Watershed Rehabilitation Status · March 2015 Rehabilitation Status by Dam State Dam Name County Status AL Choccolocco Creek 11 Calhoun Completed AR Big Creek- …

Embed Size (px)

Citation preview

Page 1: Watershed Rehabilitation Status · March 2015 Rehabilitation Status by Dam State Dam Name County Status AL Choccolocco Creek 11 Calhoun Completed AR Big Creek- …

March 2015

Fiscal Year 2014 Funding

In 2014 Congress appropriated $12 million in discretionary and $250 million in mandatory funding through the 2014 Farm Bill for the Watershed Rehabilitation Program. This level of funding signifies the importance and critical role of watershed structures in flood management, water supply, erosion control, agricultural productivity, recreation and wildlife habitat. This funding supports and strengthens communities by rehabilitating aging infrastructure, jobs creation and commerce, and protecting homes and families.

In response to this funding level project sponsors from 35 states submitted funding requests for rehabilitation of 790 dams totaling more than $868.8 million. This level of funding requests demonstrates the urgent need for dam rehabilitation assistance throughout the country. As in past years, the funding requests far exceeded available funding. This funding may only be used for rehabilitation of aging dams constructed with assistance of the USDA Watershed Programs.

Funding provided in 2014 will result in 128 dams being rehabilitated in 26 states. Funds will be used for planning, design and construction. In addition, $10.3 million dollars were utilized to complete assessments of 491 dams. The dams were selected for funding based on recent assessments that evaluated the condition of the dams and the potential risks to life and property if dam failure occurred.

For Additional Information Kevin Farmer

National Watershed Rehabilitation Program Coordinator Natural Resources Conservation Service

Washington DC 2025 Email: [email protected]

Watershed Rehabilitation Status March 2015 Report

Page 2: Watershed Rehabilitation Status · March 2015 Rehabilitation Status by Dam State Dam Name County Status AL Choccolocco Creek 11 Calhoun Completed AR Big Creek- …

March 2015

Rehabilitation Summary by State

State

No. of

Dams

In Planning

*Plan Implem.

Dam Rehab.

Complete

No. of Dam Assessments

Funded in 2014

AL 1 1 14

AR 7 1 5 1 39

AZ 9 8 1 4

CO 3 3 9

CT 1 1 24

GA 10 3 7 61

IA 4 4

ID 1

IN 1 1 17

KS 8 5 1 2

KY 4 3 1

LA 5

MA 6 1 4 1 15

MD 5

ME 3

MN 12

MO 2 2

MS 21 1 3 17 18

ND 1 1 9

NE 14 1 4 9 59

NH 1 1 18

NJ 3

NM 8 2 3 3

NV 1 1

NY 7 6 1 7

OH 9 1 8 2

OK 52 3 15 34 22

OR 2 2 2

PA 9 5 3 1 10

SC 2

TN 4 1 1 2 46

TX 33 10 9 14 12

UT 19 18 1 9

VA 16 6 1 9

VT 4

WI 11 11

WV 7 5 1 1 59

WY 1 1

Totals 272 81 61 130 491

States 30 24 16 21 29

Page 3: Watershed Rehabilitation Status · March 2015 Rehabilitation Status by Dam State Dam Name County Status AL Choccolocco Creek 11 Calhoun Completed AR Big Creek- …

March 2015

Rehabilitation Status by Dam

State Dam Name County Status

AL Choccolocco Creek 11 Calhoun Completed

AR Big Creek- Craighead 6 Craighead Implem.

AR Muddy Fork Illinois River *1 Washington Planning

AR Muddy Fork Illinois River 3; 4 Washington Implem.

AR Poteau River 5 Scott Completed

AR Poteau River 8 Scott Implem.

AR West Fork Point Remove Ck.7 Conway Implem.

AZ Apache Junction - *Powerline Pinal Implem.

AZ Buckeye *1 Maricopa Implem.

AZ Florence *1 Pinal Implem.

AZ Fredonia *1 Coconino Implem.

AZ Magma *1 Pinal Implem .

AZ White Tanks 3 Maricopa Completed

AZ White Tanks *4 Maricopa Implem.

AZ Williams/Chandler -*Vineyard Rd. Pinal Implem.

AZ Williams/Chandler -*Rittenhouse Pinal Implem.

CO Boxelder Creek *B2; *B3 Larimer Planning

CO Franktown Parker *B1 Douglas Planning

CT Norwalk *2 –CT21 Fairfield Planning

GA Little River *25 Fulton Planning

GA Little Sandy and Trail Creek 1 Madison Completed

GA Marbury Creek 22 Barrow Completed

GA Palemetto Creek *1 Harris Planning

GA Sallacoa Creek *77 Gordron Planning

GA Sandy Creek 15 Jackson Completed

GA South River 4 Madison Completed

GA Yellow River 14; 15; 17 Gwinnett Completed

IA Glen Ellen 2-2; 3-1; 3-2 Woodbury Completed

IA Indian Creek 2 Pottawattomie Completed

IN Middle Fork 1 Perry Completed

KS Little Walnut Hickory *19 Butler Planning

KS Muddy Creek *4_6 Butler Planning

KS N. Sector Upper Walnut *6; *21 Butler Planning

KS Rock Creek *2 Butler Planning

KS Spring Creek (Reno) R1 Sedgwick Implem.

