LIXHE PLANTLIXHE PLANTALF-CEMIND study tour 29 Augustus 2007g
B. GastoutPlant ManagerPlant Manager
Benelux 1
Lixhe Plant - Overview
Benelux 2
Clinker Historical
1950 First the plant in Loën (kiln A&B)1960 kiln C VH - stopped in 19921967 kiln D – 1800T/d WL – stopped in 20011976 kiln E – 3500T/d DL2001 Modernization Kiln E Design 4200T/dA t l li k itActual clinker capacity : – Average 4400T/d (achieved in 2005: 4394T/d)– BDP 4630T/dBDP 4630T/d
Benelux 3
Lixhe plant location
Romont Quarry
Underground
Con e or BeltQuarry Conveyor Belt
2.2Km
LIXHE Plant
Loen Quarry
Benelux 4
Lixhe Clinker Data
Clinker productionWet line Kiln D: 500 000 Tons/y (stop 2001)– Wet line Kiln D: 500,000 Tons/y (stop 2001)
– Dry line Kiln E: Build 1974 - 1,100,000 Tons/yModif 2000 – 1,400,400 Tons/y
Clinker storage2 Sil 45 95 kT– 2 Silos: 45 + 95 kT
– Halls: 40kT + 20kTQuality:Quality:– C3S: 66.6% C2S: 11.7% C3A: 6.9%– Sat: 96.75% M.Si: 2.58 M.Al: 1.38– Free CaO: 0.3% Eq Na: 0.67% SO3: 0.6%
Benelux 5
Mineral substitution in clinker
Substitution of Al, Fe, Si oxyde by secondary , , y y ymaterials :– Waste from steel industry (Fe, Si)– Fly Ash (Si, Al)– Shales (Al)
Blast furnace Slag (Si Ca Al)– Blast furnace Slag (Si, Ca, Al)– Sludge from water treatment (Al)– …
Benelux 6
Mineral substitution 2 750 000 tons2.750.000 tons
Secondary Gypsum2% Special clinkers2%
Water treatment sludge
Chalk and marl68%
2%
Bl t f l
Misc.2%Secondary
Materials
Fly ash7%
Blast furnace slag16%
Iron by-products1%
Natural gypsum
7%
Silt2%
Natural gypsum0%
Benelux 7
Secondary Fuels
Process Caracteristics :High Temperatureg pOxydizing conditions– Necessary for clinker production
High residence time
No waste, no ash !Ashes contribute to clinker formation– Ashes contribute to clinker formation
Benelux 8
Implementation of a calciner and full revamping of the preheater
Benelux 9
Calciner arrangement
LOOP DUCTLOOP DUCTCONNECTING CONNECTING ARRANGEMENTARRANGEMENT
MINOX DUCTMINOX DUCT
SWIRLSWIRL BURNERBURNER
MIXING MIXING CHAMBERCHAMBER
SWIRL CALCINERSWIRL CALCINER
TERTIARY AIR DUCTTERTIARY AIR DUCT
Benelux 10
KILN GASESKILN GASES
Lansink Scale
Preventing wastePreventing waste production
li h dRecycling the product
Recycling the materialy g
Incineration with heat recoveryrecovery
Incineration without In only one operation,heat recovery
Dump site
y p ,
Without any secondary waste !
Benelux 11
Dump site
The Kiln
Precalciner :Impregnated saw dustTextile pellets Main burner :
I d dp
Shredded oil filtersPolluted soilsMisc.
Impregnated saw dustAnimal mealLiquid wastesPolluted water
Kiln Inlet :Whole tires
Polluted water
Dewatered sludge
Benelux 12
Secondary FuelSubstitution ratio (energy %)
Substitution rate evolution
OP200660%
Substitution rate evolution
40%
50%
20%
30%
10%
20%
0%1993 1995 1997 1999 2001 2003 2005 F2006
Benelux 13
Mix fuel 2006 Total fuel substitution rate : 53.3%
Hazardous fuel substitution rate : 28.3%
Waste liquids0.7%
Mix Coal45.6%
Shredded oil filters2.4%
Gaz
Tires7.8%
Impregnated saw dust25.2%
1.1%
Dewatered sludge0 7%
Animal meals13.6%
Textile pellets2.7%
0.7%Dry Step
0.3%
Benelux 14
Secondary Fuels
Main burner 55% of the heat– Fine solid fuels (<2mm) or liquidFine solid fuels (<2mm) or liquid– High heat value
⇒Impregnated saw dust⇒Animal meal⇒Solvents - Oil⇒…⇒…
Benelux 15
Main Burner
Multi-channel burner designed for secondary fuels (PILLARD)
Benelux 16
Main burner : animal meals
Benelux 17
Main burner : liquids
Benelux 18
Main burner : resofuel
Benelux 19
Secondary Fuels
Précalcinateur 35% of the heatC f l OK ( 3 )– Coarser fuels OK (<3cm)
– Low heat value OK⇒Impregnated saw dust⇒Impregnated saw dust⇒Filtration earth⇒Plastic, RDF
P ll t d il (“ êté l”)⇒Polluted soil (“arrêté sol”)⇒Dry sewage sludge⇒Paper sludge⇒Meals, seeds,…⇒…
Benelux 20
Precalciner (TECHNIP)
Benelux 21
Precalciner : resofuel and plastics
Benelux 22
Secondary Fuels
Kiln Inlet 10% of the heat– Bulky FuelsBulky Fuels
⇒Whole tires – Dewatered Sludge : pumping of pasty sludge;
d i d i i ti i hdrying and incineration in one phase⇒Urban Sewage Sludge
– Limited flow (kiln unstability)Limited flow (kiln unstability)
Benelux 23
Kiln inlet : tyres
Benelux 24
Kiln inlet : dewatered sludge
Benelux 25
injection of injection of Dewatered sludgesDewatered sludgesDewatered sludgesDewatered sludges
in clinker kilnin clinker kiln
Benelux 26
Definition
Dewatered Sludge= Residuary sludge coming from water g y g gtreatment from urban and industrialForm:– humid (80% H2O)– semi dry (60% H2O)
dry (20% H2O)– dry (20% H2O)Don’t mix with dredging sludge !!!
