  • RVC status report Remote Vacuum Connection

    Karsten Gadow VXD mechanics meeting MPI Munich 08.09.2015

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 2

    Remote Vacuum Connection overview

    QCSLeft QCSRight

    Backward Forward

    RVCL

    HER

    LER

    x y

    z

    RVCR

    Ring inside

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 3

    RVC meeting @ KEK 17.04.2015

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 4

    RVC design

    •  The support for the Lock flange is not yet designed. seems not to be needed •  The route of He gas for leak check will be incorporated in RVC. will be done during the

    mechanical test

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 5

    RVC production

    The RVC housings forward and backward are under production and will be delivered end of September!

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 6

    Laboratory test of RVC

    •  Mock-up parts other than RVC prepared by DESY •  QCS vacuum vessel flange (stainless steel) production ongoing ready KW38 •  QCS pipes (stainless steel) ready •  QCS beam pipe flange (stain less steel) ready •  Diffusion welding between stain less steel and CuCr1Zr for bellow beam pipe ongoing ready KW 40 •  Stainless steel weld bellows delivered ( 5 pieces) •  No RF-bridge ok •  No BPM ok •  Cooling channel with real dimension done •  Stainless steel cover removed ok? •  New cooling tube connection done •  Stainless cooling tube ok •  Helicoflex seal (Delta seal) delivered (32 pieces) •  Rubber seal between the QCS vacuum vessel

    flange and the QCS pipe (Viton) delivered (10 pieces)

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 7

    RVC test setup

    •  QCS vacuum vessel flange (stainless steel) •  QCS pipes (stainless steel) •  QCS beam pipe flange (stain less steel) •  Bellows pipe (CuCr1Zr )

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 8

    Bellow pipe design (old)

    welded pipe screwed pipe

    CuCr1 CuCr1 stainless steel

    welded joints CuCr to stainless steel

    DESY can not provide the welding process between CuCr1 and stainless steel

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 9

    Bellow pipe design (new)

    screwed pipes

    CuCr1Zr CuCr1Zr stainless steel

    diffusion welded joints

    diffusion welding process between CuCr1 and stainless steel

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 10

    Bellow pipe material CuCr changed to CuCr1Zr

    We have to check and test carefully the difference of the material properties

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 11

    Helicoflex seal (Delta seal)

    •  32 pieces ordered for 110€ each •  delivered •  impact to CuCr1Zr has to be checked

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 12

    Summary

    •  we will mount the RVCs into the test setups in beginning of October

    •  detailed mechanical tests will start in November

    •  vacuum tests will be performed in December

    •  detailed documentation will be provided to the 23rd B2GM

    •  open issues

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 13

    RVC design

    •  RVCR include a mechanism to be used for an emergent extraction of VXD.

    no real design work started !

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 14

    Stainless Steel welded Bellows

    welded bellows SUS316L ... bellows spring constant along the axis approx. 2.2N/mm

    pressure: (inside) vacuum, (outside) atmospheric pressure

    displacement along the axis: +/- 5mm perpendicular to the axis: 1mm

    lifetime under constant pressure: 1 x 10^4 times

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 15

    Stainless Steel welded Bellows

    1 mm ? 5 mm ? 27 mm / 1,4 mm pro profile ~ 20 profile

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 16

    Issues around RVCR

    •  It is urgent to fix the route and to secure a space for cooling tubes. This will be discussed on May. •  At present bellows tubes are assumed. •  [C] Solid tube is recommended until it reaches QCS side. Bellows tube should be used thereafter. •  Karsten will consider the route for the cooling pipes of bellows.

    PXD and SVD input needed!

  • Karsten Gadow | VXD mechanics meeting | MPI Munich 08.09.2015 | Page 17

    TOP BG

    •  By changing the material density of the bellows in front of QCS to a realistic one, the source of a gamma ray background in TOP shifted towards QCS. As a next step, actual amount of the material of RVC need to be incorporated in simulation.

    •  I have send drawings. •  They are satisfied? •  They are up to date?