KS Switzler Creek 7 Osage Completed

KS Wakarusa Lower 24 Douglas Completed

KY East Fork Clarks River *32 Marshall Planning

KY Plum Creek 18 Spencer Completed

KY Red Lick Creek 1: *12 Madison Planning

MA Su-As-Co *303; *304; *310; *311 Worchester Implem.

MA Su-As-Co *309 Middlesex Planning

MA Su-As-Co Nichols Dam 301 Worchester Completed

MS Big Sandy Creek *Y-32-9A Carrrol Planning

MS Black Creek 21 Holmes Completed

MS Chicopa/Black 53 ; 54 ; 55 Holmes Completed

MS Chiwapa 3 ; 29 Pontotoc Completed

MS Chiwapa *65 Pontotoc Implem.

MS Hubbard-Murphree 72; 73; 74 Tallahatchie Completed

MS Persimmon 2; 3; 5; 7; 30 Calhoun Completed

MS Richland Creek *2A; *3 Rankin Implem.

MS Second Creek 6A; 12 Adams Completed

MS Shammack Creek 2 Kemper Completed

MO Lost Creek B-2 Newton Completed

MO Williams Creek 2 Clay Completed

ND Tongue River M-4 Pembina Implem.

NE Indian Creek *15-A Gage Implem.

NE Mud Creek 2-A Gage Implem.

NE Oak-Mid. Ck.Trib.-Salt Ck.* 82B Seward Planning

NE Papillion Ck. S-27; S-31; S-32 Sarpy Completed

NE Papillion Creek W-3 Washington Completed

NE Turtle Creek 2 Sarpy Completed

NE Upper Big Nemaha *25-C Gage Implem.

NE Upper Salt *3-A Gage Implem.

NE Upper Salt 10-A; 35-A; 19-B Lancaster Completed

NE Wilson Creek 8-H Otoe Completed

NH So Br Baker Dam *8 Grafton Planning

NM Hackberry Draw 1 Eddy Completed

State Dam Name County Status

NM Hackberry Draw *2 Eddy Implem.

NM Hatch Valley Arroyos 6 Dona Ana Implem.

NM Sandia Mt Tribs. 1 Sandoval Completed

NM Santa Cruz River *1 Rio Arriba Planning

NM Santa Cruz River 3A Rio Arriba Completed

NM U. Gila Valley Arroyos 6 Grant Implem.

NV Peavine Mountain W. Wash *78 Washoe Planning

NY Conewango Creek *13 Cattaraugus Planning

NY Ischua Creek *2 Cattaraugus Planning

NY L. Choconut *2A; *2B; 2C; 2E Broome Planning

NY Little Choconut 2 Broome Implem.

OH Chippewa 3-A; 8-D Medina Completed

OH Margaret Creek 2 Athens Completed

OH Rush Creek 7-C Fairfield Completed

OH Upper Hocking 8-D; R23 Fairfield Completed

OH Upper Hocking *9 Fairfield Planning

OH W. Fork Duck Creek 6; 7 Noble Completed

OK Barnitz Creek *5; *11 Dewey Implem.

OK Barnitz Creek 1; 14 Dewey Completed

OK Big Wewoka Creek 29 Seminole Completed

OK Caney-Coon Creek 2 Coal Completed

OK Cavalry Creek 6 Washita Completed

OK Cobb Creek 1 Caddo Completed

OK Cobb Creek 2 Washita Completed

OK Cottonwood Creek 15 Kingfisher Completed

OK Cottonwood Creek 16 Canadian Implem.

OK Cottonwood Creek 17 Canadian Completed

OK Cottonwood Creek *54 Logan Implem.

OK Double Creek 1; 2; 3; 4; 5; 6 Washington Completed

OK Fourche Maline Creek *7M Latimer Implem.

OK Fort Cobb Laterals 10 Caddo Completed

OK Mill Creek 18 Johnston Completed

OK Quapaw Creek *15 Lincoln Implem.

OK Rock Creek *2 Latimer Planning

OK Rock Creek *15; *16 Murray Implem.

OK Sallisaw Ck.15;16; 18M; 20; 26 Adair Completed

OK Sallisaw Ck. 28; 29M; 32;*33; 34 Sequoyah Implem.

OK Sallisaw Creek 30 Adair Implem.

OK Sandstone Creek 12; 16A; 17A Roger Mills Completed

OK Sergeant Major Creek 1; 2 Roger Mills Completed

OK Sugar Creek L-43; L-44 Caddo Completed

OK Turkey Creek 9 Washita Completed

OK Upper Black Bear Creek *62 Noble Implem.