Benelux 27
Technical Data
%H2O % 65-75Vol %/dry 60-65Ash %/dry 35-30PCS GJ/d 15 16PCS GJ/dry 15-16Ash composition (on dry basis)SiO2 % 5-10 Pb ppm 1000SiO2 % 5-10 Pb ppm 1000Al2O3 % 1-6 Sb ppm 200-2000Fe2O3 % 1-6 Ti ppm 5-10.000ppCaO % 2-10 Zn ppm <10.000P2O5 % 1-5 Hg ppm <1
PCI: ~2 GJ/TbrutNB: ppm = 1 gr for 1000 kg
Benelux 28
NB: ppm = 1 gr for 1000 kg
Minor elementsLimite
sur MB Permis agricultureH2O Humidité % 80 sur sec sur sec
Boue STEP
Cl Chlore % < 2 0,2 1,0S Souffre % < 3 0,4 2,0
F+Br+I autres allogènes ppm < 2000 0g pp
Sb Étain ppm < 200 0As Arsenic ppm < 200 0Cd Cadmium ppm < 70 0 < 10Cr Chrome ppm < 1000 0 < 500Co Cobalt ppm < 200 10 50Cu Cuivre ppm < 1000 6 30 < 600Sn Étain ppm < 1000 28 140Mn Manganèse ppm < 2000 200 1.000Hg Mercure ppm < 3 0,2 1 < 10g ,Ni Nickel ppm < 1000 4,0 20 < 100Pb Plomb ppm < 1000 14,0 70 < 500Tl Thallium ppm < 10 0,0
Benelux 29
V Valadium ppm < 1000 12,2 61Zn Zinc ppm < 5000 230 1.150 < 2000
Installation Lixhe
ompe àPompe à ���� � S �����
Benelux 30
Pilot InstallationP S h iPompe Schwing KPS12
Trémie 10m3
Stockage 100m3
Benelux 31
New installation
Unloading cover hoper 30m³Storage silo 500m³Storage silo 500m³Handling by screwSludge pomp: 1 – 7 T/hSludge pomp: 1 – 7 T/h Investment:
– For CBR: 150.000 € (Civil Work)S 800 000 € ( 1 €/ C– For SoTraEx: 800.000 € (contract phi 15€/T charged to CBR cover the
utilization incl. maintenance – exploitation, breakdown service by CBR)– Savings: 1M€/year (35kT/y at 45-15€/T)
Planning:Planning: – Erection: October à December 04– Electrical erection and programming : January 05
C i i i F b 05– Commissioning: February 05
Benelux 32
Flow sheet
Benelux 33
Flow sheet
Benelux 34
Installation industrielle
Silo stockage 500m³
Trémie de réception 30m²réception 30m²
avec vis d’évacuation
Pompe à boue Schwing
Benelux 35
Fosse de déchargement
Vis d’extraction sous silo Vis de gavage
Layout
Pompe Fosse
déchargement pSchwing
Trémie exterieur vers pompe
déc a ge e t1 + 1 réserve
Cit
Silo stockage
vers pompeCiterne eau
stockage boue
Boxe stockage ext – alim par
Benelux 36
chargeur
Constraints and Limitations
Technical
EnvironmentalEconomical
EnvironmentalValorization
SafetyLegal S e yLegal
Benelux 37
Environnement 2006
56 81
High 8 Nbr 9Avg 7
32 3011 9530 (50 4) 2T l d
Permit limitEmissionWID limit 1Pollutant, mg/Nm3
dioxin&furan ng/Nm3
56 81
High 8 Nbr 9Avg 7
32 3011 9530 (50 4) 2T l d
Permit limitEmissionWID limit 1Pollutant, mg/Nm3
dioxin&furan ng/Nm3
0.17
1.65
56.81
0
0
32
20.031 2HF
150.0810 2HCl
3011.9530 (50 4) 2Total dust
0.17
1.65
56.81
0
0
32
20.031 2HF
150.0810 2HCl
3011.9530 (50 4) 2Total dust
1120.1060.0440,05 3Hg (our analyser): MES
1125 8
0.050,05 3Cd+Tl
800560800 (1200 5) 2NOX
1120.1060.0440,05 3Hg (our analyser): MES
1125 8
0.050,05 3Cd+Tl
800560800 (1200 5) 2NOX
,
10,5 3Sb+As+Pb+Cr+Co+Cu+Mn+Ni+V
0.050,05 3Hg
,
10,5 3Sb+As+Pb+Cr+Co+Cu+Mn+Ni+V
0.050,05 3Hg
3078 627 7TOC recalculate
45.2 0 2504.250 2 6SO2
0.10,1 3Dioxins & furans
3078 627 7TOC recalculate
45.2 0 2504.250 2 6SO2
0.10,1 3Dioxins & furans
3078.627.7TOC recalculate
1221 2 1000346By authority 2CO
3078.627.7TOC recalculate
1221 2 1000346By authority 2CO
Benelux 38
Kiln and preheater tower
Benelux 39