2014 / 2015 STATUS REPORT
IRRIGATION REHABILITATION PROGRAM
Agriculture
and Forestry
IRRIGATION REHABILITATION PROGRAM
2014/2015
STATUS REPORT
Prepared by
Lethbridge, Alberta May 2016
Irrigation Secretariat
2
ACKNOWLEDGEMENTS
Gerald Ontkean of Alberta Agriculture and Forestry’s Basin Water Management Section provided much
of the information contained in this report as part of Mr. Ontkean’s monitoring of the construction
activities of the irrigation districts.
LIST of ACRONYMS
IRP – Irrigation Rehabilitation Program
ICW – Irrigation Capital Works
MW – Major Works
PS – Planning Studies
14/15 – Construction Period August 1, 2014 to July 31, 2015
3
ABSTRACT
This annual Irrigation Rehabilitation Program (IRP) Status Report summarizes the expenditures and status of all
IRP projects that were active during the construction period August 1, 2014 to July 31, 2015.
The IRP began in 1969 and is a cost shared program between Alberta Agriculture and Forestry and Alberta’s 13
irrigation districts. The IRP funding is provided to the districts according to an inter-district allocation formula.
Since 1969 funding levels have varied between $600,000 and $33,400,000 per year. The 2014 funding
allocations are shown in Table 1.
The provincial/irrigation district cost share ratio has varied since 1969, starting at 86% province - 14 % irrigation
district, changing to 80% - 20% in 1994/95 and to 75% - 25% in 1995/96 and remains at that ratio today.
Irrigation Rehabilitation Financing Agreements are prepared annually between the Minister and each irrigation
district. Projects must be approved by Irrigation Council prior to any project costs being paid for with cost shared
funds, and all eligible project expenditures must be documented by Progress Certificates.
Circumstances may arise that require an irrigation district to change project priorities from time to time. As well,
actual costs may differ from estimated costs because of various circumstances, i.e. poor working conditions due to
weather, construction cost inflation, etc.
Information contained in this report was gathered from random monitoring (field visits) of project construction
sites, records from the Basin Water Management Section and the Irrigation Secretariat and information from
irrigation district personnel.
4
During this reporting period the AID expended $13,367 of IRP cost shared funds on two projects in the ICW
category. Expenditures involved fencing of a previously completed project and engineering and design work.
AID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
1745 ICW Aetna Main Canal –
Phase 1 1998 11 2014 08 1% 100%
2296 ICW Lateral C15 Extension –
Phase 1 Engineering and Design
2015 02 N/A 12 12
AETNA IRRIGATION DISTRICT (AID)
5
During this reporting period the BRID expended $3,534,556 of IRP cost shared funds on eight projects in the
ICW and PS categories. Expenditures involved installation of pipeline, instrumentation, cleanup of previously
completed IRP projects, and engineering for upcoming projects.
BRID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2227 PS *Irrigation Demand
Model (IDM) 2011 02 N/A 30 65
2235 ICW Laterals
C-8/C-8-3 (Hays Block)
2012 02 N/A 1 100
2236 ICW Lateral M1 (Hays
Block) 2014 01 2014 10 96 100 6,571
2259 ICW Lateral C (West Block) 2013 02 N/A 5 100
2264 ICW Lateral D-4 (West
Block) 2014 01 2014 10 100 100 6,720
2281 ICW Structure Automation & Flow Measurement
(2013) 2014 01 2014 07 100 100 9 sites instrumented
2297 ICW Lateral C-7 (Hays
Block) 2015 02 N/A 5 5
2299 ICW
Lateral H-6-3, K-11-A, K-11-C,K-11-D,
K-11-E (Vauxhall Block)
2015 02 N/A 5 5
13,291
NOTE: * indicates Special Funding provided towards this project. The funding was allocated to BRID in 2011/12
BOW RIVER IRRIGATION DISTRICT (BRID)
6
EASTERN IRRIGATION DISTRICT (EID)
During this reporting period the EID expended $12,012,157 of IRP cost shared funds on six projects in the ICW
and PS categories. Expenditures involved cleanup of previously completed IRP projects, collection of samples
for water quality analysis, installation of pipeline and engineering for upcoming projects. EID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2226
PS *Irrigation Water Quality Assessment
2011 02 2012 06 20 80 90 sites sampled
2274 ICW AH North Bantry
2013 02 N/A 2 100
2292 ICW J West Bantry 2014 01 2014 12 92 100 16,879
2293 ICW 21 North Branch 2014 01 2015 01 100 100 5,618
2294 ICW 25 North Branch 2014 01 2014 12 99 100 4,079
2314 ICW 01 Bow Slope 2015 02 N/A 1 1
26,576
NOTE: * indicates Special Funding provided towards this project
7
LEAVITT IRRIGATION DISTRICT (LID)
No funds were expended by the LID during this reporting period.
