0.0 Expand ITA Network ProjectEST Duration: 47 Days
1.0 ManagementEST Duration: 47 Days
2.0 Requirements EST Duration: 16 Days
3.0 BuildEST Duration: 12 Days
4.0 TestEST Duration: 5 Days
1.0.2 Identify Project Deadlines
EST Duration: 3 Days
1.0.3 Project PlanningEST Duration: 10 Days
2.0.1 Purchase EquipmentEST Duration: 2 Days
2.0.3 Secure Network Configurations
EST Duration: 5 Days
2.0.4 Create a Risk Assessment
EST Duration: 5 Days
3.0.1 Assemble NetworkEST Duration: 2 Days
3.0.2 ISPEST Duration: 4 Days
3.0.3 Configure NetworkEST Duration: 2 Days
4.0.1 Troubleshoot Network
EST Duration: 2 Day
4.0.2 Debug/PatchEST Duration: 3 Days
2.0.2 Create Network Topology
EST Duration: 4 Days
3.0.4 Configure Security Protocols
EST Duration: 2 Days
3.0.5 Configure Wide Range Network
EST Duration: 2 Days
1.0.1 Plan Group Meetings
EST Duration: 2 Days
Level 1
Level 2
Level 3
1.0.4 AdministrationEST Duration: 47 Days
0.0 Expand ITA Network ProjectEST Duration: 47 Days
1.0 ManagementEST Duration: 47 Days
2.0 Requirements EST Duration: 16 Days
3.0 BuildEST Duration: 12 Days
4.0 TestEST Duration: 5 Days
1.0.2 Identify Project Deadlines
EST Duration: 3 Days
1.0.3 Project PlanningEST Duration: 10 Days
2.0.1 Purchase EquipmentEST Duration: 2 Days
2.0.3 Secure Network Configurations
EST Duration: 5 Days
2.0.4 Create a Risk Assessment
EST Duration: 5 Days
3.0.1 Assemble NetworkEST Duration: 2 Days
3.0.2 ISPEST Duration: 4 Days
3.0.3 Configure NetworkEST Duration: 2 Days
4.0.1 Troubleshoot Network
EST Duration: 2 Day
4.0.2 Debug/PatchEST Duration: 3 Days
2.0.2 Create Network Topology
EST Duration: 4 Days
3.0.4 Configure Security Protocols
EST Duration: 2 Days
3.0.5 Configure Wide Range Network
EST Duration: 2 Days
1.0.1 Plan Group Meetings
EST Duration: 2 Days
Level 1
Level 2
Level 3
1.0.4 AdministrationEST Duration: 47 Days
Level WBS Code Element Name Description Budget
1 0.0 Expand ITA Project $ 22,054.88
2 1.0 Management Organize Project $ 7,948.00
3 1.0.1 Plan Group Meetings
3 1.0.2 Identify Project Deadlines
3 1.0.3 Project Planning
3 1.0.4 Administration
2 2.0 Requirements
3 2.0.1 Purchase Equipment $ 14,106.88
3 2.0.2 Create Network Topology
3 2.0.3
3 2.0.4 Create Risk Assesment
2 3.0 Build Create Network
3 3.0.1 Assemble Network
3 3.0.2 ISP
3 3.0.3 Configure Network
The International Travel Agency (ITA) is a multinational corporation that is planning onexpanding their network to better fit their information technology needs. Form a team to set up its core,networks and at the same time improve their network security.
Get team together to communicate about project
Create clear deadlines for every phase of work for each team member
Plan project strategy, scope, budget
PM will check in with each group member and as a whole, to ensure milestones are being met and if any issues occur
What needs to be achieved
Create a layered network topology for more security
Secure Network Configurations
Make network secure with firewalls
Possible weaknesses that could allow attackers to attack network resources
Place equipment as topology requires
Assign ISP if not done already and create a backup ISP
Configure network protocols
3 3.0.4
3 3.0.5
2 4 Test Test connectivity
3 4.0.1 Troubleshoot Network
3 4.0.2 Debug/Patch
Configure Security Protocols
Add Passwords and encryption
Connect Wide Range Network
Connect all the offices and buildings together
Troubleshoot network for issues
Search for errors and fix them
Members Responsible
Sania Khan
Sania Khan
Sania Khan
Sania Khan
Sania Khan
Taufiq Sabuwala, Rahul Khinvasara
Taufiq Sabuwala
Taufiq Sabuwala
Rahul Khinvasara
Taufiq Sabuwala
Rahul Khinvasara, Liam Gracey
Liam Gracey
Liam Gracey
Rahul Khinvasara
Sania Khan, Taufiq Sabuwala, Rahul Khinvasara, Liam Gracey
Rahul Khinvasara
Liam Gracey
Liam Gracey, Rahul Khinvasara
Liam Gracey
Rahul Khinvasara