64
VXD Test Beam C. Marinas a , K. Nakamura b a University of Bonn b KEK VXD Consortium [email protected] 1

VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure [email protected] FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

VXD Test Beam

C. Marinasa, K. Nakamurab

aUniversity of Bonn bKEK

VXD Consortium

[email protected] 1

Page 2: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

2

DESY TB Schedule 2016

[email protected]

TB24 and TB24/1 CW 14 – CW 17

Installation

Page 3: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

3

DESY TB

[email protected]

• VXD common test beam in April 2016 (4 weeks) • Small sector of the final sensors and ASICs* 2 PXD + 4 SVD layers • Complete VXD readout chain: HLT, monitoring, event building, PocketDAQ

• CO2 cooling, slow control, environmental sensors

• Illumination with (up to) 6 GeV e- under solenoid magnetic field (PCMAG)

• Alignment, tracking algorithms, ROI

Goal: System integration and Phase 2 Commissioning

Page 4: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

4

DESY TB

[email protected]

Goal: System integration and Phase 2 Commissioning

• Operation with beam between Apr-19 and Apr-29

• Electron energies between 2 GeV and 5 GeV

• Trigger rate between ~0.5 kHz and ~3 kHz

• Different solenoid settings (B = 0 T, 0.2 T, 0.4 T, 0.5 T, 1 T)

https://belle2.cc.kek.jp/~twiki/bin/view/Detector/SVD/DesyBeamTest2016

https://www-h1.desy.de/belle2elog/

Page 5: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

VXD Phase 2 Hardware

[email protected] 5

- Two PXD and four SVD layers - +X direction, horizontal plane (highest background sensitivity)

+X

Test Beam set up to mimic Phase 2 arrangement

Page 6: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

6

Test Beam Set Up

[email protected]

Base plate (common ground)

PXD support

SVD support

Entry window

Page 7: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

7

Test Beam Set Up

[email protected]

Preassembled PXD*

Inner Backward Outer Backward

Page 8: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

8

Test Beam Set Up

[email protected]

SVD cartridge

Page 9: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

9

Test Beam Set Up

[email protected]

SVD cartridge fiber walls

Page 10: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

10

Test Beam Set Up

[email protected]

Outer envelope

Page 11: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

11

Test Beam Set Up

[email protected]

e-

Final rotation into the overall PCMAG structure

Page 12: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

12

Integration into PCMAG

[email protected]

e- 3+3 telescope arms 2+2 trigger scintillators

Page 13: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

13

PXD on the SCB

[email protected]

Page 14: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

14

SVD Cartridge

[email protected]

Page 15: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

15

VXD Assembly

[email protected]

Page 16: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

16

VXD Assembly

[email protected]

Page 17: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

17

Integration into PCMAG

Beam

[email protected]

Page 18: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

18

Integration into PCMAG

[email protected]

Beam

Page 19: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

19

Alignment. Telescope

• Correlations between telescope arms

• VXD illuminated under electron beam

• Expected residual distributions

Correlations Hit maps

Residuals

[email protected]

Page 20: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

20

COPPER

COPPER

FTB

FTSW ttdcpu

DHP DHE

ONSEN

R/O PC 1

hltin

hltwn1 hltwn2 hltwn3

hltout

R/O PC 2

ExpReco

Event display

FTB

FADC

FADC

TLU

Sw

itch

Switch

SVD 4 layers

IB

Scinti.

POCKET DAQ

HLT

HLT RoI

DATCON RoI

EVB2

ExpressReco

Belle2link

“Pocket TTD”

DHP DHE

DHP DHE

DHP DHE

OB

IF

OF

DHHC

VXD-Test Beam DAQ Structure

[email protected]

FTB FADC

FTB FADC

PXD R/O

* DATCON

*

*

*

*

Page 21: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

21

PXD

SVD

Telescope

Computing

Services T24 T24/1

MARCO

DHH PS

FADC-FTB PS

Beam

ONSEN DATCON

TLU

HLT

EnvMon

COPPER FOS

Floorplan Distribution

[email protected]

VX

D

Page 22: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Delays

[email protected] 22

Page 23: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Pedestal Distributions

[email protected]

IB OB

23

Page 24: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Hit Maps

[email protected] 24

Threshold = 5 (~ 1200 electrons)

Outer Backward

Inner Backward

5.6 cm2

7.7 cm2

Trigger on 4 scintillators Collimated beam No magnetic field

Page 25: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Hit Maps (B=1T)