8
LETHBRIDGE NORTHERN IRRIGATION DISTRICT (LNID)
During this reporting period the LNID expended $7,979,764 of cost shared funds on one project in the ICW
category. Expenditures were associated with the installation of pipeline.
LNID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2202 ICW Laterals H3/H8 2011 02 2014 05 42 83 16,283
9
MAGRATH IRRIGATION DISTRICT (MID)
During this reporting period the MID expended $15,130 of cost shared funds on one project in the ICW category.
Expenditures were associated with the installation of plastic drain tile.
MID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2104 ICW High Line Seepage Control (Phase 2)
2010 02 2014 11 12 62 600 m tile drain installed
10
MOUNTAIN VIEW IRRIGATION DISTRICT (MVID)
During this reporting period the MVID expended $270,700 of cost shared funds on one project in the ICW
category. Expenditures were associated with the installation of pipeline.
MVID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2295 ICW Highway 800 Pipeline
(continuation) 2014 01 2014 10 100 100 1,982
11
RAYMOND IRRIGATION DISTRICT (RID)
During this reporting period the RID expended $256,493 of IRP cost shared funds on three projects in the ICW
category. Expenditures included cleanup of previously completed IRP projects, the installation of pipeline and
preliminary work on an upcoming project. RID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2262 ICW Welling lateral #5
phase 2 2013 02 N/A 1 100
2280 ICW Welling Lateral #5
Phase 3 2014 01 2014 12 39 100 2,198
2307 ICW Welling lateral #5 -
phase 4 2015 02 N/A 1 1
12
ROSS CREEK IRRIGATION DISTRICT (RCID)
No funds were expended by the RCID during this reporting period.
13
ST. MARY RIVER IRRIGATION DISTRICT (SMRID)
During this reporting period the SMRID expended $4,886,896 of IRP cost shared funds on sixteen projects in the
ICW and PS categories. Expenditures included cleanup of previously completed IRP projects, installation of
pipelines, gabion walls and screen cleaners and preliminary work on new projects.
