    27/03/2012 Forum #1 1

    HS2 Ltd. to feedback about

    meeting with EnvironmentAgency regarding flood plains.

    Closed

    an rup ave me w e

    Environment agency twice over the past couple

    of months. Both meetings have been productive

    with then Environment Agency explaining their

    work in the area and they are handing over all of

    their data on issues such as river levels and

    flooding.

    27/03/2012 Forum #1 2

    HS2 Ltd. to send information

    about eVoice

    Closed

    Information on eVoice can be found at: http://e-

    voice.org.uk/

    Have any of the forum members had experience

    with using e-voice? HS2 Ltd is currently

    considering whether to adopt e-voice and would

    like to have further feedback on how it could be

    used.

    The Stakeholder Engagement team is currently

    looking into viability of adopting this across all

    forums.

    This is not something we would use. It looks like

    a tool that community or voluntary organisations

    can use to build a quick web site using a set of

    templates and is aimed at groups that dont have

    any web resources. HS2 have a website where

    the forum information sits. However, theres no

    reason why forum members cant set up an

    eVoice site or indeed any other kind of website

    for their own use independent of HS2. Having

    looked at a few of the eVoice sites it appears

    that all the info is in the public domain which may

    not suit everyone.

    27/03/2012 Forum #1 3

    HS2 Ltd. to consider how to

    reach local groups i.e.

    presentations

    Open

    engaged and determine stage in design process

    when this may be appropriate.

    New Stakeholder Team embarking on

    engagement campaign to identify gaps in

    representation with a view to recruiting additional

    required members for forums

    27/03/2012 Forum #1 4

    HS2 Ltd. to send membership

    of station working group (to

    identify any overlap/gaps) Closed

    P ease see attac ment 1 w ic provi es a ist o

    the members of the Curzon Street station

    working group.

    27/03/2012 Forum #1 5

    BCC to look at list of venues.

    Suggestion to rotate venues.

    Agreement to have a venue

    nearer to Washwood Heathde ot at next meetin . Closed Taken forward

    27/03/2012 Forum #1 6

    HS2 Ltd. to send links to maps

    Closed

    p o a e maps can e oun a

    http://www.dft.gov.uk/publications/hs2-maps-

    20120110/

    27/03/2012 Forum #1 7HS2 Ltd. to clarify if EIA covers

    Phase 2 depot issues. Closed

    T e EIA wi consi er t e epot an provision o

    services for phase two of HS2.

    27/03/2012 Forum #1 8

    HS2 Ltd. to consider ways in

    which to link chairs and

    representatives

    Closed

    ne n epen en c a rperson ar n roo s

    has been appointed to chair the four Birmingham

    area forums. Records of each of the forum

    meetings will continue to be added to the HS2

    Ltd website.

    Washwood Heath to Curzon Street

    Issue Information available from HS2 LtdDate Arising Ref No.

  • 7/29/2019 Washwood Heath to Curzon Street Action Log - Round 5

    2/5

    27/03/2012 Forum #1 9

    HS2 Ltd./BCC to bring more

    information on the master plan

    of Curzon Street and

    Washwood Heath

    Open

    Current high level design of these areas can be

    found at

    http://assets.dft.gov.uk/publications/hs2-maps-

    20120110/hs2arp00drrw05304issue2.pdf

    (Washwood Heath)

    http://assets.dft.gov.uk/publications/hs2-maps-

    20120110/hs2arp00drrw05305issue2.pdf

    (Curzon Street)Can Birmingham City Council provide any further

    information about the current progress of master

    planning in these areas?

    27/03/2012 Forum #1 10

    HS2 Ltd. to circulate email with

    everyones contacts to prompt a

    discussion about chair. Forum

    to suggest chairs and if possible

    vote at next meeting.Closed

    HS2 Ltd has provided an independent chair for

    the meeting on 13 J une 2012. If the forum would

    like to discuss chair in the future, this can be

    accommodated for future meetings.

    27/03/2012 Forum #1 11

    HS2 Ltd. to look into contacts

    from near neighbours and

    other resident groups and

    circulate.

    Closed

    em ers rom o er orums cou a en

    neighbouring forums as guests and share

    information between the forums. All forums

    agendas and minutes can be seen on the DfT

    website:http://highspeedrail.dft.gov.uk/communityforumsli

    st

    Forum #1 12

    BCC to chase up attendance of

    councillors.

    Open

    Mel forwarded details of BCC Ward Committees.