[email protected] 25

Threshold = 5 (~ 1200 electrons)

Outer Backward

Inner Backward

5.6 cm2

7.7 cm2 Trigger on 2 big scintillators No collimation system 1 T magnetic field

Page 26: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Hit Maps (B=1T)

[email protected] 26

Threshold = 5 (~ 1200 electrons)

Outer Backward

Inner Backward

5.6 cm2

7.7 cm2 Trigger on 2 big scintillators No collimation system 1 T magnetic field

Page 27: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Signals

[email protected] 27

Inner Backward Outer Backward

SNR ~ 32 for perpendicular incident MIPs

Page 28: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Residuals

[email protected] 28

Inner Backward Outer Backward

15 µm (18 µm) for perpendicular

incident MIPs

Page 29: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

PXD Correlations

[email protected] 29

• Mapping correct • Proper timing

Page 30: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

SVD Hit Maps (n-side)

[email protected] 30

L3 L4

L5 L6

Page 31: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

SVD Hit Maps (p-side)

[email protected] 31

L3 L4

L5 L6

Page 32: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

SVD Signal-to-Noise (p-side)

[email protected] 32

p-side ~ 14…22

L3 L4

L5 L6

Cluster size 1 Cluster size 2 All clusters

Page 33: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

SVD Signal-to-Noise (n-side)

[email protected] 33

n-side ~ 14…38

L3 L4

L5 L6

Cluster size 1 Cluster size 2 All clusters

Page 34: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

SVD Inefficiency (u-side)

[email protected] 34

L3 L4

L5 L6

• Red: SVD digit level • Blue: After clustering

Page 35: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

L3 L4

L5 L6

SVD Inefficiency (v-side)

[email protected] 35

• Red: SVD digit level • Blue: After clustering

Page 36: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

L2-L3 Correlations 0 T

[email protected] 36

Page 37: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

Online Data Reduction

[email protected] 37

Page 38: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

Express Reco: PXD DQM

[email protected] 38

L1 L2

Page 39: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

Express Reco: PXD DQM

[email protected] 39

Page 40: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

40

Global Run Control

[email protected]

Page 41: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

41

DHP DHH

ONSEN

R/O PC 2

ExpReco

Event display

IB

PXD R/O

EVB2

ExpressReco DHP DHH

DHP DHH

DHP DHH

OB

IF DHHC

BonnDAQ Database

PXD Start Up

PXD Run Control

[email protected]

OF

Global Run Control

Page 42: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

42 [email protected]

PXD Environmental Monitoring

PXD SCB PXD CO2 return line

MARCO operated at -27 ºC Complete EPICS integration

Page 43: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

43 [email protected]

SVD Environmental Monitoring

MARCO operated at -27 ºC NTC readings of SVD CO2 in/out lines:

Page 44: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

44 [email protected]

FOS Fiber in L6

~0°C

Page 45: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

45 [email protected]

Dew Point: Sniffer

Page 46: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

46 [email protected]

Noise Immunity Studies

Probably the same noise as in TB Jan 2014. But this time the SVD system was immune due to measures taken in the grounding, hybrids, dock box and FADC. * Systematic noise measurements - Spectrums and time diagrams of single and common mode noise in the SVD power and data cables, with PXD off and PXD on - Inductive probes in power cables, inductive probes in hybrid cables, current shunts in APV25 power lines * Localization of the noise source - Sequential switch off all the components one-by-one (PXD, Magnet cooling, Scintillators, Telescope, Telescope chiller… Noise bursts with 1.6 ms length all 10 ms with a modulation frequency of about 300 kHz in specific locations from the poorly filtered switched chiller power supply Conclusions: * PXD does not seem to be the noise source * SVD knows much better how to react

Page 47: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

47

Main Results

• 2 PXD + 4 SVD layers fully operational: ‘Final’ Phase 2 hardware • VXD: Hitmaps as expected in all 6 layers. SNR OK • SVD efficiency found to be >90% (all layers and both sides) • PXD residuals according to specs • VXD correlations (mapping and timing) • Online data reduction • 7 kHz ‘artificial’ trigger rate for 1 hour • Few hours 2 kHz steady data acquisition • Alignment and BASF2 framework • Noise immunity studies → No interference observed • Run control: Start/Stop fully controlled by EPICS • Environmental monitoring mostly integrated into EPICS • Operation under realistic environmental conditions (CO2 @ -27 ºC)

