Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 1 ower ower Yoshitaka Ishibashi Clean Coal Power R&D Co., Ltd. Osamu Shinada Mitsubishi Heavy Industries, Ltd. October 7, 2008 ower First Year Operation First Year Operation Results of Results of CCP CCP s Nakoso 250MW Air s Nakoso 250MW Air - - blown blown IGCC Demonstration Plant IGCC Demonstration Plant Gasification Technologies Conference 2008 Washington, D.C.

Washington, D.C. First Year Operation Results of CCP’s ... Net Gross Gas Turbine Gas Treatment Gasifier approx. 1,700 t/day (metric) 250 MW gross (16%O 2 basis) Flue Gas Properties

  • Upload
    vokiet

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 1owerower

Yoshitaka IshibashiClean Coal Power R&D Co., Ltd.

Osamu ShinadaMitsubishi Heavy Industries, Ltd.

October 7, 2008ower

First Year OperationFirst Year Operation Results of Results of CCPCCP’’s Nakoso 250MW Airs Nakoso 250MW Air--blown blown

IGCC Demonstration PlantIGCC Demonstration Plant

Gasification Technologies Conference 2008Washington, D.C.

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 2owerower

CRIEPI-MHI 2t/d(1983-1995)

MHI Nagasaki 24t/d (1998-2002)

CCP R&D Co.,Ltd.1700t/d 250MW (2007-2009)

Demonstration plant

IGC Research Association200t/d Equivalent to 25MW (1991-1996)

Pilot plant

Confirmation test plant

Process development unit

History of AirHistory of Air--Blown IGCC in JapanBlown IGCC in Japan

CRIEPI: Central Research Institute of Electric Power Industry

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 3owerower

Sep. 2007

250MW 1,200˚C-

class

1,700 t/d

Air-blownDry-feed

MHI

NakosoJapan

2,500 t/d2,500 t/d2,600 t/d2,000 t/dCoal

consumption(metric t/d)

315 MW1,300˚C-

class

297 MW1,300˚C-

class

335 MW1,300˚C-

class

284 MW1,100˚C-

class

Gross output(GT)

Sep. 1996Oct. 1995Dec. 1997Jan. 1994Demonstration test start

O2-blownSlurry-feed

GE

O2-blownSlurry-feed

E-GasTM

O2-blownDry-feedPlenflo

O2-blownDry-feed

ShellGasifier type

TampaUSA

WabashRiverUSA

PuertollanoSpain

BuggenumNetherland

ProjectsSite

Coal IGCC ProjectsCoal IGCC Projects

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 4owerower

Thermal Efficiency Improvement for COThermal Efficiency Improvement for CO22 ReductionReduction

Thermal Efficiency in JapanThermal Efficiency in Japan

(2700˚F)

(2400˚F)

(2200˚F)

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 5owerower

CCPCCP

Joint project agreement

Personnel

30% subsidy

70% contribution

Mitsubishi Heavy Industries, Ltd.

Mitsubishi Heavy Industries, Ltd.

EPC Contract(Single Point)

Hokkaido EPCo.Tohoku EPCo.Tokyo EPCo.Chubu EPCo.Hokuriku EPCo.Kansai EPCo.Chugoku EPCo.Shikoku EPCo.Kyushu EPCo.J-POWERCRIEPI

Hokkaido EPCo.Tohoku EPCo.Tokyo EPCo.Chubu EPCo.Hokuriku EPCo.Kansai EPCo.Chugoku EPCo.Shikoku EPCo.Kyushu EPCo.J-POWERCRIEPI

Joban Joint Power Co.,Ltd.Joban Joint

Power Co.,Ltd.Operator, etc.

METI:Ministry of Economy, Trade and Industry

Project SchemeProject Scheme

METIMETI

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 6owerower

IWAKI City

Entire View ofEntire View of the the NAKOSO Power StationNAKOSO Power Stationof of JOBAN JOINT POWER CO., LTD.JOBAN JOINT POWER CO., LTD.

TOKYO

IWAKI CityNAKOSO

Fukushima Prefecture

Location of IGCC Demonstration PlantLocation of IGCC Demonstration Plant

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 7owerower

Demo PlantOperation

Construction ofDemo Plant

EnvironmentalImpact

Assessment

Design ofDemo Plant

PreparatoryVerification Test

'09'08'07'06'05'04'03'02'01'00'99FY

CCP established

Demonstration Project ScheduleDemonstration Project Schedule

The construction work finished in September 2007, and demonstration operation is executed now.

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 8owerower

Schematic Diagram of IGCCSchematic Diagram of IGCC

BoosterCompressor

M

G

Gas C/UGas C/U

HRSGHRSG

O2N2

GypsumGypsumrecoveryrecovery

(For coal and char transport N2)

ASUASU

Air

GasifierHigh Temp.