    Briefings have been arranged to encourage

    elected member attendance at forums

    Forum #1 13

    BCC to look into their list of

    local groups and circulate.

    Open

    Mel forwarded some new contacts and will

    forward more when she receives them from

    colleagues. Stakeholder Team are contacting all

    to solicit interest and offer bilateral meetings

    13/06/2012 Forum #2 1

    HS2 Ltd to circulate the remit

    of the Curzon Street Station

    Working Group to forum

    attendees. Open

    This is being chased by the Stakeholder Team.

    The Curzon Street Station Working Group is a

    technical meeting, which meets to review

    progress on the development of Curzon Street

    Station and the associated High Speed 2 railway

    as this progress towards the Hybrid Bill

    submission.

    13/06/2012 Forum #2 2

    rmng am y ounc o

    send a list of local community

    groups and representatives for

    HS2 Ltd to make contact with

    and invite to future forum

    meetings. Open

    Mel forwarded some new contacts and will

    forward more when she receives them from

    colleagues. Stakeholder Team are contacting all

    to solicit interest and offer bilateral meetings

    13/06/2012 Forum #2 3

    o con ac a en ees

    from the last forum meeting on

    27 March 2012 and ask what

    would encourage them to attend

    in future. Closed Stakeholder Team have contacted

    13/06/2012 Forum #2 4

    o prov e more

    information about the three-

    stage design process which is

    currently underway. The forum

    members would like to know

    more about how the design

    work is progressing through this

    process. Open

    HS2 have completed a priliminary design that

    has been delivered to the Environmental Team

    to complete an Environmental Impact

    Assessment. Communities and other

    stakeholders can influence the design

    thooughout this process

    13/06/2012 Forum #2 5

    HS2 Ltd to work with

    Birmingham City Council on

    stakeholder identification in the

    local area in preparation for the

    property and compensation

    consultation, to ensure

    community members receive

    the consultation information. Closed

    Ongoing - consultation package to be

    announced after summer recess

    An update on the consultation arrangements will

    be given at the November forum as part of the

    presentation on the property compensation

    measures.

  • 7/29/2019 Washwood Heath to Curzon Street Action Log - Round 5

    3/5

    13/06/2012 Forum #2 6

    HS2 Ltd to update forum

    members on the potential

    locations for electrical

    substations, once this has been

    determined in the design. Open

    This information will be shared with forum

    members when more detailed designs are

    pproduced

    13/06/2012 Forum #2 7

    HS2 Ltd to provide a cross-

    section drawing of Curzon

    Street station showing theplatform layout and dimensions,

    at the next forum meeting. Closed

    This is being followed up.

    A drawing was circulated at the September

    forum meeting.

    13/06/2012 Forum #2 8

    o s are n orma on

    about the layout of Washwood

    Heath depot once further

    design work has been carried

    out. Open

    Design development is still underway. However

    we are looking to minimise the land take as

    much as possible.

    13/06/2012 Forum #2 9

    o a se w

    Birmingham City Council

    regarding the East Side Master

    Plan and proposed provisions

    for car parking. Open

    HS2 is liaising with BCC on East Side Master

    Plan

    13/06/2012 Forum #2 10

    o a se w

    Birmingham City Council

    regarding attendance at WardCommittee meetings. Closed

    Stakeholder Team are attending WardCommittee meetings

    24/09/2012 Forum #3 1

    HS2 Ltd to contact community

    forum members not present at

    the meeting to seek their

    approval of including names

    against attendees for inclusion

    within future meeting notes. Open Email sent with meeting papers.

    24/09/2012 Forum #3 2

    HS2 Ltd to seek to preserve two

    types of access to and from the

    proposed Curzon Street

    Station: (a) access to the

    station, including a southern

    access point in addition to thenorthern access, and (b) access

    across the station between

    Digbeth and Millennium Point Open

    The design options are progressing and the

    station architects are currently consideringwhether a southern access point could be

    incorporated along with access across the

    station.

    24/09/2012 Forum #3 3

    o prov e a

    longitudinal cross section of the

    station building from Moor

    Street Queensway to the ring

    road. Open

    24/09/2012 Forum #3 4

    HS2 Ltd to work with Centro

    and Birmingham City Council to

    present wider public transport

    proposals around the station at

    a future community forum fordiscussion to enable forum

    input into emerging proposals. Open This action is ongoing.