SMRID IRP Project Construction Summary August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
1799 ICW Bow Island Lateral 26
Concrete 1998 06 2014 10 11 84 3907
2117 ICW West Medicine Hat Lateral 16
2010 03 N/A 2 100
2168 ICW West Medicine Hat Lateral 2 (upstream)
2009 02 2014 11 2 100
2176 ICW Yellow Lake Lateral 13 2010 02 N/A <1 100
2198 ICW South Grassy Main 2010 02 N/A 1 1
2212 ICW Cameron Lateral 2011 02 N/A <1 24
2250 PS Water Storage Opportunities - Study
2012 02 N/A 14 100
2251 ICW Yellow Lake Lateral 11 2012 02 N/A <1 100
2253 ICW Coaldale Lateral 2015 02 2015 03 29 29 1,092
2269 ICW Aquatic Weed and Algae Control
Structures 2014
2013 02 N/A 1 100
2270 ICW West Medicine Hat Lateral 13A and 13D
2013 02 N/A 3 100
2271 ICW Chin Lateral 10 Canal Armouring and structure
replacement
2013 02 N/A 4 27
2273 PS NE reservoir dam safety review
2013 02 N/A 3 22
2288 ICW Bow Island Lateral 7 Pipeline
2014 01 2014 10 100 100 2,221
2289 ICW Aquatic Weed and Algae Control
Structures 2015
2014 01 N/A 90 100 5 sites installed
2290 PS Dam Safety Review for Stafford, Grassy Lake,
and Lateral 10 Reservoirs
2014 01 N/A 78 78
7,220
14
TABER IRRIGATION DISTRICT (TID)
During this reporting period the TID expended $1,283,163 of IRP cost shared funds on eleven projects in the ICW
category. Expenditures involved cleanup of previously completed IRP projects, installation of canal liner, plastic
drain tile, gabion walls and screen cleaners and preliminary work on upcoming projects. TID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
1988 ICW Big Bend Main Canal 2004 02 2014 11 66 100 590
2239 ICW Lateral E-3 Big Bend Pipeline
2012 03 N/A <1 100%
2266 ICW North Fincastle East Canal d/s Reach
2013 02 N/A <1 100
2267 ICW Lateral 3 East Horsefly
2013 02 2014 10 25 100 1700 m plastic drain tile
2268 ICW Lateral G Big Bend SW 3-11-16-W4
2013 09 N/A <1 100
2282 ICW Long Term Infrastructure Plan
2014 01 2014 05 100 100
2283 ICW Aquatic Weed & Algae Control
Structures (2015)
2014 01 2015 02 100 100 7 gabion walls and 2 automated mechanical screen cleaners
2285 ICW Overshot Control Gate Taber Main
Canal at Lateral 11
2014 01 N/A 62 62
2286 ICW Overshot Control Gate East Horsefly
Main Canal at Lateral 10
2014 01 N/A 73 73
2303 ICW Lateral 18 Taber 2014 10 N/A 0 0
2313 ICW Aquatic Weed and Algae Control
Structures (2016)
2015 02 N/A 0 0
15
UNITED IRRIGATION DISTRICT (UID)
During this reporting period the UID expended $563,606 of IRP cost shared funds on four projects in the ICW
category. Expenditures involved cleanup of previously completed IRP projects and the installation of pipeline.
UID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2158 ICW Lateral D3 & D3a 2009 02 N/A <1 100
2160 ICW Lateral B9 2009 02 2014 10 100 100 1,053
2162 ICW Lateral D4 2009 02 N/A <1 100
2263 ICW Lateral E 2013 02 2015 03 100 100 3,347
4,400
16
WESTERN IRRIGATION DISTRICT (WID)
During this reporting period the WID expended $2,455,218 of IRP cost shared funds on five projects in the ICW
category. Expenditures involved cleanup of previously completed IRP projects, installation of pipeline and
preliminary work on upcoming projects.
WID IRP Project Construction Summary
August 1, 2014 to July 31, 2015
Date Rehabilitation Completed
IRP #
ICW /MW /PS
Project Name
Project Approved
Construction Start
% Completed
in 14/15
% Completed
to July 31/15
Liners (metres)
Pipe (metres)
Earth (metres)
2108 ICW Sublateral
74T4 & 84T4A (Cemetery Hill)
2014 01 2014 09 100 100 3,138
2246 ICW Secondary A Canal
Rg Rd. 231 to S. Cluny
2013 02 N/A 3 100
2278 ICW A Canal
Sublateral 81F11 2014 01 2014 10 100 100 4,203
2279 ICW North Cluny Lateral 83H6
2014 01 2015 01 87 94 4,036
2304 ICW Standard Lateral
85N7, 85N8, 85N9 2015 04 N/A 3 3
11,377
17
TABLES
18
TABLES
The following tables summarize the results of each district’s activities for 2014/2015:
Table 1: Irrigation Rehabilitation Program – Funding o Lists the IRP grant funding received by each district and the district’s contribution.
