Software Innovation is committed to helping organizations
manage, share and use information, turning it into their most
valuable asset
Slide 3
Why Supplier Room ? To whom is it for ? The how (step by step)
A bit about the future How to get started Wrap up Agenda
Slide 4
If I stand like this, it seems I know what Im talking about If
I sit like this, it seems I understand what hes talking about Take
your positions
Slide 5
Lets illustrate what its all about Supplier(s) Documentation
deliveries Client/Contractor Internal review Return of status codes
Incl publishing to selected Interface Contractors, Partners, other,
etc. Supplier Document Requirement List Supplier Master Document
Register (rev. 1)
Slide 6
Supplier Room Information flow, simplified
Slide 7
Well, the main issue is the document traffic between the
Contractor and the Supplier(s) Get control of what to deliver and
when To be able to deliver correct documents, on time Keep track on
document delivery dates and actual deliveries On large projects, it
is essential to predict, control and monitor the incoming and
outgoing of documentation. Usually driven by workflow/transmittals,
and revisions/status. Offer reporting on status (delay, look ahead
etc.) Publish selected documentation to selected Suppliers,
Interface contractors, Partners etc. Why Supplier Documentation
?
Slide 8
Ok, but how do I do this with ProArc (Supplier room) ?
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Automatic return from Contactors ProArc to Supplier Room
Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slide 31
Slide 32
Slide 33
Slide 34
Slide 35
Slide 36
Slide 37
Slide 38
Slide 39
Slide 40
Slide 41
Slide 42
Say again ?
Slide 43
A tailor made ProArc SharePoint Portal for Client/Contractor
and their Suppliers Documents can be uploaded/published from ProArc
Supports review and approval activities When documents/files are
ready for review they are sent to (the Client/Contractors) ProArc,
one or several files can be transferred When the document is
reviewed by the project, a status is returned to the Supplier Room
telling the Supplier if the document is accepted or not, if not, a
non-acceptance code is given and a new due date is set for the
document to be re-issued Repeat until acceptance is reached
Suppliers perform and maintain their document deliveries through
the Supplier Room and can create new ones any time Normally a
workflow is used in ProArc for the review process, but this can
also be done without using the workflow module/feature
Documentation for info can be sent to any Supplier/Interface party
etc. ProArc Supplier Room short recap:
Slide 44
Standard reports or predefined searches (queries on dates)
Overdue from supplier (per PO) / contractor Look ahead from
supplier / contractor Recently received documentation (last 5 days)
Recently sent documentation (last 3 days) Etc. Reporting
Slide 45
ProArc ver. 6.7.5 or higher SharePoint Foundation 2010
(installed by SI on a separate server, in DMZ) External SharePoint
Connector Some ports needs to be open Technical pre requisites
Slide 46
In summary:
Slide 47
Purpose: To get better control of Supplier deliverables and the
delivery schedule (with less manual labour) To easily communicate
document delivery requirements To speed up the exchange of
documentation and review results between Contractor and Supplier(s)
To easily publish information to selected project participants How
? Set up a Supplier Room to each PO/Supplier Decide on direct
delivery or engage in workflow processes Configure some selected
reports/searches Introduce method/procedure to chosen Suppliers
Wrapping up: Go ProArc Supplier Room !.
Slide 48
Thank you for your attention ! Kind Regards, Trond Bjrseth