    24/09/2012 Forum #3 5

    and Birmingham City Council to

    make available to the

    community forum the wider

    West Midlands-Centro-HS2

    local transport

    connectivity/accessibility

    proposals. Open This action is ongoing

    24/09/2012 Forum #3 6

    HS2 Ltd to update forum

    members on when the detailed

    station design be available for

    input and the consultation andengagement process. Open Update to be given.

  • 7/29/2019 Washwood Heath to Curzon Street Action Log - Round 5

    4/5

    24/09/2012 Forum #3 7

    HS2 Ltd to provide a 3D virtual

    model of Curzon Street station

    at the next forum meeting. Open

    This is something that is likely to be produced in

    the longer term. Updates will be given as the

    design progresses.

    24/09/2012 Forum #3 8

    HS2 Ltd to consider the options

    for the retention of the Fox &

    Grapes public House within the

    station design and to consider

    national and international bestpractice for retaining and

    including historic assets in

    major development schemes. Open

    The design options for the station are currently

    being progressed and options for heritage assets

    are being considered.

    24/09/2012 Forum #3 9

    HS2 Ltd to liaise with Petes

    Haulage representative for a 1

    2 1 discussion regarding the

    impact of HS2 on the property. Open Meeting to be arranged

    24/09/2012 Forum #3 10

    HS2 Ltd to liaise with

    Birmingham City Council

    regarding the consultationarrangements for the

    forthcoming property

    compensation and safeguarding

    consultation. Closed

    HS2 Ltd WM Stakeholder Team worked with

    Birmingham City Council to deliver a strategy for

    promoting the property compensation

    consultation. This resulted in 4 road shows being

    delivered across the Birmingham section of the

    route and the details of the road shows beingpromoted via the city councils website.

    Discussions are on-going as to whether further,

    targeted meetings are required and we will

    update the forum accordingly.

    24/09/2012 Forum #3 11

    e ommun y orum o

    identify potential additional

    members of the forum and to

    forward details to HS2 West

    Midlands stakeholder team. Open

    03/12/2012 Forum #4 1

    HS2 Ltd to contact Birmingham

    Friends of the Earth to arrange

    bilateral meeting to discuss

    access issues in more detail;particularly the impact on their

    property by w/c 17th Dec. Closed Meeting has taken place, February 2013.

    03/12/2012 Forum #4 2

    o up a e e orum a

    its next meeting on how the

    designs of the proposed depot

    are progressing (February

    meeting). Open For future meetings

    03/12/2012 Forum #4 3

    rmng am y ounc o

    provide an update on the

    masterplan for Washwood

    Heath site at the next

    community forum meeting

    (February meeting). Open For future meetings

    03/12/2012 Forum #4 4

    o con rm ncus on o

    high quality illumination and

    design as part of the on-going

    station design work for a

    presentation at a future

    community forum to enable

    forum input into emerging

    proposals. Open For future meetings

    03/12/2012 Forum #4 5

    o up a e orum

    members on the proposals for

    highway changes at the

    Bromford Roundabout at the

    next community forum meeting

    (February meeting). Open For future meetings

  • 7/29/2019 Washwood Heath to Curzon Street Action Log - Round 5

    5/5

    03/12/2012 Forum #4 6

    o cons er e ssue o

    betterment and best practice

    when dealing with land

    impacted by HS2 prior and

    during construction for a further

    discussion at a future forum

    meeting once safeguarding

    confirmed. Open For future meetings

    03/12/2012 Forum #4 7

    o c rcua e ra

    engagement andcommunication strategy for

    comment. To be circulated with

    meeting note. Open

    Sent with the draft meeting note. A further

    update will be provided at the March community

    forum meeting.

    03/12/2012 Forum #4 8

    HS2 Ltd to distribute details of

    property compensation

    roadshows in Warwickshire &

    Staffordshire by 7th December

    (Forum Members are welcome

    to attend these roadshows). closed Circulated

    03/12/2012 Forum #4 9

    o s r u e copes o

    the noise monitoring pro-forma

    by 7th December. closed Circulated

    03/12/2012 Forum #4 10

    HS2 Ltd to confirm details of theconsultation arrangements for

    the Code of Construction

    Practice. A note to be circulated

    with meeting notes. closed

    The draft Code of Construction Practice (CoCP)will form part of the assumptions in the

    Environmental Impact Assessment (EIA) and will

    be consulted on as part of the Environmental

    Statement (ES) consultation in Spring 2013.