Table 2: Irrigation Rehabilitation Program – Project Construction o Lists the IRP projects having substantial construction in each district with
statistical data for each project.
Table 3: Irrigation Rehabilitation Program – Summary of Funding and Expenditures o Lists each district’s Major Works (MW), Irrigation Capital Works (ICW) and
Planning Study (PS) expenditures, total funding allocation, and total expenditures.
The expenditures are calculated from each district’s progress certificates submitted
for the construction period.
Table 4: Irrigation Rehabilitation Program – Summary of Existing Rehabilitated Lengths o Lists the length of the irrigation districts current distribution systems, rehabilitated
lengths in each district to July 31, 2014, the length of rehabilitation within the
2014/2015 construction period, and the total length rehabilitated to July 31, 2015.
Table 5: Irrigation Rehabilitation Program – Summary of Lengths and Type of
Rehabilitation o Historical summary of total length and type of rehabilitation completed from 1969
to July 31, 2015.
19
Table 1. Irrigation Rehabilitation Program Funding - 2014 The following table lists IRP grants received by each district and each district’s contribution.
Irrigation District
Base Funding
Provincial Grant
Special Funding
Base Funding District
contribution
Total Program
Aetna $72,711 $0 $24,237 $96,948
Bow River $3,185,862 $0 $1,061,954 $4,247,816
Eastern $5,090,220 $265,000 $1,696,740 $7,051,960
Leavitt $84,518 $0 $28,173 $112,691
Lethbridge Northern $2,299,009 $0 $766,336 $3,065,345
Magrath $238,465 $0 $79,488 $317,953
Mountain View $78,843 $0 $26,281 $105,124
Raymond $567,546 $0 $189,182 $756,728
Ross Creek $18,248 $0 $6,083 $24,331
St Mary River $5,480,096 $0 $1,826,699 $7,306,795
Taber $1,127,534 $0 $375,845 $1,503,379
United $536,307 $0 $178,769 $715,076
Western $1,955,641 $0 $651,880 $2,607,521
TOTAL $20,735,000 $265,000 $6,911,667 $27,911,667
Note: Base Funding Grants are cost shared 75% Province/25% Irrigation District
Base Funding Grants are based on the Inter-District Allocation Formula as follows:
- 50% of the funds allocated on the basis of the number of irrigation acres in each district
- 50% of the funds allocated on the basis of the infrastructure replacement cost of specified infrastructure
in each district
$265,000 Special Funding Grant to EID in support of Irrigation Water Quality Assessment
20
19
t
Table 2. Irrigation Rehabilitation Program Project Construction - August 1, 2014 to July 31, 2015
Date
Rehabilitation Completed
District Project #
ICW /MW /PS
Project Name Project Approval
Construction Start
% Completed In 14/15
% Complete To July 31/15
Liners Pipe Earth
(Length in metres)
BRID 2236 ICW Lateral M1 (Hays Block) 2014 01 2014 10 100 100 6,571 553
BRID 2264 ICW Lateral D-4 (West Block) 2014 01 2014 10 100 100 6,720
EID 2292 ICW J West Bantry 2014 01 2014 12 92 100 16,879
EID 2293 ICW 21 North Branch 2014 01 2015 01 99 100 5,618
EID 2294 ICW 25 North Branch 2014 01 2014 12 99 100 4,079
LNID 2202 ICW Laterals H3/H8 2011 02 2014 08 42 83 16,283
MID 2104 ICW High Line Canal Seepage Control 2010 02 2014 11 12 62 600 m drain tile
MVID 2295 ICW Highway 800 Pipeline (continuation) 2014 01 2014 11 100 100 1,982