FilterGas Turbine Steam Turbine

Combustor Air

GasifierStack

Char

Coal

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 9owerower

Specification of IGCC Demonstration PlantSpecification of IGCC Demonstration Plant

(metric)

0.006 lb/MMBTU (LHV) ( 4 mg/m3N)

0.03 lb/MMBTU (LHV) ( 5 ppm)

0.06 lb/MMBTU (LHV) ( 8 ppm)

42%(LHV) 40.5%(HHV)48%(LHV) 46%(HHV)

1,200 ○C -class (2,200 ○F)(50Hz)

Wet (MDEA) + Gypsum Recovery

Air-brown & Dry Feed

Dust Loading

NOx

SOx

NetGross

Gas Turbine

Gas Treatment

Gasifier

approx. 1,700 t/day (metric)

250 MW gross

(16%O2 basis)

Flue GasProperties

(Target Value)

Efficiency(Target Value)

System

CoalConsumption

Capacity

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 10owerower

Nagasaki Shipyard & Machinery Works of MHINagasaki Shipyard & Machinery Works of MHI

Manufacture of Manufacture of GasifierGasifier Pressure VesselPressure Vessel

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 11owerower

Transportation of Transportation of GasifierGasifier Pressure VesselPressure Vessel

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 12owerower

Assembling of Assembling of GasifierGasifier Pressure VesselPressure Vessel

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 13owerower

Assembling of SGC Pressure VesselAssembling of SGC Pressure Vessel

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 14owerower

COS Converter

Gas Scrubber

Gas Quencher

H2S Absorber

Installation of Gas CleanInstallation of Gas Clean--up Facilityup Facility

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 15owerower

Takasago Machinery Works of MHI (M701DA)Takasago Machinery Works of MHI (M701DA)

Manufacture of Gas TurbineManufacture of Gas Turbine

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 16owerower

HRSG

Gas Turbine, Steam Turbine & Generator

Gasifier

Gas Clean-up

View of IGCC Demonstration PlantView of IGCC Demonstration Plant

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 17owerower

0

500

1000

1500

2000

2500

3000

RUN1 RUN2 RUN3 RUN4 RUN5 RUN6 RUN7 RUN8 RUN9

Long Term Continuous Operation TestJun 10 - Sep 17RUN 9Validity Test after Long Term InspectionMay 26 - Jun 2RUN 8Load Swing Test, Initial Plant Performance TestMar 28 - Apr 7RUN 7Syngas Power Generation at 100%Load, Load Rejection TestMar 03 - 07RUN 6Syngas Power Generation at 75%Load, Load Rejection Test2008 Jan 9 - 11RUN 5Syngas Power Generation at 50%Load, Load Rejection TestDec 18 - 21RUN 4First Syngas to Gas TurbineDec 05 - 07RUN 3Gasifier Initial AdjustmentNov 29 - 30RUN 2First Syngas Production2007 Oct 10RUN 1

Syng

as P

ower

Gen

erat

ion

Hou

rs

2590hr

2039hr

Records of OperationRecords of Operation

Hours of Power Generation on SyngasCumulative Hours

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 18owerower

1,250˚C (2300˚F)Ash Analysis

Fluidization Temp.

29.3 MJ/kg (12,600Btu/lb)27.8 MJ/kg (12,000Btu/lb)

Heating Value (Dry Base)HHVLHV

56.2%34.3%

1.69.5%0.3%

Proximate Analysis (Dry Base)Fixed CarbonVolatile MatterFuel RatioAshTotal Sulfur

Chinese CoalChinese Coal

Properties of Coal UsedProperties of Coal Used

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 19owerower

Example of Plant PerformanceExample of Plant Performance

0.01lb/MMBTU (1.0 ppm)0.02lb/MMBTU (3.4 ppm)

< 0.0001lb/MMBTU (< 0.1mg/m3N)

Environmental Performance(16% O2 Corrected) SOX

NOXParticulate

30.5 %2.8 %

10.5 %0.7 %

55.5 %

Syngas Composition COCO2H2CH4

N2 & Others

75.3 %> 99.9 %

5.2 MJ/m3N (132 BTU/SCF)

Cold Gas Efficiency of GasifierCarbon Conversion EfficiencySyngas LHV

13.1˚C (55.6 ˚F)250.0 MW124.2 MW125.8 MW

42.4 % (LHV)

Atmospheric TemperatureGross OutputGas Turbine OutputSteam Turbine OutputNet Efficiency

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 20owerower

Trend Data of Long Term Reliability TestTrend Data of Long Term Reliability Test

0

1 0 0

2 0 0

3 0 0

4 0 0

Outp

ut

[MW

]

0

1 0

2 0

3 0

4 0

Atm

osp

heric t

em

pera

ture

[℃

]

O p e r a t in g d a y s

0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 5

Capability of stable power generation was confirmed.

※ The GT output has decreased slightly by increase of atmospheric temperature.

0

Gross outputGT outputST outputAtmospheric temperatureProduct gas LHV

0 5 10 15 20 25 30 35 40 45 50 55Operating days

400

300

200

100

0

Out

put [

MW

]

40

30

20

10

0

Tem

pera

ture

[˚C

], LH

V [M

J/m

3 N]

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 21owerower

(As of September 17, 2008)(As of September 17, 2008)

2,660 hrsGasifier Operation

185,000 ton(metric)

Cumulativecoal consumption

FuelConsumption

590 GWhCumulativegross output

PowerGeneration

2,590 hrsGT Operationby SyngasOperating

Time

Operating ResultsOperating Results

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 22owerower

Slag Hole View from Lower Side

Gasifier SGC

Molten Slag ObservationMolten Slag Observation

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 23owerower

SGC

Molten Slag ObservationMolten Slag Observation

Gasifier

Surface of the Water in Slag Hopper

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 24owerower

Ground Flare

Syngas Combustion in Ground Flare

SyngasSyngas Combustion in Ground FlareCombustion in Ground Flare

Copyright Clean Coal Power R&D Co., Ltd & Mitsubishi Heavy Industries, Ltd. 2008 25owerower

• Adjustment of the plant operating parameters to increase the net plant efficiency furthermore and load changing rate from this December.

• US PRB coal and Indonesian coal are planned to be used from early next year.

• 5,000 hr durability test is also planned from May to December next year.

Future PlanFuture Plan