[email protected]

Page 48: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

48

Open Issues

• Different system gain for same settings. Rings. • ASICs running at 250 MHz • Links unstable. • QC/QA power supplies and cables. • Pedestal calculation and update. Pedestal distribution. 2b DAC. • PXD internal trigger mismatch. • Stable and traceable firmware versions. Additional features. • DHP or matrix coordinate mapping (DHE-ONSEN). • DATCON and SVD trigger mismatch. • MARCO instabilities. Fixes for Phase 2. • Regular system crashes of different kinds. • ROI efficiency and purity. • Jig and laser scans. Trigger.

[email protected]

Page 49: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

49

Page 50: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

50

Page 51: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

51

Page 52: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

52

Page 53: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

53

Page 54: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

54

* Event mismatches from different sources, reasons partly unclear * Workarounds on HLT, unpacker and special modules * Happened in significant amount of runs. * TODO: Fix firmware, test! Mapping, coordinate flipping * Remapping not existing in DHH firmware -> consequences for ROI on HLT and PXD Unpacking * Hotfix on ONSEN failed. * Extend ROIs on HLT -- hampering ROI selection * Remapping during unpacking + coordinate flips * Remapping triggered other errors in software (PXD Sorter, clusterizer) -> problems in express reco, no DQM * TODO: fix DHH firmware, remove patches from HLT and Unpacker as necessary

"Empty" first Ladder * ordering of DHE data/DHE-ID was inverted (increasing order expected as for ROIs) * Swapped cables * In unpacker not checked -> fixed meanwhile * TODO: first time two DHE were read out to ONSEN Other things: * Minor issues with data format from DHH (not as defined in specs) -> Trigger Errors and Warning in PXD Unpacker * TODO: fix firmware, change Warning back to Errors in software

Page 55: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

55

Page 56: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

Things that worked. In TB14, abrasive wear of gears caused clogging of micro filters. The new pump (upgraded in January) worked fine and solved this problem. For long term running, we need to fill CO2 while it's running, with the speed of 1kg/10min, no temperature changes in detector.

Bullet Points about the Cooling Operation in TB

Things that did not work. Leakage of CO2! → low temperature below dew point (due to the logic setting in Marco)

Temperature on CO2 in/outlet will decrease to -40oC.

Page 57: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

How to address. Make sure the whole circuit is leak tight (Pressure test) No level meter in Marco (not IBBelle), we need interlock on CO2 temperature. Things to be tested: Do we really need so cold CO2 of -30oC? The full VXD thermal mock-up will tell us. [Temperature dependency. Noise. C. M.]

Lessons learnt. Be careful in transportation.

→ May result in cavitation in the CO2 pump, which can easily damage the pump in this case.

The sub-cooled CO2 will prevent the pump from cavitation.

Cooling plant Detector

Flex lines

Page 58: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services
Page 59: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services
Page 60: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

60

Main Results

The overall campaign was a great success!

STILL not there yet • Regular system crashes of different nature • Trigger mismatches, 0-1 counting,… • Further debugging still needed Proposal: • Permanent VXD set up at DESY with regular dry runs • Step by step increasing complexity • FANGS, CLAWS, PLUME dry integration CW46-CW48 • Final complete Phase 2 test beam in CW49-CW51

[email protected]

Page 61: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

61

Schedule 2016

[email protected]

Page 62: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

62

PXD Standalone TB Campaign

• What do we want to measure? Charge collection properties Efficiency in long matrices Lorentz angle

• What do we need?

PCMAG and telescope FE-I4 trigger Rotating stages Modified jig Stable firmware for UDP to BonnDAQ and mem_dump Power supply and long cables

• After the test beam, start putting together all the pieces for the dry tests • 18th May, tentative date for opening the dry box (SVD to confirm)

[email protected]

Page 63: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

63

Schedule 2016

PXD

Phase 2 Dry Integration

VXD Dry Tests

[email protected]

Irradiation

Page 64: VXD Test Beam - (Indico) · DHP DHE DHP DHE OB IF OF DHHC VXD-Test Beam DAQ Structure cmarinas@uni-bonn.de FADC FTB * FTBFADC PXD R/O DATCON * * * 21 PXD SVD Telescope Computing Services

64

Monitoring

[email protected]

Thanks