RID 2280 ICW Welling Lateral #5 Phase 3 2014 01 2014 12 39 100 2,198
SMRID 1799 ICW Bow Island Lateral 26 Concrete 1998 06 2014 10 11 84 3,907
SMRID 2168 ICW West Medicine Hat Lateral 2 (upstream) 2009 02 2014 11 2 100 2 drain crossings
SMRID 2253 ICW Coaldale Lateral 2012 04 2015 03 29 29 1,092
SMRID 2288 ICW Bow Island Lateral 7 Pipeline 2014 01 2014 10 100 100 2,221
SMRID 2289 ICW
Aquatic Weed and Algal Control Structures 2015
2014 01 2014 10 90 98
5 Sites installed
TID 1988 ICW Big Bend Main Canal 2004 02 2014 11 66 100 590
UID 2160 ICW Lateral B9 2009 02 2014 10 100 100 1,053
UID 2263 ICW Lateral E 2013 02 2015 03 100 100 3,347
WID 2108 ICW Sublateral 74T4 & 84T4A (Cemetery Hill) 2014 01 2014 09 100 100 3,138
WID 2278 ICW A Canal Sublateral 81F11 2014 01 2014 10 100 100 4,203
WID 2279 ICW North Cluny Lateral 83H6 2014 01 2015 01 87 94 4,036
590 83,327 553
TOT
AL: 84,470 metres
21
Table 3. Irrigation Rehabilitation Program Summary of Funding and Expenditures -
August 1, 2014 to July 31, 2015
District
2014 Total
Funding Gov't & district
2014/15 MW
Expenditures
2014/15 ICW + PS
Expenditures
2014/15 Total
Expenditures
AID $96,948 $0 $13,367 $13,367
BRID $4,247,816 $0 $3,534,556 $3,534,556
EID $7,051,960 $0 $12,012,157 $12,012,157
LID $112,691 $0 $0 $0
LNID $3,065,345 $0 $7,979,764 $7,979,764
MID $317,953 $0 $15,130 $15,130
MVID $105,124 $0 $270,700 $270,700
RID $756,728 $0 $256,493 $256,493
RCID $24,331 $0 $0 $0
SMRID $7,306,795 $0 $4,886,896 $4,886,896
TID $1,503,379 $0 $1,283,163 $1,283,163
UID $715,076 $0 $563,606 $563,606
WID $2,607,521 $0 $2,455,218 $2,455,218
Total $27,911,667 $0 $33,271,050 $33,271,050
NOTE: (1) The total expenditures do not equal the total program funding as construction may occur
in a different year (or years) than the year the funds were allocated.
(2) Special Funding is included (if any) in total funding.
(3) Some districts accrue funds to construct a larger project in the future.
(4) Expenditures are categorized as either:
MW (Major Works) - includes storage reservoirs and dams or conveyance works and seepage control where the design capacity is 6 m3/s or greater,
ICW (Irrigation Capital Works) - all other irrigation district infrastructure, or PS (Planning Studies) - studies and digital or photographic imagery used in an irrigation district's overall rehabilitation planning.
22
Table 4. Irrigation Rehabilitation Program Summary of Rehabilitated Lengths
to July 31, 2015
District
Total District Systems
(Km)
Total Systems Rehabilitated
To July 31, 2014 (Km)
2014/2015 Rehabilitation
(Km)
Total To July 31, 2015
(Km)
% Of Total District System
Rehabilitation
AID 37.89 22.99 0.00 22.99 61
BRID 999.30 811.00 13.29 824.29 82
EID 1,911.71 798.54 26.58 825.12 43
LID 54.75 41.34 0.00 41.34 76
LNID 751.17 559.42 16.28 575.7 77
MID 100.81 90.67 0.00 90.67 90
MVID 39.67 33.83 1.98 35.81 90
RID 236.39 215.94 2.20 218.14 92
RCID 12.18 12.18 0.00 12.18 100
SMRID 1,804.64 1,250.95 7.22 1,258.17 70
TID 342.74 324.76 0.00 324.76 95
UID 233.08 160.61 4.40 165.01 71
WID 1,060.22 339.69 11.38 351.07 33
Total 7,584.55 4,661.92 83.33
4,745.25 62
NOTES:
(1) Lengths in AID, BRID, EID, LNID, SMRID, UID, & WID exclude Main Canals that were rehabilitated under Alberta Environment's Water Management Systems Improvement Program.
(2) Total Systems Rehabilitated for EID does not include Bank Rebuilding Projects constructed from 1977 to 1982.
(3) Total Systems Rehabilitated for WID does not include "Tree Removal" Projects.
(4) Totals do not include drainage works.
(5) Totals do not include works rehabilitated by a district using its own funds.
(6) Total length differs from Table 4 (Totals) due to recurrent rehabilitation.
(7) Total Systems Rehabilitated under the IRP to July 31, 2014, and Total District Systems are based on the Basin Water Management Branch current 2015 IIMS database.
23
Table 5. Irrigation Rehabilitation Program Summary of Length and Type of Rehabilitation
1969 to July 31, 2015
CONCRETE LINING (km)
MEMBRANE LINERS (km)
PIPELINES (km)
EARTH CANALS (km)
TOTALS (km)
OPEN DRAINS (km)
69/80 219.14 36.07 83.41 211.30 549.92 205.85
80/81 20.04 19.50 24.18 73.19 136.91 41.16
81/82 13.12 18.50 30.27 45.78 107.67 72.89
82/83 15.52 29.13 97.63 103.98 246.26 36.02
83/84 7.01 56.63 56.48 106.52 226.64 16.33
84/85 7.05 48.92 53.09 87.02 196.08 26.68
85/86 7.71 28.08 94.39 94.93 225.11 7.05
86/87 4.58 32.44 85.61 75.00 197.63 15.58
87/88 2.79 37.80 49.75 55.45 145.79 12.83
88/89 0.04 43.16 60.68 47.27 151.15 47.08
89/90 0.00 18.96 54.27 49.03 122.26 3.12
90/91 0.00 34.09 64.54 51.49 150.12 4.21
91/92 0.00 15.86 95.59 43.30 154.75 3.18
92/93 0.00 11.20 76.44 28.33 115.97 7.64
93/94 0.00 26.32 78.22 75.29 179.83 8.58
94/95 0.00 23.31 69.97 15.31 108.59 8.44
95/96 0.00 18.63 92.62 23.28 134.53 8.58
96/97 0.00 11.85 138.74 26.24 176.83 0.00
97/98 0.00 23.71 88.52 16.87 129.10 0.29
98/99 0.00 21.68 86.53 16.57 124.78 0.00
99/00 0.00 11.00 116.57 24.76 152.33 4.59
00/01 0.00 11.65 91.22 9.15 112.02 0.15
01/02 0.00 1.37 96.40 14.55 112.32 0.00
02/03 0.00 4.20 129.31 18.56 152.07 1.70
03/04 0.00 6.37 157.23 8.72 172.32 2.45
04/05 0.00 15.74 97.62 12.94 126.30 1.42
05/06 0.00 1.24 117.86 16.02 135.12 1.42
06/07 0.00 0.70 123.11 13.25 137.06 0.00
07/08 0.00 2.91 73.89 7.17 83.97 0.00
08/09 0.00 2.85 89.20 23.06 115.11 0.50
09/10 0.00 3.32 137.48 18.87 159.67 0.00
10/11 0.00 13.21 99.63 10.51 123.35 0.00
11/12 0.00 0.58 87.31 17.36 105.25 1.80
12/13 0.00 3.10 62.18 6.24 71.52 0.00
13/14 0.00 6.79 54.33 15.03 76.15 0.00
14/15 0.00 0.59 83.33 0.00 83.92 0.55
Total 297.00 641.46 3,097.60 1,462.34 5,498.40 540.09
% of Total 5.4 11.6 56.3 26.6
NOTES: (1) Open drains designate earth drains used to channel irrigation spill water: lengths do not
include deep interceptors, toe drains, tile drains or tile grid systems. (2) Drains are not included in Total. (3) Total length differs from Table 5 due to recurrent rehabilitation.