6
0.0 Expand ITA Netw or EST Duration: 47 D 1.0 M anagem ent EST Duration: 47 Days 2.0 Requirem ents EST Duration: 16 Days 1.0.2 IdentifyProject Deadlines EST Duration: 3 Days 1.0.3 ProjectPlanning EST Duration: 10 Days 2.0.1 Purchase Equipm ent EST Duration: 2 Days 2.0.3 Secure Netw ork Configurations EST Duration: 5 Days 2.0.4 Create aRisk Assessm ent EST Duration: 5 Days 2.0.2 Create Netw ork Topology EST Duration: 4 Days 1.0.1 Plan Group M eetings EST Duration: 2 Days Level 1 Level 2 Level 3 1.0.4 Adm inistration EST Duration: 47 Days

WBS WBS Dictionary

Embed Size (px)

DESCRIPTION

wbs

Citation preview

Page 1: WBS WBS Dictionary

0.0 Expand ITA Network ProjectEST Duration: 47 Days

1.0 ManagementEST Duration: 47 Days

2.0 Requirements EST Duration: 16 Days

3.0 BuildEST Duration: 12 Days

4.0 TestEST Duration: 5 Days

1.0.2 Identify Project Deadlines

EST Duration: 3 Days

1.0.3 Project PlanningEST Duration: 10 Days

2.0.1 Purchase EquipmentEST Duration: 2 Days

2.0.3 Secure Network Configurations

EST Duration: 5 Days

2.0.4 Create a Risk Assessment

EST Duration: 5 Days

3.0.1 Assemble NetworkEST Duration: 2 Days

3.0.2 ISPEST Duration: 4 Days

3.0.3 Configure NetworkEST Duration: 2 Days

4.0.1 Troubleshoot Network

EST Duration: 2 Day

4.0.2 Debug/PatchEST Duration: 3 Days

2.0.2 Create Network Topology

EST Duration: 4 Days

3.0.4 Configure Security Protocols

EST Duration: 2 Days

3.0.5 Configure Wide Range Network

EST Duration: 2 Days

1.0.1 Plan Group Meetings

EST Duration: 2 Days

Level 1

Level 2

Level 3

1.0.4 AdministrationEST Duration: 47 Days

Page 2: WBS WBS Dictionary

0.0 Expand ITA Network ProjectEST Duration: 47 Days

1.0 ManagementEST Duration: 47 Days

2.0 Requirements EST Duration: 16 Days

3.0 BuildEST Duration: 12 Days

4.0 TestEST Duration: 5 Days

1.0.2 Identify Project Deadlines

EST Duration: 3 Days

1.0.3 Project PlanningEST Duration: 10 Days

2.0.1 Purchase EquipmentEST Duration: 2 Days

2.0.3 Secure Network Configurations

EST Duration: 5 Days

2.0.4 Create a Risk Assessment

EST Duration: 5 Days

3.0.1 Assemble NetworkEST Duration: 2 Days

3.0.2 ISPEST Duration: 4 Days

3.0.3 Configure NetworkEST Duration: 2 Days

4.0.1 Troubleshoot Network

EST Duration: 2 Day

4.0.2 Debug/PatchEST Duration: 3 Days

2.0.2 Create Network Topology

EST Duration: 4 Days

3.0.4 Configure Security Protocols

EST Duration: 2 Days

3.0.5 Configure Wide Range Network

EST Duration: 2 Days

1.0.1 Plan Group Meetings

EST Duration: 2 Days

Level 1

Level 2

Level 3

1.0.4 AdministrationEST Duration: 47 Days

Page 3: WBS WBS Dictionary

Level WBS Code Element Name Description Budget

1 0.0 Expand ITA Project $ 22,054.88

2 1.0 Management Organize Project $ 7,948.00

3 1.0.1 Plan Group Meetings

3 1.0.2 Identify Project Deadlines

3 1.0.3 Project Planning

3 1.0.4 Administration

2 2.0 Requirements

3 2.0.1 Purchase Equipment $ 14,106.88

3 2.0.2 Create Network Topology

3 2.0.3

3 2.0.4 Create Risk Assesment

2 3.0 Build Create Network

3 3.0.1 Assemble Network

3 3.0.2 ISP

3 3.0.3 Configure Network

The International Travel Agency (ITA) is a multinational corporation that is planning onexpanding their network to better fit their information technology needs. Form a team to set up its core,networks and at the same time improve their network security.

Get team together to communicate about project

Create clear deadlines for every phase of work for each team member

Plan project strategy, scope, budget

PM will check in with each group member and as a whole, to ensure milestones are being met and if any issues occur

What needs to be achieved

Create a layered network topology for more security

Secure Network Configurations

Make network secure with firewalls

Possible weaknesses that could allow attackers to attack network resources

Place equipment as topology requires

Assign ISP if not done already and create a backup ISP

Configure network protocols

Page 4: WBS WBS Dictionary

3 3.0.4

3 3.0.5

2 4 Test Test connectivity

3 4.0.1 Troubleshoot Network

3 4.0.2 Debug/Patch

Configure Security Protocols

Add Passwords and encryption

Connect Wide Range Network

Connect all the offices and buildings together

Troubleshoot network for issues

Search for errors and fix them

Page 5: WBS WBS Dictionary

Members Responsible

Sania Khan

Sania Khan

Sania Khan

Sania Khan

Sania Khan

Taufiq Sabuwala, Rahul Khinvasara

Taufiq Sabuwala

Taufiq Sabuwala

Rahul Khinvasara

Taufiq Sabuwala

Rahul Khinvasara, Liam Gracey

Liam Gracey

Liam Gracey

Rahul Khinvasara

Sania Khan, Taufiq Sabuwala, Rahul Khinvasara, Liam Gracey

Page 6: WBS WBS Dictionary

Rahul Khinvasara

Liam Gracey

Liam Gracey, Rahul Khinvasara

Liam Gracey

Rahul Khinvasara