OK U. Clear Boggy Ck. 33; 34; 35; 36 Pontotoc Completed

OK Upper Clear Boggy Creek *26 Pontotoc Planning

OK Upper Elk Creek 23D Beckham Planning

OR Copper Creek *OR-R496 Douglas Planning

OR Plat 1 *OR-R475 Douglas Planning

PA Brandywine Creek *433, *436F Chester Implem.

PA Conneatvile *112 Crawford Implem.

PA Greene-Drehir- *Kintzk Ck. Pike Planning

PA Marsh Creek *PA-602 Tioga Planning

PA Mill Creek *PA-454 Tioga Planning

PA Mill Run *PA-460 Crawford Planning

PA Neshaminy *PA-620 Crawford Planning

PA North Fork Cowanesque 406 Potter Completed

TN Marys and Dand Creek 7; 8 Shelby Completed

TN Marys and Dand Creek *9 Shelby Implem.

TN Pine Creek *4 Scott Planning

TX Calaveras Creek 6 Bexar Completed

TX Calaveras Creek *10 Bexar Implem.

TX Cedar Creek Trinity River *87A Kaufman Planning

TX Chambers Creek Trinity River *11 Ellis Planning

TX East Fork Above Lavon 1A ; 2B; 3C; 3D; 3E; 5A; 17 Collin Completed

TX E. Fork Above Lavon *2A; *4 Collin Implem.

TX Lower Brushy Creek *20 Williamson Planning

Page 4: Watershed Rehabilitation Status · March 2015 Rehabilitation Status by Dam State Dam Name County Status AL Choccolocco Creek 11 Calhoun Completed AR Big Creek- …

March 2015

State Dam Name County Status

TX Lower Plum Creek 28 Caldwell Planning

TX Lower Running Water Draw *4 Hale Planning

TX Martinez Creek 4; 5; 6A Bexar Completed

TX Martinez Creek *1; *2; *3 Bexar Implem.

TX Mountain Creek *10 Ellis Implem.

TX Nolan Creek 15 Bell Completed

TX Olmitos & Garcias Creeks *7 Starr Implem.

TX Plum Creek 5 Hays Completed

TX Plum Creek *6 Hays Implem.

TX Plum Creek *10; *12 Hays Planning

TX Plum Creek *21 Caldwell Planning

TX Upper Brushy Creek 13A Williamson Completed

TX Upper Brushy Creek *32 Williamson Planning

TX Williams Creek *3 Gillespie Planning

UT American Fork –Dry CK.-*Tribble Utah Planning

UT American Fork – Dry CK. -*Silver Utah Implem.

UT American Fork – Battle Creek Utah Planning

UT American Fork-Dr CK. - Dry Utah Planning

UT Ferron Creek - *Millsite Ferron Planning

UT Glenwood-Mill -*Glenwood Sevier Planning

UT Santaquin Creek - *Santaquin Utah Planning

UT *Sandy Hollow Sevier Planning

UT Warner Draw *Frog Hollow Washington Planning

UT Warner Draw -*Stucki Washington Planning

UT Warner Draw- *Warner Draw Washington Planning

UT American Fork – Grove Creek Utah Planning

State Dam Name County Status

UT Warner Draw -Ivins 1;2;3;4;5;6 Washington Planning

UT Warner Draw Gypsum Wash Washington Planning

VA Cherrystone Creek *1; *2A Pittsylvania Planning

VA Johns Creek *1 Craig Planning

VA Marrowbone Creek 1 Henry Completed

VA Mountain Run *11 Culpepper Planning

VA Mountain Run *50 Culpepper Planning

VA Pohick Creek 2; 3; 4;8 Fairfax Completed

VA South River 10A; 23; 25; 26 Augusta Completed

VA Upper North River *10 Augusta Implem.

VA Upper North River *77 Augusta Planning

WV New Creek 14 Grant Completed

WV New Creek *17 Mineral Planning

WV Upper Deckers Creek *1 Preston Implem.

WV Wheeling Creek 25 Marshall Planning

WV Brush Creek* 9; 14; *15 Mercer Planning

WI Alma Mill 2; 3; 5 Buffalo Completed

WI Bad Axe 24 Vernon Completed

WI Glen Hills 2 St. Croix Completed

WI Mill Creek 10 Richland Completed

WI Otter Creek 9 Iowa Completed

WI Plain Honey Creek 3 Sauk Completed

WI Plum Creek 19 Pierce Completed

WI Twin Parks 10 Iowa Completed

WI W. Fork Kickapoo - Klinkner 1 Vernon Completed

WY Dull Knife *1 Johnson Planning

* Funded with CCC funds authorized in the 2014 Farm Bill There are multiple dams in some lines. These dams are in the same watershed, same county and have the same status: Example: Brush Creek 9; 14; 15.