CT RFO 2012-0002
19 7 2 7 Bristle Cone (Torrey Pine) GENSERV RFO 2012-0002
20 7 2 8 Red Bay (Red Pine) GENSERV Model Unit 2012-0002
21 7 2 10 Long leaf CT Model Unit 2012-0002
22 7 2 11Bristle Cone Pine( Torrey
Pine)GENSERV Model House 2012-0002
23 7 2 12 Red Bay Pine ( red Pine ) GENSERV Model House 2012-0002
24 4A 13 15 Linnea Juan Design RFO 2011-029
25 4B 19 9 Malva CTManoy, Marianito M. / Mary
Ann Lenneth2011-060
26 4A 3 11 Linnea ACDCHarada, Jennifer T. / Harada,
Takahiro2012-001
27 1B 3 6 Malva CT Paderan, Josephine P. 2011-049
28 1B 1 1 Improved Tulip AQL Model Unit 2012-0003
29 1B 1 2 Improved Poinsettia ACDC Model Unit 2012-0003
30 1B 1 3 Improved Pyxie ACDC Model Unit 2012-0003
31 1B 1 4 Improved Nalin ACDC Model Unit 2012-0003
NAME OF OWNER JO No.No. PH. BLOCK LOT MODEL Contractor
7/29/2019 Weekly Housing Report 060112-GW
17/17