For perfect external wall insulation every time...just follow the Saint-Gobain Weber advice!

Page 2: Weber EWI Training Guide

1

Introduction...This Training Guide supplements the trainingprovided by WWeebbeerr and is a quick reference tothe key stages in the installation of wweebbeerr..tthheerrmmExternal Wall Insulation systems.

For full technical details on all wweebbeerr..tthheerrmmsystems, please refer to Site Application Guides,WWeebbeerr’s Render Solutions handbook and ourwebsite www.netweber.co.uk

WWeebbeerr can provide technical and applicationsupport for all house types including a widerange of non-traditional and system builtconstruction types.

Training Guide Contents...Introduction and contents 1Health and safety 2Preparation... 3-5Preparation... beads, sills and trims 6Preparation... base bead fixing 7-8Preparation... fixings 9-12Preparation... boarding around windows 13Preparation... preparation for rendering 14Preparation... weather working 15-16wweebbeerr..tthheerrmm XXMM... basecoat 17-18wweebbeerr..tthheerrmm XXMM... rendering 19-20wweebbeerr..tthheerrmm XXMM... topcoat finishes 21wweebbeerr..tthheerrmm XXMM... RB brick effect 22wweebbeerr..tthheerrmm XXPP... 23wweebbeerr..tthheerrmm XXPP... scraped finish 24wweebbeerr..tthheerrmm XXPP... ashlar cutting 25wweebbeerr..tthheerrmm XXPP... spray rough cast 26wweebbeerr..tthheerrmm XXPP... dry dash finish 27wweebbeerr..tthheerrmm XXPP... 28

Copyright SSaaiinntt--GGoobbaaiinn WWeebbeerr - not to be reproduced without permission

Page 3: Weber EWI Training Guide

2

Health and safety...Health and safety is the number one priority at WWeebbeerr.

This applies to our behaviour on construction sites, inour factories and offices, and on the road.

We also want to ensure that our customers are safe - so please follow the use of Personal ProtectiveEquipment shown in this Training Guide at all times.

Page 4: Weber EWI Training Guide

3

Preparation...

Page 5: Weber EWI Training Guide

4

Page 6: Weber EWI Training Guide

5

Page 7: Weber EWI Training Guide

6

Preparation... beads, sills and trims

Page 8: Weber EWI Training Guide

7

Preparation... base bead fixing

For below DPC, WWeebbeerr has specific detailing recommendations.Please refer to Site Packages for details

Page 9: Weber EWI Training Guide

8

Page 10: Weber EWI Training Guide

9

Preparation... fixings

Page 11: Weber EWI Training Guide

10

All insulation boards should be fixed with fivefixings per board. Cut boards should be fullysupported with fixings at sides and corners as appropriate.

Fixing types are contract-specific with thermalfixings being the most commonly required.Non-standard substrates may rquire specialfixings - if in doubt consult WWeebbeerr for advice.

Page 12: Weber EWI Training Guide

11

For full boards, fixings should be150mm from all board edges.

Page 13: Weber EWI Training Guide

12

Page 14: Weber EWI Training Guide

13

Preparation... boarding around windows

Page 15: Weber EWI Training Guide

14

Preparation... preparing for rendering

Page 16: Weber EWI Training Guide

15

Preparation... weather working

Page 17: Weber EWI Training Guide

16

Page 18: Weber EWI Training Guide

17

wweebbeerr..tthheerrmm XXMM... basecoat

Page 19: Weber EWI Training Guide

18

Page 20: Weber EWI Training Guide

19

wweebbeerr..tthheerrmm XXMM... rendering

Page 21: Weber EWI Training Guide

20

Page 22: Weber EWI Training Guide

21

wweebbeerr..tthheerrmm XXMM... topcoat finishesSynthetic top coat Dash top coat

Page 23: Weber EWI Training Guide

22

wweebbeerr..tthheerrmm XXMM... RB brick effect

Page 24: Weber EWI Training Guide

23

wweebbeerr..tthheerrmm XXPP...

Page 25: Weber EWI Training Guide

24

wweebbeerr..tthheerrmm XXPP... scraped finish

Page 26: Weber EWI Training Guide

25

wweebbeerr..tthheerrmm XXPP... ashlar cutting

Page 27: Weber EWI Training Guide

26

wweebbeerr..tthheerrmm XXPP... spray rough cast

Page 28: Weber EWI Training Guide

27

wweebbeerr..tthheerrmm XXPP... dry dash finish

Page 29: Weber EWI Training Guide

28

wweebbeerr..tthheerrmm XXPP...

Page 30: Weber EWI Training Guide
Page 31: Weber EWI Training Guide

Our other activities...

ConstructionMortar Products

Tile FixingProducts

Render & DecorativeFinishes

FlooringSystems

Page 32: Weber EWI Training Guide

Saint-Gobain Weber Ltd

GB Head OfficeTel: 08703 330070Fax: 01525 [email protected]