  • Waterfront Substation

    July 8, 2015

  • I Pepco Holdinqs Inc

    Project Milestones

    2

  • I Pepco Holdings Inc

    Waterfront

    Substation

    Impacted

    / Streets

    ,~--r___,.,.

    ' " C . ' 1,., , -0 C N

    n

  • I Pepco Holdings Inc

    Site for Waterfront Substation

    Overhead view of property

    4

  • I Pepco Holdings Inc

    Waterfront Substation 1st and Q Streets SW

    5

  • I Pepco Holdings Inc

    Waterfront Substation 1st and R Streets SW

    6

  • I Pepco Holdinqs Inc

    Waterfront Substation Project Schedule

    Obtain Permits for Waterfront Site Preparation* April – August 2015

    Prepare Waterfront Site for Construction June – October 2015

    Award EPC Contract; Perform Detail Engineering July 2015 – July 2016

    Obtain Building Permit January 2016

    Construct Substation Building January 2016 – April 2017

    Install Electrical Equipment August 2016 – April 2017

    Initial Transfer of Electrical Load May – June 2017

    * Multiple permits are needed and duration may extend beyond date shown

    7

  • I Pepco Holdinqs Inc

    Permits Status

    8

  • I Pepco Holdinqs Inc

    5

    Permit Matrix Permit/Notice Agency Demolition Substation

    Construction

    Transmission

    Construction

    1 Notice of Construction DC PSC NA Received Received

    3 Underground Storage Tank

    Activity Notification

    DDOE Complete NA NA

    4 Leaking Underground Storage

    Tank Directive Letter

    DDOE Received,

    Pending Action

    NA NA

    Erosion and Sediment Control DDOE Pending Pending Pending

    Permit Application Application Application

    6 Storm Water Management Plan DDOE Pending Pending NA

    Application Application

    7 Asbestos Abatement Permit DDOE Complete NA NA

    8 Building Permit Supplemental Form – Environ. Questionnaire

    DDOE Pending

    Application

    Pending

    Application

    NA

    9 Lead Abatement Permit DDOE Complete NA NA

    10 Raze Application & Certification DCRA Application

    Submitted

    NA NA

    11 Building Permit Application DCRA NA Pending

    Application

    NA

    9

  • I Pepco Holdinqs Inc

    Permit Matrix Permit/Notice Agency Demolition Substation

    Construction

    Transmission

    Construction

    12 Environmental Intake Form DCRA NA Pending

    Application

    NA

    13 Environmental Impact

    Screening Form (EISF)

    DCRA NA Pending

    Application

    Pending

    Application

    14 DC Green Building Act

    Permit Application Intake Form

    DCRA NA Pending

    Application

    NA

    15 Zoning Approval BZA NA Complete NA

    16 Certificate of Occupancy DCRA NA Pending

    Application

    NA

    17 DC Well Construction Permit DCRA/

    DDOE

    Complete NA Complete

    18 Public Space / ROW Permit DDOT Pending

    Application

    Pending

    Application

    Pending

    Application

    19 Traffic Control Permit DDOT Pending

    Application

    Pending

    Application

    Pending

    Application

    20 Occupancy Permit DDOT NA NA Pending

    Application

    21 Steel Plate Permit DDOT NA NA Pending

    Application

    10

  • I Pepco Holdinqs Inc

    Demolition and Mitigation Measures

    11

  • I Pepco Holdings Inc

    Demolition Schedule

    Applied for Raze permits for the 3

    existing buildings.

    Raze process should take 6 weeks

    to complete- likely start in July 2015.

    Raze the buildings, place four inches

    of topsoil and seed the entire site.

    AECOM is environmental lead for

    HazMat Assessment and Abatement.

    McCormick & Taylor is the third-party

    environmental monitor for Demo and

    Construction.

    Contractor will monitor the

    surrounding roadways for tracked

    soil and will utilize street sweepers

    when needed.

    Site Controls: silt fencing, hay bales,

    gravel construction entrance,

    stormwater inlet protection and

    mister for dust control.

    12

  • I Pepco Holdings Inc

    Construction & Mitigation Measures

    Limit noise-sensitive

    construction activities during

    daytime as per DC Noise

    ordinance.

    Notify community in advance of

    any excessive noise activities

    Shut down idling construction

    equipment.

    Stabilized construction entrance

    on 2nd St., SW.

    No permanent street/lane

    closures anticipated during

    construction.

    Crews will utilize DDOT

    approved traffic control plans.

    13

    http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAcQjRw&url=http://classicstaruae.com/our-products/construction-equipment/&ei=CSCVVfCzEoav-AHi6oyQBg&bvm=bv.96952980,d.cWw&psig=AFQjCNGlicuCpKhwmm3ck2v1mXfIXj3Xig&ust=1435922651177236

  • Asbestos and Lead Removal

    Asbestos and lead abatement

    completed in June 2015 in

    accordance with DC Regulations.

    Abatement conducted under

    negative pressure conditions with

    sealed doors utilizing proper worker

    protection (HEPA filters).

    Monitored the air to ensure no

    workers were exposed and no

    particles become airborne off site.

    Submitted air monitoring report to

    DDOE to ensure compliance.

    Lead paint collected and disposed

    to an off site to licensed facility.

    Temporary EPA ID # was acquired

    to dispose of hazardous material.

    14

  • '?; vi 1-w w ty Iv, 0 z 0 V w (f/

    C: STRE~T S .V, .

    ' ' -·0 "'·' --·--·---+·-------- ---·~ ze-, . ----- ---------- --

    r ',, \j; i c: ___ __i :o,),:c::.F· 1

    i ' ···~ !

    t::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::J~SWf ____ J ~r,,,_ ~~~~~-·-.·

    0

    ·_--_·c--·.--.-·-·-·-·-J· ~:-;.-·"~.-::~:._:·"'. ;---·-··---- ·-··--··---·-··------·-··-·--···-·-··-·-----··-·------- V

    9 ;,

    I Pepco Holdings Inc

    I w w (: 1-01

    1-u:

    "' i.:

    Environmental Assessments Soil Sampling Locations

    Substation Site

    15

  • I Pepco Holdings Inc

    Waterfront Environmental Impact: Soil Sampling Results

    38 Substances Tested at 12 Locations (4 Foot Depth)

    34 Not Detected

    Benzene

    Ethylbenzene

    Toluene

    Diesel Range Organics

    PCBs - Non-aqueous

    Mercury

    Arsenic

    Cadmium

    Chromium

    4 Detected

    Selenium

    Silver

    1,4-Dichlorobenzene

    2,4-Dinitrotoluene

    Hexachlorobenzene

    Hexachlorobutadiene

    Hexachloroethane

    2-Methylphenol

    3- & 4- Methylphenol

    Nitrobenzene

    Pentachlorophenol

    Pyridine

    2,4,5-Trichlorophenol

    2,4,6-Trichlorophenol

    Benzene

    Carbon Tetrachloride

    Chlorobenzene

    Chloroform

    1,2-Dichloroethane

    1,1-Dichloroethene

    Methyl Ethyl Ketone

    Tetrachloroethene

    Trichloroethene

    Vinyl Chloride

    Organic Halides

    Xylenes Gasoline Range Barium Lead

    (504 mg/kg)** Organics (814 mg/kg)** (100 mg/l)** (5 mg/l)**

    0.018 mg/kg (1

    location) 2.40 mg/kg average 0.91 mg/l average 0.21 mg/l average

    (DC Action Level Standards in parenthesis)**

    16

  • I Pepco Holdings Inc

    Waterfront Environmental Impact: Soil Sampling Results

    38 Substances Tested at 12 Locations (8 Foot Depth)

    36 Not Detected

    Benzene Selenium 3- & 4- Methylphenol Chlorobenzene

    Ethylbenzene Silver Nitrobenzene Chloroform

    Toluene 1,4-Dichlorobenzene Pentachlorophenol 1,2-Dichloroethane

    Diesel Range Organics 2,4-Dinitrotoluene Pyridine 1,1-Dichloroethene

    PCBs - Non-aqueous Hexachlorobenzene 2,4,5-Trichlorophenol Methyl Ethyl Ketone

    Mercury Hexachlorobutadiene 2,4,6-Trichlorophenol Tetrachloroethene

    Arsenic Hexachloroethane Benzene Trichloroethene

    Cadmium 2-Methylphenol Carbon Tetrachloride Vinyl Chloride

    Chromium Xylenes

    Gasoline Range

    Organics Organic Halides

    2 Detected

    Barium Lead

    (100 mg/l)** (5 mg/l)**

    1.22 mg/kg average 0.24 mg/l (1 location)

    (DC Action Level Standards in parenthesis)**

    17

  • I Pepco Holdings Inc

    DDOE Directive Letter – Leaking Underground Storage Tank (LUST)

    Underground Storage Tanks were

    removed without going through

    proper Underground Storage Tank

    Closure process with DDOE.

    To remove the soil, requested

    Erosion and Sediment Control

    permits from DDOE.

    LUST case was opened by

    DDOE.

    Soil with petroleum residue is

    being removed and disposed of at

    an authorized facility by AECOM.

    18

  • I Pepco Holdinqs Inc

    Appendix

    19

    undefined: undefined_2: undefined_3: j 1 1 l: undefined_4: LOT 809 USQ H: r: Benzene: Selenium: Chlorobenzene: Ethylbenzene: Silver: Nitrobenzene: Chloroform: Toluene: Pyridine: Mercury: Arsenic: Benzene_2: Trichloroethene: Cadmium: Vinyl Chloride: 2MethylphenolChromium: Carbon TetrachlorideChromium: Organic Halides: Benzene_3: Selenium_2: Chlorobenzene_2: Ethylbenzene_2: Silver_2: Nitrobenzene_2: Chloroform_2: Toluene_2: Pyridine_2: Mercury_2: Arsenic_2: Benzene_4: Trichloroethene_2: Cadmium_2: 2Methylphenol: Vinyl Chloride_2: Chromium: Xylenes: Gasoline Range Organics: Organic Halides_2: